Capacity requirements generation at phase level only

Hi gurus,
Is there any setting to get capacity requirements generation at phase level only?
At present in my system iam getting for both operation and phase. Since we do confirmation at phase level only, practically system should not generate capacity requirement at both levels.
Please throw some light on this.
Regards
Venkat V

Dear ,
I think you are working in a PP-PI system .There are operation control key which can be assinged in the master recipe which will not carry out Capcity Requirement Planning .Goto -spro-define operation control key -Check the PP-PI related Control key like PI01-select that -goto detail information -Check if the Capacity requirement check box  should not be marked .Assing that control key which will not allow to do the Capcity Requirement check .
Or else , in master recipe you can choose the control key which does not have CRP activated -go details information befor assing the same
Hope this is clear to u
Regards
JH

Similar Messages

  • Level/Generation of members with only one child

    Hello!I have a little problem with generations and levels in an outline like this: Dimension Member1 Member1a Member1b Member2 Member2a Member3 Member3a Member3b"Member2" has only the child "Member2a". All other members in generation 2 have more than one member. The function @CURGEN(Dimension) shows for all these members the value 2, but for the member "Member2" it shows generation 3 and level 0. In my opinion "Member2" is generation 2 and level 1.Who is wrong? Essbase? Thanks for your support!Andreas

    This is the classic 'implied share' gotcha. When a member has only one child, Essbase by default sets up the child as a shared member to the parent. I believe this was an attempt to save space etc. but it causes problems in @ functions and partitions (and maybe elsewhere!). You need to tag the parent (level 1) member as 'never share'. This should solve it.

  • Capacity requirement reduction

    I need an information about capacity requirement reduction in CRP.
    During production process I confirm, with CO11N transaction, only time
    (setup and machine) but without quantity. The quantity is confirm when
    each operation is finish.
    Can the CRP reduce the requirements capacity (for processing formula)
    after each confirmation without quantity (only machine time)
    declaration for processing formula?
    I have tested but without quantity confirm the system didnu2019t reduce
    the capacity requirements. These is a good solution? Do we have to
    modify the setting in work centre?
    Thank you in advanced for your support.
    Best regards.

    Dear,
    You can do the capacity levelling in CM25 else
    Capacity requirement reduction only possible if you active TECO the order in CO02FunctionRestrict processing--Techenical Complated. After teco also system will allow you to do the confirmation.
    Please rfer this also,
    http://help.sap.com/saphelp_47x200/helpdata/EN/8a/a586964adc11d189740000e8322d00/frameset.htm
    Regards,
    R.Brahmankar

  • Restrict Collaboration tab page view at project definition level only

    Hi,
    I have a requirement where the cProjects user should be able to view the Collaboration tab page at project definition level only & not at the phase, checklist, checklist item or task level. This is to prevent the user from assigning/creating collaborations at a level other than the project definition.
    Is there a way out to get this setting done & how?
    Regards
    Deepak

    My proposal is that you modify the logic in
    CL_DPR_BSP_S_PRO_TYPE
    Method SHOW_COLLABORATIONS
    a small I condition here can control the tab view hide/unhide feature.
    or modify the BSP page and take out the complete call
    in
    phaDetail.bsp
    tskDetail.bsp
    etc.
    Message was edited by: Björn Kettner

  • MD02 - Capacity Requirement Plan for External Procurement Material

    Hi, I have the following requirements.
    MRP Scheduling is getting executed material level (material no, plant) with scheduling type 2 which means lead time scheduling using MD02 Transaction Code. This is works fine for the Inhouse Product. In order to achieve lead time the functional team has maintained the necessary routing/workcenter configs.
    The business needs the same functionality "Capacity requirements calculation" for the external procurement material. Business is willing to maintain routing/workcenter config.
    Currently standard program (MD02) is not considering the Capacity planning for the external Procurement material.
    Could you please suggest is it can be controlled through programming.
    Kindly suggest the function modules for Capacity Planning - materialwise, plantwise.
    Please suggest.
    Thanks
    Giri

