Capacity Planning CM01

Hello Experts,
The required hours of a production order are the actual hours and not the remaining hours. So if the order has 8 hours and there is already 6 hours booked, I want to see the remaining 2 hours and not the complete 8 hours. How to do that? I have tried a lot off things but donu2019t get the result that I want?
Mukesh

Not clear how you have booked 6 hours out of 8. You mean dispatched? Ot they are in different operations and you have dispatched the first ? Or you have confirmed 6 hours as partial confirmation in an operation having 8 hours as planned time ?

Similar Messages

  • Plant Maintenance: Capacity planning CM01/ CM07

    Hi
    In capacity planning CM01, the standard sap shows all the maintenance orders which have system status created. But we would like to look at onlly the released pm order in the standard overview list and detailed capacity list. Please let me know if there is way we can configure it.
    Thanks

    Hi Nayan202,
    You could configure desired "selection set" T.code "CSM1" and then assign this to appropriate "Selection Profile" under initial set.
    Hope this helps.
    Shahnawaz

  • Maintenance Work Center : Capacity Planning CM01

    Hello Gurus,
    We are using T-code CM01 to determine the Requirements / RemAvailCap of the Maintenance Work Orders in a given Maintenance Work Center.
    After executing CM01, the detail capacity list contains Not Scheduled orders( CRTD )and  capacity of these not Released orders also taking into consider.
    How to restrict CM01 Order selection based on the work order System status or User status ?
    I found below discussions on SCN but couldn't get precise answere.
    Plant Maintenance: Capacity planning CM01/ CM07
    Configuring profiles in CAPACITY PLANNING (CM07)
    Please help.
    Thanks in Advance
    Ashok M

    There are a few ways:
    Create a new status profile via BS42 and assign the REL status only (see image 1). Then in the CM01 display screen, use menu path: Planning->Selection->Order and enter the status profile created above (see image 2)
    Create a new selection combination via OAP0. In the CM01 display screen, use menu path: Planning->Selection->Combination and enter the selection combination created above (see image 3)
    The above settings can then be defaulted via the various capacity planning profiles.

  • Capacity planning CM01 not displaying PM Order capacity

    Hi experts,
    I have created one order with the work center and defined operations...... but i am not able to see the CAPACITY REQUIREMENTS in the capacity planning (CM01)............
    Please suggest me what should  i do for this.............

    Hi Maheswaran,
    Thanks for the information , in configuration "Capacity Requirement Planning" have been maintained and now i am getting the CAPACITY REQUIREMENTS and CAP. LOAD also .........................but there is one problem i.e. when i am seeing the capacity planning (CM01) , IT IS NOT SHOWING THE VALUES ON THE DAY WHICH IS WORKING actually according to factory calendar FRIDAY and SATURDAY are holiday, but it is showing the value on SATURDAY and not showing the value on THURSDAY that is today........Please see the screen shot also......
    what should i do.......

  • OPU5 settings and Capacity planning-CM01

    Hi All,
    I have a confusion while configuring the settings for scheduling for planned orders in REM environment PE order type, when i select the scheduling and capacity requirements in DS section system shows me capacity requirements in CM01,CM50 reports  and also DS tab in planned order but when i deselect the same check boxes there si no data in CM01, CM02 or CM50,
    If I need to generate the CM01, etc reports in REM environment , then do i need to select DS check boxes also?
    My OPU5 settings are as attached in this case CM01 reports are fine.
    Regards,
    Anupam Sharma

    Hi Anupam,
    Screen shot is missing. Rate based scheduling is fine for REM.
    Create a "Run schedule" planned order and schedule it via rate-based scheduling.
    In transaction OPU5, choose order type PE and the plant you use.
    Choose "Details" and in the field "Scheduling level", set "1 Via rate-based scheduling" and save the change.
    For more information on this visit the following links
    http://help.sap.com/saphelp_47x200/helpdata/en/8a/a58a864adc11d189740000e8322d00/frameset.htm
    Levels of Scheduling - Planning Process - SAP Library
    Regards,
    R.Brahmankar

