Capacity over load message with Persons assignment in Maintenance order

Hi experts,
I have maintained the system with the following parameters and system is showing capacity detail / finite popup when capacity find overload in maintenance order screen.
Work center number of individuals: 1
HRMS assignment in work center: only one person is assigned
Settings maintained in OIOI transaction (check availability during order creation): Overall profile under capacity availability, SAPPM_G013 and Collect. Conversion, 1
Settings maintained in OIOI transaction (check availability during order release): Overall profile under capacity availability, SAPPM_G013 and  Release order, 3
My query is when I assign more than one, number of individuals in work center and then plan those persons in maintenance order operations data and assign persons in Operation general data --> Requirements Assignments --> Assign persons from work center assigned on operation and maintained work for each person.
In this case, system does not show any capacity overload message and I am free to create orders in same date and time with the same work center assignment in maintenance order operations.
Can anyone tell me where am I doing mistake or where should I maintain configuration ?
Please also tell which transaction must be used to dispatch person wise operation like transaction CM25 ?
What is the correct profile ID of transaction CM25 in both cases of 1 / multiple persons assignments in operations?

Dear Experts,
What I am doing. I assign number of individuals in work center capacity as 2 and create work center in by clicking HRMS button and I assign 2 person in PERSON folder.
Further, I assign work center in maintenance order operations, enter number of person as 2, then I press internal button, click on button Requirmnt Assignment and I assign persons those are attached in work center.
When I create 2 order on same date, time with assignment of same work center and persons on operations, In this case system is not showing me the capacity popup.
Please advise, what should I do?

Similar Messages

  • Open purchase order only with open production or maintenance order

    Hi everyone,
    I am looking for a report that would show open purchase order but only linked to open orders (I am here talking about the source production or maintenance order in the Account Assignement tab).
    I have already checked transactions ME2L and ME2N but these do not seem helpfull.
    Thanks in advance for your help.
    Kind Regards,
    Olivier

    Use ME2K and enter the A/C category faor Production order and Maintenance order
    make sure that Selection parameter should be selected as open GR and if you want to make your own filter than
    go to SPRO-MM-Purchaisng-reporting-selection parameter-define sel parameter
    here you can create your own and use that for report.

  • Person responsible wise maintenance order

    Hi,
    In the maintenance order header screen,we maintain the person responsible (HR employee).
    I need a report to find number of orders per person responsible. I thought it would be available in IW38 but strange could not find.
    Kindly help.
    Regards,
    Smart

    I think you have it there (IW38)
    KJogeswaraRao

  • WoL over 802.1X with Vlan Assignement

    Hello
    I have a switch 3560, and an ACS v4
    In phase of test i have an infrastructure with 802.1X PEAP with automatic VLAN assignation by the ACS according to the Machine.
    My question is:
    it possible to implement Wake One Lan on 802.1x with a assigantion of vlan not statics (i.e. without use of command Switchport access vlan XXX)
    PS: if I do in statics the VLAN on a port Wake one Lan work without Pb with 802.1X

    Ok, on interface 0/19 :
    Switchport mode access
    speed 100
    duplex Full
    dot1x pae authenticator
    dot1x port-control auto
    dot1x control-direction in
    spanning-tree portfast
    The software use is like "wolcmd" with configuration of
    MAC address of the PC
    IP of the PC (give by DHCP reservation)
    Subnet mask
    Remote port Number : 7
    The authentication on ACS work fine and on ACS whe have this field
    [064] Tunnel-Type
    value : VLAN
    [065] Tunnel-Medium-Type
    Value : 802.
    [Tunnel-Private-Group-ID]
    Value : 69
    In fact, the only difference between config is assignation static or dynamic of VLAN
    I don't know if this what you wan't
    thanks

  • Proxy client (over USB connection) with DHCP assigned IP address doesn't work with FRDM-K64F

