     I gave my XI certification exam at the Bangalore Teched'05. I have couple of questions about the post certification process.
         At the end of the test, the message "Congratulations, you have passed the certification exam." appeared. Does this imply that I will be getting a certificate?
I and my collegue got a total score of 70% and 65% respectively , with a minimum individual section score of 55% in every section. Will there be any minimum section cut off for the certification.
         When and how will we be getting the certificate?
thanks,
venky

Hi venkatesh,
<i>
>>"Congratulations, you have passed the certification exam." appeared. Does this imply that I will be getting a certificate?</i>
Definitely, you will be getting.
<i>
>>Will there be any minimum section cut off for the certification.</i>
yes there is. I think it is 50%.
<i>>> When and how will we be getting the certificate?</i>
It will take atleast 3 weeks.
Regards
Suraj

Similar Messages

  • [svn:bz-trunk] 23085: Fix test to explicitly remove an event listener after the test is finished .

    Revision: 23085
    Revision: 23085
    Author:   [email protected]
    Date:     2011-10-21 07:49:33 -0700 (Fri, 21 Oct 2011)
    Log Message:
    Fix test to explicitly remove an event listener after the test is finished. Not doing this was causing the test to throw an RTE.
    Modified Paths:
        blazeds/trunk/qa/apps/qa-regress/testsuites/mxunit/tests/messagingService/security/stream ing-amf/MessagingAuthProSendTest.mxml

    Thanks for the ideas regarding beforeInvoke, Ben.  I will try to check that out.  In my situation, here's essentially how my script is working...
    BeforeSave is invoked.
    Script makes a change to the document, which should be captured in the saved file.
    Document saves.
    Document appears saved for a moment, and then appears unsaved (asterisk in the document title).
    My biggest problem is that this behavior isn't consistent.  I have dozens of users, all running the same script, and the problem only occurs with certain users and at random times. I can move a problematic document from a user's machine to a different machine, and the problem doesn't occur there.  It's very difficult to troubleshoot because I can't reproduce it consistently.

  • How to stop a process chain after the current running process

    Hi experts,
    I try to stop a running process chain, but only at the end of the current process load.
    I try to unscheduled process chain : the job of the current process is killed and the process stop
    I try to execute the programm rspc_process_finsh : same result.
    Actually, I aim at waiting of the current process completion and stop the chain.
    Thanks and regards,
    Bobby

    Hi all,
    Thanks for answer.
    If I resume the situation :
    - Click on Unschedule process chain stop the current process. We have to change the status of the process in Yellow to Red.
    - Go to sm37 to kill the job change the statut in red.
    So there is no way to stop the running of a process chain only after the good or bad end of the last runnning process ?
    Example :
    My chain is running. The process which is running is a DTP loading process. There are 50 packages to load. I decide to click on Unschedule process chain when the package 18 is running.
    If I do that, the loading of package 19 will not start right ?
    So is there a way to wait that the 50 packages are loaded before that the system stop the chain ?
    Thanks in advance,
    Bobby.

  • After the test DB created using cold backup..things to do..

    Dear All,
    I had done Physical cold backup cloning to create the test DB using Production DB.
    After that ,Is anything need to do before give to the application team?
    For say,
    index recreation,
    index re-build,
    valid the invalid objects
    Please help me and input your suggestions.
    Thanks in Advance,
    Regards,
    DB.

    All objects should be fine – no need to rebuild/recompile anything.
    If tables in the production DB contain references to production HTMLs, production server names, production usernames/passwords, etc, they need to be changed or deleted. The DB password should be changed.
    If the production DB has DB links to other production DBs, those DB links have to be redefined.
    If any of the data in the production DB should not be visible to the developers, it should be masked.
    Iordan Iotzov

  • HT3805 I selected 179 photos to be have printed 4 x 6.  The program indicated that they were being processed.  After the completion of that process I get the message that I cannot get a connection.  What gives?  I can connect to the internet for other pro

    I selected 179 photos to be printed 4 x 6.  The program indicated that they were being processed.  At the completion of the processing, I get the message "I can not get a connection".  I am able to connect to the internet for other programs, but not aperture.  What gives???

    Hello thexchicop,
    Thanks for using Apple Support Communities.
    I'm sorry to hear about the difficulties you're experiencing when trying to place your prints in Aperture.  I'd like you to do the steps in this article to help resolve the issue:
    Aperture 3: Book ordering panel turns white when submitting an order
    http://support.apple.com/kb/TS3464
    Take care,
    Alex H.

