Capacity Levelling Error

Hi All:
While running capacity leveeling on capacity over loading,I am getting error "Errors Occured during time stamp calculation.Calendar:IN Time Stream". Resource consumption on SNP ppm is defined as day wise.
Ashish Gupta

Hi :
This is the scenario which I am modelling.I am using factory calendar as IN which has 5 working days in a week.It has been assigned to a resource.I have crerated a time stream which the same factory calendar and it has been assigned to the plant.
I am using standard planning book of SNP 9ASNP94 where storage bucket is defined as 9ASNP.
I am not able to assign same time stram into that storage bucket.Should I assign it to the same or is there any other way to solve this issue.
Ashish Gupta

Similar Messages

  • Capacity Leveling error CM22

    Hi,
       I get a problem when I do capacity leveling in CM22..I can perform the leveling in CM21 successfully while I get error msg in CM22..I search this forum but no answer for this similar question..
    error msg:
       I try CM21 and it works..I didn't save the leveling result in CM21 and switch to CM22,but I get this error msg..
    Capacity not availableMessage no. C7056
    Diagnosis
    The system could not find any remaining available capacity within the planning period.
    things checked:
        I checked CM01 and I am sure there are enough capacity available ,the planning period in CM21 is also correct (2011/7/1 to 2012/3/31).I also check the strategy(finite schedule and planning direction checked)..

    Hi,
    Overall prof: SAPSFCG006           SFC: View work cntr/ind.cap.  (tabular)
           Select.profile:                     SAPSFCS006      SFC: View center  -> ind.cap. (tabular)
           Control profile:                    SAP___C001      Gen: Planning table (tabular form)
           Time prof:                          SAP___Z002      Gen: short-term (3 month)
           Evaluation prof.:                   SAP___A001      Gen: Standard evaluation profile
           Strategy prof.:                     SAP___T012      Gen: Finite sched.backw./alloc.& dispat.
           Capacity planning table (tab.form): SAPSFCR002      SFC: with indiv. capacities
               Layout ID                           SAPSFCLA04      SFC: Individual capacities (tabular)
               Ind. width
               FormulaRem.avail.capacity           2               Remaining av. cap. = Av. cap. - dispatch
               Dispatch time                       08:00:00
               Rqts to be displayed                3
    I use CMCH to check the overall profile and I don't get any error msg..But I still get error msg"no available capacity" when do leveling in CM22/CM25...Pls help...thanks..
    already fix it..it is due to the evaluation profile problem..
         still not fix..anyone can hep on it?thanks..
    Edited by: Monst Yang on Nov 29, 2011 9:05 PM
    Edited by: Monst Yang on Nov 30, 2011 8:00 PM

  • Is capacity leveling is in ltp

    Is capacity leveling possible in the Long term planning i.e after simulative mrp run.
    Regards,
    Sunil Patil

    Hi Mr.Sunil Patil,
    Please check the help given by SAP.
    SAP allows this.
    http://help.sap.com/saphelp_470/helpdata/en/92/bf055544bd11d182b40000e829fbfe/frameset.htm
    Leveling Capacity in the Planned Order
    Prerequisites
    The planned order must be scheduled.
    Procedure
    Starting from the Long-term Planning node, choose Long-term planning ® Simulative planned order ® Change.
    The system displays the details screen for the planned order. From this screen, you can call up the capacity check, if necessary, by choosing Edit ® Capacity check. The system then checks available capacities. If no overload exists on the work centers in question, the system displays a message stating that no overload exists. If an overload does exist, the system branches to the capacity situation where you can make any necessary changes.
    To level capacities, choose Goto  Capacity leveling.
    The system displays the dialog box entitled, Settings for Capacity Planning if you have not yet defined any parameters for capacity planning.
    Select the appropriate planning type and the period type for capacity planning. If necessary, select a period of examination. Choose Continue.
    The system carries out scheduling using the parameters set in Customizing.
    If scheduling could not be carried out free of error, the system displays an overview of the scheduling errors based on the planned orders in question. From here, you can access the scheduling log to check the details on the scheduling errors. To do this, choose Log.
    5. Choose Continue. The system displays the evaluation of the capacity situation.
    Capacity leveling is also displayed with reference to a work center and a capacity category (for example, machine or person) and the unit of measure is displayed from the work center. Here, the following is valid: If a planning work center (routing header) is entered in the routing the system first displays this work center with the corresponding capacity category. Otherwise, the selection is random. The system also displays the following data:
    Order number, order quantity and order finish date
    Available capacity
    Total capacity requirements for the selected work center
    Capacity requirements for the material
    Capacity requirements of the selected planned order
    Capacity loads resulting from the selected planned order are specially indicated.
    Regards
    Mangal

