Hi all,
Can anyone please tell me the transaction code or if some config. required to change my control cycle record.
I created one from PK01, now when I wish to edit it at PK02, it gives me the following error.
Control cycle from WM/PP may not be processed here
Message no. PK083
Diagnosis
Control cycles are created both for Kanban and for warehouse management. However, control cycles created for the warehouse management system may not be used in Kanban and vice versa.
Any help is appreciated
Rgds,

HI
I am also facing the same problem.
I am working on r/3 4.7
Please can any one help regarding this problem.
Thanks in advance

Similar Messages

  • PP/WM control cycle records

    Our company is working to install SAP WM. I am looking for easy to use reporting to identify materials that are missing control cycle records, but have been allocated to a work center/operation.

    Hi,
    Try this table PKHD at SE16/SE11 . Create a query for the table so that you can get the information.
    Regards,

  • BAPI /FM to create /change KANBAN control cycle

    Hi
    Is there any BAPI or FM to create or Change control cycle?
    Thanks.

    Check
    BAPI - BAPI_KANBANCC_ADDEVENTDRKANBAN
    Short Text
        Create Event-Driven KANBAN for Control Cycle
    Functionality
        With this method you can procure a material quantity for a control cycle. To procure this material quantity one or more kanbans are created in the control cycle and set to status EMPTY.
        The essential entry parameters are:
        o   Control cycle (if the function module is called as a method for the object kanban control cycle, this parameter is not available, but given by the object.
        o   Material quantity
        Information about the status change is issued.
        COMMIT and ROLLBACK WORK: the function module does not carry out any COMMIT work. Command off. This must be ensured by the initiator after ending the function module. Each time the function module is called, a COMMIT WORK must take place. It is not permitted to call this FM several times and to post the result with a COMMIT WORK. If, during the process,
        the FM comes across an error, in some cases the command ROLLBACK WORK wil be carried out. In these cases the kanban is either set to ERROR status, or in the parameter RETURN an error message is given.
    Hope this helps.
    Regards
    Vinayak

  • BADI to Change control record from idoc

    I’m trying to use the BADI IDOC_CREATION_CHECK to change the control record from the idoc but im not able to do it because the parameter IDOC_CONTROL is an importing parameter not a changing parameter, I’ve tried to use the BADI IDOC_DATA_MAPPER but I this case I’m just able to change the data record, should I use another BADI?
    Regards
    Luis Constantino.

    hi.
    have you tried ABI_IDOC_PROC_MODIF?
    i did not read much thru the documentation...
    i hope this helps.

  • Stanging indicator change in control cycle after production order released

    HI
    We have MM PP interface active
    i setup staging indicator 4 for one material via control cycle
    Production order is created and released
    now we would like to change staging indicator to 1 [pick parts]
    how we reread control cycles data in production order
    Thanks

    Try: CO02 > Functions > Read PP master data

  • Change KANBAN Status Sequence in Control Cycle

    Hi guys,
    Can anyone please detail which are the implications if I should change the status sequence for a control cycle, which is in use now?
    Regards,
    Ileana

    Hi
    In the kanban process the actual sequence is
    Wait>Empty>In process > Intransit> Full > In use>Empty.This is complete cycle
    If ur present kanban bin status is "In use" then then u changed the sequence in the control cycle.
    When ever u trigger the kanban card, then system  move to control cycle and checks the kanban sequence by referring the standard sequence it move to next status.  
    Eg: Ur present sequence is like
    Empty>In process> In -transit --> Full -->  Empty
    Now ur bin status is "Full" then u have changed the sequence in the control cycle.
    New sequence is like
    "Empty--> In process > Full> In use -->Empty"
    Now u triggered the kanban card of " Full" status bin, then system refer first sequence in the control cycle and then standard sequence then status is changing to " In use"
    Means when ever u change the sequence in the control cycle system checks the sequence in the control cycle by reference of standard sequence it will changes the bin status.
    So if ur bin is in the "In -use " status, then what ever the next  status in the sequence is taken when u trigger the kanban signal

  • Tracking changes to LPK2 (Control Cycle)transaction

    Hi,
    We would like to track the changes made to the existing control cycle data.
    The changes to the control cycle are performed through LPK2 transaction.
    The transaction takes material, plant and supply area as inputs.
    We would like to know for particular material, plant and supply area who,when and what data has been changed.
    I appreciate your quick help in this regard.
    Thanks in advance..

