Hey All,
I would like to know how Capacity is booked on the Planned orders resulting from the MRP run.
Regards.

Hi Danish,
On the basis of Delivery Date or requirement date system schedules the order either it is though Backward or Forward scheduling. For this calculation system considers the Inhouse Production Time , GR Processing Time , Routing data etc.And during this calculation system will ignore the available capacity on particular date means you have to perform Capacity Leveling later.
And on the basis of that Routing which is selected during MRP run system generates the Capacity requirement on the relevant work centers / Resources.
Refer below link,
[Detail Scheduling|http://digilander.libero.it/vietrim/]
Regards,
Dhaval

Similar Messages

  • Generate Plan Order from MRP Run (MD51) by WBS Element

    Dear All,
    1. I have created sales order with assigment WBS element (VA01)
    2. Then I created Routing & BOM for Material (CA01 & CS01)
    3. Generate MRP Run (MD51)
    The problem the generated mrp run doesnt consume planned order .. i have set the planning strategy 21 or 40, but still doesnt works.. is there any other parameter that i should configure..???
    Help Me...
    MamaRara

    Hello,
    Hopefully, the following link can assist you.
    - Re: After firming planned order, new planned order is generating in MRP run
    - Basic Scheduling in MRP run
    - Re: MRP run
    - During MRP run unwanted plant and storage location include and exclude
    - MRP run does not consider the common stock
    Thanks & Regards
    JP

  • Standard Purchase order from MRP

    Hi
    I am trying to create standard purchase order from MRP using quotation, asl,sourcing rule ,assigement sets, but it is only going upto Requisition.For the same item if i run the min-max planning it does generate Req as well as standard PO.
    Am i correct that i can create standard po by using Quotation etc ?? if so what is wrong with setup ??
    Thanks
    Anshuj

    Sorry for posting. works fine.
    anshuj

  • Problem with scheduling planned orders in MRP

    There is a problem with scheduling planned orders in MRP. SFG is assigned to the BOM of FG. No inhouse production time maintained in the material master of SFG & FG. routing maintained for both . In OPU5 scheduling & capacity reuiremnts tickmarked for detailed scheduling. Scheduling level - via detaied scheduling. Scheduling type - backward. Adjust basic dates , adjust dep. req. to order start set. In MD02 , scheduling is via ' lead time scheduling'.
    My problem is the start date & time & finish date & time is same for planned orders of FG & SFG in the detailed scheduling tab of the planned orders. (Duration is same because of same capacity requirements on the same work centre. But how is the finish date same for both SFG & FG?)
    (Capacity requirements are being generated.)
    What could be the problem ?

    Dear,
    By scheduling the routing and maintain lot size dependent time in material is best practice and result of scheduling will be consistent.
    If you want SFG before FG you need to define lead time offset in BOM or need to maintain the floats before production.
    Hope clear to you.
    Regards,
    R.Brahmankar

  • Tracing Planned Order from Purchase Req.

    I want to find the Table - field relationship to trace a Planned order from Purchase Requisition.
    Once we convert planned order to purchase requisition, system deletes planned order in MD04.
    Is it possible to find out which planned order had been used to create purchase requisiton.

    Hi Raj,
    Generally Peggeed requirement is nothing but it represents the Higer level material. For example if raw material purchase requisition for 100 nos, then it is a Pegged Requiremet of the Assembly or the FERT. Simple its a dependent requiremnt for FERT or SFG.
    MD09 is used to find out the Pegged Requirement. If you give the Purchase Requisitiion of the Raw material, then system will tell you the pegged requirement i.e. the production order order to which the purchase requisition belongs to.
    Pegged requirement may be a Sales Order,Reservation,Production Order,Project,Network,WBS etc.
    Select one MRP element in MD04 screen and if you select pegged requirements system will show you these elements created for any higher level material or not.
    Note :Once a GR is done to PO, there is no more pegging possible for the PO, as it is in Inventory. Pegging is possible as long as it is an open order (PO, PR etc.)
    Apart from above case If you have other requirment you to devlope your own.
    Regards,
    Ram

  • Production orders in place of planned orders in MRP run

    Hi,
    Please help me with this senario,
    we receive saleorders through CRM interface then these are chnged to redistribute to different plants by changing the plants in saleorders.
    we want to run and create production orders directly for these saleorders without creating planned orders.
    I tried using strategy 82 but it makes the production order online, but we want it to be created after mrp run.
    Is there a way to create production orders instead to planned orders in MRP run.

