Cfalibration of test equipment.
Hi,
My clinet is working on calibration scenario.Here calibration of some equipment is done by maintenance department . So I would like to know what are the different setting i have to do before creating calibration order(PM06). I konw for that i have to create master data for testing equipment (Q).
I am facing problem in QM point of view.So it is integration of PM-QM so i would know how
Expecting for reply.
Regards,
Pravin
hi
check the link
http://help.sap.com/saphelp_46c/helpdata/en/f4/e0e869af9911d29a250000e8a529f3/content.htm
http://help.sap.com/saphelp_46c/helpdata/en/bf/b9b3341a933f50e10000009b38f83b/frameset.htm
IE01:Equipment
IP11: Maintainence Strategy
IA05: Task List
IP42: Maintainence Plan
IP10: Scheduling Of plan
IP30: Job Planning
Create Measuring inspection characteristics....QS21
Create Task list by assiging ispection point as 300 /310...IA05
Assign MIC & Strategy to the task list....IA05
Create PM order for calibration order which should have ...IW31 (inspection type assigned as 14 as std)
Assign Task list to PM Order...IW32
Release PM order....IW32
You will get inspection lot
Provide readings against the inspection lot...QE17/QE51
Provide Usage decieon for the FL/ EQ...QA11
If you aregoing for Maint plan then crete maint item...IP41
Assign this to maint plan & scheduling paramertes
Schedule maint plan...IP10/IP30
Get PM Orders Release it Get Inspection lots..IW38
-ashok
Similar Messages
-
Trying to run Accutest 1000 manufactured by Physical Testing Equipment with Labview
We have an Accutest 1000 which is manufactured by Physical Testing Equipment and we would like to run the equipment and gather data thru Labview.
Does Labview support this type of activity? Is there a 3rd party that would contract to set-up this configuration?
ThanksNational Instruments doesn't officially support interacting with this board. Do you have more information about it? Can it communicate via serial? If so, you could try to use NI-VISA to communicate with the board.
Ravi A.
National Instruments | Applications Engineer -
Test Equipment for calibration
Dear Experts,
Is it necessary to create Calibration Orders against Test Equipments only ?? or we can do the same against Machines also??
As in some cases there is preventive & calibration plan against same equipment then if we create Test equipment,, there is going to be doubling of equipment??
Plz guide
rgrds
DMDear DM,
For the same Equipment U can distinguish one is M - Machine , and Q- Test Equipment categories.
So u can do preventive maintenance and caliberations plan also
If u not clear pls come back
Regards
SMC -
Error during usage decision for Test Equipment
Hi,
I have completed results recording for Test Equipment using QE51N (results closed and confirmation completed). When I tried to make usage decision (QA11) for the lot the pop-up message shows as "Not all equipment is valuated! Do you want to force inspection completion. I also noticed that in equipment tab of qa11 code valuation column shows as Not Valuated.
I request you to help me to solve this problem.
Thanks & Regards
V.DevarajHI,
You may try changing the valuation mode in IA06. In the inspection characteristic overivew, click on details -> operation, scroll down, you will find Quality management inspection points -> maintain automatic valuation based on inspection points.
The changes if made will be effective only for the next inspeciton lots.
Regards,
M.M -
Hi Experts,
Please can any one brief me about the cycle of Test Equipment Management in QM.
Pls provide with T codes.
Thanks in Advance.
Vishalhi
IR01
IE01 with category Q,
IA05 - task list , in header data you need to selct the inspection points 300. and assign the Strategy (IP11) alonfg witth assing MIC(QS21) to the operations.
IP42
IP10
IW38 or Iw32 if you know the order number. then relase the order you get the inspection lot no,
then goto QA32 to do results recording and usage dessicion.
pl try
-ashok -
Error while result recording for test equipment
Dear Gurus
My scenario is to do unplanned maintenance for test equipment and recording the result.
For that I have done the following steps
1) Created Notification for the test equipment (customized notification type TE).
2) For that notification I created order. (customized order type TE01).
3) Attached General maintenance task list for that order. Task list has inspection point 300.
4) Released the order and saved. Inspection Lot is created.
5) In QE51N / QA32 when I tried to do results recording, it shows the following error.
"Equipment VERN01 do not exist in the object list for order 4001214"
Please help me to correct this error.
Regards
Babu RHi
I applied oss and today I got reply. When 1278254 notes is implemented it is solved.