  • Resource scope when performing capacity leveling with Optimization method

    Hello,
    Can anyone tell me if, when performing the Optimization method in Capacity Leveling for transportation resources production resources are validated? I am currently testing this and I found out that if the capacity variant of the production resource is no 00, 01 or 02 the system will give an error message when trying to level a transportation resource, the message indicates that there is no available capacity for the production resource.
    When reading documentation in help.sap it appears to me that Capacity Leveling should only focus on the resource to be level not in other resources and in this case my transportation resource has available capacity that shouldn't be affected for master data errors of production resources...
    Could somebody help me clarify this issue?, I have already open a message and they suggested me to change the capacity variant of the production resource, evidently when I do this everything works but I still don't understand why capacity leveling, with Optimization method, of a transportation resources is checking on production resources.
    Thanks!
    Erika

    Hello Ian,
    I am not talking about the SNP Optimization Run that is certainly manipulated by the constraints that you update on the optimization profile; in this case "Capacity Leveling with Optimization Method" the constraints are automatically set by the system and what I need to know is if these constraints are considering not only the resource that is to be leveled (in this case the transportation resource) but also the production resource.
    Sorry but your answer does not correspond to my request, because you are talking about the Planning Optimization run and I am talking about  "Capacity Leveling with Optimization Method".
    Erika

  • "Multi-level error propagation carried out" in SCM 5.0

    When I use the SNP PPM Generation With Lot Size Margin function in SCM 5.0, I got the following error:
    Multi-level error propagation carried out
    Message no. /SAPAPO/OM242
    Could you please give me this help?
    Thanks,
    Lian

    Hi,
    Thank you for the information, but the problem is still there though I de-activated all user-exits...
    I also saw the following error:
    Invalid planning version
    Message no. /SAPAPO/OM015
    Thanks,
    Lian

  • Multi-level error propagation carried out Error in APO

    Dear Experts,
    We had developed a custom program that is same as /sapapo/rrp3 report, but the issue is when we use planning version other then 000 the custom program is giving the error ""Multi-level error propagation carried out"" but the RRP3 report works fine with all the planning versions.
    Please help to find the cause and to solve the issue.
    Thanks.
    Regards
    Abhinav Nallani.

    Dear Arek,
          The problem is not yet resolved . we have raised an OSS note for the same.
    as the relevant notes are already implemented in our case.
    regards
    Kiran

  • Error "Multi-level error propagation carried out" when I run a report

    Hi All,
    When I run the report /SAPAPO/CDPS_REPT - Order and Resource Reporting with the below criteria I getting error "Multi-level error propagation carried out"
    Planning Version - Simulation Version XXX
    Evaluation Start - 05/03/2011
    Evaluation End - 12/31/2013
    Evaluation List - Extended Operation List
    I do not get error when I run the report with selection as Active version 000 and Evaluation List as Order List, Operation List.
    I have tried by ruuning Live cache consistancy check, but the issue is not fixed
    Please help me to resolve this issue
    Thanks & Regards,
    Rajkumar

    Hi Jack,
    Please do post the server log file here so that we can try and find a solution for the problem you are facing.
    I had a problem a while ago with the app server too. While trying to run an application, after a few times, it would give me an error message saying the Application Server cannot be started. I rebooted my machine and thankfully it worked again. Just try this too and see if it works.
    If it doesnt we can go through the server log and try to identify the cause of the problem.
    Cheers :-)

  • CIF error-Multi-level error propagation carried out

    Dear ALL,
        When i am trying activate the integration model for Material transfer it generates queue with status SYSFAIL with message "Multi-level error propagation carried out".
    and the integration model is not activated.
      please help
    regards
    Kiran

    Dear Arek,
          The problem is not yet resolved . we have raised an OSS note for the same.
    as the relevant notes are already implemented in our case.
    regards
    Kiran

  • Multi-level error propagation during the execution of CFM2 transaction

    Hi,
    We are implementing SAP SCM 5.0 integrated to SAP R/3 Mills IS.
    During the execution of CFM2  transaction, while  trying to activate the integration model for the object u201COrdersu201D for the very first time, the following error message appears:
    *"Multi-level error propagation carried out".*
    There are also messages related to inbound queues blocked. In the case of maintenance orders, CIF_MNT_INBOUND message shows up. While working with Production orders, CIF_ORDER_INBOUND message emerges.
    The items listed below should be taken into account:
    -The production orders that are meant to be transferred to APO are regular production orders corresponding to several products.
    -We are working with configurable materials.
    -We are working with the active model (000) and for each plant we are using 2 different planning versions.
    Regards,
    Analía Nahmías

