Change Currency of entire workbook

I have finally taken the plunge and converted my life from PC to Mac.
In opening some of my old Excel spreadsheets in Numbers, I have found that the Mac automatically assigns the wrong currency to my pre-formatted currency columns.
Is there a way to change the overall currency used in a document? Otherwise I'd have to select column for column, cell for cell. What a time-consumer!
Any help is much appreciated.
Thanks

If you enter the Numbers Preferences, you may ask the app to display every currencies.
Doing that on my machine I got two kinds of Rand :
Rand financier whose symbol is ZAL
Rand whose symbol is ZAR
The way you described Rand in Excel doesn't match the list of currencies symbols used by Apple (which is an outdated one but I already reported tha several times to Apple).
I guess that the described problem is linked to this "wrong" currency identifier.
I searched in the features available in AppleScript for a way to drive the currency setting with a Script. I am able to define a range's format to currency but alas, I don't know the way to define the exact currency used. So, when I define a cell as a currency one, I always get the default currency setting.
Yvan KOENIG (VALLAURIS, France) mercredi 30 décembre 2009 21:10:16

Similar Messages

  • Change description of Bex Workbook in 2004s

    How do we change description of the workbooks? Change description option from Bex analyzer is not available.
    How would one move or copy a query / workbook from a role to another role ( There was an option with 3.5 in Bex browser and Bex Analyzer)
    Option of saving a workbook and query to a role from Bex Analyzer > Open screen is not available
    Rgds
    Dinesh

    Workbook settings -
    <a href="http://help.sap.com/saphelp_nw2004s/helpdata/en/54/a493f7256b43698191a2623e5a0532/content.htm">http://help.sap.com/saphelp_nw2004s/helpdata/en/54/a493f7256b43698191a2623e5a0532/content.htm</a>
    Global Settings-
    <a href="http://help.sap.com/saphelp_nw2004s/helpdata/en/f1/0a551ce09411d2acb90000e829fbfe/content.htm">http://help.sap.com/saphelp_nw2004s/helpdata/en/f1/0a551ce09411d2acb90000e829fbfe/content.htm</a>
    Hope it Helps
    Chetan
    @CP..

  • How to change currency in PO item by using BAPI 'BAPI_PO_CREATE1'

    Hi. i want to change currency in PO item.i just find this field in condition table in this BAPI. code is as below
    *POPULATE condition data
            CLEAR t_po_condition.
            t_po_condition-ITM_NUMBER      = v_poitem * 10. " Item No.
            t_po_condition-COND_TYPE       = 'PBXX'. " Condition type
           t_po_condition-CALCTYPCON      = C_B. " Calculation type
            t_po_condition-COND_VALUE      = SEQ_FILEH-NETPR. " Condition value
            t_po_condition-CURRENCY        = SEQ_FILEH-WAERS.
            t_po_condition-COND_P_UNT      = SEQ_FILEH-PEINH.
            t_po_condition-CONDCHAMAN       = c_x.
            t_po_condition-COND_UPDAT      = c_x.
            APPEND t_po_condition.
    *POPULATE condition data flags
            CLEAR t_po_conditionX.
            t_po_conditionX-ITM_NUMBER         = v_poitem * 10.
            t_po_conditionX-ITM_NUMBERX        = C_X.
            t_po_conditionX-COND_TYPE          = C_X.
            t_po_conditionX-CALCTYPCON         = C_X.
            t_po_conditionX-COND_VALUE         = C_X.
            t_po_conditionx-CURRENCY           = C_X.
            t_po_conditionX-COND_P_UNT         = C_X.
            t_po_conditionx-CONDCHAMAN       = c_x.
            t_po_conditionx-COND_UPDAT      = c_x.
            APPEND t_po_conditionX.
    any advice?

    Just Select The Total Column, then Drag & Drop accordingly..
    whereever you want..
    Alternatively you can do by
    in the top right corner of the item overview you have a button for table control (above the vertical scroll bar).
    If you click that button, you get a pop-up from where you can customize the layout.
    Press the blue info button there and read how this is to be done.