    Hi You used Right strategy only.Use Strategy '82',  Transfer requirement from CRM and execute MRP run in Background.It will generate Production order.But i didn't understand what you mean by 'Online' 3
    Pl.  Correct me If I am wrong.
    Edited by: Velmurugan S on Mar 4, 2008 10:02 AM

  • How to create planned order from the sales order for a processing item

    In the MTO sceanrio, assembly order is created directly from the sales order. I would like to create a planned order from the sales order.
    I tried the Planning strategy group 81 in the material master but it didnt work.
    Could you please let me know how to do it? Is it Schedule line config that controls whether planned order is created?
    Thanks
    Harish

    Narayana,
    Planning strategy 82 is the best & standard way of getting production order created on sale order create.
    just assign this strategy  in MRP 3 view under strategy group.
    If not then using sale order reqt type ( KMFA- Assembly with production order) & assigning this to your sale order item category is also another way to create prodcution order without using planning strategy in material master.
    Follow steps in SPRO-->Sales & dist --> basic functions >avail check &transfer of requirements> transfer reqts-->determination of reqt type using transaction
    Here you may select the item category you in sale orders & assign KMFA to your item category. this will then give option in sale order create to change reqt type to KFMA for assebly orders.
    If you need KFMA to be default assign it to Item cat/ MRP type ( PD) combo.
    Regards
    Ritesh

  • What are the ways to Copy Firm Planned Order from one ASCP Plan to another?

    We run two EDD Plans with very similar options, but with different plan horizons.
    To have the suggestions synchronized, we need to copy the "Firm Planned Orders" from one plan to another.
    We tried inserting the records in MSC_ST_SUPPLIES with Order type 5 and firm planned type 1 with appropriate plan id, but Planning ODS Load is not considering those inserted records.
    We don't want to insert directly into MSC_SUPPLIES.
    Any inputs is appreciated.
    Thanks
    Sundar

    You can also call a custom DTSX package in SSIS via the datamanager.
    there are at least 5 ways of transfering data in BPC between apps.
    1. Through the front end (excel etc) via evdre/evsnds
    2. Through Script logic using *Dest App
    3. Using BPC's standard export dtsx package via DM
    4. Using SSIS using BPC's custom SSIS tasks
    5. Through Script logic using stored procs.
    i am sure people will come up with more.
    remember if you use ssis and move data into any table but the wb, you need to process the cube afterwards.

  • Raising Partial Production and purchase order from MRP.?

    Hi Experts,
    How to raise partial production order and purchase order from MRP..
    Karthik

    Karthi,
    I believe you should go through both of these topics relating to Production Orders and MRP.
    https://websmp105.sap-ag.de/~form/sapnet?_FRAME=CONTAINER&_OBJECT=011000358700000321882005E&_SCENARIO=01100035870000000183&_ADDINC=
    https://websmp105.sap-ag.de/~form/sapnet?_FRAME=CONTAINER&_OBJECT=011000358700001061692007E&_SCENARIO=01100035870000000183&_ADDINC=
    Best wishes
    Suda

  • Locating Planned order from a  purchase requisition

    Hi Gurus ,
    A purchase requisition has been created manually , by converting a planned order . Is it possible to find out the planned order , from a purchase requisition   Pls advise.

    Hi
    Once planned order converted in to Production order or Purchase requisition, we can't see any details of the planned order.Planned orders are stored dynamically in tables.once it is  coverted,Details can not be seen even in PLAF-Plan order table.
    In production order, you can see the planned order number but for PR , it is difficult to get the reference Plan order number.
    Regards
    Ramakrishna

  • Block the order from MRP

    Hi Guru
    We currently have credit blocks on a sales order - they are either a block 25 or a CR block.
    But neither block actually blocks the order from MRP - we can still buy parts and manufacture.
    Can you provide us with a block that we can use on orders that will stop them from processing until it is removed.
    Thanks
    Suresh
    Edited by: sureshsdconsult on Dec 8, 2011 7:01 AM

    Hi Suresh,
    Here i have one doubt is "25" means
    U can use credit block in sales order,  either warning msg or error msg.
    If u choice warning msg system show how much credit exceed only.
    If u choice error msg, order can't process.