    Hi Giri
        I think the requirement is not mentioned clearly. Capacity is required only if the material is assembled/produced in house.
    Anyway try this. Set the Procurement type to X in the MRP views in material master. You might have to define your custom material type so that it does not force the procurement type to F. Try the feature called "Quota arrangement". The idea is to define the material in such a way that it can be procured externally or produced in house. With quota arrangement you can say what % has to be bought and what % to be produced in house. If it is produced in house then you can have capacity requirements.
    Regards
    Pragnesh

  • Query: Cannot extract resource working hours&price at phase level together

    Dear PP Guru,
    I am working on a query to satisfy business requirement: resource working hours - meaning "activity type quantity" (PLPO table field VGW01, 02, 03 ...) together with activity type price at phase level.
    I combined following tables together:
    PLPO --> CRCO --> CSSL --> COST
    Now the issue is: resource hours - meaning "activity type quantity" at phase level cannot be extracted. The reason is that "Object ID" - PLPO table ARBID field is only assigned to Operation level, not Phase level.
    My question are:
    1. I have to go for ABAP development to do such modification to extract resource hours at phase level?
    2. What is the reason that "Object ID" is not assigned at phase level but operation level in PLPO table? Shall I raise a question to SAP to get further detail?
    Many thanks in advance for your prompt feedback!
    Mengyu

    My guess is that the German Locale interfere with the English .Net3.5
    Some info on .net3.5 http://www.microsoft.com/en-us/download/details.aspx?id=22
    ---Additional
    information
    The following information may be relevant for administrators performing deployments of the .NET Framework on to operating systems using non-English locales. This package does not contain localized resources for non-English locales. By default, itdownloads and installs the
    language pack that matches the language of the customer’s operating system. This may not be desired behavior when managing deployments of the .NET Framework. To avoid the automatic download use the following command:
    dotnetfx35setup.exe /lang:enu
    Have you tried to switch to english locale and then install?
    This posting is provided "AS IS" with no warranties or guarantees and confers no rights. Whenever you see a helpful reply, click on Vote As Helpful & click on Proposed As Answer if a post answers your question.

  • Don't create massive capacity requirements

    Dear guru ,
    For a specific order type in OPU3 I have filled that this order type don’t generate capacity requirement.
    I have create many production orders with this order type without generation of capacity
    requirement.
    After one month I have  filled in OPU3 that this order type  generate capacity requirement.
    I have run COHV for creating massive capacity requirements of the actual production orders but if i verify these haven’t capacity requirement.
    I have tried to technically close and open but without positive result.
    Only for new production orders created the system generate capacity requirement.
    It’s right this behaviour ?
    Thanks in advance.

    Solved.
    I must fill Calculate Capacity Requirement Flag in View Control Data of Production Order Header

  • Capacity requirement for long term planning and make to order planning

    hello,
    anybody please guide me.
    my client using make to order scenarion and we are doing regulaly MRP run is MD50 with refernce to sales order.
    sales orders planning will follow for 2 to 3 months.
    at the same time my client wants to do long term planning also. to analize the capacity.
    for that he is creatind planning scenario and multi level planning with MS02 also.
    But the problem is when they are checking capacity requirement in cm38 it is showing only planning scenario load only. my client wants existing load and longterm planning load also. so they can plan the planning is sutibale in existing plan.
    so how can i get both plan in CM 38or is there any other T.code to get that data.
    please suggest me
    Thanks & Regards
    Bhakta

    Hi Pierre and Rajesh,
    When we create the simulation version, you have the possibility to choose the short-term planning. My point of view is, you can use the LTP fonction to do your scheduling for ex the next 3 months.
    I think it's what Pierre did. Am I right ?
    between to scheduling scenario to deliver my customer. With the simulation mode I can do my scheduling + use the MRP simulation to check if the raw material are available or not. Then use the MD04 to do the comparaison (or MS04 to compare between 2 scenario).
    But I found 2 problems :
    First : I don't find the parameters to show in the graphic MFS0, the planed fix order (I can only see the process order)
    Second : When my scheduling is finished, I want to update my operational planning with the simulation version. But I don't want to do article by article : when you have 400 references (raw mat, packaging, finish goods)  it's impossible (same issue like Pierre)
    Have you found a solution for this 2 points ?

