Change Contract Length from 2yr to 1yr

This Monday I will receive my Moto Droid X phone from FEDEX. I have yet to activate my phone. When I made my purchase over verizonwireless.com I check out with 2yr contract.  So my question is if I have not activated my phone yet, can I still be able to change my 2yr contract to 1yr? I am willing to pay the differences of $70 dollar and if I could what do I need to do?
Thanks

I think it should be possible, although it could be a hassle.
You have 30 days to return the phone and cancel the contract with no ETF, so the most convoluted way of going about it (and Verizon may make you do this) would be to return the phone and cancel the contract under your 'Worry Free Guarentee" and once the return is processed, request your upgrade again with a 1-year contract length.
Hopefully, you'll get a competent Verizon rep who will realize that since you CAN return the phone and go through that whole rigamorole, it would be easier to just charge you the difference and modify your contract term before you activate the phone.  Of course, it may not even be possible to do that within Verizon's system, leaving you with having to go the long way.
Good luck!

Similar Messages

  • Changing Marketing Attribute Length from 2 to 3 places

    Hi
    In our project we are using certain marketing Attribute. Now requirement is to change their length from 2 char to 3 char.
    Now these attributes have already been used in Attribute set and assigned to BP..Please tell me how can I resolve this issue.
    Thanx & Regards
    Hits

    The correct way is:
    1. Do a separate selection / target group for each of the values and save that
    2. Delete the assignment of the attribute using CRMD_MKT_TOOLS reports
    3. Delete the attribute from the attribute set
    4. Create a new attribute with length 3
    5. With CRMD_MKT_TOOLS (appropriate report there) you set the value for each target group again.
    However, you can still go and directly update the appropriate content of the tables cabn (definition of the attribute), cawn (attribute values) and ausp (assignment to the business partner) directly with an own report - if you want to.
    Be aware that the second solution definitely does not work with mobile sales, and if you have the set assigned to more than 400 BP's the first solution does not work directly either. There is note 772711 describing a report helping you out there, but this report is not compatible with mobile sales either, you need to write a oss message on this to get the correct code modification (hopefullly they will put it into standard somewhere in future).
    Regards, Kai

  • How can I change the length of multiple lines at the same time?

    This just seems like it should be a no-brainer, but obviously for me it isn't.  I'm trying to change the length of multiple lines, that are at different angles, at the same time, in CS4.  Basically, I design the face of dials used for airplane instrument gauges (like RPM, Torque, etc), and they have gradiation marks (lines) located all around, similar what a clock looks like with the hour and minute gradiation marks (lines).  Is there a way to select all the lines, that I know are the same length, and change it to a different length, that's accurate to the 1/100th of an inch?  It would just be like selecting multiple lines that have all the same stroke, then using the stroke box to change the stroke weight from .025in to .030in.
    I've used the transform box to change the 'height' of a line before, but the line has to be at 90 degrees (straight up and down), and that won't work for the lines that are at, say, a 45 degree angle.
    I hope i'm explaining this in a way that someone will understand. If not, I can sure try to clarify more, or insert the picture so you could see what i'm talking about.
    Thanks for any help you can give!

    OK, after fiddling around with everyone's ideas, I think I finally got it. I knew there had to be something with proportions between W and H, but couldn't figure out the math, until Jacob answered with:
    "If each line must be strecthed from the inner/outer end, you may select each and use the Transform palette, choosing the right Reference Point, multiplying by the proportion in W or H (1.75/1.5), and Ctrl/Cmd clicking."
    Now, I basically did everything above, (but I couldn't figure out what you were talking about with the Ctrl Clicking thing), except after figuring out the right proportion (which ends up being so small you guys would die if I told you the number; the numbers I gave earlier were just an example and much larger than what i'm really working with) I just clicked the little chain next to the W and H boxes to constrain the proportions. I then put the new number (multiplied proportion by whatever was in W) in the W box. The line lengthened perfectly toward the center of the dial, keeping the correct angle!
    And Harron-Thanks for the link to Teri's, It is going to help with some things I do, but most of the dials I design don't have equal distances between each gradiation mark, and the blueprints I work off of usually have exactly what distances that the grad. marks are supposed to be. So, after selecting one of my grad marks that is already at it's correct place, I then use the rotate tool and Alt-Clicking the very center of the dial, I can then put in exactly what distance I want the next grad. mark to be at, I hit copy (instead of OK) and there will be a new grad. mark exactly the correct distance from my original. Then if I want to have the 3rd grad. mark I just hit Ctrl-D and it will copy another mark to the next position. I don't know if you necessarily wanted to know all that, but i thought i'd explain why I like doing it that way.
    A BIG thanks to everyone! I'm really a AI newbie and am the only one at my company that knows how to use it, so I don't have anyone close to ask stupid questions to. So I appreciate all your help!