  • Capacity planning ( CM01 ) across Plants

    Hi all
    I have a scenario where a material can be manufactured across Plants as an example
    Plant1 - Work Center ( WC 1)
    Plant 2 - WC2
    Plant 3 - WC3
    I want to look at capacity across all the 3 work centers at a group level so that if WC1 is overloaded then I can shift my production to WC 2. I want to use a 'pooled' capacity concept. If I use Work center heirarcy then I am restricted to creating a heirarcy at a Plant level.
    Is there a way I can pool capacity of work centers in different plants into one pooled capacity?
    thanks a bunch

    Hello
    1)Using CM50 you will get details capacity load irrespective of plant,just u have to enter the work center  and execute it will display the work center wise capacity detail
    2)Using CM21 transaction enter only work center and execute it will display the planning table with order number details on which date work center is loaded. So manually u can allowcate the operation to the particular work center
    I think this will be helpfull to u

  • Capacity Planning CM01 Question?

    We have a production order schedule for a workcenter over 3 Days.
    The workcenter capacity is 15.74 HR
    When i run CM01 without any Qty confirmed.
    Day 1 has Requirements as 14.24 HR
    Day 2 has 15.7HR
    Day 3 has 15.7 HR
    After i did a confirmation for Qty 1000.
    Day 1 has 13.28 HR
    Day 2 has 14.67 HR
    Day 3 has 14.67 HR
    My questions is why would capacities for Day 2 and Day 3 reduce. All the hours should have been consumed from Day 1 ?

    Please check your order. It must have been scheduled over >= 3 days. Thereby adding capacity requirement over 3 days.
    When you confirm the order, where confirmed order quantity is equivalent to 3 days of your capacity. Thus system reduces the capacity requirement from 1st Day and subsequently from next days also.
    Thanks

  • CM01 / capacity planning / generate graphic automatically ?

    Hello experts,
    we have implemented the capacity planning for our production.
    The processes are working fine.
    But I've got the following requirement to solve:
    Is it possible to generate the graphical views from CM01 every day automatically in background jobs and send them to printers or email-accounts (nice to have)?
    Thanks a lot for your answers.
    Regards
    Markus

    Dear,
    Yes it is possible to generate the graphical views from CM01go toGraphic--standard overview.
    But automatic in background it is not possible.
    Hope clear to you.
    Regards,
    R.Brahmankar

  • Maintaining work center list in Capacity Planning: Selection List in CM01

    Hi,
    Where can find the config route in SPRO for maintain work center into the Capacity Planning: Selection List in CM01?
    Thanks a lot!
    Min

    Mandy,
    Couple of combinations you should check,
    1. First try to identify "Selection Profile" which is used. In "CM01" go to menu Planning->Profiles->Selection Profile.
    2.Check the defination of this profile using transaction "OPA2". Here you need to look for "Work center Set" which is assigned.
    3. Now look at the defination of the workcenter set using transaction "CMS3", here is were we define as how the list is to be fetched.
    Hope this helps....Reward your points and close the thread if so,
    Regards,
    Prasobh

  • Planning Capacity using CM01 and CM07 transaction

    Hi,
    there are two kinds of sales order in our company: the "confirmed" order sales and the "not confirmed" order sales. The both we need to plan in PS and need use the factory capacity. But when we need to analyze the capacity planning of these projects, it's interesting if we can separates both types of projects, the "confirmed" and the "not confirmed project". And we have to change the projects from "not confirmed" to "confirmed" when a costumers really confirmed a sale. The input in CM07 transaction that I use is the work center.
    I think this case is very common in the companies since there are situations that it's necessary to use the factory forces even a order sales is not confirmed but probably is going to. Than we need to change this project to "confirmed" and is going to show us in CM07 as a confirmed project.
    Thanks,
    Tiago

    Try this function module,
    CLOI_WC_CAPACITY_READ  Similarly
    Please search in SE37 using f4 by giving the capacity in the description field and search.
    there are many function modules are listed for capacity related one , then try  giving your input value and find the output you are expecting...
    Thanks.