I have one more question, now in QE51N, I did result recording and when saved it is asking for order confirmation, I have given all data and came back to the same screen. There is one more option for Valuate Inspection Point. In that I have selected Can be used option and saved. Now if I goto maintenance order and TECO the order, it is saying that A usage decision has stll to be made.
Whether I want to take UD once again in QA32 ?
Also is there any settings to TECO the notification automatically when the maintenance order is TECO'ed. Now the notification is not TECO'ed when order is TECO'ed.
Babu R -
Message if Expiry date of Master Test Equipment is in the Past
Hi All,
We need system give a mesage when expiry date of master test equipment (which is assigned as a PRT in the equipment task list) is in the Past at the time of result recording of an Equipment.
Problem Details:-
Master test equipment is defined in equipment category "P".
Expiry date of master test equipment is maintained in the field
of "start up date" in General Tab
2.Equipments is defined in equipment category "Q"
3.A task list is created in which master test equiment is assigned as a PRT
4.Maintenance plan is created in which equipments is assigned & task List is selected
5.Inspection lot is generated when maintenance plan is schedule & released.
At the time of Calibration result recording "We want the system to give a message when expiry date (entered in start up date filed on master equipment master view) of master test equipment is in the past"
The end date in equipment master data cannot be altered and
Hence we have used the "start up date" field for the equipment expiry date.
Pl assist me for solving this issue.
Thanks & Regards,
SKDhi shiv
Start up date is the date at which the equipment is commisioned or the equipment starts working,it is not the expiry date
start up date is mainly used for calculating the MTTR/MTBF of the equipment
regards
thyagarajan -
I have developed a test equipment to test a unit which manages three power supplies and a dc electric load. These power supplies and load are controlled pragmatically by LabVIEW through R232 interface. There are five voltage and current sensors, and sixteen power relays inside the unit. Each sensors and relays operation has to be checked for the proper functioning in the system for the given command from the system(PXI) .PXI system consist of serial add -on cards and NI PXI-6229 for discrete I/Os connected to the test unit with a interface unit.inputs to UUT are serial/discrete inputs(from relay drivers). This bench level test is achieved through LabVIEW programs with simple VI’s and sub VI’s and built in drivers.
Now the requirement of the consumer goes to the next level. The above mentioned test has to be automated fully. By clicking one button the whole test has to be performed automatically in a prescribed sequence test and verify each parameter in the test case and display the result and has to written into a document report.
For example
Source /Load and VI Checks (Commands through Serial Link)
Source/load
Commands
Parameter
Expected value
Obtained value
Channel 1
Channel 2
channel 3
Channel 4
Alternator-2
55F0020000F2CC
Voltage: 24V
0x7F ± 0x0E
0x
0x
0x
0x
Current: 5A
0x1A ± 0x04
0x
0x
0x
0x
Battery-1
55F0040000F4CC
Voltage: 32V
0xAA ± 0x12
0x
0x
0x
0x
Current: 10A
0x35 ± 0x06
0x
0x
0x
0x
Battery-2
55F0080000F8CC
Voltage: 32V
0xAA ± 0x12
0x
0x
0x
0x
Current: 10A
0x35 ± 0x06
0x
0x
0x
0x
Hardwired Checks
Parameter
Connector Pin for command
Expected Value
GPCC/DT
RFCC
Channel 1
Channel 2
channel 3
Channel 4
Battery 1 – ON
Pin 1 of J2
0xF0
0x
0x
0x
0x
Battery 2 – ON
Pin 2 of J2
0xF0
0x
0x
0x
0x
Battery Charging – ON
Pin 4 of J2
0xF0
0x
0x
0x
0x
to start the automation of above mentioned application I searched for the tutorial and found NI teststand is suitable for this. I'm still confused about which NI application software to use and how to start them. So please help me in this and guide me how to start an basic automation.
Attachments:
manual test.vi 280 KB
manual test.vi 280 KBTestStand is meant for these sort of automation requirements only.
TestStand can reuse the VI's you have already developed to call the tests and automate it.
You can install TestStand ( trail version) to try it out.
There are examples for TestStand - Labview interface examples. -
Is it possible for the test equip. to tell me the measured data is ready?
When programming to read from a test equipment (e.g. ocsilloscope)
connected to PC/GPIB, many times I have to set a delay before reading
the value, otherwise the return value will be some invalid numbers
(e.g., 0). To achieve valid test results and testing time reduction, I
used trial-and-error to get a "minimum" delay time. But even this
delay time which works for one equipment may not work for another.