  • Changing the length of a key field in a table

    Hi,
    I want to increase the length of the field from 2 to 4 in a standard SAP table and deliver it to the customers. This field is a key field in table. This field from this table is also used in view and view clusters.
    What is the implication of changing the length to the customers. The customers would have already data in this field and they should not loose any data. Will the existing data for customers remain at length 2 or do they have to do some conversion?
    Regards,
    Srini.
    Edited by: Srinivasa Raghavachar on Feb 7, 2008 12:45 PM

    hi,
    The database table can be adjusted to the changed definition in the ABAP Dictionary in three different
    ways:
    By deleting the database table and creating it again. The table on the database is deleted, the inactive
    table is activated in the ABAP Dictionary, and the table is created again on the database. Data
    existing in the table is lost.
    By changing the database catalog (ALTER TABLE). The definition of the table on the database is
    simply changed. Existing data is retained. However, indexes on the table might have to be built again.
    By converting the table. This is the most time-consuming way to adjust a structure.
    If the table does not contain any data, it is deleted in the database and created again with its new
    structure. If data exists in the table, there is an attempt to adjust the structure with ALTER TABLE. If the
    database system used is not able to do so, the structure is adjusted by converting the table.
    Field 1     Field 2,    Field 3
    NUMC,6  CHAR 8    CHAR, 60
    Field 1    Field 2       Field 3
    NUMC,6 CHAR, 8     CHAR,30
    The following example shows the steps necessary during conversion.
    Starting situation: Table TAB was changed in the ABAP Dictionary. The length of field 3 was reduced
    from 60 to 30 places.
    The ABAP Dictionary therefore has an active (field 3 has a length of 60 places) and an inactive (field 3
    still has 30 places) version of the table.
    The active version of the table was created in the database, which means that field 3 currently has 60
    places in the database. A secondary index with the ID A11, which was also created in the database, is
    defined for the table in the ABAP Dictionary.
    The table already contains data.
    Step 1: The table is locked against further structure changes. If the conversion terminates due to an
    error, the table remains locked. This lock mechanism prevents further structure changes from being
    made before the conversion has been completed correctly. Data could be lost in such a case.
    Step 2: The table in the database is renamed. All the indexes on the table are deleted. The name of the
    new (temporary) table is defined by the prefix QCM and the table name. The name of the temporary
    Step 3: The inactive version of the table is activated in the ABAP Dictionary. The table is created on the
    database with its new structure and with the primary index. The structure of the database table is the
    same as the structure in the ABAP Dictinary after this step. The database table, however, does not
    contain any data.
    The system also tries to set a database lock for the table being converted. If the lock is set, application
    programs cannot write to the table during the conversion.
    The conversion is continued, however, even if the database lock cannot be set. In such a case
    application programs can write to the table. Since in such a case not all of the data might have been
    loaded back into the table, the table data might be inconsistent.
    You should therefore always make sure that no applications access the table being converted
    during the conversion process.
    Step 4: The data is loaded back from the temporary table (QCM table) to the new table (with MOVECORRESPONDING).
    The data exists in the database table and in the temporary table after this step.
    When you reduce the size of fields, for example, the extra places are truncated when you reload the
    data.
    Since the data exists in both the original table and temporary table during the conversion, the storage
    requirements increase during the process. You should therefore verify that sufficient space is available in
    the corresponding tablespace before converting large tables.