  • How to change the result status "Failed" after the test to "Passed"

    We make a picture of a LCD screen and look if its all working. Sometimes the LCD screen is working propper but the Step Failed. In case automatic LCD test fails we show the picture from the camera to the user and he can decide if the LCD screen passed or failed. So when the user decide that the screen is working propper we should overwrite the status of the automatic test that in the report and database shows lcd screen test passed. I tried with 
    RunState.SequenceFile.Data.Seq["Check_LCD_V3-0"].M​ain["154 Execute - All Horizontal Segments On"].Result.Status="Passed",
    RunState.SequenceFile.Data.Seq["Check_LCD_V3-0"].M​ain["154 Execute - All Horizontal Segments On"].Result.PassFail="True",
    But in the database the Status of this step is still "Failed"
    What i do wrong?
    Thanks
    Solved!
    Go to Solution.

    Alteschwed wrote:
    We make a picture of a LCD screen and look if its all working. Sometimes the LCD screen is working propper but the Step Failed. In case automatic LCD test fails we show the picture from the camera to the user and he can decide if the LCD screen passed or failed. So when the user decide that the screen is working propper we should overwrite the status of the automatic test that in the report and database shows lcd screen test passed. I tried with 
    RunState.SequenceFile.Data.Seq["Check_LCD_V3-0"].M​ain["154 Execute - All Horizontal Segments On"].Result.Status="Passed",
    RunState.SequenceFile.Data.Seq["Check_LCD_V3-0"].M​ain["154 Execute - All Horizontal Segments On"].Result.PassFail="True",
    But in the database the Status of this step is still "Failed"
    What i do wrong?
    Thanks
    I recommend the following:
    1) Make the automated LCD test an Action step rather than a Pass/Fail step and instead set a local variable to whether the automatic LCD test failed (e.g. Locals.AutomatedLCDFailed).
    2) Create a new Pass/Fail test (using the none adapter) that takes both the local variable and the user's input into account to determine it's pass/fail status (e.g. Set the step's data source to an expression like: !(Locals.AutomatedLCDTestFailed && Locals.UserLCDTestFailed)
    As an alternative to making 1) an Action step you could leave it a pass/fail step and uncheck the step setting on it for "Step failure causes sequence failure". Then you could use the status of that step instead of Locals.AutomatedLCDTestFailed. The one difference is that the automated test will still show up as failed in your report even though the sequence can still be passed. It's somewhat a matter of preference.
    Hope this helps,
    -Doug

  • Job help to regenerate the test plan after test case addition in solar02

    Hi,
    Any job help to regenerate the test plan after the test case addition in the solar02?
    It is very hard to regenerate in the test plan in test plan management, need to select the test case manually every time.
    Rg,
    Karthik

    Hello,
    You can send mail with the status of the test catalog-
    specify a mail system to which Test Workbench test objects send messages to the people responsible
    Please refer the below link for more information:
    http://help.sap.com/saphelp_smehp1/helpdata/en/6a/88370a002911d2bd02080009b4534c/frameset.htm
    Regards,

  • Need to Trigger a Program in ECC after the DSO load has completed

    HI Experts,
    I have scenario where i need to trigger a Program in ECC after the load to DSO has been completed successfully. Basically opposite of the everyday scenario.
    Can i still use the  the RSSM_EVENT_RAISE FM in the program to call the event in ECC.
    If the above is true.Do i need to have code in the program to confirm the DSO has been loaded or can i just have the program (which basically calls the FM RSSM_EVENT_RAISE) appended to the process chain after the DSO Activation?
    Appreciate your advice

    Hi,
    To help future proof your solution, lean towards using the process chain as much as possible.
    A "Green/Success" only link from the DataStore Activation process variant to an ABAP Program process variant will work nicely. It will also still allow your program to be executed by other scenarios (like manually because you want the event raised now without any dependency on the DataStore status).
    SAP now recommends you use the CL_BATCH_EVENT class and it's methods to interact with the system events. Use transaction SE24 to review the methods and parameters available and then use the sample code below to test your solution.
    Here is a starting point for coding that is used within an ABAP Program process variant in a process chain.
    Use transaction SE38 to store this code to be called by the ABAP Program process variant.
    constants:
      c_interrupt_eventid   type btceventid  value '[Event]',
      c_interrupt_eventparm type btcevtparm  value '[Parameter]'.
    data:
      l_interrupt_eventid   type btceventid value c_interrupt_eventid,
      l_interrupt_eventparm type btcevtparm value c_interrupt_eventparm.
    call method cl_batch_event=>raise
      EXPORTING
        i_eventid                      = l_interrupt_eventid
        i_eventparm                    = l_interrupt_eventparm
      EXCEPTIONS
        excpt_raise_failed             = 2
        excpt_server_accepts_no_events = 3
        excpt_raise_forbidden          = 4
        excpt_unknown_event            = 5
        excpt_no_authority             = 6
        others                         = 1.
    if sy-subrc <> 0.
      message e051(rsar) with 'Failed to raise background event.' c_interrupt_eventid c_interrupt_eventparm.
    endif.
    Note: The error message is process chain friendly and will appear in the RSPC transaction GUI and system logs.
    Hope this helps,
    John.