    Dear Analía,
    The corresponding error messages issued when executing //CCR indiacted the peg-ids are missing in liveCache.
    Recommendations:                                                      
    -Run transaction /SAPAPO/OM17 to check the internal consistency between database and liveCache within SCM system. Correct the inconsistencies                                                       
    -Execute report /sapapo/cif_deltareport3 to correct the inconsistencies between ECC and SCM system                            
    Regards,
    Tibor

  • Database-level error reported by JDBC driver

    Hi everyone,
    I get an error in my Sender JDBC adapter. I am executing a stored procedure every minute. In total I have 34 JDBC senders for every different database. The error is like below. The problem is in Alert Inbox I cant see the rest of the message. This error occures just once every hour (average). I dont know why and I dont know what the rest of the error is saying.
    Any ideas how i can see the rest of the message? And where the error might be?
    Note: In communication channel monitoring everything is green.
    Database-level error reported by JDBC driver while executing statement 'EXEC [TB

    Hi,
    obviously there are concurring accesses to the table your stored procedure is accessing. This is nothing serious, because SAP XI will retry the execution of the stored procedure according to the settings of the communication channels (3times all 5 minutes is the default).  Additionally you can set the repeats in case of SQL errors in the extended tab of the communication channel configuration.
    Tuning the transaction isolation levels might help to avoid the error but can decrease the consistency of the data as well. Default isolation level is always the highest available in a database (in case of SQL Server it should be SERIALIZABLE), so locks might easily occur. I would suggest to have a look at other applications accessing the tables and determine their isolation level.
    All in all, I guess there shouldn't be real problems, because of the repeated execution of you stored procedure, but it's worth to have a look at the isolation level.
    Regards Sven

  • How to fix the field level Error(Invalid Date)

    Hi All,
    Error: 1 (Field level error)
      SegmentID: ACK
      Position in TS: 5
      Data Element ID: ACK05
      Position in Segment: 5
      Data Value: 162014
      8: Invalid Date
    can anyone help me out, How to fix above error? i searched about this but only information about the error  is given and no where it is mentioned how to fix it  and how is it generated please help me out.
    Thanks,
    Nitish

    Are you sending or receiving the EDI?
    Either way, "162014" is simply not a valid EDI data format.  Dates in x12 are expressed as CCYYMMDD so December 30, 2013 would appear as 20131230.
    If you are receiving, you need to contact the sender and have them correct the output.
    If you are sending, you need to property format that date value.  For example:
    myDateVar.ToString("yyyyMMdd");

  • A Transport-level error

    Our .net application throws an error when the wireless laptop switches from wireless access point to another inside a building. it seems like SQL is closing the existing connetion without notifying the application which thinks that sqlconnetion is still
    in OPEN state. why does SQL close a connection without notifying the application? Our programming team does not want to open and close the connection on each transaction because they think it will slow down the application.
    Error:
    "A transport-level error has occurred when sending the request to the server. (provider: TCP Provider, error: 0 - An existing connection was forcibly closed by the remote host.)"

    I would expect a disconnect error in such a case.
    I don't think SQL Server has a design feature to follow mobile wireless devices.
    Threads:
    Timeout issue when connection to SQL Server in Wireless environment
    Having disconnections with SQL Server using a wireless connection
    QUOTE: "Ah, SQL Server connections (and the connection pooling mechanism) are not at
    all tolerant of WiFi connections. I suggest you use a replication technology
    as exposed by the SQL "Server" Compact Edition and ADO.NET 3.5 Sync
    Services. This gives you a local DBMS to work with and connectivity designed
    to work over an occasionally (and unreliable) connection."
    You may try to adjust the TCP/IP Keep Alive parameter, but no guarantee though.
    BOL: "Keep Alive
    This parameter (in milliseconds) controls how often TCP attempts to verify that an idle connection is still intact by sending a
    KEEPALIVE packet. The default is 30000 milliseconds."
    LINK:
    http://technet.microsoft.com/en-us/library/ms190771(v=sql.105).aspx
    Related thread:
    Wireless connections to SQL Databases
    Kalman Toth Database & OLAP Architect
    SQL Server 2014 Design & Programming
    New Book / Kindle: Exam 70-461 Bootcamp: Querying Microsoft SQL Server 2012

  • Use of Planning Table (MF50) in Capacity Levelling with Production Order

    Hello Experts
    I wish to know that is it possible to perform Capacity Levelling in planning table (tcode MF50) with respect to a Production Order ? It is known that MF50 is used in Repetitive manufacuring to do the capacity levelling with respect to Planned orders. But in our discrete manufacturing scenario we want to use planning table to the capacity levelling with respect toa Production order.
    Any clue or help pertaining to this will be highly appreciated.
    Thanks in advance
    Regards
    Jayanta