    Hello,
    after reading about the issues on this forum with a static IP address on the Freescale FRDM-K64F board I went for an DHCP address but I can't get the proxy client to work over a USB connection with DHCP either.
    My console tells me the following:
    RTC Time: Wed 2014-01-01 00:07:27
    Network initialized
    IP Address:      10.143.xxx.yyy (xxx and yyy is real numbers, just changing them for the forum to letters)
    Subnet mask:     255.255.252.0
    Gateway:         10.143.xxx.yyy
    MAC-address:     00:0c:00:06:70:00
    And when I try o to connect with the following command :
    java -jar proxy.jar -socket 10.143.xxx.yyy
    I get the following output and no CLI interface:
    Trying to open socket connection with device: 10.143.xxx.yyy:2201
    Connected to the socket: Socket[addr=/10.143.xxx.yyy,port=2201,localport=49605]
    Open channel 8 with hash 0x130399b3
    Channel 8 CLOSED -> OPENED
    notifyResponse AVAILABLE_RESPONSE on channel 8
    Channel 8 OPENED -> AVAILABLE
    Open channel 9 with hash 0x0
    Channel 8 AVAILABLE -> REQUEST_SENT
    notifyResponse ACK_RESPONSE on channel 8
    Channel 8 REQUEST_SENT -> ACKNOWLEDGED
    Channel 8 ACKNOWLEDGED -> DATA_SENT
    notifyResponse AVAILABLE_RESPONSE on channel 8
    Channel 8 DATA_SENT -> AVAILABLE
    Channel 8 AVAILABLE -> REQUEST_SENT
    notifyResponse ACK_RESPONSE on channel 8
    Channel 8 REQUEST_SENT -> ACKNOWLEDGED
    Channel 8 ACKNOWLEDGED -> DATA_SENT
    notifyResponse AVAILABLE_RESPONSE on channel 8
    Channel 8 DATA_SENT -> AVAILABLE
    Channel 8 AVAILABLE -> REQUEST_SENT
    notifyResponse ACK_RESPONSE on channel 8
    Channel 8 REQUEST_SENT -> ACKNOWLEDGED
    Channel 8 ACKNOWLEDGED -> DATA_SENT
    notifyResponse AVAILABLE_RESPONSE on channel 8
    Channel 8 DATA_SENT -> AVAILABLE
    Channel 8 AVAILABLE -> REQUEST_SENT
    notifyResponse ACK_RESPONSE on channel 8
    Channel 8 REQUEST_SENT -> ACKNOWLEDGED
    Channel 8 ACKNOWLEDGED -> DATA_SENT
    notifyResponse AVAILABLE_RESPONSE on channel 8
    Channel 8 DATA_SENT -> AVAILABLE
    Channel 8 AVAILABLE -> REQUEST_SENT
    notifyResponse ACK_RESPONSE on channel 8
    Channel 8 REQUEST_SENT -> ACKNOWLEDGED
    Channel 8 ACKNOWLEDGED -> DATA_SENT
    notifyResponse AVAILABLE_RESPONSE on channel 8
    Channel 8 DATA_SENT -> AVAILABLE
    Channel 8 AVAILABLE -> REQUEST_SENT
    notifyResponse ACK_RESPONSE on channel 8
    Channel 8 REQUEST_SENT -> ACKNOWLEDGED
    Channel 8 ACKNOWLEDGED -> DATA_SENT
    notifyResponse AVAILABLE_RESPONSE on channel 8
    Channel 8 DATA_SENT -> AVAILABLE
    Channel 8 AVAILABLE -> REQUEST_SENT
    notifyResponse ACK_RESPONSE on channel 8
    Channel 8 REQUEST_SENT -> ACKNOWLEDGED
    Channel 8 ACKNOWLEDGED -> DATA_SENT
    notifyResponse AVAILABLE_RESPONSE on channel 8
    Channel 8 DATA_SENT -> AVAILABLE
    Channel 8 AVAILABLE -> REQUEST_SENT
    notifyResponse ACK_RESPONSE on channel 8
    Channel 8 REQUEST_SENT -> ACKNOWLEDGED
    Channel 8 ACKNOWLEDGED -> DATA_SENT
    notifyResponse AVAILABLE_RESPONSE on channel 8
    Channel 8 DATA_SENT -> AVAILABLE
    I don't know if this matter but my java version is:
    java version "1.8.0_31"
    Java(TM) SE Runtime Environment (build 1.8.0_31-b13)
    Java HotSpot(TM) 64-Bit Server VM (build 25.31-b07, mixed mode)
    Any ideas or am I missing something completely?
    Thanks
    Andy