  • Execute Process chain after infopackage run for a PC file

    Hello all.
    The scenario I need to solve is the following.
    I have several files to be load to ODS from P users PC. I will do this with an info package. But after this load there are some more process that have to be run whoch are created in a process chain.
    I would like to automate the execution of the precess chain right after the load from PC file is done.
    Any sugestions?
    Thanks and regards,

    Hello Javier Alvarado,
    If you use process chains, the automatically integrated processes are ignored and have to
    be implemented using the process chain. If you schedule a specific process in a chain,
    you support the automatic insertion of additional, relevant standard processes with the
    consideration of such automatic actions.
    For example, if you have selected the processing types Only PSA and Subsequently in
    Data Targets in the InfoPackage from the tabstrip Processing, and you are using this
    InfoPackage in a process chain, then the further processing into the data target does not
    automatically happen. Instead, it only happens if the process Update PSA is scheduled in
    the respective process chain after the loading process. Thus, the process chain
    maintenance supports the automation in this case. In this way, you generate a process
    variant for updating from the PSA in the chain when inserting the loading process with the
    process types Only PSA and Subsequently in Data Targets automatically into a chain.
    Well i am talking about 30B Version
    Regards,
    Mohan.

  • Re-establish mirroring after DR test

    Hi all,
    I have posted a similar question before but did not get a clear answer. My question is, After breaking the mirroring database to allow testing on the DR site, is the only way to re-establish the mirroring again to copy the backups from the actual production
    site ?. Can something be done on the DR site to put back the mirroring after the test ?. Thanks
    SQL Server 2012 SP2
    Windows 2008 R2.

    If you are doing a POC, then you need to build a like to like system to do a DR test.
    In an ideal environment, there should a maintenance window where you test a production DR system. This is done in many many companies around the globe and is considered a best practise. In environments where this is not possible, normally a PreProd/UAT environment
    is used to prove the DR test. Obviously this means that the PreProd/UAT is a very controlled system which mimics production in every aspects.
    What ever other tests you do which doesnt mimic the normal DR scenario then its of no use and cannot be considered a normal DR test.
    I know that you were not happy with the answers provided when you asked same question last week, but the truth is there is no way we can do something which you want to do.  
    Regards, Ashwin Menon My Blog - http:\\sqllearnings.com

  • Processing speed after importing

    Hi,
    I'm using Aperture 3.x on my iMac with i7 and 8GB RAM, Lexar USB card reader.
    If I'm importing 30 RAW files to the Aperture Library on the internal HD of the iMac and let these process, it took about 1min 40s.
    If I'm importing the same 30 RAW files to the Aperture Library as referenced files to an external iSCSI and let these process, it took about 1min 10s.
    Looking at the processor load it between 100-200%, which is not much, since there are four cores in the i7.
    Why is Aperture not more processor power to speed up the processing part after the import?
    Regards,
    JO

    This is really a question for the Aperture engineers (at least for an accurate, competent answer).
    In the cases that I am aware of (mostly regarding Photoshop), some tasks are not worth the processing 'overhead' to send to more than one or two processor cores.
    This may be the case here, or it could be that the engineers are not coding for more cores until later versions (remember; Aperture can run on machines with only two cores - albeit more slowly).
    Much of the processing after import of RAW files is rendering the image in RAM, so the processors aren't needed as much there as they are in processing the edits.
    Again, this is just a best guess on my part as I am not a software engineer at Apple.