It's such a headache!!!
Is it possible to poll/inquire the status of the test equipment in the
program if the measured data is ready? If yes, how?
Thanks a lot for your answer!If you are programming using VISA, the following link takes you to some examples of waiting until the instrument has data available. The example link also includes other examples of synchronizing your application with your instrument.
Using Instrument Status Registers with Service Requests and Polling -
Test Equipment Management in BPR
Hi,
I am current setting up BPS for our company, and I am having some difficulties finding Scenarios, Processes, and Process Steps for Test Equipment Management in the BPR.
Any suggestions?
BR
Bendt BendtsenDear friend
If you goto Organizational area wise
Coorporate Support & Services
Business Processes->Test Equipment Management
Hope it solves ur query.
Regards
Prakhar -
TEST EQUIPMENT MANAGEMENT- TCODES
Hello Guru
Kindly explain me how test equipment management in QM functions. kindly send me the step by step procedure with tcodes.
I will be really thankful.
Nithihi nithi
Test equipment is as same as calibration of equipments please refer the follwing site for process
<b>http://help.sap.com/saphelp_47x200/helpdata/en/02/4ed734da22514ee10000009b38f83b/frameset.htm</b>
in the below link a model company has performed the required operaion with menu path
<b>http://help.sap.com/saphelp_46c/helpdata/en/fe/67fbcc9d6f11d189b60000e829fbbd/frameset.htm</b>
regards
thyagarajan -
Test equipment as PRT , Material or Equipment
Hi there ,
As per my understanding we can maintain test equipment as PRT , Material or Equipment....
Can anyone please suggest me that on what factors we can take the decision & what is the relative pros & cons of each.....
Thanks & Regards
KaushikHi Charles,
Even if we maintain the Test equipment Material or Equipment we can do the same .
What are other factors that will lead us to maintain the same as PRT , Material or Equipment ?
Thanks & Regards
Kaushik -
Test equipment design & Development
Dear Candidates,
We are having an excellent opening for Design and Development of "Test Equipment" for hardware with one of the Leading MNC company in Bangalore. Experience of 2-4 years experience. If interested please send us your updated profile of call us on 9880957399
Srihari
9880957399Hi,
Glad to see the relevant opening here. Unfortunately, the provided number is not working for me. Could you provide me your Email address, so that I could send my CV.
Thank you . -
Test equipment needed to measure the RF power from an Aironet 1500 AP
Is there a piece of test equipment I can use to measure the RF Power from an Aironet 1500 AP? I need to determine if people in a building are working far enough away from an existing Aironet 1500 AP unit. Many thanks, Chris.
Fluke Network's Airmagnet Spectrum Analyzer is second to none.
For freebies: Netstumbler and inSSIDer. -
Discovery of Test Equipment on the LAN
Does Labview provide a discovery feature to find Test Equipment on a LAN?
Hi,
LabVIEW itself does not have this functionality, however, the NI-VISA driver does have it. If you have NI-VISA installed, you can auto-detect LAN instruments in Measurements and Automation Explorer (MAX) and set them up as VISA resources. Once you do this, you can call the resouce in LabVIEW with the VISA API. In order to detect a LAN instrument in MAX, right-click Devices and Interfaces >> Create New.. and select VISA TCP/IP Resource from the list.
Eli S.
National Instruments
Applications Engineer
Maybe you are looking for
-
I cannot turn off ken burns on iMovie for the life of me! Everyone is telling me to fit the photo or stop it, which I have done. However, when cropped the ken burns effect is still there in full force!!! What can I do to turn off this dreadful effect
-
Error 150:30 CS4 (student edition) on a Macbook
I recently had a corrupted operating system and had to erase and reinstall, but had error with backup reinstall and now can no longer use any of my Master Collection CS4 (student edition) with an error 150:30 licence issue, all my information was los
-
How to attach scroll bar to my form in oracle forms 10g.
-
Exporting direct from FCP vs. sending to Compressor?
I've done both, but the choice ends up being a coin toss. So I'm curious if there's any accepted wisdom as to the Pros & Cons of each workflow (using the current versions of each app, and in a hypothetical All Things Being Equal scenario)? In other w
-
Packaging POF object class in a jar file
I have the following issue packaging a POF class. I have two POF classes which are defined in the package oracle.communications.activation.asap.ace; 1. Token.java 2. Asdl.java For simplicity i package them in the coherence.jar along with the other ne