    Hi, Andy. Please excuse my ignorance, I am very new at this ME embedded stuff. I had my challenges, but was finally able to get my board up with a static address. I went through a lot of headaches, but finally got the board flashed with the latest bin. I then updated the jwc_properties.ini file on the SD card to include:
    # Whether static configuration or DHCP server is used do get IP address. Possible values: dhcp,static
    ip.method = static
    # IP address,used with static IP configuration only
    ip.addr = 192.168.0.30
    # Network mask,used with static IP configuration only
    ip.netmask = 255.255.255.0
    # Network gateway,used with static IP configuration only
    ip.gateway = 192.168.0.1
    # DNS server,used with static IP configuration only
    ip.dns = 208.67.222.222
    # MAC address
    mac.addr = 01:02:03:04:05:06
    I was then put the card into the board, disconnected both USB cables, and then powered it up. From that point I was able to ping the board. I can now use Device Manager in NetBeans to connect to the device.
    I am struggling quite a bit with many issues. It seems that when I try to stop the app from NetBeans, the "please wait" dialog hangs forever. I have to use Windows Task Manager to kill the "JavaW" process tree and reconnect the board.
    I have also had trouble understanding the GPIO pin assignments. Another gotcha was trying to use the AutoStart feature. Since the sample app never cleanly exited, I thought that I bricked the board. The secret is to power it down, remove the SD card, and then delete all files EXCEPT the jwc_properties.ini file, put the SD card back in, then power up. It seems that the board forgets that the MIDlet was installed.
    Hope this helps others out there.
    Please everybody, post your experiences here. There seem to be very few of us, and finding pearls in the dust is rare right now.
    Regards,
    Pete

  • Imac os x 10.6.8 no scanner loaded message with HP photosmart c5180 despite downloading software updates

    When I open the scanner window on the imac, which should bring up the HP photosmart c5180, it gives a message that no scanner is loaded. I have dowloaded the software updates . What else should I try?

    How much RAM is installed in your iMac?
    How Full is your internal hard drive?
    Are you sure you are saving Time Machine backups to an external drive like Apple's Time Capsule drive?
    Running any antivirus software of your iMac? Running any "crapware" like special hard drive "cleaning" utility apps?
    Do you have extended AppleCare on this iMac?
    It is also possible your internal hard drive is failing.
    If this hard drive is a 1 TB size drive, it could be a Seagate hard drive. The 1 TB Seagate drives have defects and are covered for free replacement, by Apple, under their Seagate hard drive replacement program until this April 12.
    You can find out if your iMac is eligible for the replacement program here.
    http://www.apple.com/support/imac-harddrive/

  • Capacity over load -levelling??

    Hi Gurus,
    I have an work center  available capacity for producing 500 Tones in a month .
    But, in this period my order is for around 600 tones.
    How could i map this in Standard SAP?
    I can't increase the number of individual capacities as the work centers are same.
    can any one advise me what are all the possible ways to produce 600 Tones??
    Thank you.
    Naveen

    Increase the efficiency  or  working hours  for the work center. It depends  on how are expecting the 500 Tonnes capable WC to produce 600 T.
    cheers
    Rav

  • Need to create stock item reservation with account assignment

    Hi Gurus,
    we are working on EBP 4.0 , extended classic scenario . We have a scenario where we want to create a shopping cart for stock item reservation with account assignment as work order.
    but when we try to do it , we are getting following error message
    "Unable to create stock reservation for this account assignment."
    Any ideas how this can be resolved?
    Regards,
    Mangesh

    Hi Mangesh,
    In reference to the info. you have provided, the issue seems to be with the account assignment category than anything else.What do you mean by Account assignment as work order? Need some clarity in this statement, to help you in this regard.
    You can create a cost center (account assignment) P.O and can mention the storage location. The stock will be updated in the storage location where as the FI document will be posted against the cost center.
    Rgds,
    Teja

  • (animated) Loading message

    Hi,
    I am trying to display an animated "Loading" message with the execution of an iView. The iView points to a JSP that takes a fair amount of time to execute; before I try to create something of my own, could I reuse the portal mechanism to display it?
    How can I invoke this functionality? Is this EPCM?
    Thank you,
    Adrian

    Hi,
    I cannot use the message bar element as it is too small. I need an image that could be displayed in the middle of the screen as I have multiple iViews.
    The solutions I've found on SDN so far seem to use EPCM; I wasn't able to make them work and see if they are suitable for my case. As EPCM is Javascript, I don't know how that would work since Javascript is client side and requires the page to be loaded to execute. It is the loading time of the page that I am trying to fix though...
    I am dissapointed such a little thing would take forever to implement... if it is out-of-the-box feature, where is it documented?
    Thanks,
    Adrian

