Change Diagram Type in Control Chart in QE51N

Hi
I'm using the QE51N to record the results.
I press the Control Chart Button and it's OK.
I change the Diagram Type from "Lines" to "XY" (Dispersion), but the change isn't keep it for the other characteristics, or if another day I execute the QE51N the Diagram type remains like "Lines"
Is it possible to change the diagram type and keep it forever? I have used the "Save Mode" button but doesn't work.
Thanks a lot for the answe.I will give the points.
Take care,
Francisco

Dear Fransisco
Try to change the same in the configuration. It might help
SPRO > QM >Quality Control > Define Graphic Types for Evaluations of Original Documents > here choose 003 for control chart and change the chart type on the right hand side
Regards
Gajesh

Similar Messages

  • Change Currency Type in Controlling area

    Dear Gurus,
    We have the following settings in the customizing:
    1 - OKKP - Currency Type 20 and Currency key "USD"and flag "Different Company Code Currency is Allowed" set;
    2 - Object Currency WBS "10 Company code Currency" "BRL";
    3 - OB22 - Currency Type 1st local currency "10 Company code currency -
    BRL" and 2nd local currency "40 hard currency - USD";
    We would like to change the Currency Type in OKKP of "20 Controlling area currency" for "40 Hard Currency"  without modifying the currency key.
    That impact this modification can be generate if in the Production System already exists real postings and Settlement to FI-AA?
    Thanks,
    Elza Silva
    Message was edited by:
            Elza Aparecida da Silva

    SELF Solved.
    Regards,
    Sharvari Joshi.
    Edited by: Sharvari Joshi on Aug 12, 2010 10:44 AM

  • Windows BUG: Can't change file types through control panel Quicktime settings

    I am running the latest version of Quicktime on Viista Home Premium 64-bit.
    When I into Control Panel -> View 32-bit Control Panel Items -> Quicktime -> Browser, and I click on "File Types" or "MIME Settings", I get a blank page that looks like this: http://oi40.tinypic.com/hvbbia.jpg, and Quicktime momentarily freezes.
    I have no issue adjusting file type settings when bringing up Quicktime outside of control panel, or when using "Default Programs" within control panel, it's only when I do it within "View 32-bit Control Panel Items" that it does this.
    This is a minor bug but still weird. Can anyone else verify the issue? I tried uninstalling and reinstalling but that didn't help.

    This could be caused by damaged QuickTime preference files (or possibly a permissions problem on the preferences files).
    We can try rebuilding one set of your preference files to see if that helps with the greyed-out stuff.
    First, quit QuickTime if you have it open.
    Next, you'll need to make sure you are set up to view hidden files and folders in Vista (or 7).
    1. From the Start menu, click Open.
    2. In the Organize menu, click Folder and Search Options.
    3. Click the View tab.
    4. In the "Advanced settings" pane under "Hidden files and folders" make sure that the "Show hidden files and folders" option is selected.
    5. Click OK.
    Next, you'll remove the QuickTime preference folder (and contained file).
    6. In Computer, open Local Disk: C or whichever drive your documents are stored on.
    7. Open the Users folder.
    8. Open the folder with the name of the Windows 7 user account in which the QuickTime file types are "greyed out".
    9. Open the AppData folder.
    10. Open the Local folder.
    11. Open the Apple Computer folder.
    12. Drag the QuickTime folder out onto the Desktop.
    Now you'll rebuild the preference folder and file.
    13. Launch QuickTime. Check your file types again.
    Are they still greyed out, or can you change them now?

  • Control chart title in chinese (QE51N)

    Hello,
    In the QE51N transaction, there is a control chart. The english title is "Acceptance chart for x-bar / samples". In the V_QPSH view there is the translation in chinese: "承兑图,用于 x 条 / 样本". But the chinese title doesn't appear correctly in the chart control. Indeed, i have "???????X ? / ????".
    I try to change the regional options of my computer in chinese but i still have the same title with the ?.
    What must i do in order to have the correct title?
    Thanks by advance,
    Laurent.

    This can also be an authorization issue.
    There is an authorization object S_TRANSLAT ( translation environment) which checks the authorization for translation in deifferent languages and texts.
    Please ensure that you sufficient authorization for the fields Activity, Language & Text in this object.

  • How to generate control limits in control chart

    I want to generate a X bar chart with control limits, sample size is Fix- 1.
    SPC criterion I selected is 020 ie Task List characteristics/ Material.
    1)Sampling Procedure I used- Fixed-1
    2)Valuation mode I used- Attrib non conforming units/ manual.
    3)Control chart I am using is 110- Shewart chart for X bar.
    But when I click for control limits in chart it is saying control limits for track 1 could not be calculated.
    Could anyone guide me, how to generate control limits for this graph. Sammple size will alwyas be 1.
    Please let me know should I change control chart type in this case.

