Capacity availability

HI Friends,
i am facing a problem in capacity planning, while checking capacity for an order i am receiving the following error. i have given SAPSFCG015 (SFC: Evaluation, standard overview) as the overall profile in production schedular profile and in availability check, checking control. please give solution  
The profile entered for the capacity availability check is not suitable
Message no. CY297
Diagnosis
The control profile for the overall profile in the capacity availability check has not been correctly defined.
Procedure
Correct the control profile as follows:
presentation: 4 (capacity availability check)
layout type: 1 (display per period).

Check your settings in transaction OPJK
Note 160613 explains them.
best regards

Similar Messages

  • HT4623 why does my ipad kick me out of FB and sometimes to the 'settings' page or sometimes to the desk top, for what reason?     I have 50.8 GB of capacity available; it is version 5.1.1 and model MC497LL.   it is WIFI and internet via AT&T???  Can you h

    Can anyone help me?  Why does my ipad kick me out of FB?  Sometimes to the 'settings' page and sometimes to the desk top?  I would like to know why this happens and what I can check or change to make it stop.   I have 50.8 GB of capacity available; it is version IOS 5.1.1; model MC497LL.  It is WIFI and internet via AT&T?   Can anyone give me some clues on what to do; or change in settings???  Thank you very much! 

    Please read this whole message before doing anything.
    This procedure is a diagnostic test. It’s unlikely to solve your problem. Don’t be disappointed when you find that nothing has changed after you complete it.
    The purpose of the test is to determine whether the problem is caused by third-party software that loads automatically at startup or login, by a peripheral device, by a font conflict, or by corruption of the file system or of certain system caches.
    Disconnect all wired peripherals except those needed for the test, and remove all aftermarket expansion cards, if applicable. Start up in safe mode and log in to the account with the problem. You must hold down the shift key twice: once when you turn on the computer, and again when you log in.
    Note: If FileVault is enabled, or if a firmware password is set, or if the startup volume is a Fusion Drive or a software RAID, you can’t do this. Ask for further instructions.
    Safe mode is much slower to start up and run than normal, with limited graphics performance, and some things won’t work at all, including sound output and Wi-Fi on certain models. The next normal startup may also be somewhat slow.
    The login screen appears even if you usually login automatically. You must know your login password in order to log in. If you’ve forgotten the password, you will need to reset it before you begin.
    Test while in safe mode. Same problem?
    After testing, restart as usual (not in safe mode) and verify that you still have the problem. Post the results of the test.

  • Reg Capacity used and capacity available

    Dear all,
    How can I see the capacity available and capacity used for a particular resource for previous month , is there any standard report available in standard SAP.
    Regards
    madhav

    Try transaction MCP7

  • System status for capacity availability in Process order

    Hi,
    I have activated the capacity availability check in SPRO to have a capacity check while process order  creation.
    But system doesnt provide any status in the process order for this. No status is appearing even  if I do a manual capacity check in process order.
    Is there any system status for capacity is available?.
    Thanks in advance
    Prathib

    Hi Prathib
    System will be give any status if capcity is available, but it will give a status MSCP if there is Capacity shortage.
    Rgds
    UK

  • ATP based on material and capacity availability

    Hi Experts,
    Is there a way to implement ATP with finite capacity availability and material availability in a Make to stock (MTS) environment in R/3? In other words, when a sales order is created for a material, the confirmation date that is recd. should be based on Capacity and Material availability. What planning strategy would you use?
    I understand that this can be implemented in assembled to order environment (planning strategy 82 or 83), but my question is more related to MTS environment.
    Regards,
    Praveen

    Hi Praveen,
    SAP recommends APO as a solution for your scenario.  Check out their documentation on Capable to Promise (CTP) under
    http://help.sap.com/saphelp_scm2007/helpdata/en/64/7294375960a42be10000009b38f8cf/frameset.htm
    This is not a trivial implementation.  You need to be sure that this is what your business wants before you embark on the change.
      Regards,
      Bruce

  • Capacity availability check

    Hi All,
    I need to check the capacity availability for a person who assigned to workcenter which is assigned to the activity in the network. I maintained the cap.planning profile for network order type.
    I have created 2 activity under the same network and assigned the same person to those activities. If i do check the capcity it always saying ALL THE CAPACITIES ARE AVAILABLE.Eventhough there is a capacity overload.
    PLease tell me what i shall i do...
    Thanks

    Hi ALl,
    I want to do capacity availability check for network. can you please explain waht are all the steps to be followed.....
    Thanks

  • Capacity availability check during prod order creation

    When i create many  production order for a particular material with different huge quantities , while doing capacity availability check system issues a message *" No reqmts/caps exists or not relevant to finite scheduling*
    Here as per the message i have checked all the possible errors and everything is fine.
    As per actual requirements, work centers are overloaded. But here system displays that all work centers are available.
    Any help regarding this.