  • Machine capacity planning and efficency

    Dear Guru,
    I have number of machines and i want there individual capacity and efficency can we see that by any report or any tcode to see all capacity of machine.What is capacity leveling.
    Is thee any configuration for capacity planning.
    Thanks in advance

    Hi, the following configuration steps involved in the capacity planning: SPRO --> IMG --> PRODUCTION --> CAPACITY REQUIREMENT PLANNING Capacity Requirements Planning: 1) Define time units 2) Define Capacity Category 3) Set up Capacity Planner. 4) Define parameters 5) Define Standard value key. 6) Define Move time matrix. 7) Define Setup matrix. 8) Define Control Key. 9) Define Shift Sequence. 10) Define Key for performance efficiency rate. 11) Define Formula parameters. 12) Specify Scheduling type. 13) Set up Production scheduler group 14) Select Automatically. 15) Define Scheduling parameters for Production orders 16) Define Scheduling parameters for networks. 17) Define Reduction Strategies planned/ production orders. 18) Define Reduction Strategies for network/process orders. 19) Define Control Profile. 20) Define Selection profile. 21) Define time profile. 22) Define Evaluation profile. 23) Define Strategy Profile. You can follow these above configuration steps in capacity planning Yes you need to active your all work center for the finite scheduling at the bottom of capacity view. Use all standard SAP configurations, Capacity Leveling Profile. Define time profile in OPD2. Define the strategy profile in OPDB Define the Overall profiles in OPD0. Then only you need to to active your all work center for the finite scheduling at the bottom of capacity view in work center.(CR02) Then run MRP with scheduling- 2 Lead time scheduling and capacity planning.(MD02) You will get your capacity requirement in CM01, or CM25/CM21. In rem you can use MF50. -
    OR refer below steps Capacity Planning Evaluation: Use this procedure to Evaluate the Capacity of a Work Center (Resource). The same transaction will be used for finding out the Capacity Overload on the Work Center Select Logistics -> Production -> Capacity Planning -> Evaluation ->Work Center View ->Load and go to the Capacity Planning Selection screen (CM01) Through capacity planning : Standard overview :System will show week wise overload in Red Color. If there is no overload then system will show in the normal color. Date wise Capacity can be overviewed. If there were capacity overload, system would show with Red Color indication and Percentage overload can be viewed. Through capacity planning : Standard overview: Details: Date wise, planned process order wise capacity requirement. Through capacity planning : Standard overview: Graphical: Yellow Color indicates capacity lying un-used. Red Color Bars is the indication for Capacity Overload and Blue Color Bars indicate for Capacity available Use this procedure to Level / Schedule the Capacity of a Work Center Capacity Planning - Levelling/Scheduling: Select Logistics ->Production->Capacity Planning -> Levelling -> Work Center View and go to the Planning Table (Graphical) screen (CM21) Key Points u2022 This would be used for Shop floor production scheduling u2022 Capacity Scheduling is mandatory for correct results of Master Production Schedule and Material Requirement Planning For settings: Define formulas for resources: (OP54) IMG -> Production Planning For Process Industries -> Master Data ->Resource->Capacity requirements planning->Formulas for resources->Define formulas for resources. For formula parameters for Resource/workcentre:(OP51) IMG -> Production Planning For Process Industries -> Master Data ->Resource->Capacity requirements planning->Formulas for resources->Define formula parameters for resources-> Standard Value u2013 Define Parameters (OP7B) IMG -> Production Planning For Process Industries -> Master Data ->Resource-> General Data -> Standard value -> Define Parameters Define standard value key(OP19) IMG -> Production Planning For Process Industries -> Master Data ->Resource-> General Data -> Standard value -> Define Standard Value First configure the below settings in the capacity Planning. 1) Define time units Path : SPRO ->Production-> Capacity Requirements planning ->Master Data-> Define Time units (OPCF) 2) Define Capacity Category Path : SPRO ->Production ->Capacity Requirements planning->Master Data-> Capacity Data ->Define Capacity category. 3) Set up Capacity Planner. Path : SPRO ->Production ->Capacity Requirements planning -> Master Data->Capacity Data -> Set up Capacity Planner 4) Define parameters Path : SPRO->Production ->Capacity Requirements planning -> Master Data ->Work Center Data->Standard value ->Define Parameters (OP7B) 5)Define Move time matrix. Path : SPRO -> Production-> Capacity Requirements Planning -> Master Data-> Work Center Data -> Define Move time Matrix (OPCN) 6) Define Setup matrix. Path : SPRO -> Production ->Capacity Requirements Planning -> Master Data -> Routing data -> Define Setup Time Matrix 7)Define Control Key. Path : SPRO-> Production-> Capacity Requirements Planning -> Master Data ->Routing data -> Define Control Key(OPCG) 8) Define Shift Sequence. Path : SPRO -> Production-> Capacity Requirements Planning -> Operations -> Define Shift Sequences (OP4A) 9) Define Key for performance efficiency rate. Path : SPRO-> Production -> Capacity Requirements Planning -> Operations-> Available Capacity-> Define Key Performance Efficiency Rate (OPDU) 11) Specify Scheduling type. Path : SPRO ->Production ->Capacity requirements Planning->Operations->Scheduling ->Specify Scheduling Type (OPJN) 12) Set up Production scheduler group. Path : SPRO ->Production->Capacity requirements Planning -> Operations -> Scheduling -> Set up Production Scheduler Group (OPCH) 13) Select Automatically. Path : SPRO -> Production -> Capacity Requirements Planning ->Operations->Scheduling ->Task List Type-> Select Automatically (OPJF) 14) Define Scheduling parameters for Production orders. Path : SPRO -> Production ->Capacity Requirements Planning-> Operations->Scheduling -> Define Scheduling Parameters for Production orders (OPU3) 15) Define Reduction Strategies planned/ production orders. Spro-> Production->Capacity reqirements planning->operations->Scheduling->Reduction strategies->Define reduction strategies planned-/production order 16) Define Reduction Strategies for network/process orders. Spro-> Production->Capacity reqirements planning->operations->Scheduling->Reduction strategies-> Define reduction strategies for network/process order 17) Define Selection profile. Spro->Production->Capacity requirements Planning->Evalution->Profiles-> Define selection profiles Hope clear to u. Regards Alok