    There is a database commit after 16 MB when you copy the data from the QCM table to the original
    table. A conversion process therefore needs 16 MB resources in the rollback segment. The existing
    database lock is released with the Commit and then requested again before the next data area to be
    converted is edited.
    When you reduce the size of keys, only one record can be reloaded if there are several records whose
    key cannot be distinguished. It is not possible to say which record this will be. In such a case you should
    clean up the data of the table before converting.
    Step 5: The secondary indexes defined in the ABAP Dictionary for the table are created again.
    Step 6: The temporary table (QCM table) is deleted.
    Step 7: The lock set at the beginning of the conversion is deleted.
    If the conversion terminates, the table remains locked and a restart log is written.
    Caution: The data of a table is not consistent during conversion. Programs therefore should not access
    the table during conversion. Otherwise a program could for example use incorrect data when reading the
    table since not all the records were copied back from the temporary table. Conversions therefore
    should not run during production! You must at least deactivate all the applications that use tables to
    be converted.
    You must clean up terminated conversions. Programs that access the table might otherwise run
    incorrectly. In this case you must find out why the conversion terminated (for example overflow of the
    corresponding tablespace) and correct it. Then continue the terminated conversion.
    Since the data exists in both the original table and temporary table during conversion, the storage
    requirements increase during conversion. If the tablespace overflows when you reload the data from the
    temporary table, the conversion will terminate. In this case you must extend the tablespace and start the
    conversion in the database utility again.
    If you shorten the key of a table (for example when you remove or shorten the field length of key fields),
    you cannot distinguish between the new keys of existing records of the table. When you reload the data
    from the temporary table, only one of these records can be loaded back into the table. It is not possible
    to say which record this will be. If you want to copy certain records, you have to clean up the table
    before the conversion.
    During a conversion, the data is copied back to the database table from the temporary table with the
    ABAP statement MOVE-CORRESPONDING. Therefore only those type changes that can be executed
    with MOVE-CORRESPONDING are allowed. All other type changes cause the conversion to be
    terminated when the data is loaded back into the original table. In this case you have to recreate the old
    state prior to conversion. Using database tools, you have to delete the table, rename the QCM table to
    its old name, reconstruct the runtime object (in the database utility), set the table structure in the
    Dictionary back to its old state and then activate the table.
    If a conversion terminates, the lock entry for the table set in the first step is retained. The table can no
    longer be edited with the maintenance tools of the ABAP Dictionary (Transaction SE11).
    A terminated conversion can be analyzed with the database utility (Transaction SE14) and then
    resumed. The database utility provides an analysis tool with which you can find the cause of the error
    and the current state of all the tables involved in the conversion.
    You can usually find the precise reason for termination in the object log. If the object log does not
    provide any information about the cause of the error, you have to analyze the syslog or the short dumps.
    If there is a terminated conversion, two options are displayed as pushbuttons in the database utility:
    After correcting the error, you can resume the conversion where it terminated with the Continue
    adjustment option.
    There is also the Unlock table option. This option only deletes the existing lock entry for the table .
    You should never choose Unlock table for a terminated conversion if the data only exists in the
    temporary table, i.e. if the conversion terminated in steps 3 or 4. table for table TAB is therefore QCMTAB.
    Hope this is helpful,Do reward.

  • Is it possible to change the length of a note in the score editor?