    Dear Nandi,
    Please refer the below link,
    No reqmt/capacity exist or not relevnt for finite scheduling: Mesage: CY298
    Regards,
    Sundhu

  • Auto Material & Capacity Availability check when releasing Production Order

    Dear Experts,
    Is there any configuration in Production Planning that will automatically check material availability and capacity availability automatically when a Production Order is released?
    Meaning to say, users will not need to manually click on the Check Material Availability and Check Capacity Availability button.
    Please advise.
    Thanks in advance.

    Hi,
    I've solved the problem. Just maintain the config in transaction OPJK.
    Thanks

  • Capacity planning: capacity available at all workcenters

    Dear all,
    We have configured all the requirement for capacity availability check. the planned order is showing overload of capacity. but while doing conversion and checking in production order i am getting "capacity available at all work centers, which is actually overloaded.
    Can anyone suggest how to resolve this?
    Regards,
    Sharmila

    Sharmila,
    I will assume this is a new implementation.  Have you calculated the basic load yet?
    http://help.sap.com/erp2005_ehp_06/helpdata/EN/60/13e30b133a11d3bf550000e83235ee/frameset.htm
    http://help.sap.com/erp2005_ehp_06/helpdata/EN/60/13e314133a11d3bf550000e83235ee/frameset.htm
    Best regards,
    DB49

  • Query of capacity availability

    hi experts,
    I am testing capacity availability check when release work order,
    I have done configuration to active this function by T-code:OIOI,
    but when release the order, a dialogue pop up
    No reqmts/caps exists or not relevant to finite scheduling
    and the help text is that:
    No reqmts/caps exists or not relevant to finite scheduling
    Message no. CY298
    Diagnosis
    In the capacity availability check either no capacities were found or none were found that were relevant for finite scheduling or no capacity requirements were found.
    The possible causes are:
    no capacities have been assigned to the work centers checked
    in the capacities at the work centers checked the indicator Relevant to finite scheduling is not set. Thus the capacities can have an unlimited load.
    no capacity requirements exist for the order checked
    System Response
    The capacity availability is checked.
    Procedure
    Assign capacities to the work centers affected by the order.
    Set the indicator Relevant to finite scheduling at the capacities in the work centers affected.
    Find out why no capacity requirements exist and, if possible, solve the problem.
    Carry out the capacity availability check again.
    I have checked my work center, I have assigned capacity to work center, and marked the finite scheduling indicator in capacity head screen.
    can anyone give some suggestion?
    thanks

    Hi,
    Did you maintianed the Release order condition in OIOI transaction? Pls maintain one of them. And the No check in capacity window of OIOI must be un selected.
    And in work center did you maintain the number of capacities. If so it should work.
    Regards,
    N.Nagaraju

  • I recently upgraded from Leopard to Snow Leopard and I noticed that I have more capacity available on the Macintosh HD. I checked my files and applications and they are still on my computer. Can capacity on the HD change after an OS upgrade?

    I recently upgraded from Leopard to Snow Leopard on my MacBook and I noticed that I have more capacity on the Macintosh HD than before the upgrade. I checked my files and applications and they are still on my computer and nothing appears to be missing. Before the upgrade I had around 111 GB capacity with around 10.50 GB available on the Mac HD but now after the upgrade I have 119 GB capacity and 20.92 GB available. Can capacity on the HD change after an OS upgrade?

    No, but the upgrade removed unneeded PowerPC code and changed the way free space is determined.
    (72071)

  • [PM] - Work order (shifted) capacity availability check

    Hi all,
    I've created a shifted capacity work center (1 person) and attributed to it a planning intervals:
    As you see, this person is available during the first shift on Sunday (07.08.2014)
    I've tried to see if SAP will check the availability of this work center in the IW31 menu by planifying a WO in a non availability time of this work center (interval 4PM - 8PM)
    But SAP mention that capacities are available
    Could SAP check the availablity of persons
    (sorry for my English)

    Hi Anand,
    That's why I'm talking about finite scheduling, the example that I've put in the start of this topic shows that:
    - The technician is available by default from 3PM to 11PM (capacity)
    - Specially, on the 07.09.14 (the last day of the inteval), the technician was declared available from 7AM to 3PM
    In the work order, i've requested a job from 4PM to 8PM (normally the technician will not be available in this interval)
    But as an output, SAP shows that the capacities are available (in this case, SAP refers to the default capacity and not the special interval..)
    So i wonder to know how SAP could deep analyse the availability interval of every capacity (taking on consideration intervals)
    @Kaushik: The 3rd screen capture shows "person responsible" that is different from the work center (MT-MED)..
    Waiting for your reply guys !
    Regards