  • Any good table for Capacity Planning?

    HI all,
    Is there any table for capacity planning?
    we want to do some development to get capacity requirements data for each work center, don't like using CM01.
    Thanks!
    Harvey

    Dear
    Please find below SAP tables for CRP :
    CRHD         Workcenter Header Data
    CRCA         Workcenter Capacity Allocation
    CRCO         Workcenter Cost Center Assignment
    CRHH          Hierarchy Header
    CRHS           Hierarchy Structure
    CRTX          Workcenter Text
    KAKO         Capacity Header
    KAZY          Intervals of Capacity
    Regards
    JH

  • Tables for capacity planning?

    HI all,
    Is there any table for capacity planning?
    we want to do some development to get capacity requirements data for each work center, don't like using CM01.
    Thanks!
    Harvey

    >
    harvey wu wrote:
    > HI all,
    >
    > Is there any table for capacity planning?
    > we want to do some development to get capacity requirements data for each work center, don't like using CM01.
    > Thanks!
    >
    > Harvey
    Hi Harvey,
    Kindly check if the Below tables satisfy ur requriement
    KBED      Capacity Requirements Records
    KBEZ      Add. data for table KBED (for indiv. capacities/sp
    KBKO      Header Record for Capacity Requirements
    Reg
    Dsk

  • Capacity planning at Planned order level

    Dear All,
                      In my current scenario i'm able to see load of process orders against the workcenter in CM01. My requirement is to do capacity levelling at the planned order level.
             I have created Production version also & attached to the planned order. Still in CM01  no load or planned order is shown on workcenter.
    when i convert it into process order then it shows load / process order.
    pl.let me know how i can do the capacity planning at planned order level.
    Thanx & regards,
    dev