  • Change Currency in Park Document

    Hi,
    I have parked one document with currency USD, now I want to change same document from USD to SAR in FBV2. How can I change currency field, please advise!
    Regards
    VS Rao

    Hello VS RAO
    It is not possible to change the currency field in a parked document
    after at least one G/L account line item is entered. This is highlighted
    in SAP Note 851736
    'ENJOY: Currency in parked document can be changed'.
    There are a number of reasons why the currency should not be changed.
    One such reason is mentioned in the SAP Note:
    ..'You park a cross-company code document with an Enjoy transaction. You
    change the document currency in the parked document. The currency is
    adjusted for the source company code only. The original currency remains
    in all other company codes....'
    Only possible solution is to delete these parked documents which
    have incorrect currencies entered.
    Hope this clarifies
    Ray

  • Change currency in pr

    Hi all,
    Can any one through some light on "changing currency in PR".
    my user want to change the currency in PR.
    (in dev i can change the currency of PR  (where master data is copied from PRD) but in PRD system does not accept me to change teh currency ).
    helpful answer will be appreciated.

    Hi,
    You can't change currecy If your PRD PR already released.
    So please RESET your release then try to change currecy.
    Please find the below path to RESET release.If your version is 4.6C.
    ME54 > Edit > Release > Reset.
    Regards,
    Nagapandian.

  • Change Currency in Venezuela

    Please, I like to know if someone has some information how will SAP treat the change currency in Venezuela at the beginning of 2008.
    Any information will be very good.
    Thanks

    Hi
    Read this:
    http://www.worldservicesgroup.com/publications.asp?action=article&artid=1896
    regards
    Srinivas

  • Change currency in Stock Transfer

    Dear Experts,
    One of the client asking option to change currency in inventory transfer. Please help me, how can I?
    Regards,
    silambu

    Hi,
    Hereby I attached screen shot,
    Here, the price is showing in USD. They want to change  AED dynamically.
    Regards,
    silambu

  • How to change currency in material master

    Could you please tell me multiple way to change currency in material master (mm02/mm02). Currency is under Costing2 tab in material master.
    Thanks..

    Hi,
    In <b>SPRO</b>, u can change the Cuurency.
    The Exchange Rate Type is used to store currency conversion rates for different purposes, in the R/3 System.
    If the R/3 System is to perform exchange rate conversions between a large number of different currencies, it can be simplified by specifying a base currency per particular exchange rate type. Then specify the exchange rates of all currencies in relation to the base currency for the exchange rate type concerned.
    In accordance with legal requirements, the base currency (EUR) must be defined as the From currency for currency conversions within the EMU (European Monetary Union). To do this, set the indicator in the field BCurr = From.
    <b>IMG->SAP Netweaver->General Settings->Currencies->Check Exchange Rate Types.</b>
    Regards,
    Padmam.

  • Change currency in condition in PO after cancel GR

    Hi everyone,
    I have met a problem.  I want to change currency in PO condition, like FRB1, after GR has been cancelled.
    First, I created a PO, then did GR in MIGO.
    Next, I cancelled the GR and now I want to change the currency of condition FRB1 in ME22N. However, it is not possible to change condition FRB1 at all.
    I tried to modify the definition of FRB1 in IMG, but it doesn't work.
    So I would like to know that if it is possible to change currency of certain condition after cancelling the GR. If it is possible, pleaes kindly share your idea.
    Many thanks in advance.

    Hi Jack,
    Delete the PO line item and Create another PO with the currency of the choice.
    As you have already done the GR with the PO and then deleted the GR, delete the PO as well and try with the changed Currency.
    Regards,
    Nani.

  • Changing currency in PO ?

    Can I change currency in PO after saving once ?

    Before releasing  the P.O you can change."N" Number of times
    As a basic rule, the currency cannot be changed if there has already been a goods receipt against a document.
    Please check whether good receipts is done if so you cannot change the currency
    G.Ganesh Kumar

  • Printing Entire workbook problem

    Discoverer version 10.1.2.48.18
    When printing an entire workbook the printout is not consistant at all. There's a looping of a grouped item and the grand total does not print out at all. The reports look great in print preview but the printout is completely off. We first thought it was the printer driver issue but after testing on many printers both network and local printers the same problem occurred.
    Although it's not consistant in accuracy it's usually inaccurate on all printers. Please help us figure this out.