    I thought I saw somewhere that it was now possible to adjust the length of a note in the score editor graphically, i.e. by clicking on the note and somehow adjust its length directly to change it from 1/4 note to 1/8 (for example).
    I don't want to do this by going over to the "Length" dialog on the left because I hate having to switch from thinking in terms of music notation and then having to think (temporarily) in MIDI ticks per beat, etc.
    I must admit that I'm finding it extremely frustrating to simply enter music into Logic in a score....I thought this was supposed to be one of its strengths but it seems to be providing amazing capabilities at the expense of ease of use for beginners.

    dhjdhj wrote:
    I thought I saw somewhere that it was now possible to adjust the length of a note in the score editor graphically, i.e. by clicking on the note and somehow adjust its length directly to change it from 1/4 note to 1/8 (for example).
    greetings dh... are you into Key Commands? There are two which will help you do the above in a trice:
    • Nudge Region/Event Length Right by SMPTE Frame
    • Nudge Region/Event Length Left by SMPTE Frame
    I set mine to the simple letter o and n
    - I click on a note and press o repeatedly.. it grows and grows longer and longer
    – I click on a note and press n repeatedly.. it shrinks and shrinks shorter and shorter
    All by little increments
    If you keep a Piano Roll window open while you do this, you can see the length do this exactly
    man, it is VERY quick and handy for changing the length of notes
    It really helps to have a view of the midi Piano Roll to cross check the exact length and position of the notes.
    Check out the Key Commands:
    • Set Next Higher division
    • Set Next lower division
    These change the note value in the transport bar near the time signature. Your time signature may be 4/4 but the "grid" on which the notes are appear in the Piano Roll could be displayed in quarter, 8th or 16th notes. If you experiment with these commands, then you can match the note lengths easily to the grid display visually (with the above nudge length commands)
    Also - you may like to experiment with the following 3 KEY Key Commands:
    1 • Nudge Region/Event Position Right by Nudge Value
    2 • Nudge Region/Event Position Left by Nudge Value
    This will move your selected notes forward in time or back in time according to the
    value that is set in the Transport bar - say it is 16ths .. then each press of the key will move the notes a 16th
    or if the value is 8th notes, then each press of the key forward or backwards will move the selected notes forward or back by this amount
    ... amazingly useful when you are taking a whole phrase and pasting it somewhere else, or if say you started to write a phrase in the Score Editor and you started on the wrong beat.. then you just Nudge back and forth
    3 • Set Nudge Value to Division
    .. this will in a trice change change the Nudge Value to whatever Note division value is set in the Transport bar
    HTH and forgive me if I have given you too much information
    ..problem is I spent too much time in the Transport Bar in Los Angeles last year drinking with the iSchwartz and other Logic reprobrates... you should join us some time

  • How do I change the length of a column in the metadata?

    A very simple package, reads data from SQL Server and FTPs it to a destination. I have zero experience with SSIS.
    I had to add a new column (HEA_ID) to the input and output. The output record has a filler at the end (I hope you know what a filler is) and the new column has to go before the filler and the filler length reduced accordingly.
    Problem: there is no apparent way to place the new column anywhere but after the Filler. The filler in the metadata is the wrong length and there is no way that I can see to change the length.
    There is a yellow exclamation mark on the Flat File destination (where the filler is wrong length)
    I get these erros when I run the updated package.
    "The external metadata column is out of sync with the data source column. The column 'HEA_ID' needs to be updated in the external metadata column collection".
    "The column filler needs to be updated in the external metadata column collection"
    I have no idea how to fix these errors. Help needed.

    Hi AllTheGoodNamesWereTaken,
    According to your description, you add a new column HEA_ID and make some changes in filler column in the External Columns, so those two columns are out of sync with the data source column.
    Please note that columns are created based on the data source columns. So we couldn’t directly change them in the Flat File Destination Advanced Editor.
    To avoid this error message, just as Visakh said, just review mappings once again in the Flat File Destination. If we want to change the columns in the Flat File Destination, we need change the source columns.
    Thanks,
    Katherine Xiong
    Katherine Xiong
    TechNet Community Support

  • How to change the lengths of the layout

    Hi ,
    I am executing one report, output is coming fine but next if i go to print preview for PO number only 9 digits are appearing one digit is missing, actually column is trucated, there in print preview there is one tab called Change Layout, there if i see length of the PO no is 9, so its showing only 9 digits, actually length of the PO no should be 10.in change layout the length is editable i can change from 9 to 10, after that there is a button called copy, then it will show correctly, it works only one time, so each and every time user has to change the length, so can any one suggest how to change that length in the layout permanently, bcos there is no save button there.
    Can any one tell me from where all these lengths are coming which are appearing in change layout.Surely its not coming from the report.