  • Capacity availability in capacity header screen of work center

    hi all
    In capacity header under Standard avalaible capacity we have start time ,Finish time and Break time and Number of individual capacity . I have definesShift sequence and grouping and assign it in this view.
    but My questionis  Standard available capacity maintaines per day or per shift.?
    what about individual capacity (i.e Number fo machines avalable per shif .   I defined the avalable capacity i.e operating time 7 hours. per shift then in CMO3 t-code Available capacity should be 21 hours per day but it is showing only 7 hours .Why it is
    for examlpe
    Start time 06.00
    Finish time 14.00
    Break time 01.00
    no .of in capacity 01
    so in CMO3 t-code Available capacity should be 21 hours per day
    Regards
    dev

    Hi
    If you are running three shifts ,please maintain the data as given belwo
    start :00:00:00
    End:23:59:59
    Break :03:00:00 ( 1 Hour per shift so 3 hrs for 3 shifts)
    No.of individual capacity :1
    System will understand that it is round the clock operation with total three hour brak and you will get 21 hour per capacity
    Hope this helps
    regards
    Prakash

  • Current Month Capacity Availability in Capacity Data View

    Capacity Data View Does Not Roll Forward - current month still shows full monthly capacity being available (744 hours for January 2008) even though we are on 01/11/2008 (504 hours left in January 2008).  Where in the configuration this value is calculated?  What change I need to make to the configuration to make the monthly capacity view rolling forward.
    Appriciates all of your help.
    Thanks.  Tom

    I am not sure if you can debug the code. Anyway when you go into Macroworkbench, you can right click and pickup the option to look into the ABAP code generated behind the macros. It may be definitely more than 1000 line code and so am not sure if you want to go there. You may want to eliminate the macros in the capacity view one by one to exactly isolate the code that does the capacity calculation.
    Alternatively as I suggested, you can use a user exit macro to do the calculation. The UE macro can look into tables such as /sapapo/editquan to exactly calculate the resource per day and finally interrogate location calendars to calculate available capacity which can be published in a user defined key figure.(even a planning book KF should do unless you want to generate DB alerts).

  • Capacity available but still getting start up disk full message

    Hi
    I got the start up disk full message a few days ago. I did command i and ran Omnisweeper and deleted all the large files. I now have over 50% available capacity but my Mac is still running on slow and I still get the start up disk full message....and request to force quit.
    Any thoughts on what I can do. Run idefrag?
    Many thanks
    Claire

    We never asked for the serial number.  I've asked it be removed.  It is a link to your personal information which others can use to search about you.
    Remove McAfee.  It is only necessary if you run Windows.
    Early 2008 models were not Intel CoreDuos. They might a have been Core2Duo, but not CoreDuo.
    Your model if the serial number is correct, which I verified with:
    https://selfsolve.apple.com/agreementWarrantyDynamic.do
    is indeed a Core2Duo Early 2008 model by serial number.
    Go to Apple menu -> About This Mac to verify you have a Core2Duo and not a CoreDuo, otherwise you are getting your serial number and processor information from two sources that got wrongly combined.
    An Early 2008 model can upgrade to Mavericks and Mountain Lion.   It can also install any version of Snow Leopard that is retail, and not system specific with a Mac model name on it.  So your issue with file space is likely due to something else you installed.     Not a virus per say, but probably something that eats up a lot of temporary space. I would run the machine overnight in screen saver, not energy saver model to ensure the logfiles get properly cleaned up.  I'd temporarily turn off any backup software.   And the next time you shut down, make sure not to leave any applications open, by checking command-tab that the Finder is the only open application before shutting down or restarting.

Maybe you are looking for

  • IPhone charging bug in 3.0

    Hi, I am curently using a Dension Gateway 100 to connect my iPhone 3GS to my car audio system. It's the model with the new cradle compatible with USB charging for the iPhone 3G/3GS / Touch 2G. However, I do have a charging issue with my iPhone 3GS (r

  • Problem with loading Images from Google

    if i click on one of this pictures & chose open in new tab https://fud.community.services.support.microsoft.com/Fud/FileDownloadHandler.ashx?fid=23a96ac6-b84d-4e5a-be5f-ee9132199fac new windows starts loading, but the loading never ends, in past it u

  • I can't get itunes to start now that I downloaded 10.5.3

    i can't get itunes to start now that I downloaded 10.5.3

  • "Other" Taking up Capacity. Help! :(

    Hi! I'm going to attempt at describing my problem. When I first got my IPOD, I spent the day trying to figure out how to download songs to it. I unknowingly transfered over 200 songs I had on my Windows Media Player thinking that would do it, but the

  • Dwonload older version Database..........

    Could someone please tell me how to download older version database? I need Oracle database 10g (10.2.0.1) , BR Al Razi