  • After soak test update, I get error messages repeatedly. The majority are "unfortunately, messaging has stopped", but you can replace messaging with "android os", or any other process, as it happens with more than just messaging. I have had numerous peopl

    After soak test update, I get error messages repeatedly. The majority are "unfortunately, messaging has stopped", but you can replace messaging with "android os", or any other process, as it happens with more than just messaging. I have had numerous people call and ask why I didn't reply to their texts...and I look, but have not received any new texts. YES, I have restarted phone. I have cleared data as well as cache on all apps. I have downloaded the vzw messaging app, which seems silly, since it happens with several different processes and apps, but all to no avail. I am missing texts from my employer, from my family. This did happen, but rarely, before this "soak test". It is now Kitkat version 19.6.3.obake_verizon.en.US. THIS is when I started having problems...like 50 times a day kind of problems! I have seen hundreds of posts all over the internet over the past 3 days. Does no one know how to fix this??? Shouldn't there be a way to revert phone to a pre-update state? and no, hard reset did NOT work!!!! I have been with verizon for well over 15 years, but I have not upgraded my lines and will not in July either. This is ridiculous. It's not like my games aren't working, it is my messaging and "android os"...my lifeline at work!

    kristinaf333,
    Oh no, I am sorry to hear your messages are not working since the software update. I greatlly appreciate doing all that troubleshooting to try and get the messaging application back in business. I know how much I rely on my messages so I can understand the urgency to get this resolved. Have you had a resolution ticket opened since you started experiencing issues with your messages? Does this happen with all contacts or just some? Please provide additional information to ensure we get to the bottom of this for you.
    KarenC_VZW
    Follow us on Twitter @VZWSupport

  • Process Order does Confirmations and GR even after the Process order is CNF

    Not Sure why the Formatting is lost.
    Hi Gurus,                                                                               
    I am a beginner in this area and request your help.                                                                               
    We are implementing a project where the process order Confirmation in SAP ECC 5.0 in SAP PPPI module is done using xMII which call the BAPI_PROCORD_CREATE_TT     RFC.
    The customer wants to (certain times) do a final confirmation without actually completing the order e.g if the Order Qty is 100 then, they want to just manufacture 25 and then do a final confirmation, after which SAP GUI screen does not allow any Process order Confirmations against that process order.
    We are using the BAPI_PROCORDCONF_CREATE_TTRFC to do multiple PO Confirmations and GR for particular Process order. Below is a scenario
    Case 1:
    1. Order Qty =100  ( Unlimited Delivery is not checked and tolerance is Zero).
         Which means only 100 is accepted.
    2. 100 Quantities are produced and confirmed using the BAPI_PROCORDCONF_CREATE_TT (with Final confirmation value as 1 , which mean auto confirmation)
    3. Next when the BAPI confirms & GR's against the same order, the Complete qty is not visible in the COR3 status. And is visible only in the COGI transaction.
    That is expected behavior. and i am ok with that.
    Case 2: (The one with the problem)
    1.  Order Qty =100  ( Unlimited Delivery is not checked and tolerance is Zero).
         Which means only the 100 is accepted.
    2.  25 Quantities are produced and confirmed using BAPI_PROCORDCONF_CREATE_TT (with Final Confirmation value as X , which mean Final confirmation)
    3. The Confirmation and GR go through and the status of the process order now changed is CNF and the Deliverd qty is 25.
    At this point , if you logon to SAP GUI and try to make a process order confirmation you get an error messages which says the Process Order is already confirmed and no more confirmations or GR can be done against this Process order.
    4. But when you Again Run the BAPI_PROCORDCONF_CREATE_TT, it goes ahead and confirms and makes the GR for that Process order.
    The Expected Behavior should have been that this quantity is now in the COGI transaction.
    5. The Process order  allows any number of Further confirmations till the Ordered Qty and Delivered quantity are  same .
    so dear gurus I know i have written a very long doubt but would be very happy to get a response from you. I would ideally not like to enhance or change the BAPI and want to understand if I have missed some setting or parameter that I have to pass in the BAPI for the final confirmation so that once the Status of the Process order is CNF , no more Confirmations are allowed even from the BAPI.
    Thanks in Advance.
    Regards
    Suraj

    Hi Suraj,
    I am not positive, but I suspectt the problem lies in the BAPI.  It might be how you have the data set in MII, but it sounded like you are doing it correctly. 
    However there are a number of things you can do to troubleshoot your situation.
    First create a few process orders to test with. 
    Record the confirmation numbers and counters for each of the following:
    1) Do a final confirmation (for quantity of 25 instead of the 100) in CORK (or whichever transaction you are using). 
    2) Do a final confirmation (for quantitiy of 25 instead of the 100) in SE37 or BAPI in ERP using the BAPI_PROCORDCONF_CREATE_TT.
    3) Do a final confirmation (for quantitiy of 25 instead of the 100) from MII using your current transaction. 
    Review the confirmations in ERP to see if there are any differences.
    Review the confirmaitons in MII to see if there are any non visible differences (use a Tracer to retrieve the response segment from an execution of BAPI_PROCORDCONF_GETDETAIL using the recorded confirmation numbers and counters) 
    Case 1) If there are differences in the results, that should tell you how to modify your transaction to include or change the appropriate values in your inputs. 
    Case 2) If there are no differences, then it is most likely that there is something not working properly in the BAPI you are using.  It may not completely replicate the functionality in CORK (or whichever transaction you are using in ERP).  Then open a ticket, because the BAPI is not working as it should.
    Good luck,
    Mike
    Edited by: Michael Appleby on Aug 17, 2009 8:20 PM

  • Server 2012 R2 SMB - The process cannot access the file '\\server\share\test.txt' because it is being used by another process.