    Hi friend,
    That depends upon the space provided by the ALV column for that variable or the heading size its not based on the data element size.
    If you want to be more clear lust count the space available for each field available at the print preview.
    The details for that are stored in table T180S just see the documentation available for that table.
    And see when the table is getting filled like that so that you will be able to find a solution where and how it is getting populated.
    Use column width optimization for getting the correct output.
    If you have any queries in this please revert back to me i will help you.
    Thanks,
    Sri Hari
    Edited by: srihari.kumar on Jan 5, 2012 4:01 PM

  • How to change Infoobject length in Datasource - Netweaver2004s

    We are using Netweaver 2004s and when I try to load data using flatfile getting the below error.
    I have mapped legacy field HSTDRWMO of type NUMERIC 8 with BW field ZMONDRW of type QTY.
    I am getting the following error:::
    Error 'The argument ' .00          .' cannot be interpreted as a number' while assigning character to application structure *****
    In DATASOURCE I tried to change the length of the BW infoobject in the length box from 17 to 8 and it is not allowing to change. When I change, it is automatically resets back to original length. 
    Is there any other way to change the length in this screen rather than changing the infoobject itself.
    Your help in this regard is highly appreciated.

    Hi Sivaraman,
    let's have another look on Ron's reply:
    As he said, a datasource consists of fields (see tab "fields", column "fields"), not infoobjects. There, I understand, you typed in your field name ZMONDRW. Then, I suppose, you typed into the column "template infoobject" the same name. That's why BI uses the length etc of the infoobjct ZMONDRW for your field in the datasource.
    You do not need to fill in a "template infoobject". In that case you are free to define your field ZMONDRW in your datasource. I hope that might help you.
    Best regards,
    Iris

  • How can i change the length of a narration ?

    how can i change the length of a narration ?

    hotts77
    Thanks for the reply.
    Still not sure what version of Premiere Elements that you are using. But, the following should apply nonetheless
    What you describe is what I have described in my blog post and for which I have discussed all aspects of the issue. There
    is no workaround to force the program to give you more than you are getting now without other clips also on the track(s). The
    blog post just about says it all.
    You might have to weigh the pros and cons of
    a. Recording your narrations as .wav files in a free audio editor such as Audacity
    Audacity: Free Audio Editor and Recorder
    and then importing those into your Premiere Elements project with Premiere Elements' Add Media/Files and Folders/Project Assets from where you drag the narration to the Narration Track.
    b. Put any video clips on the Timeline when you are recording your Premiere Elements narrations with its Narration Tool. Then remove these video clips and replace them with the real thing when you are ready to put narration and clips into the project.
    Please let me know if you are OK with the details.
    Thank you.
    ATR

  • Changing the Length of the Label

    Hi friends,
    How do I change the Length of the Label in Select-options Component, by default it is taking only
    20characters i.e, medum from dataelement.say I want display more than characters i.e  Long Text of Data element.
    How can I access the Long Text of dataelement in Webdynpro select-options component?
    Regards,
    Xavier.P

    I think,  in select-options component we will be adding the fields to selection screen using the method
    add_selection_field of if_wd_select_options. no where we will be placing the UI elements in view.
    Regards,
    Xavier.P

  • SRM 7 - Contract replication from ERP to SRM

    Hi all,
    We have SRM 7 and ECC 6.0 and we have a requirement to have contract handling for invoices functionality, in SRM, in order to create invoices with reference to a contract directly.
    We want to have ERP system as the central repository for all contracts, meaning that we need to replicate the contracts to SRM, and all the changes made to the contract in ERP side should also be replicated to SRM.
    Does anyone know if this scenario can be done as per standard?  And if so, how can we replicate the ERP contracts to SRM and ensure that all the changes made in ERP will be replicated to SRM?
    Thanks in advance.
    Regards,
    AN