    Dear ,
    MF50 is does the cacapcity leveling based on mateail -run schedule order (planned order ) where as in discrete manufacturing , when you run the MRP ,  MRP system assume Infinite Capacity  and schedule the order as per your selection in MD02(2,1,3,3,2)  and then you convert those planned order to Production order .Here you checkied the Capacity in Production Order level .
    In stanadrd SAP  , it is not possible to use MF50 for discrete production order.
    In discrete order or process order ,  do the caapcity leveling , there are seperate planning table available based on Over all Capacity Profile and Schedule type .This can be done  in following way :
    1.CM31-Production Order Wise -Tabular
    2.CM23-PO wise -Graphical
    3.MC88: Ruf Cut Planning
    Work Centre Wise : CM21 -Graphical , CM22-Tabular Planning Table .
    Make sure the below set up before  you carry on the Capacity leveling :
    .Define time profile in OPD2.
    Define the strategy profile in OPDB
    Define the Overall profiles in OPD0.
    In OPJK  maintained check capacity with SAPSFCG013 profile for your production order type
    In OPU3 , scheduleing parametre s: Generate Capacity , Scheduling Type , Automatic Log ,Start date in Past as per your req.
    In OPJU , chekc the contol tab of the scheduleing as per OPU3
    In OPKP- Production scheduling paranmeters assing the overall capacity profile -SAPSFCG013  with finte scheduling tick.
    Master Data :
    1.Materials Master define the Production scheduler and production scheduling profile
    2.Work Center - Define the capcity planner group,activate checkbox Relevant for Finite sceduling,on the capacity header define the shift timings,break timings and unit of measure,no of individual capaity, enter formula for scheduling in capacity view.
    3.Routing - enter the values for the standard values. Use control key with scheduling.
    Hope this will help you .
    Regards
    JH

  • Routing update in capacity leveling CM21

    Hi Collogues,
    We have simple production type. Production order with production versions.
    16 production lines (work centers) with different rates.  1 operation per routing.
    I want to use in capacity leveling CM21 to dispatch planned/production orders on these 16 lines.
    The problem is that when I dispatch a pln/prd order in CM21 on a work center nether routing nor production version gets updated.
    Your suggestion are welcome.

    Solution found.
    Set for each production version "Production line".
    Then go Mf50 switch to graphical planning table. It updates routing when I move planned order over work centers.

  • JDBC: Database-level error

    Hi Folks,
         I'm trying a JDBC to JDBC scenario and I'm getting the following error.
    *Database-level error reported by JDBC driver while executing statement 'select * from EMPLOYEE where flag = 'X'.'. The JDBC driver returned the following error message: 'java.sql.SQLException: [Microsoft][ODBC Microsoft Access Driver] Syntax error (missing operator) in query expression 'flag = 'X'.'.'. For details, contact your database server vendor.*
      My select statement is  : select * from employee where flag = 'X'.
    Regards,
      Santosh

    Hi,
    Try with following sql query.
    select * from employee where flag = "X".
    Hope this helps.
    Thanks and Regards,
    Kalpesh

Maybe you are looking for

  • Error message when installing Digital Edition

    I am getting the following error log when installing digital edition. I had the old verion of DE installed and it was working fine. When I was asked to upgrade I started to get errors to install the new version. Output folder: C:\Program Files\Adobe\

  • PlayStation 3 (320GB) Uncharted 3 Bundle

    I wanna order this product, but the specifications are quite vague. http://www.bestbuy.com/site/Sony+-+PlayStation+3+%28320GB%29+Uncharted+3+Bundle/3652529.p?id=1218424... I would like to know about the bluray and dvd player, which region area they c

  • Watching youtube w/o flash

    I want to keep my new MBP flash free. Can't do many things of course (still have my old MBP), but I hope at least to be able to watch youtube videos. When I go to youtube, the first thing I see is - as expected - that I do need flash. When I click on

  • I cannot remove the dialog box from my ipad. It says 'not enough storage' I click on settings and close, but still there. I need help. thx

    I cannot remove the dialog box from my ipad. it says 'not enough storage'. I click on settings and close but still there. How can i remove this message? Thnx

  • Printing Non-Stop

    My Laser Jet P2035n prints a job over and over until you cancel the job.  The printer is rather new and had been working fine until I replaced the toner cartridge.  In looking at the 'Advaced' tab of the Printer Properties, the number of copies is "1