Change company code based on profit center at line item level in FB50

Hi All,
Following is my requirement, would be thankful if anyone can provide inputs on the same.
When posting documents through FB50, In line item table control company code column gets un-editable ones correct entries are entered for that line. But after this if we want to change the profit center which belongs to different company code system throws error and makes company code column un-editable. In this situation there is no option left for user to correct the values unless he deletes the current line and creates a new one.
Here can we make the company code field always editable?
If not can we update the company code based on the profit center entered on that line item?
I looked for exits but couldn't find any, validation and substitution are also not working because error message thrown by SAP is getting triggered before the substitution or validation code is executed.
Please drop in your comments/inputs.
Thanks in advance.
Lucky.

Transaction Code - FB50                     G/L Acct Pstg: Single Screen Trans.
Exit Name           Description
RFAVIS01            Customer Exit for Changing Payment Advice Segment Text
RFEPOS00            Line item display: Checking of selection conditions
RFKORIEX            Automatic correspondence
SAPLF051            Workflow for FI (pre-capture, release for payment)
F050S001            FIDCMT, FIDCC1, FIDCC2: Edit user-defined IDoc segment
F050S002            FIDCC1: Change IDoc/do not send
F050S003            FIDCC2: Change IDoc/do not send
F050S004            FIDCMT, FIDCC1, FIDCC2: Change outbound IDoc/do not send
F050S005            FIDCMT, FIDCC1, FIDCC2 Inbound IDoc: Change FI document
F050S006            FI Outgoing IDoc: Reset Clearing in FI Document
F050S007            FIDCCH Outbound: Influence on IDoc for Document Change
F180A001            Balance Sheet Adjustment
FARC0002            Additional Checks for Archiving MM Vendor Master Data
FEDI0001            Function Exits for EDI in FI
No of Exits:         14
USER EXIT
http://www.sap-img.com/abap/a-short-tutorial-on-user-exits.htm
http://www.sapgenie.com/abap/code/abap26.htm
http://www.sap-img.com/abap/what-is-user-exits.htm
http://wiki.ittoolbox.com/index.php/HOWTO:Implement_a_screen_exit_to_a_standard_SAP_transaction
http://www.easymarketplace.de/userexit.php
http://www.sap-img.com/abap/a-short-tutorial-on-user-exits.htm
http://www.sappoint.com/abap/userexit.pdfUser-Exit
http://www.sap-img.com/ab038.htm
http://help.sap.com/saphelp_46c/helpdata/en/64/72369adc56d11195100060b03c6b76/frameset.htm
USER EXIT
http://www.sap-img.com/abap/a-short-tutorial-on-user-exits.htm
http://www.sap-img.com/abap/what-is-user-exits.htm
http://expertanswercenter.techtarget.com/eac/knowledgebaseAnswer/0,295199,sid63_gci982756,00.html
Rewards if useful.........
Minal

Similar Messages

  • Balancing field "Profit Center" in line item 001 not filled T Code:J1IEX

    Hello Exerts,
    I am doing T Code:J1IEX
    I am getting this error,i had check document Splitting Configuration,but i am unable to fine the cause can any body help to solved this error.
    Balancing field "Profit Center" in line item 001 not filled
    Message no. GLT2201
    Diagnosis
    The field Profit Center marked as balancing is not filled with any value in line item 001, even after document splitting.
    System Response
    The document cannot be posted.
    Procedure
    First check your entries.
    Additional causes could be:
    No value can be derived for this field from the current document data.
    You have entered a document type that is not designed for this business purpose.
    Procedure for System Administration
    Customizing
    Warm Regards,
    Jemes

    Hi Experts,
    I am doing this activity what you had suggest me.
    spro>Fin acc new> Gl new> Bus transactions> doc splitting>extended doc splitting>define doc splitting rule.
    here against method - 0000000012 - transaction - 0300variant 0001/method - 0000000012 - transaction - 0300variant 0002
    This is actual configuration.
    0000000012
    0300       Vendor invoice
    0001       Standard
    And this is what you had suggest
    0000000012
    0300       Vendor invoice
    0002       Standard (or there is no 0002 entry)
    But SAP System gives error
    Entry 0300 0002  does not exist in T8G031 (check entry)
    Message no. 00058
    Diagnosis
    Input values must be defined in Table T8G031. The value or values '0300 0002 ' are not specified in this table.
    Procedure
    Check whether the input is correct and correct if necessary.
    Procedure for System Administration
    If this is not an incorrect entry, check the system settings and change them if necessary.
    If there is a connection to the Customizing system, you can maintain the system settings by choosing Customizing in the Performance Assistant or Maintain Entries (F5) when displaying the help in a modal dialog box.
    if i am wrong please let me correct.
    waiting for reply.
    Regards,
    Jemes