    Dear Krupa,
    Thank you for your quick reply.
    So we should consider the scenario where SRM is the central repository for the contracts, and all the changes done in SRM should be replicated to ERP.
    In this scenario, do you know which steps should be done to allow contract replication from SRM to ERP? I already created a central contract in SRM but there is no message sent to PI.
    Thanks in advance.
    Regards,
    Andreia

  • Issue with Contract Replication from SRM to MDM  - XML structure

    Hi
    We are having an issue with trnsfering a contract to MDM. We have released the contract for update to MDM in the contract through the distribute to catalog option. An XML is generated in SRM that gets sucessfully passed to PI through Catalogupdatenotification_out. In PI the XML fails in the Interface Determination step. the issue that has been noticed is that the XML that is generated in SRM does not contain product category or product ID which is basically what the condition mapping in PI checks for. The conditions in PI were setup as per SAP.
    But now the XML fails in PI because it does not find a combination for Catalog type code = 03 and product category. Please find the XML structure in SRM and you will see that it does not have a product category even though the contract has one.
    <?xml version="1.0" encoding="utf-8" ?>
    - <n0:CatalogTransmission xmlns:n0="http://sap.com/xi/EBP" xmlns:prx="urn:sap.com:proxy:SS1:/1SAI/TASDE808778FFEB81012891:701:2010/10/07">
    - <StandardBusinessDocumentHeader>
      <ID schemeID="0080">56000004100000000220110616202243</ID>
      <CreationDateTime>2011-06-16T20:22:43Z</CreationDateTime>
    - <SenderParty>
      <InternalID schemeID="PartyID" schemeAgencyID="SS1CLNT100">143</InternalID>
      </SenderParty>
      </StandardBusinessDocumentHeader>
    - <Catalog>
      <ID>5600000410</ID>
      <CatalogTypeCode>03</CatalogTypeCode>
    - <NameList>
      <Name>(Copy of Contract 5600000395)</Name>
      </NameList>
      <ActionCode>04</ActionCode>
      <CompleteTransmissionIndicator>true</CompleteTransmissionIndicator>
    - <ValidityDateTimePeriod>
      <StartDateTime>2011-06-13T12:00:00Z</StartDateTime>
      <EndDateTime>2012-06-12T12:00:00Z</EndDateTime>
      </ValidityDateTimePeriod>
    - <CatalogContent>
    - <ItemList>
    - <Item>
      <ID>1</ID>
      <ActionCode>04</ActionCode>
      <CompleteTransmissionIndicator>false</CompleteTransmissionIndicator>
    - <PropertyValuationList>
    - <PropertyValuation>
      <PropertyReference>/CCM/PRICE</PropertyReference>
    - <PropertyValues>
    - <MultipleValue>
      <Index>1</Index>
    - <SimpleValue>
      <AmountSpecification currencyCode="USD">1.0</AmountSpecification>
      </SimpleValue>
      </MultipleValue>
      </PropertyValues>
      </PropertyValuation>
    - <PropertyValuation>
      <PropertyReference>/CCM/PRICE_BASIS_QUANTITY</PropertyReference>
    - <PropertyValues>
    - <SimpleValue>
      <QuantitySpecification unitCode="EA">1.0</QuantitySpecification>
      </SimpleValue>
      </PropertyValues>
      </PropertyValuation>
    - <PropertyValuation>
      <PropertyReference>CCM/PMNTTRMS</PropertyReference>
    - <PropertyValues>
    - <SimpleValue>
      <NameSpecification>0002</NameSpecification>
      </SimpleValue>
      </PropertyValues>
      </PropertyValuation>
      </PropertyValuationList>
      </Item>
    - <Item>
      <ID>2</ID>
      <ActionCode>04</ActionCode>
      <CompleteTransmissionIndicator>false</CompleteTransmissionIndicator>
    - <PropertyValuationList>
    - <PropertyValuation>
      <PropertyReference>/CCM/PRICE</PropertyReference>
    - <PropertyValues>
    - <MultipleValue>
      <Index>1</Index>
    - <SimpleValue>
      <AmountSpecification currencyCode="USD">12.0</AmountSpecification>
      </SimpleValue>
      </MultipleValue>
      </PropertyValues>
      </PropertyValuation>
    - <PropertyValuation>
      <PropertyReference>/CCM/PRICE_BASIS_QUANTITY</PropertyReference>
    - <PropertyValues>
    - <SimpleValue>
      <QuantitySpecification unitCode="EA">1.0</QuantitySpecification>
      </SimpleValue>
      </PropertyValues>
      </PropertyValuation>
    - <PropertyValuation>
      <PropertyReference>CCM/PMNTTRMS</PropertyReference>
    - <PropertyValues>
    - <SimpleValue>
      <NameSpecification>0002</NameSpecification>
      </SimpleValue>
      </PropertyValues>
      </PropertyValuation>
      </PropertyValuationList>
      </Item>
      </ItemList>
      </CatalogContent>
      </Catalog>
      </n0:CatalogTransmission>
    Edited by: vishakhrajeev123 on Jun 20, 2011 6:49 PM