  • Service PO Commitment with refrence to stasticall Internal Order is not get

    PO is created with Account assigned to Internal Order stastically and Cost center as real cost object. Wih PO creation we check commitment in system
    According to standard SAP, at creation of PO, system creates commitment & while doing GR/IR, system should reduce PO commitment and increase actual by that amount. Service PO is created for amount 239200 USD with Account Assigned Category K, Item category D, Account assigned to Cost Center & Statistical Orders (9 orders by approximate 11% ) So, initially there is commitment of 26000 USD on each service order. However from March 2009 onward business has done GR and IR for this PO approximate 50000 USD but nor commitment have reduced neither any commitment line item were posted in system.
    As a result of it, business actual budget is fully consumed by (Commitment + Actual) and while doing IR budget deficient errors is received.
    Here main problem is, non reduction of Service PO commitment while doing GR and IR.
    Tried below approch so far.
    CoAr / Order type Comitment acitive, Costcenter updates commitment and GL is valid on delivery date. Service PO order unit is JOB and commitment reduction is based on value match with PO details.
    In order to test really probelm is with Commitment updation or reporting. I checked COOI and COSP with reference to object no.
    but there is only one posting in line item of original PO amount and at total level there are two posting one is origiona one and seocind is with zero amount. but in both total line item for one of the peiod quantity is incomplete even after clicking Final Invoice.
    Even after final Invoice ticked thre is not commitment line item gets posted in system. Even I run RKANBU01 program.
    This is quite strange, if some one can give me other suggestion to proceed further.
    With Regards
    Nitin P.

    This issue got resolved with OSS. There is technical glitch when you upgrade to EH4.0 and use valuated GR with multiple account assignment. Below is list of notes required to be apply in sequence. (1492317,
    1491430, 1505733 & 1484993)
    With Regards
    Nitin P.

  • Person assignment with workforce planning

    Dear All,
    I plan activity for one day 8 hours & assigned person to activity in CMP2 & distribute work for same day & for same hours,
    when i assign same person with diffrent activity with diffrent project with in CMP2 system not showing any message with same person is assigned same day with diffrent project.
    How same person can work two project with same time,
    Kindly share yours experiance.
    Regards
    Gajjen

    Hi,
    I tested with without person assignment in work center, yes you can assign any person to any project if have capacity but when we distribute work in workforce planning by assignment of person with day & time then same person how can assign to other activity ,because his working hours are fixed,if working time is 8.5 hours & person assign for 8 HR to activity then same person should not work to another activity more than 0.5 hrs,system should not allow.
    May i know Standard SAP allow it or not?
    Regards
    Gajjen

  • TS2755 Why cant i load earlier messages when im looking at text messages with a certain contact?

    whenever i try to load earlier messages with one of my contacts it only shows a couple more of the previews texts we sent using both imessage and normal texting. Then i tried deleting a couple of our texts and tapped on load earlier messages it would show a few more. But it only does this with one contact and theres plenty of space left too so thats not the problem, how do i fix this??
    Please Help Me!!

    I disagree, the old way was worse. If you were searching for a particular text or photo and didn't know exactly when it was sent, each time more messages loaded below the button you would have to scroll down through that new batch to see if the text was there. And if it wasn't, you'd have to scroll all the way back up through the same messages to get to the button again. Plus, each time you loaded more messages and scrolled through them, you'd have to remember where the previous batch ended so you wouldn't keep searching through the same messages over and over.
    The new way is much more logical. Load more equals "load more from this point". However, I agree that more control over how many messages are loaded, or ways to narrow your search, would be better.
    Besides, there is a super simple solution to your complaint. Tap on the time at the top of the screen to automatically scroll back to the top of the list (and the buttons). If you're really in a hurry, use one finger to hit the button and another to hit the time.
    There does seem to be an actual problem though. After I click the button a few times, it starts scrolling back to the very bottom of the list instead of staying at the same point. That's not the new way (stay at this message) or the old way (scroll to the top) and is obviously useless.

  • Sql@loader-704  and ORA-12154: error messages when trying to load data with SQL Loader

    I have a data base with two tables that is used by Apex 4.2. One table has 800,000 records . The other has 7 million records
    The client recently upgraded from Apex 3.2 to Apex 4.2 . We exported/imported the data to the new location with no problems
    The source of the data is an old mainframe system; I needed to make changes to the source data and then load the tables.
    The first time I loaded the data i did it from a command line with SQL loader
    Now when I try to load the data I get this message:
    sql@loader-704 Internal error: ulconnect OCISERVERATTACH
    ORA-12154: tns:could not resolve the connect identifier specified
    I've searched for postings on these error message and they all seem to say that SQL Ldr can't find my TNSNAMES file.
    I am able to  connect and load data with SQL Developer; so SQL developer is able to find the TNSNAMES file
    However SQL Developer will not let me load a file this big
    I have also tried to load the file within Apex  (SQL Workshop/ Utilities) but again, the file is too big.
    So it seems like SQL Loader is the only option
    I did find one post online that said to set an environment variable with the path to the TNSNAMES file, but that didn't work..
    Not sure what else to try or where to look
    thanks