  • Function Module to get a work center's capacity requirements (load) within a given period

    Hi all experts,
    Currently I’m doing a capacity summary report similar to CM01, but with a summarized capacity availability and loading for a period.
    Selection Parameters: Work center range from and to, Period from and to
    List Format: Work Center, Avail Capacity, Loaded Capacity, Free Capacity, Load %
    I have found a standard function module (FM) to get work center's available capacity for a period, but still facing the challenge to find a FM to get a work center’s capacity requirements (load) in a period.
    I have read through all the related threads from the web, and tested the recommended FMs, but still cannot get a right result.
    Please help to provide some leads for a FM or the logic.
    Best Regards
    Philip

    Hello Philip
    The following function modules should be useful:
       - CY_PRIMARY_SELECTION            - Function module for selection of orders for the work center
       - CY_SECONDARY_SELECTION          - Check for additional criteria
       - CR_CAPACITY_AVAILABLE_PERIODS   - Reads the available capacity from work center
       - HR_PERSON_READ_TIME_INFO        - Reads the available capacity from person (modification)
       - CY_GET_PART_CAPACITY            - used only for the first period to read backlog
       - CY_LOAD_DISTRIBUTION            - Distribution key
    Please observe that these are simple function modules, not BAPIs, That means, they were developed to be used on the SAP internal programs and they are not supported by SAP when used in custom programs.
    BR
    Caetano

  • Surcharge at the header level only to the customer in the sales document

    Hi guys,
    I have requirement to charge the surcharge at the header level only to the customer in the sales document, the condition type as well as the value should not be distributed to item level
    I have marked the condition as header. But still the value is copied to the item as well,
    If I mark the condition as Group condition, then it distributes the total value to each item in the document according to Qty
    Is there any other way, I could set up through config,
    Regards,
    Rao.

    Hi,
    In T.Code VTFL, check what is maintained for field Pricing Type. If it is B then change it to G or depending on your business select a suitable value.
    This should resolve your issue. Let me know in-case the issue still persisits.
    Regards,
    Rohan Gudavalli

  • Repetitive manufacturing - CM01 Capacity Requirement

    Hi All,
    I configured repetitive manufacturing process with lead time scheduling.
    Conf. at OPU5 is set as below
    Rate.plng horzn  - 999
    SelID:rate plng -  02
    Scheduling u2013 X (selected)
    Generate Capacity reqs. u2013 X (selected)
    Scheduling level  - Via Rate based scheduling
    Adjust dates u2013 Do not adjust basic dates, dep reqmt to operation dates 
    For capacity scheduling u2013 Always basic dates, dep. Reqmt to operation dates 
    I run MRP (MD02) with option - Lead Time Scheduling and Capacity Planning
    I could see required capacity is calculated at tab u201CProduction Ratesu201D & also in menu Planned order >> Goto >>Capacity leveling.
    we are unable to view Capacity requirement in CM01 transaction & in planning table MF50.
    Regards

    Hi,
    Select the correct profile in CM01.  Menu->Planning->Profiles
    Thanks

  • Capacity planning at Planned order level

    Dear All,
                      In my current scenario i'm able to see load of process orders against the workcenter in CM01. My requirement is to do capacity levelling at the planned order level.
             I have created Production version also & attached to the planned order. Still in CM01  no load or planned order is shown on workcenter.
    when i convert it into process order then it shows load / process order.
    pl.let me know how i can do the capacity planning at planned order level.
    Thanx & regards,
    dev

    Hi,
                       In MD12 when click on Go to > Capacity Levelling >
    Error Message : No work centers with capacity requirements were found
    I have given formula : SAP006 in capacity & Relevant to finite schedulling indicator is also active.
    what may be the cause ?
    thanx & regards,
    dev

  • Error message require adminstrator or higher level, already did disk repair

    Hi all,
    I can't seem to install my printer drivers without an error message coming up:
    The program you are trying to install requires admin. or higher level access.
    I have gone to disk utilities and tried to repair disk permissions but it no use. It still keeps coming up.
    I'm logged in as admin and am the only user on my mac. It seemed to happen when I updated to 10.4.4
    My printer stopped working so I did as the instructions said and deleted the printer, but now I can't reinstall the drivers.
    Help please!!!
    powermac g5   Mac OS X (10.4.4)   dual 2.0 pros
    powermac g5   Mac OS X (10.4.4)   dual 2.0 pros