    Dear Krupa,
    Thank you for your quick reply.
    So we should consider the scenario where SRM is the central repository for the contracts, and all the changes done in SRM should be replicated to ERP.
    In this scenario, do you know which steps should be done to allow contract replication from SRM to ERP? I already created a central contract in SRM but there is no message sent to PI.
    Thanks in advance.
    Regards,
    Andreia

  • Dump "Buffer table not up to date" when we change contracts

    Hi experts
    I use SRM 3.0
    Since we have added modifications in contracts, it is impossible to change contracts there's always a dump like "Buffer table not up to date : In FORM ITMADM_UPDATE (function group SAPLBBP_PDIAD) an inconsistent status was discovered. "
    I saw a message in sdn with the same problem and so i tried to desactivate the BADI Check and the problem is not coming any more.
    But I need to reactivate the Badi and I really do not understand why it dumps and the link with the badi Check and everyhting is correct in the Badi.
    My last changes were  : add a custumer field on header and check in the badi check tke rights values for this CUF.
    Thank you for your help.
    Peggy.

    Dear Rao
    Go to Tr:ST22, get the dump log details, from there you will find where the error occur, as well as the callstack, Eg, which
    FM, form ,has been called before the error occur. Set BP  there , so you can proceed debug.
    This dump could happen  if there are some data is missing for this SC, in this case, FUNCTION 'BBP_LINK_GET_OW'
    might interesting.
    Regards
    Lauren

  • BAPI for changing CONTRACTS.

    Hi All,
    I want to update the short text for CONTRACTS in table EKPO from filed CDPOS-VALUE_NEW
    for this i was using function module BAPI_PO_CHANGE
    This Bapi is is succesfully updating the PO it is not updating the contracts....
    Please help me with the BAPI to update text in contracts....
    Please its very urgent
    Thanx in advance,
    Amruta.