  • AFAB:Balancing field "Profit Center" in line item for Single Company

    Balancing field "Profit Center" in line item 005 not filled , This Error is coming for only one company code Alone in AFAB Tcode
    Thanks & Regards,
    Daniel

    Check this T.code OBC4.Here you need to check the field status group G001,G005.which Field status is using for the GL
    U have to write substitution for T code J2IUN and Plant combition .
    Eg.whenT code is J2IUN and Plant is XXXX  Profit center is YYYYY.
    please check the same and then execute further your process.
    Regards
    Ketan

  • T-code: F-02 (Balancing field "Profit Center" in line item 001 not filled)

    Dear Experts,
    I am getting following error while i am doing transfer by using t-code F-02.
    "Quote
    Balancing field "Profit Center" in line item 001 not filled
    Message no. GLT2201
    Diagnosis
    The field Profit Center marked as balancing is not filled with any value in line item 001, even after document splitting.
    System Response
    The document cannot be posted.
    Procedure
    First check your entries.
    Additional causes could be:
    u2022 No value can be derived for this field from the current document data.
    u2022 You have entered a document type that is not designed for this business purpose.
    Procedure for System Administration
    Customizing
    Unquote"
    Where do you thing the mistake is and what i have to do? Please resolve my problem.
    Thanks advance,
    Best Regards.
    Ripon Kumar Paul

    Hi
    Balance Sheet Accounts are required to be split in case you have document splitting activated u2026.. and in your case the profit center is made mandatory for the documents to get splitted u2026.. and the profit center would be derived from cost centeru2026u2026u2026. therefore to split the document by using document type u2013 SA through F-02 we need to do further settings, i.e., you need to configure u201CExtended Document Splitting Configurationu201D
    For example: Rent expenditure is been posted which is having more than 2 Debits and consisting of different Cost Centers and posting to Rent Payable A/c which is a Balance sheet A/cu2026u2026.
    Path: Financial Accounting (New) - - General Ledger Accounting (New) - - Business Transactions - - Document Splitting - - Extended Document Splitting -- Define Document Splitting Rule
    Define your Business Transaction variant and for that variant define document splitting rule u2026u2026u2026.. where in you need to activate Automatically split check box for the desired categories.
    Regards,
    Sathish

  • F-54 Balancing field "Profit Center" in line item 002 not filled  Message no. GLT2201

    Hi,
    During F-54 error "Balancing field "Profit Center" in line item 002 not filled" "Message no. GLT2201"  showing.
    I have gone through previous posts with  message no. I got below solutions but those applicable belongs to EHP 600 but ours is EHP 605.
    1. Note: 930365 not applicable for EHP 605
    2. Note: 887794 correction process according to note applies max EHP 600.
    3. http://wiki.scn.sap.com/wiki/display/ERPFI/Document+split+when+clearing+down+payment+with+taxes
    My querrys are If i apply above 2 & 3 points solutions what will happen. However instead of creation of new "Document type" if i do configuration changes for existing document type "KA" what will the negative impact and risk.

    Dear Mr Rahul
    Thanks for your suggestion
    but there's something odd about this..
    the other company code is working just fine for years..
    and i've already maintain configuration both for doc splitting especially the splitting rule and GSP_KD1
    yet the error still occur
    is there any suggestion Mr Rahul?
    or anyone?
    Best Regards
    Rumi

  • Balancing field "Profit Center" in line item 001 not filled in vendor post

    Dear Experts,
    Document Spitting is activated in our system. Now in Vendor posting we are getting the error " Balancing field "Profit Center" in line item 001 not filled ". Please provide your suggestions on this.