  • Migration of Planned Orders from one SAP system to another one

    Hi,
    A quick help needed.
    We are migrating SAP data from one SAP system to other due to business split. Regarding PP data, can Planned orders be migrated as it is from one SAP System to another? What is the impact if we do so?
    Appreciate your response.
    Kind Regards,
    tanuji

    hi ,
    As suggested , you can propose to migrate only Firmed Planned orders from SAP  to SAP system .
    How to acheive it ?
    You can use below BAPI to extract details of planned order from Table PLAF and upload in TARGET SYSTEM
    BAPI_PLANNEDORDER_CREATE
    Please note  newly created Planned order in Target system would not have BOM EXPLOSION and Scheduling .
    If need , Make a BDC recording as a add on step to explode Bom and Schedule by clicking those icons in Planned order .
    Technical Team can do this .

  • Unable to view planned order from exceptional summary window

    Hello All,
    I have ran ASCP plan and it details out the exceptions and recommendations, but I am unable to view planned order from exceptional summary window>recommendations>cilck discrete jobs, no planned orders visible. This issue also shows up for other exceptions, on click of exceptions details it shows up the items but unable to take any actions.
    I have tried by giving large no of days to view recommendations in preference.
    Can someone help me to reslove issue.
    Thanks,
    Edited by: user604737 on Jul 18, 2011 6:09 AM

    We don't have any query built on the exceptional window. As I am able to view below recommendations
    Recommendations
    Discrete Jobs 8
    Purchase Req 27
    When we click on discrete jobs/purchase req, its not showing any planned orders in supply window.
    Can you please let me know, which is the backend table which stores supply information which are displayed in exceptional window.
    Edited by: user604737 on Jul 18, 2011 9:15 AM

  • BAPI to get Planned orders from SNP,PPDS in APO

    Hi Sap Gurus,
    i want to find out a BAPI to fetch the planned orders from SNP,PPDS in APO BY PASSING THE parameters like Resource id ,Start time and End time.

    hi,
    check out this , if u find any new BAPI , just add to this list.
    https://www.sdn.sap.com/irj/sdn/wiki?path=/display/scm/apo-technical
    regards
    Prabhu

  • Can't Release firm planned order from ASCP.

    I can't release firm planned order from ASCP the following massage appear " FRM-40200 , Field is protected against update ".
    appreciate your help on that.
    regards.
    Ahmad.

    Please post the details of the application release, database version and OS.
    I can't release firm planned order from ASCP the following massage appear " FRM-40200 , Field is protected against update ".
    appreciate your help on that.Please mention the navigation path along with the form name and version.
    Thanks,
    Hussein

Maybe you are looking for

  • Select on a view containing a function

    Hi, I have a problem with my production user (LABO): he's trying to access a view on another schema ( METAP ). This view use a function on another schema ( APPDATA ). The view: CREATE OR REPLACE VIEW metap.foreg_best AS select TX, TN, TG, WW, WW_1, W

  • How to have firefox on my kindle

    Is it possible to load firefox onto my kindle fire?

  • Page dialog box in printing

    Hi, I want to get the page margins from the Page setup dialog box which i get from the 'printjob' class. Also, i want to set the paper to A4 as default instead of 'letter'. Is there any method through which i can retrieve the paper size and the margi

  • Text Message sent from LabVIEW using ActiveX and Internet Explorer

    I am fairly new to LabVIEW and I am trying to make a VI that will be able to text me and let me know when a test is about to be done or if something has caused it to shutdown.  My VI uses www.onlinetextmessage.com but I can't get it to click the Send

  • Action Profiles problem

    Hi All, I have an action profile(Method Call) which sends an E-Mail notification for Sales Quotation. This triggers when the status is changed to approved and the document is saved. The E-Mail notification is sent but the Indicator in the scheduled a