I need an information about capacity requirement reduction in CRP.
During production process I confirm, with CO11N transaction, only time
(setup and machine) but without quantity. The quantity is confirm when
each operation is finish.
Can the CRP reduce the requirements capacity (for processing formula)
after each confirmation without quantity (only machine time)
declaration for processing formula?
I have tested but without quantity confirm the system didnu2019t reduce
the capacity requirements. These is a good solution? Do we have to
modify the setting in work centre?
Thank you in advanced for your support.
Best regards.

Dear,
You can do the capacity levelling in CM25 else
Capacity requirement reduction only possible if you active TECO the order in CO02FunctionRestrict processing--Techenical Complated. After teco also system will allow you to do the confirmation.
Please rfer this also,
http://help.sap.com/saphelp_47x200/helpdata/EN/8a/a586964adc11d189740000e8322d00/frameset.htm
Regards,
R.Brahmankar

Similar Messages

  • How to calculate the Remaining capacity requirement in SAP Production Planning?

    Hi SAP Guru's,
    I would like to make report on Work center capacity with Remaining capacity requirement, available Capacity and Remaining available capacity requirements.
    Can please let me know the Transparent tables for below Fields?
    BEDAKT: Capacity Consumption Rest
    OUTPUTLEN: Capacity Consumption Offer
    SLIBELAS: Capacity load and
    SLIDELTA: Capacity Unused.
    Could you please help me accordingly
    Regards
    Bhupal

    Wrong space. Please move this to BW area.

  • Function Module to get a work center's capacity requirements (load) within a given period

    Hi all experts,
    Currently I’m doing a capacity summary report similar to CM01, but with a summarized capacity availability and loading for a period.
    Selection Parameters: Work center range from and to, Period from and to
    List Format: Work Center, Avail Capacity, Loaded Capacity, Free Capacity, Load %
    I have found a standard function module (FM) to get work center's available capacity for a period, but still facing the challenge to find a FM to get a work center’s capacity requirements (load) in a period.
    I have read through all the related threads from the web, and tested the recommended FMs, but still cannot get a right result.
    Please help to provide some leads for a FM or the logic.
    Best Regards
    Philip

    Hello Philip
    The following function modules should be useful:
       - CY_PRIMARY_SELECTION            - Function module for selection of orders for the work center
       - CY_SECONDARY_SELECTION          - Check for additional criteria
       - CR_CAPACITY_AVAILABLE_PERIODS   - Reads the available capacity from work center
       - HR_PERSON_READ_TIME_INFO        - Reads the available capacity from person (modification)
       - CY_GET_PART_CAPACITY            - used only for the first period to read backlog
       - CY_LOAD_DISTRIBUTION            - Distribution key
    Please observe that these are simple function modules, not BAPIs, That means, they were developed to be used on the SAP internal programs and they are not supported by SAP when used in custom programs.
    BR
    Caetano

  • Function module to calculate capacity requirements of production order

    HI
    Hav a requirement to calculate capacity requirement  for production orders like we see in cm50... does anyone know a function module to calculate capacity requirement?

    Hi All,
    Just to reopen this issue, even I am looking for a similar functionality.
    To reinstate the requirement:
    I want to find shifts and corresponding capacities for a work center. These details are obtained from CR03 and CR13 transaction.
    If possible do let me know Function module or tables for the same.
    Debs

  • Tables for PDS modes and capacity requirements

    Does anyone  know which tables store the Mode and Capacity Requirement data for SNP PDSs?  In particular I am looking for the Mode Duration and Capacity Requirement Bucket Resource Consumption fields. 
    Thanks,
    Laurence.

    Thanks Nanda,
    I am unable to find this BAPI on our system  (we are on SCM 4.1).  Do you know the tables that store SNP PDS Mode and Capacity Requirement data?
    Regards,
    Laurence.

  • Error in SAP APO Inbound: capacity requirement is invalid

    Hi Experts
    I am getting an error in APO Inbound in APO queue manager. The error text reads " Capacity requirement is invalid".
    I checked for all the resources whether they have validity and also checked for mismatching control key. But these fields are allright in both ECC and APO system.
    I checked note # 924562, but i am still not able to solve this issue.
    Can you please suggest how should i debug this error?
    Many Thanks!!
    Regards
    Mansi

    Hi Mansi,
    Were you able to replicate the issue on which activity triggers this CIF error?
    I remember a similar error which happened when converting planned order to production order where it was giving error"“Bucket capacity requirement has an invalid value” .
    SAP had suggested to implement note 1381483 to fix this.
    Thanks
    Ajay

  • Remaining capacity requirements scheduled for operation in Planned Order

    Hi all,
    I'm workig with planned orders, and I need the "Remaining capacity requirements scheduled for operation" data to list it in a Z Report, but I don't know how to get it.
    You can see the info in the "Detail Scheduling" of the planned order in MD13.
    Anyone knows how to get the info? Any table or any FM to get it?
    Points will be given for helping
    Thanks in advance!