    Balancing field "Profit Center" in line item 001 not filled  error is coming due to splitting .Try to do the following and check ...
    First check the line item 001 and get the GL no for which GL you are getting the error.
    Goto PCP0 and double click on Document then goto Settings -> Layout -> Change here select Document Line Number ......check the line item 001
    Ask your FI persons and get the required profit center or default Profit Center for that company code.
    Goto Tcode FAGL3KEH and enter the company code......enter GL code and Default profit center in the last column.
    Before doing this check the Business Area in IT 0027 and IT0001.Make sure that same Business Area is there in both the ITs.
    Mohan

  • Posting to FI error *Balancing field "Profit Center" in line item 001*

    Hi Gurus,
    I have been posting my payroll results to FI accounts and CO (internal order).
    I executed the following transactions:
    1) PC00_M99_CIPE - Create Posting Run
    following are the results of generated document and its a successful run:
    17.01.2009 Posting Document
    Run              0000000051
    Company Code     2000
    Document         0000000011
    PostingCurrency  SAR
    Reference        XXXXX00001
    Doc. Type        AB
    Run Type         PP
    Posting Date     31.01.2009
    Document Type    G/L Account Document
    Document Date    31.01.2009
    Bus. Transaction HRP1
    Account Number with Text                       PTyp     CO Accnt A         Debit Amount         Credit Amount
    55000000   Dir Sal/wag bonus                  G/L       OrdNo 100000      6,495                      
    13113000   "Salary, wage pybl"                G/L                                                                6,495 SAR
    Posting document 0000000011                                                      6,495                      6,495 SAR
    17.01.2009 Posting Document
    Total of All Documents
    Account Number with Text         PTyp CO Accnt A                  Debit Amount         Credit Amount Crcy
                                                                                   6,495                    6,495 SAR
    2) PC00_M99_PPM - Generate Posting Run for Payments 
    when I have run above mentioned transaction
    I am getting the following error:
    Messages for Document 0000000012
           Error in document: HRPAY 0000000012 SNDCLNT101
           Balancing field "Profit Center" in line item 001 not filled
    I would really appreciate a valuable suggestion .
    Thanks in Advance !!
    KPJ

    Hi KPJ,
    I am also facing same problem please tell me the solution.
    Please give me the reply.
    Regards,
    Leelaprasad.A

  • Balancing field "Profit Center" in line item 002 not filled and VF02

    Dear All,
    Below mentioned error we got in VF02 while releasing the billing to Accounting document.
    In this case SO has created. Later with out delivery has been created Billing ( VF01) And Later Releasing through VF02 ( For only 1 specific Billing type )
    But we have CRM Integration also from CRM 7.0 TO ECC 5.0 ( New GL Is there in ECC 5.0)
    Here alternative solution is there i.e In OKKP T code if we deselect Profit center Button Issue will be resolved from SD side ( PC Issue )
    Then problem will come to CRM with another message as ( Account-based PCA not active in year 2011 in controlling area 1001 (Notification I KM 029) Message no. CRM_ORDER_MISC 060)
    Balancing field "Profit Center" in line item 002 not filled
    Message no. GLT2201
    Diagnosis
    The field Profit Center marked as balancing is not filled with any value in line item 002, even after document splitting.
    System response
    The document cannot be posted.
    Procedure
    First check your entries.
    Additional causes could be:
    No value can be derived for this field from the current document data.
    You have entered a document type that is not designed for this business purpose.
    Please help on same.

    Hi
    If i am selecting that indicator in 0KE5 Problem will be resolved in CRM.
    But VF02 Is getting this Balancing field "Profit Center" in line item 002 not filled  problem.
    With out selecting that indicator please suggest. From Last 5 years we are using this Production System.
    0KE5 indicator has not selected from 2005 to 2011 also.
    CRM Is is process. we have selected in QA, But problm occurs to VF01 and CRM Process.
    Simply if i select 0KE5 CRM problm will resolved.
    Later SD Problem will come into the pictute.
    Note: In PD1 System we hav not selected for 2011 also.
    Pls put more inputs.

  • New GL,when do GR, message:Balancing field "Profit Center" in line item 001

    Hi
    We use new GL,and now when we do GR,the system report error message "Balancing field "Profit Center" in line item 001 not filled".so there must be anywhere to assign the profit to GR account ,but i can not find.:(
    can anyone tell me how to assign the profit to GR account?
    thanks a lot.