    <b>Transfer requirement</b>
         LTBK               Transfer requirement - header
         LTBP               Transfer requirement - item
    <b>Transfer order</b>
         LTAK               Transfer order - header
         LTAP               Transfer order - item
    <b>Master data - stock positions</b>
         LQUA               Quants
    <b>Inventory documents in WM</b>
         LINK               Inventory document header
         LINP               Inventory document item
         LINV               Inventory data per quant
    These are the tables which are affected when you make the modifications.
    Hope this helps you
    Regards,
    Pavan

  • KANBAN control cycle quantity changes tracking -reg

    Hi,
    Which tables and fields are to be used to knwo the changes in the kanban quantities in the control cycle of a part number
    for a part number over a period of time what and all changes are done to the kanban quantity we would like to track
    how to go about ?
    pl guide
    regards,
    madhu kiran

    Hi,
    Try Table PKCH and field PKCMG.This would be your best bet.

  • KAMBAN: Change Status Sequence in Control Cycle

    Hi guys,
    Can anyone please detail which are the implications if I should change the status sequence for a control cycle, which is in use now?
    Regards,
    Ileana

    Hi
    In the kanban process the actual sequence is
    Wait>Empty>In process > Intransit> Full > In use>Empty.This is complete cycle
    If ur present kanban bin status is "In use" then then u changed the sequence in the control cycle.
    When ever u trigger the kanban card, then system  move to control cycle and checks the kanban sequence by referring the standard sequence it move to next status.  
    Eg: Ur present sequence is like
    Empty>In process> In -transit --> Full -->  Empty
    Now ur bin status is "Full" then u have changed the sequence in the control cycle.
    New sequence is like
    "Empty--> In process > Full> In use -->Empty"
    Now u triggered the kanban card of " Full" status bin, then system refer first sequence in the control cycle and then standard sequence then status is changing to " In use"
    Means when ever u change the sequence in the control cycle system checks the sequence in the control cycle by reference of standard sequence it will changes the bin status.
    So if ur bin is in the "In -use " status, then what ever the next  status in the sequence is taken when u trigger the kanban signal

  • Cycle recording

    Cycle recording on Garageband.
    I want to change a small section of the recording.
    It records the new recorded section but doesn't attach to the rest of the old recording.
    If I choose the new recorded section the rest of the original recording disappears.
    What am I doing wrong?

    Thanks Christoph
    I appreciate your time.
    This is on a Real Instrument track. It's a vocal.
    I get the impression that I'm able to re-record a section that I want to improve by putting the cycle section exactly where I want to replace, and it is replaced in the original recording.
    However I can't do it.
    What is happening is that it records the new improved version but I can't work out how to incorporate it into the original recording.
    If the new one is 2 and the original is 1.
    How do I incorporate 2 into 1?
    When I play 2 it is only the new revised section. The rest of the song I want to keep is not there.
    When I play 1 it is the old version, still with the bit I don't want and want to replace.
    Without splitting and copying and pasting..... how do I add the new improved bit to the original recording using the cycle section?
    Thanks again
    Stephen

  • Issue with control cycle

    Hello all,
    Can somebody please tell me how to find who created a particular control cycle?
    Is there a way to find the id of the person who created/modified a control cycle?
    If yes, please tell me.
    Thanks and Regards,
    Umakanth.

    Hi
    Use Transaction AUT10 with T-codes PK01/PK02.
    Give the period for which you want to find changes.
    keep the changed by field open , i.e dont put your user id there.
    and execute, you will get list of all changes done through creation or chage transaction of control cycle.
    check it out and revert back for further discussion.
    Hope it helps you.
    regards
    Ritesh

  • Creation of control cycles for lean WH

    Hi All,
    Is it possible to create control cycles (backflush) for LWH, if so how?

    HI ,
    There is one more way to create control cycle.
    1. PK05 - create supply area ( earlier explained the procedure)
    2. PKMC - enter plant - go to change mode ( click on change icon ) - in the right hand window - you can see the create / copy icon.
    3.click on create icon
    4.select option - classic Kanban or event driven kanban
    5.enter material/ plant/ supply area.
    6.enter no of kanban / qty.
    7.In replenishment strategy - select appropiate option ( in our case it is stock transfer)
    8.enter - the tab will change from replenishment strategy to stock transfer.
    9.enter storage location.
    10.enter destination- storage type- bin
    11.enter if any additional data required to enter.
    12. save- control cycle will get generated.
    thanks
    Om