    Hi,
    You must have more than one tnsnames file or multiple installations of oracle. What i suggest you do (as I'm sure will be mentioned in ed's link that you were already pointed at) is the following (* i assume you are on windows?)
    open a command prompt
    set TNS_ADMIN=PATH_TO_DIRECTOT_THAT_CONTAINS_CORRECT_TNSNAMES_FILE (i.e. something like set TNS_ADMIN=c:\oracle\network\admin)
    This will tell oracle use the config files you find here and no others
    then try sqlldr user/pass@db (in the same dos window)
    see if that connects and let us know.
    Cheers,
    Harry
    http://dbaharrison.blogspot.com

  • Loading and with error message :COLLECTION in SOURCE SYSTEM ENDED

    Hi,
    Facing problem with master data object while loading and with error message :COLLECTION in SOURCE SYSTEM ENDED
    This load is getting failed every day. It is a full load and records are getting transferered and added.
    when we check in details tab in RSMO all data packets in processing is green but in extraction some of the data selection scheduled are in yellow.We are changing QM status to green as records are added.
    Version i am using is BW 3.5
    Please let me know what will be the problem???
    Thanks,
    Edited by: lokesh thonsyd on Feb 18, 2009 8:55 AM

    First try to find out the reason for the load failure. Once you fix this, do a manual run of the infopackage and when successful you can continue with the rest of process chain.
    Sometimes, it doesn't help to just set a request to green status in order to run the process chain from that step on to the end.
    You need to set the failed request/step to green in the database as well as you need to raise the event that will force the process chain to run to the end from the next request/step on.
    Therefore you need to open the messages of a failed step by right clicking on it and selecting 'display messages'.
    In the opened popup click on the tab 'Chain'.
    In a parallel session goto transaction se16 for table rspcprocesslog and display the entries with the following selections:
    1. copy the variant from the popup to the variante of table rspcprocesslog
    2. copy the instance from the popup to the instance of table rspcprocesslog
    3. copy the start date from the popup to the batchdate of table rspcprocesslog
    Press F8 to display the entries of table rspcprocesslog.
    Now open another session and goto transaction se37. Enter RSPC_PROCESS_FINISH as the name of the function module and run the fm in test mode.
    Now copy the entries of table rspcprocesslog to the input parameters of the function module like described as follows:
    1. rspcprocesslog-log_id -> i_logid
    2. rspcprocesslog-type -> i_type
    3. rspcprocesslog-variante -> i_variant
    4. rspcprocesslog-instance -> i_instance
    5. enter 'G' for parameter i_state (sets the status to green).
    Now press F8 to run the fm.
    Now the actual process will be set to green and the following process in the chain will be started and the chain can run to the end.

  • Hello, I have a problem with my iphone 4 battery, it looses 20% over the night with wifi on and without receiving any phone call or notification. It also uses 1 or 2% each time I check my iphone even if it is just to check up my messages. Is it normal?

    Hello, I have a problem with my iphone 4 battery, it looses 20% over the night with wifi on and without receiving any phone call or notification. It also uses 1 or 2% each time I check my iphone even if it is just to check up my messages. Is it normal? Please someone give me a solution

    Yes this is fairly normal. When you have wifi on the phone, it drains the battery life of the device.
    Here is an article that has some tips that you can follow so you can modify the settings on your device to extend it's battery life to the fullest.
    http://www.apple.com/batteries/iphone.html

Maybe you are looking for

  • Fontd process causing Mac to lock up for minutes at a time

    Here is a problem and also the solution, (in case you have the same problem): My Mac (running OS X Lion) was exhibiting a problem whereby it paused for minutes at a time; the mouse moved, but no applications could respond (and they all showed the spi

  • How to create select-options in module pool program

    Hi i am structed at this point could you please tell me how to create select-options in module pool program

  • ListView changing style

    Hi, i trying to change the colors of the ListView. First of all i defined a default list-view styleclass for selection of the elements in the list. .list-view:focused .list-cell:filled:selected, .list-view:focused .list-cell:filled:selected:hover {  

  • Error Installing Illustator Trial?

    Okay, when I first installed the CS5 trial of Illustrator, the files didn't download correctly, so I deleted EVERYTHING that had to do with illustrator, all of the files etc., so I could restart the download and installation process. Now, when I go b

  • Hiding Buttons in FPM

    Hi All I am new to FPM. I added some buttons like Save, Send for Approval etc. to standard toolbar where Next, Privious buttons come. Now depending on some validations i want to Enable/Disable, Visible/Invisible these buttons. Plz guide me. Thanks in