    Dear Mr Rahul
    Thanks for your suggestion
    but there's something odd about this..
    the other company code is working just fine for years..
    and i've already maintain configuration both for doc splitting especially the splitting rule and GSP_KD1
    yet the error still occur
    is there any suggestion Mr Rahul?
    or anyone?
    Best Regards
    Rumi

  • Error: (GLT2 201) Balancing field "Profit Center " in line item 001 not fi

    Hi All,
    While trying to upload a MT940 bank statement thru FF_5 am facing this error " Error: (GLT2 201) Balancing field "Profit Center " in line item 001 not filled".
    Can any one let me know how to overcome this error.
    Thanks and Regards
    SrihariBolla

    Hi
    Document Splitting is active in your Company Code.
    Hence while doing posting it is mandatory to give Profit Center.
    If you dont enter profit center during postings it will throw errors like this Balancing field "Profit Center " in line item 001 not filled.
    Go to Img -->FinancialAccounting(new) -->General Ledger Accounting(new) -->Business Transactions -->Document Splitting -->Define Document splitting characteristics in General Ledger Accounting
    Deselect the Mandatory Field CheckBox for Profit Center and save.
    Now you will be able to Upload.
    Regards
    Venkat

  • Balancing field "Profit Center" in line item 003 not filled during AFAB

    Hello all,
    We have activated business function FIN_GL_REORG_1 on EHP5 in ECC 6.0 and related reporting business function. One of the advantages of activating this for Fixed Assets is now asset balances can be reported at Profit Center/Segment level in sub ledger.
    During executing depreciation, we are getting the below error message
    Balancing field "Profit Center" in line item 003 not filled
    Message no. GLT2201
    Diagnosis
    The field Profit Center marked as balancing is not filled with any value in line item 003, even after document splitting.
    Below configuration is done in our system -
    Document splitting is active with standard variants for FA accounts.
    Segment Reporting is actived under Asset Accounting IMG (under Integration with General :edger Accounting)
    Activation of account assignment objects is active for cost center and specify account assignment types for account assignment objects KOSTL is configured for all transaction types (*) for APC and Depreciation postings is activated.
    APC, Accumulated Dep and Dep expense account field status groups are changed to have profit center and segment as optional fields for inputs.
    After all these settings, I am still getting the above error message.
    Can someone please let me know if you had similar situation and how to resolve this issue.
    Thanks,
    Praveen

    Hi
    Check the below locations
    Fin Accounting(New)Fin A/c Global Settings NewLedgersAssign scenarios and Customer Fields to Ledgers (Here assign Profit Centre)
    Fin AccountingGL Accounting NewBusiness  TransactionsDoc splittingDefine doc splitting characteristics for GL Accounting (Here Profit Centre mandatory check) Check with Activate and Deactivate
    Regards
    Sridhara Rao D

  • In J1IH - Balancing field "Profit Center" in line item 001 not filled

    Dear Sir/Madam,
    Am doing Additional Excise JV in J1IH, when put some amount in AED filed and save getting the error as below
    "Balancing field "Profit Center" in line item 001 not filled"
    If any one have come across this error while doing Additional Excise JV in J1IH please help me in resolving this issue.
    Note : Below points may be helpful for you to help me,
    1. Document Splitting is active,
    2. Profit center made mandatory,
    3. The relevant GL is assigned in item category of classify GL step in Document Splitting process.
    4. Substitution is only for FI documents.
    Regards - Manjunath AR

    Hi
    One way is to maintain a default profit center for the transaction in FAGL3KEH. Else depending on your plant structure, you may write a susbstitution rule as
    T Code = J1IH and Plant =X and G/L = 123221
    Profit Center =200001
    Regards
    Sanil Bhandari

  • MIRO Error - Balancing field "Profit Center" in line item 001 not filled

    Dear Experts,
    Recently we upgraded to ECC 6.0 from 4.6C. We implemented new GL functionality.
    We have also introduced new Profit Centers and have updated the same in Material Master.
    Now, the new Profit Centers are valid from 01.04.2009 till 31.12.9999.
    Now my problem is while doing MIRO after 31.03.2009 for old PO's i.e. the PO's which were created before 01.04.2009 the system gives me error "Balancing field "Profit Center" in line item 001 not filled".
    This is because for the particular line item it picks the profit center from material master, but the validity of that (NEW) profit center is from 01.04.2009 whereas I want to do the posting in back date i.e. for eg. 28.03.2009. Due to which it does not get any profit center.
    How do I resolve this problem. Is there any exit or BADI to do the same.
    Regards...