    Did you ever find out where the planned order capacity information lives?  I can find the production capacity information in table KBEZ, but it appears that there is no planned order info there.
    Thanks,
    Matthew Bruckner

  • Requirement Reduction integration model

    Hi,
    Can someone explain in layman terms with an example what happens when "requirment reduction" object is CIF'd alongwith Planned independent Requirements (to APO). Why should/would someone create an integration model for requirement reduction when integration models exist for PIRs and Sales Orders consumption settings are taking care of netting (as applicable/set). we have funtionalities for consumption and reduction of sales orders from PIR's e.g in APO and ECC.
    Thanks
    Lok

    Hello,
    I would like to see a clear explanation to that as well.
    From what I understand reading about this topic it is to have additional control over this by applying own logic in CIF.
    Quoting the SAP documents:
    <<If you set this indicator, you can create integration models specifically for
    the Requirements Reduction filter object type (type T_FCC).
    The filtering takes place on the basis of active integration models for
    requirements reduction. In this case, you can control in greater detail for
    which material-plant combinations a requirements reduction should be transferred
    to SAP APO.>>
    For normal cases this is not needed. Perhaps it is needed if you want certain shipments to other plants to reduce forecast. E.g. mixed MRP.
    Regards,
    Tor

  • Repetitive manufacturing - CM01 Capacity Requirement

    Hi All,
    I configured repetitive manufacturing process with lead time scheduling.
    Conf. at OPU5 is set as below
    Rate.plng horzn  - 999
    SelID:rate plng -  02
    Scheduling u2013 X (selected)
    Generate Capacity reqs. u2013 X (selected)
    Scheduling level  - Via Rate based scheduling
    Adjust dates u2013 Do not adjust basic dates, dep reqmt to operation dates 
    For capacity scheduling u2013 Always basic dates, dep. Reqmt to operation dates 
    I run MRP (MD02) with option - Lead Time Scheduling and Capacity Planning
    I could see required capacity is calculated at tab u201CProduction Ratesu201D & also in menu Planned order >> Goto >>Capacity leveling.
    we are unable to view Capacity requirement in CM01 transaction & in planning table MF50.
    Regards

    Hi,
    Select the correct profile in CM01.  Menu->Planning->Profiles
    Thanks

  • Requirement class- consumtion indicator and requirement reduction indicator

    hi
    in DEMAND MANAGEMENT WE CAN SET REQUIREMENT CLASS
    can any one elobrate whats the difference between the consumption indicator and requirement reduction indicator.
    in help i dint get any explanation regarding the indicators which we need to se at requirement class
    in siemens material i got the diff on between but i couldnt understood
    can any experts elobrate the issue.
    the explantion is like that
    consmtion is not the only integartion between actual sales requirements and PIR. reduction of the PIR will also takes place asa result of the sales requirement.
    Reduction is the process of actual reducing the value of PIR and its stored in the system. where as  during  consumtion the actual value stored was not changed, only the quantity passed to planning was lowerd.
    can any body elobrate the above statement
    regards
    sasikanth

    HI
    Consumption indicator
    The PIR are consumed with respectve to sales order
    requirement reduction indicator
    make-to-stock production is reduced by customer requirements which are planned as sale from stock
    -ashok

  • Putting a production order on hold, removing capacity requirement

    Hi,
    I have a need to temporarily remove capacity requirements from production order because there is situation on the shop floor that caused the particular order unable to move ahead.
    Capacity requirement shall be re-instated when the order specific production issue is cleared.
    Is there a way to update a production order to release capacity requirement yet allowing changes to production order routing? I tried "LOCK" production orders but that will not allow me to change anything in the order.
    Can I set up a user status + user exit to remove the capacity requirement? If so, how to?
    Thanks all in advance!!!
    Regards.

    Hi
    Capacity requirement can be deleted when the following functions are carried out.
    1.The production order is set to Technically Complete.
    2. The deletion flag is set for the production order
    3.The production order is locked
    4.The indicator capacity  requirement in the procdution order is reset  and order is rescheduled
    5.The capacity requirement is reset with fucntions -----Availability check---reset cap stock
    Regards,
    Sadan

  • Capacity Requirement

    Hi
    After creating Production order. In Control data tab what is the setting so that the calculate capacity requirement tick will come automatically.
    Regards,
    Anand

    Hi All,
    Nice to see the response for this post. All 4  replies are posted at the  same time. Though the solution was the same, I like the attitude of the Forum members for their prompt reply for the posts & sharing their knowledge & experience.
    Keep it up dear members. Special thanks to Rajesha vittal, Prasobh Karunakaran,YM Reddy,Krishna Mohan,Pradeep,Mangal,Nandakumar,Jaganathan Saravanan & Dharma for their active contributions.
    Dear New members please close the threads if you are satisfied by the replies & reward the posts suitably, which will help all members to post prompt replies for our queries.
    Have a nice day!
    Regards,
    Senthilkumar