    Hi,
                       In MD12 when click on Go to > Capacity Levelling >
    Error Message : No work centers with capacity requirements were found
    I have given formula : SAP006 in capacity & Relevant to finite schedulling indicator is also active.
    what may be the cause ?
    thanx & regards,
    dev

  • Capacity planning issue

    Dear all
    My customer has two actor types: project managers PM and 7 work center managers WCM, with strong antithesis: PM looks at project quality and productivity; WCM looks at his resources capacity planning.
    Every PM defines wbs basic start / finish dates with appropriate, large and comfortable time lag. Into this time lag, during the capacity planning, the WCMs can set definitive activity start / finish dates, by their needs (and with user status communicates to PM the happened choice) .
    The generic project is composed of more wbs elements and 7 networks: all activities of a generic network are assigned to only one work center. Every lowest wbs element has only one activity.
    Every PM plans dates (large and comfortable) and efforts on network activities; schedules via bottom up and copies wbs scheduled dates on basic dates. After, CP sets the top down scenario and save the project. In IMG, network profile, the type of checking during top-down time scheduling is u201CEu201D:  exit with error (transaction code OPUU).
    Every WCM using transaction code CM01 doesnu2019t see the WBS constrains. So doesnu2019t know the wbs dates range. Moreover the WCMs donu2019t like a dashboard like CM01 because it is not user friendly. They prefer a graphical dashboard. 
    My personal idea to resolve this issue is use transaction code CM21 or similar with the display of wbs time lag. Is it possible?
    Is there anyone who could help me, please? I am also interested in other technical solution.
    Thanks in advance.
    Salvo50

    Venky,
    1) Sales order when enter in the system can perform the capacity availability check ?
    Not in ECC/R/3.  However, in APO this is possible.
    2) The delivery dates & confirmation in the sales order is on what basis?
    Depends on how you have configured your availability check.  There are a number of possibilities.  Many companies confirm MTS orders to Total Replenishment Lead time in the Material master.  Other companies leave the orders unconfirmed until Planning has created supply elements (production orders).  
    As far as the delivery date is concerned, it can also start with the confirmed material availability date as calculated by ATP, and then additionally schedule in the warehouse pick-pack-load times, and route transit time (the time it takes to move the shipment from your loading dock to the customer's location.
    In 'Assemble to order' (a special version of Make To Order) it is possible to confirm to the scheduling time of the supporting Finished goods production orders combined with the availability of the components of the FG production order.
    In R/3, some companies will confirm the MTS sales order to a date that is farther into the future than the actual estimated process time including capacity backlog.  Then, they run MRP to create planned orders.  Then, they run Capacity leveling.  Then, they run BackOrderProcessing (rescheduling) of the sales orders to re-confirm to the planned or production orders that have been capacity leveled.  In this way, Sales orders are indirectly confirmed to capacity.
    Consult with your local SD and PP ATP experts to discover the options available.
    Rgds,
    DB49
    Edited by: Dogboy49 on Jan 6, 2010 10:37 PM

Maybe you are looking for

  • How do I copy a photo from the internet to iPhoto library?

    I am a new Mac user. Love it so far! I am trying to drag and drop a photo from the internet into my iPhoto library. I guess I am doing it wrong. Suggestions? Thanks so much

  • OSX Lion & Bootcamp

    Updated to OSX Lion. Startup on MAC Side does not see Bootcamp Partition. In Disk Utility can see Bootcamp Partition, but cannot mount it. Reboot holding OPTION key boots fine to windows. Errors out in MAC side triing to start Bootcamp partition in V

  • EP 6.0 SP2 MSS ITS Logout

    We have implemented MSS in an EP 6.0 SP landscape.  There are some aspects of MSS that still use ITS, even in the portal.  I am having some trouble closing the ITS browser window when a users launches an ITS session from MSS.  The exiturl is working

  • Adaptor engine is yellow in cache connectivity test

    hi all, in cache connectivity test the adaptor engine status is yellow. how can i resolve this. regards, KRUSHI

  • Can apple replace my iphone if it fell into water

    can apple replace my iphone if it fell into water