    Hi
    There could be multiple reasons for this. Pls check on:
    1. For the Expense Account assigned in DIF, have u made the assignment for deriving Profit Center & Business Area in T Code OKB9
    2. Ask your FI Consultant to check the Splitting Characteristics for the MIGO. Check the Splitting Characteristics assigned to the Accounting Document Type assigned to T Code MIGO. Also check if all the GL Accounts have been assigned a splitting characteritics. The path is:
    IMG> Financial Accounting(New)>General Ledger Accounting (New)>Business Transactions>Document Splitting
    3. Do you maintain profit center as a default in material Master? If yes, check if the same has been assigned in the view extended for the plant concerned?
    Pls check the settings. If any doubt, revert back.
    Thanks & Best Regards,
    rahul.

  • Balancing field "Profit Center" in line item 001 not filled in f-90

    Dear Experts
    the below error is comming at the time of procuring the assets with vendor in t code f-90
    Balancing field "Profit Center" in line item 001 not filled
    Message no. GLT2201
    Diagnosis
    The field Profit Center marked as balancing is not filled with any value in line item 001, even after document splitting.
    System Response
    The document cannot be posted.
    Procedure
    First check your entries.
    Additional causes could be:
    No value can be derived for this field from the current document data.
    You have entered a document type that is not designed for this business purpose.
    Procedure for System Administration
    Customizing
    Kndly help me on this
    regards
    venkataswamy

    Hi,
    1. Check the asset Master whether Cost center is assigned to asset.
    2. In Cost center profit center should be assigned.
    3. Specify Account Assignment Types for Account Assignment Object (ACSET)
    SPRO → financial accounting → asset accounting → integration with the general ledger accounts →
    Additional Account assignment Objects → Specify Account Assignment Types for Account Assignment Object.
    You can make a generic entry, using an asterisk (*), for the transaction type. The system then uses the
    account assignment type you entered for all transaction types for that account assignment object.
    Do the same for all depreciation area then from asset master cost center will flow to accounting document
    and form cost center profit center will get derived.
    Regards,
    Rohidas Shinde

  • Balancing field "Profit Center" in line item 001 not filled...ERROR

    Dear All,
    We wan to make Down payment thru F11O, following steps were followed
    First Step:
    We created noted item thru T.code: F-47
    Second Step:
    In APP, we got error Balancing field "Profit Center" in line item 001 not filled
    Can you pls give solution
    regards
    nitin

    This is a SAP BW forum - you will be better off in the FI forum

Maybe you are looking for

  • Bridge CC hangs/freezes with AE animation presets.

    Does anyone else have the issue of Bridge CC hanging/freezing when an AE animation preset is selected in Bridge?  This happens whether I Browse Presets from AE or I attempt to navigate to the presets folder directly through Bridge CC. I have uninstal

  • Acrobat 9 (Mac) can't edit this particular interactive pdf. Why not?

    Hi, I sent a Word doc off to someone to get him to make an interactive pdf form, checkboxes etc.  My caveat was that I had to be able to edit the pdf on my Mac with my version of Acrobat (9.0).  ...And guess what.  I can't edit it. Everything works a

  • Shouldn't be this hard -  I just want to know what number a text is coming from.

    I have texts from a friend. I want to tell someone else what thier cell phone number is. I go to the under contact. There are three numbers, all in a row - how do I tell which one the texts are coming from (and going to)? Might be the blue one, but I

  • How Integrate a Java Program with Javafx

    Hi All, I am new to javaFx. I want to call a java class method in javaFx Program how to call. Please help me out. Thanks In advance

  • Multiple UOM's

    Hello All, We have an article which is sold in each but when we sell a box it is actually of 12 eaches (when a multiple quantity of such an  item is sold we sell it as one item only(1box=1box(base unit in this case)) but we do not mention about eache