    For questions about ClamXav please visit the ClamXav Forum
    cpflueger wrote:
    I ran ClamXav and it just told me I had 11 errors
    Not sure exactly what you mean by errors. If they show up in your Scan Log, then they almost always involved files that you don't have read access to.
    If they were errors during Definitions Update there will be more in your Update Log and are usually network related. 
    If they were infections then I would need to know the infection name and exact location of the file in order to be able to advise you on those.
    To get detailed infomation on what ClamXav has found, after completing the scan, click in the top pane of the ClamXav window where it shows the Infection / File Name / Status to make sure it's in front and type the key combinations <command>-A, <command>-C (or choose "Select-All", "Copy" from the "Edit" menu) to copy the information to your clipboard, then come back here and type <command>-V or choose "Paste" to show us what was found where.

  • Capacity requirement showing up in previous month in RCCP

    Hi Experts,
                     I am doing RCCP through MC88. But when i am giving the sales quantity in January and generating a synchronous production quantity, the capacity requirement and load are shown in the month of December instead of in January.
                     How can i get the requirement and load in January, please suggest.
    Regards
    Sm.

    Hi Jiaul,
                I cannot find a provision to change the profile dynamically from MC88 screen. This is possible in my understanding in capacity levelling/planning screens like CM38/CM01, etc.
                But even in such screens the same problem remains. For example when i did LTP for this material with PIRs in Feb 2011, the capacity requirements in CM38 appeared from current period that is from 09.12.10, though my planning scenario was valid from 01.01.2011. I changed the period and evaluation period dynamically from  the CM 38 screen, but that did not solve the problem as the requirement and load which was wronly showing up in Jan instead of Feb 2011 ( just as it happened in RCCP) merely vanished from the output and now i have the available capacity in Feb 2011 showing up but without any capacity requirement or load in the month.
    Regards
    Sm.
    Edited by: Sm on Dec 9, 2010 1:02 PM

  • Capacity requirement in workcenter.

    Hi all
    Please explain about  setting for determining actual capacity requirements in workcenter.
    Also explain how it is useful?

    Hi,
    Capacity planning is divided into two components in SAP
    1. capacity leveling
    2.capacity Evaluation
    Capacity Leveling
      Following elements will create Capacity requirements,
      1. Planned order with Lead time scheduling
      2. production orders
    Following elements will be used to calculate  required capacity  and Capacity Percentage:( Actual capacity calculation)
    1. Work center formula
    2. Routing Base qty.,activity times
    3. Number of Individual capacity
    4. production order/ Planned order Order Qty
    Capacity Evaluation
    Capacity evaluation is fully controlled by setting maintained in IMG 'Overall profile'
    This is Just an overview about CRP.
    Regards,
    Velmurugan S

Maybe you are looking for

  • Can't delete attachments in mac mail

    On the mac mail I used to be able to select a mail, then press "Command" button and "M" to delete an attachment (without deleting the whole e-mail, just delete the attachment). But right now, when I try to delete attachments in some e-mails by pressi

  • Do I use Oracle SOA Suite or OSB or both ?

    Hi, I've done some research on the web but still it seems slightly ambiguous to me. If a company has requirements for moderate levels of business services (<100) what is the best Oracle service bus choice?. It feels like OSB and SOA Suite overlap a l

  • Change language of AI CS5

    Is there any possibility to change language of Illustrator CS5? I am getting sick of translating in my head english tutorials to polish words... This is very strange when you are watching exercises and there are totally different commands and names.

  • Zen 6.5 AXT/AOT backward compatability

    Hi, In my environment we've got a few different Zenworks for Desktops versions. Primarily we use Zen Desktop Management 6.5 however some sites are still running ZFD 4.01. We create our snapshots using version 6.5 however if we take those snapshots an

  • Pp order actvity tables

    hello , masters , i am searching of tables related to pp-co in which i can find  production order no, actvity , activity plan quantity , actvity actual quantity, activity text.