    Hi,
    We are having issues with Server 2012 R2 SMB shares.
    We try to write some changes to a file, but we first create a temporary backup in case the write fails. After the backup is created we write the changes to the file and then we get an error:
    The process cannot access the file '\\server\share\test.txt' because it is being used by another process.
    It looks like the backup process keeps the original file in use.
    The problem doesn't always occur the first time, but almost everytime after 2 or 3 changes. I have provided some code below to reproduce the problem, you can run this in a loop to reproduce.
    The problem is that once the error arises, the file remains 'in use' for a while, so you cannot retry but have to wait at least several minutes. 
    I've already used Process Explorer to analyze, but there are no open file handles. 
    To reproduce the problem: create two Server 2012 R2 machines and run the below code from one server accessing an SMB share on the other server.
    Below is the code I use for testing, if you reproduce the scenario, I'm sure you get the same error.
    We are not looking for an alternative way to solve this, but wonder if this is a bug that needs to be reported?
    Anybody seen this behavior before or know what's causing it?
    The code:
    string file =
    @"\\server\share\test.txt";
    if (File.Exists(file))
    File.Copy(file, file +
    ".bak", true);
    File.WriteAllText(file,
    "Testje",
    Encoding.UTF8);
    The error:
     System.IO.IOException: The process cannot access the file '\\server\share\test.txt' because it is being used by another process.

    Hi,
    There is someone else having the same issue with yours. You could try code in the article below:
    “The process cannot access the file because it is being used by another process”
    http://blogs.msdn.com/b/shawncao/archive/2010/06/04/the-process-cannot-access-the-file-because-it-is-being-used-by-another-process.aspx
    If you wonder the root cause of the issue, the .NET Framework Class Libraries forum can help.
    Best Regards,
    Mandy 
    If you have any feedback on our support, please click
    here .
    We
    are trying to better understand customer views on social support experience, so your participation in this
    interview project would be greatly appreciated if you have time.
    Thanks for helping make community forums a great place.

  • If you *just* earned your MCTS certification, will it remain "active" after the MCTS title retires this year (on January 31, 2014)?

    ...Or will your transcript show your certification as "retired, "legacy", or "expired", etc?
    (I'm particularly concerned about "MCTS: Windows Server 2008 - Active Directory Configuration").
    My understanding is: the MCTS "title retirement" just means newcomers will need to pursue the MCSA (or MCSE) after January, but existing MCTS certifications will remain *active* until the product's "end of mainstream support" date (January
    13, 2015 for the Windows Server 2008 product line)...
    Is my understanding correct? -The above MCTS will officially retire (on our transcripts) on: January 13, 2015?
    -Thank you.

    Hi, Digital guy 001.
    Your MCTS certification title will never retire. Instead, it may be marked as "Legacy" on your transcript but that will be several years from now (2023? guessing...)
    When an exam retires, it will no longer be available to be passed at the testing center. As well, even if a title is no longer available, you keep it on your transcript for many years to come, until it is eventually marked "Legacy".
    Yes - you are correct in that title retirement means that people cannot earn that title any more - usually because the exams have retired,
    but not always. For example, exam 70-640 is not scheduled for retirement at all, but the related MCITP titles are retired and the MCTS title will retire at the end of the month. On February 1st, 2014, the 70-640 exam will only be helpful
    for those wanting to earn the title: MCSA: Windows 2008.
    The word "Expired" applies to your opportunity to earn a certification title based on a date.
    The word "Inactive" is only applied to MCSD and MCSE certifications titles that have passed their recertification dates. MCSEs must recertify every three (3) years while MCSDs must recertify every two (2)
    years. If you haven't recertified, the term "Inactive" will appear next to the title on your transcript.
    Please keep the terms separated in your head: 
    Retired Exam (no longer available)
    Retired Title (no longer achievable)
    "Legacy" transcript certification title (really old)
    "Inactive" transcript certification title (requiring recertification).
    Good luck!
    Best wishes, Davin Mickelson

Maybe you are looking for