    Hi Ajay,
    I have done the same .....
    REPORT  ZTEST1234                            .
    data : wa_ekpo-ebelp type ekpo-ebelp value '00010'.
    parameters :ebeln type ekpo-ebeln.
    data : it_poitem type STANDARD TABLE OF BAPIMEPOITEM with HEADER LINE .
    data : it_poitem1 type STANDARD TABLE OF BAPIMEPOITEMX WITH HEADER LINE.
    data : it_return type STANDARD TABLE OF bapiret2.
    it_poitem-PO_ITEM = wa_ekpo-ebelp.
    it_poitem-SHORT_TEXT = 'mod'.
    APPEND it_poitem.
    it_poitem1-PO_ITEM = wa_ekpo-ebelp.
    it_poitem1-SHORT_TEXT = 'X'.
    APPEND it_poitem1.
    CALL FUNCTION 'BAPI_PO_CHANGE'
      EXPORTING
        purchaseorder                = ebeln
      POHEADER                     =
      POHEADERX                    =
      POADDRVENDOR                 =
      TESTRUN                      =
      MEMORY_UNCOMPLETE            =
      MEMORY_COMPLETE              =
      POEXPIMPHEADER               =
      POEXPIMPHEADERX              =
      VERSIONS                     =
      NO_MESSAGING                 =
      NO_MESSAGE_REQ               =
      NO_AUTHORITY                 =
      NO_PRICE_FROM_PO             =
    IMPORTING
      EXPHEADER                    =
      EXPPOEXPIMPHEADER            =
    TABLES
       RETURN                       = it_return
       POITEM                       = it_poitem
       POITEMX                      = it_poitem1
      POADDRDELIVERY               =
      POSCHEDULE                   =
      POSCHEDULEX                  =
      POACCOUNT                    =
      POACCOUNTPROFITSEGMENT       =
      POACCOUNTX                   =
      POCONDHEADER                 =
      POCONDHEADERX                =
      POCOND                       =
      POCONDX                      =
      POLIMITS                     =
      POCONTRACTLIMITS             =
      POSERVICES                   =
      POSRVACCESSVALUES            =
      POSERVICESTEXT               =
      EXTENSIONIN                  =
      EXTENSIONOUT                 =
      POEXPIMPITEM                 =
      POEXPIMPITEMX                =
      POTEXTHEADER                 =
      POTEXTITEM                   =
      ALLVERSIONS                  =
      POPARTNER                    =
    CALL FUNCTION 'BAPI_TRANSACTION_COMMIT'
      EXPORTING
        WAIT          = ' '
              IMPORTING
                RETURN        =..
    This is my code just for updating the text but now the problemis this works with
    When ebeln = 45000000017
    whose bstyp = F  ie PO
    but when i do the same for Ebeln = 45000000000
    whose bstyp = K ie contracts 
    it gives me error message that this BAPI  cannot be executed for Contracts...
    So please help me with the Bapi to change Contracts.
    Thanx,
    Amruta

  • Is it possible to Extend the Storage Bin Length from 10 Char to 25 Char

    Dear Experts,
    We have a Requirement for Extending the Storage Bin Length from 10 Character to 25 Character.
    Question 1:
    Is it possible to Extend or Not?
    Question 2:
    Even if we extend what will be Impact on the Current Storage Bin Numbers used now.
    Thanks for your support in Advance.

    No, you can't change length for storage bin field in standard and also it is not suggestable to client. If client forcing on requirement, You can suggest like below.
    create one more field for EXT.storage bin by using enhancement  and do one customized report for show as ,  storage bin number+EXT.storage bin = actual storage bin.
    For only client reference you do this report and in standard reports it will not show like this else tell to client ---> it is not possible, because it is replicating and using at different programmes.

Maybe you are looking for

  • Transfer within a company for zero value assets

    Hi experts, I am transferring zero value assets (no acquisition cost, no depreciation, zero NBV) from 1 business area to another business area, therefore use tcode ABUMN (Transfer within company code) with transfer variant 4 (Transfer within a compan

  • My iPhone 3gs sudden turned off and after a few hard resets, and plugged in over night... still nothing. What else can I do?

    The phone was not dropped or wet, but jut went off, it's charged all night and still after a few hard resets it will not switch on? is it dead?

  • Open Sql Insert

    Hi Friends!    Using insert can we use direct to insert record in database table its possibe whats the syntax.

  • Odi 11g under win 7 issue

    Hello. I have a problem with installation ODI 11g (11.1.1.3.0) under Widows 7. When I start setup.exe (run as Administrator), Oracle Universal Installer starts, but needs to specify path to JDK "Preparing to launch Oracle Universal Installer from C:\

  • Join / Merge 2 XLS file in XSTRING Mode

    Hello, I have a XLS file in MIME Repository. What I need to do is, to read the XLS file and then append more data in my program and download it. Steps i have tried:   1. Reading XLS from MIME     l_mr = cl_mime_repository_api=>get_api( ).     l_mr->g