  • Manual Staging in control cycle TR creation WM/PP integration

    Hi,
    We defined Material Staging Indicator as 4 in Control Cycle
    How do we trigger TR for this materials ly??? Do we need to create TR manually? OR any transaction which will allow to create TR automatically for desired quantities
    When i go to Change production Order and WM pick list Requested quantiry/confirmed Quantory is Blank only requirement qty column has values
    How i can enter quantities manually and trigger TR
    Can i have in Prduction Order few materials manually staged and few option 1 [pick parts]

    Let me rephrase
    We are using Standard PP/WM integration to stage materials from warehouse to production Bins.
    We defined Material Staging Indicator as 4 [Manual Staging] in Control Cycle of materials [as business wishes to move materials manually from warehouse to production Bins]
    How do we trigger Transfer requests[TR] creation to initiate movement of raw materials from warehouse to Production bins.
    Do we need to create TRu2019s manually? If yes How [As I understand TR doesnu2019t allow to move more than one material at a time from one Bin to another]
    When i go to Change production Order and select WM pick list I could see Requested quantity and confirmed Quantity column are not getting filled only requirement qty column has values. All columns are grayed.
    Can we have few materials manually staged and few via Staging indicator option 1 pick parts?  so that all critical parts will be moved manually and others SAP to create TRu2019s automatically
    PLEASE HELP

  • Control cycle mass creation with staging indicator 4

    Hi All,
    Is there any way to create control cycles in mass for staging indicator other than 3 - rel order parts?

    You can define a generic control cycle for manual staging parts and it will be valid for parts w/o control cycle. Please read SAP online help:
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/c6/f841494afa11d182b90000e829fbfe/frameset.htm
    For manual staging, you can define one control cycle per production supply area for all materials. This control cycle is then valid for all the materials in the production supply area, for which you have not defined an individual control cycle.
    If you want other mass cration / change tool, you have to develop it on your own.
    Edited by: Csaba Szommer on Dec 13, 2011 9:59 PM

  • OWB 10gR2 - Security and Change Control

    I am attempting to setup a customized change control policy in 10gr2. As part of change control, I'll need to setup security to only allow changes to objects that are scoped to the version. In previous versions, I could use WBSecurityServiceImpl. With 10gr2, it looks like the security is more tightly integrated into the control center and I am trying to determine the best strategy.
    The interface to control changes in OWB will likely be written in Unix (ksh scripts that run tcl scripts in OMBPlus).
    By default, users will have read-only access on all objects. If a change is required, they will need to "check out" the map. Only one user will be able to check out an object at any time. When a map is checked out, a snapshot will be made, and the user will be given access to edit the object.
    Once the change is complete, the map will be "checked in", the edit priv will be revoked from the object, and a description of the change will be recorded in a table outside of the control center.
    If developer determines that they do not want to make the change, they will simply "release" the object which will cause OWB restore the last snapshot.
    If the change is checked in but it is later determined that we need to go back to a previous version of a map, we could "restore" the object from a previous snapshot from the command line.
    That is my basic change control strategy. Has anyone attempted to do something similar? Could anyone see problems with this strategy?
    I'd really appreciate some feedback from any OWB experts out there. Thanks.

    Hi,
    you can use the security options in the project configuration. It's for new and old objects, there you can restrict the permissions.
    Regards,
    Detlef

Maybe you are looking for

  • Why can I no longer close down Firefox while saving existing tabs?

    For some freason, I don't know what, but 2 things are going wrong. 1. I cannot log in to an already registerd account with the same name an my [email protected] email address 2. Why can I no longer close down Firefox while still saving existing tabs.

  • For those of u with screen flicker, what did applecare say

    I noticed an ever so slight flicker a couple of weeks ago; only a few times, randomly, and so little that i would think to myself "did the screen just flash" (it was infact, cause i would stare at it for a few seconds afterwards and it would keep doi

  • HT4009 How do I cancel in apps purchasing for yearly suscription which I did intend to?

    I recently downloaded TripIt. When I tried to figure out the things accidently click on a link and take me to purchase the service with no price displayed. I thought it was free. It actually did purchase one year of TripIt Pro Services for $48.95. Ho

  • Connecting BI 7.0 with SQL server R2

    I get the error below when I try to link the open hub destination with the sql server r2. I am able to view the data correctly in preview mode but when I execute the package in realtime mode I get the below error. Any help is greatly appreciated. I h

  • Name in Shared Network

    I have several Apple computers all connected through a network including some pc. I tried to change the "Computer Name" from System Pref->Sharing but all the other computers including Apple ones, kept the previous name. I restarted the "Sharing Servi