    Hey there.
    I just don't see the problem but I'd suggest you repost to the Discoverer forum
    Discoverer
    as the traffic there is much higher on Disco issues. Hope it'll help get you as resolution as someone's come against it before in your version.
    Russ

  • Precautions for Changing Currency Decimal Places

    Hi Gurus,
    I am having a requirement to change currency decimal place, which is set wrong at the time of golive.I wanted to know what are the precautions i need to take for changing the currency decimal places. As per the note at the time of changing currency decimal places, we need to check is there any transactions posted in this currency. I have checked BKPF table and no transactions are posted.
    1. what are all the other tables i need to check for ensuring there is no transaction posted in that currency?
    2. Is there any other place we need to do this change?
    Thanks in Advance
    Regards,
    Giri

    Dear!
    We also faced this problem,But I recommend
    Please do check following befor chaning the currency decimals
    1- transaaction data
    2-Project profile currecnt setting ( OPS9)
    3- Internal order budget profile setting ( OKOB)
    3- funds management profile setting ( OF12)
    4- All other proifle.
    5-Als0 consult with other Module  team/HR
    Thanks
    Message was edited by:
            MS

  • Changing currency to 5 decimals, affecting dialog programming.

    Changing currency to 5 decimals.
    The dialog program is affected.
    A price field on dialog program, having data element BAPRE (Curr 11 Decimals 2). For instance, enter price 2000, after pressing enter button, the price will turn into 2.00000  it was automatically devided by 1000, any idea what went wrong?

    You are using currency fields that reference a currency code. Most currencies in SAP have two decimal places. Dividing by 100 will work in most cases. Ideally you should get the CURRDEC value in table TCURX for the currency you are working with... then divide by 10 that number of times.
    example-
    USD, 2 decimals, divide by 10 twice.
    There is a function module that will do this for you. Can't think of the name...???
    YA..
    function modules <b>G_DECIMAL_PLACES_GET or TCURX_READ</b>

  • How can change currency rate in clearing document

    How can change currency amount in clearing document

    Dear Michael,
    It was a User confusion with Creation Date of Invoice, Billing Date of Invoice and Posting date of Accounting Document.
    User had created Invoice on some 01.03.2009 but Kept Billing Date as 26.02.2009. So, while released Accounting Doc. on 10.03.2009 (Releasing date and not Posting Date), It gets Posted on 26.02.2009, only, and not on 10.03.2009.
    The whole confusion was:
    When User refers Document Flow (for Invoice in VF02), System shows Invoice Date as 01.03.2009, against Accounting Posting Date 26.02.2009.
    Whereas,
    When I showed FBL5N to user, BL Document and AB Document both get posted on 26.02.2009 only.
    Its Clear now.
    Best Regards,
    Amit

  • Change Currency Format

    How to change currency format from US to Indian format?

    Check if the below link helps...
    Number/Currency Formating Problem
    ~Abhijit

Maybe you are looking for

  • Free goods but want to freight cost updation upon GR

    Hi, Scenario: I have a PO with 20 line items and header freight cost. There are few more items in PO which are ticked as free goods. There is a stock of those materials with certain MAP. Freight condition has been configured as vendor GR so that it g

  • Weblogic 10.3.2.0 installation does not pick the right JDK

    The installation does not pick up the right jdk version that is jdk 11.6.0_11 . Although the machine is running the same. Instead it picks up jdk 1.6.0_14. have tested the machine many times. I am Installing Oracle SOA Suite 11g.

  • Passing date parameter from prompt

    Hi experts I am getting some problem while passing date from a dashboard prompt. In RPD i have changed the date column properties as DATE only so that i will get the DATE part of the data not the time stamp. Now in the dashboard prompt i added a prom

  • I'm hostage: Can synch Ipod with 5.0 but not 6.0

    I posted about this issue before, but want to resurrect the issue as there is definately a problem with the Itunes 6.0 and my Ipod and there must be others out there.. I managed to find a 5.0 version so I un-installed 6.0 and re-installed 5.0, Now I

  • Dreamweaver local site root no longer recognized after Leopard installation

    Hi, After installing Leopard, my Dreamweaver CS3 local site root is no longer available, although files and folders still exist in it. Any suggestions? Thanks!