  • Capacity requirement and scheduling process

    Hi Experts,
      please explain me how capacity requirement and scheduling (please explain with configuration  settings)    will help in SAP PP.
    Regards,
    Bhaskar.
    Edited by: basi123 on Nov 7, 2011 1:12 PM

    Dear
    Capacity Requirement Are those Which is used  For Operation And Calculate the Time with help of Dervied Formulas
    for instance i take an Example To Describe so that u get clear Picture
    Ex: Suppose i have machine Drilling u assume that Drilling machine as a one capacity under capacity catergory
    here to operate this i need to make my machine set up first then machine time i need to arrange a labour
    so total i required Setup Machine Labour so Here in sap we define a standard value key with all these combination and there we will assign formula for HOW Much to Produce so on...... and in turn it is assigned to control key to perform all the Actions.....
    Scheduling : Scheduling is Nothing but to sechedule Right time at Right job This helps in shop floor to over come overload on machines.scheduling used in
    scheduling for Production orders
    scheduling for Planned Orders
    scheduling for Plant maintainence Order
    Configuration :
    1. Capacity Requirenemnt ;
    SPRO>>>production >>> capacity requirement >>>> Define capacity catergory
    2.Capcity planner
    3.Define parameters OP7B
    4.Assign this to OPCM
    Scehduling
    1. go to OPU3
    With regards
    Pushpalas

  • Capacity requirement showing up in previous month in RCCP

    Hi Experts,
                     I am doing RCCP through MC88. But when i am giving the sales quantity in January and generating a synchronous production quantity, the capacity requirement and load are shown in the month of December instead of in January.
                     How can i get the requirement and load in January, please suggest.
    Regards
    Sm.

    Hi Jiaul,
                I cannot find a provision to change the profile dynamically from MC88 screen. This is possible in my understanding in capacity levelling/planning screens like CM38/CM01, etc.
                But even in such screens the same problem remains. For example when i did LTP for this material with PIRs in Feb 2011, the capacity requirements in CM38 appeared from current period that is from 09.12.10, though my planning scenario was valid from 01.01.2011. I changed the period and evaluation period dynamically from  the CM 38 screen, but that did not solve the problem as the requirement and load which was wronly showing up in Jan instead of Feb 2011 ( just as it happened in RCCP) merely vanished from the output and now i have the available capacity in Feb 2011 showing up but without any capacity requirement or load in the month.
    Regards
    Sm.
    Edited by: Sm on Dec 9, 2010 1:02 PM

  • Capacity requirement in workcenter.

    Hi all
    Please explain about  setting for determining actual capacity requirements in workcenter.
    Also explain how it is useful?

    Hi,
    Capacity planning is divided into two components in SAP
    1. capacity leveling
    2.capacity Evaluation
    Capacity Leveling
      Following elements will create Capacity requirements,
      1. Planned order with Lead time scheduling
      2. production orders
    Following elements will be used to calculate  required capacity  and Capacity Percentage:( Actual capacity calculation)
    1. Work center formula
    2. Routing Base qty.,activity times
    3. Number of Individual capacity
    4. production order/ Planned order Order Qty
    Capacity Evaluation
    Capacity evaluation is fully controlled by setting maintained in IMG 'Overall profile'
    This is Just an overview about CRP.
    Regards,
    Velmurugan S

Maybe you are looking for

  • Unable to convert the sender service to an ALE logical system... Urgent..!!

    Hi, Im DOing File to Idoc scenario. Firstly i check LS name exist or not in BS.. then i found its not maintained. I edited the BS and provided the required LS name. and the same has been tested in ID Business System -> Service -> Adapter Specific Ide

  • Apple wired keyboard - certain keys not working with shift

    I treated myself to a new Apple wired keyboard MB110B/A for my mac mini. My previous keyboard worked fine, however the new keyboard causes the computer to enter the Hardware Test mode every time the computer is restarted. The computer only starts nor

  • What is the best way of reading a browser cookie and writing to sessionbean

    Hi, So far I have happily written a cookie in the visting browser and happily can display with a browser using a servlet println etc But what is the best way to take that value and put it into say getSessionBean1().setCookieValue("Cookievalue"); I wa

  • Keep a button set to Hover once clicked

    Hi, I was wondering if there was a quick way to set a button to it's hover state once clicked? I know how to do this by having it be a movie clip and changing its time line position onRollOver. onRollOut and onRelease. I am just trying to do this qui

  • Greying exchange rate fixed

    Dear Gurus I want to make exchange rate fixed field grey of the delievery/invoice tab. please tell me the procedure to grey this field of the po. Regards