    Hi Jaison,
    You should use valuation mode - SPC valuation in sampling procedure.
    Also you have to use sampling procedure with inspection points.
    as practically every hour or depending on the frequency decided we collect the measurements and calculate the SPC.
    now after correction in the sampling procedure create new inspection lot and check SPC.
    try out and revert.
    Regards,
    Anil

  • Control Chart Query

    Dear Experts
    As part of SAP QM Implementation we are implementing control chart functionality to get graphical representation against measured values for pre-defined parameters. I am facing two issues mainly:
    1. When I try to calculate control limits (clicking calculator button) getting message "Control limits for track 1 could not be calculated". MICs has the upper limit and lower limit maintained which I can see in QAMV table for the inspection lots.
    2. In the attached control chart , I am getting Upper Limit, Lower Limit and the Valuated Result in graphical form, when I try to display the inspection date, for the characteristics against inspection lot, I get lost. System is showing some date 7/14/14 against all the characteristics which I am not sure how to achieve.
    Settings I made:
    Sampling type: Fixed sample
    Valuation mode: SPC inspection
    W/O inspection point
    Sample size: 5
    Chart type:115 Shewhart chart for X bar/USA
    MIC Settings:
    Quantitative / Lower / Upper Sp. Limit / Sampling Procedure / SPC Characteristics / Summerised Recording / Required Char.
    Inspection plan setting is:
    SPC criterion : 020 task list char/material
    Base qty : 1KG
    Control Chart Configurations:
    1. Control Chart Type -115
    a) Change Control Limit not checked
    b) Characteristics Type- Fixed Scope, Record measured values
    c) Reference Axis (x-axis) - Time of Creation ( Do I need to change here to "Object Number" or "Time Of Inspection" ?)
    Any input will be highly appreciated.
    Regards
    SK

    Hello,
    For Control limits your chart needs to closed. and offcourse for calculation u need to have more than one inspection lot. then system will calculate the same. UD is also required against lots.
    Regards

  • Is it possible to develop the control charts in WAD.

    Hi Gurus and Experts
    We need your suggestions to go futhure with our requirement.
    Right now KPI's are currently displayed in graphical form with the
    ability to drill down into WO's( Work orders) from the graph page. our
    new requirement is to get exactly the same set of information captured
    and presented in control chart form. This is to be an adjunct. to, not
    replace, the existing graphical set of data. Upper and lower control
    limits will be set initially by the business, and the same drill down
    functionality should be available from the control chart. The charts
    can be displayed seperately from the exisiting set of charts if this
    makes it easier.
    Can you please suggest us whether is it possible to develop the control
    charts and also have the functoinalities of the existing dashboards
    (example drill down of WO's using the control charts) in WAD or through
    viusal composer
    Waiting for your responses..
    Thanks
    Ravi...

    Hello dj_page!
    Thanks for the answer, but I know this already.
    My problem is, that the small picture in the side panel and the histogram in LR5 are bigger than in LR4.
    The two pictures are showing the difference between the versions.
    On the left hand (LR4) you can see a smaller preview and histogram than on the right hand (LR5).
    In each version you can change the size of the side panel only as small as the preview-window is.
    The pictures are also showing the smallest size of the side panel in each version.

  • Change color of series in Charts to custom colors - error in macro generated by Excel

    The case:
    Excel 2013, Multiple cheets with multiple charts of different type. Several charts doesn't show well will the defaut color automatically generated by Excel. -> The idea is to modify these graphics only with a specific color combination (modifying the
    color of the series)
    I'm able to modify the color of each series of 1 chart using the UI. but there are many charts so doing them with a simple macro would speed these repeative steps.
    I turned on the macro recording to capture the change of the color of a selected serie in a selected chart.
    The generated code is:
        ActiveChart.Legend.LegendEntries(1).Select
        With Selection.Format.Fill
            .Visible = msoTrue
            .ForeColor.ObjectThemeColor = msoThemeColorAccent3
            .ForeColor.TintAndShade = 0
            .ForeColor.Brightness = -0.25
            .Transparency = 0.3000000119
            .Solid
        End With
    When I execute the macro, Excel trigger an error:
    Execution error -2147467259 (80004005)
    method "Fill" of object "ChartFormat" has failed   (this is a translated error message, as I run a french version)
    Any idea why Excel cannot run its own generated code ?
    Thanks in advance.

    Very surprisingly the following code (also generated by the macro recording) works ok.
    (I selected the serie inside the chart instead of selecting the serie in the legend)
        ActiveChart.FullSeriesCollection(1).Select
        With Selection.Format.Fill
            .Visible = msoTrue
            .ForeColor.ObjectThemeColor = msoThemeColorAccent3
            .ForeColor.TintAndShade = 0
            .ForeColor.Brightness = -0.25
            .Transparency = 0.3000000119
            .Solid
        End With
    If an MVP or Microsoft official come accross this, I suggest further testing as it is very likely a bug (with the first set of code generated by Excel)

  • How can I change the font within a chart in an ibook

    I need to change the font size in a chart that is in an iBook because it is so small I can't read any of it.  When I try pressing the larger/smaller font buttons, the text outside the chart changes but not within the chart.

    Use the SeriesCollection(1).Name function. In LV, wire up the following:
    _Chart into Method SeriesCollection (index = 1 to 4)
    Cascade into Variant to Data (wire type Excel.Series)
    Wire Series into Property Name, Write the string
    Michael Munroe
    www.abcdefirm.com
    Michael Munroe, ABCDEF
    Certified LabVIEW Developer, MCP
    Find and fix bad VI Properties with Property Inspector

  • QM Control Chart Limits

    I'm having trouble with the X bar and S chart control limits.  I am not able to get them to calculate as expected.  Also, I'm not clear on what the number parameters (parameter 1, 2, 3, and 4) in the IMG do. 
    Has anyone out there successfully set-up SPC charting?  If so, will you please give me some pointers?  We are collecting the mean and standard deviation for each of our test parameters by inspection lot.  The number inspected varies per inspection lot.
    Thanks,
    Bob

    Hi Shailendra,
    After I change the SPC criteria to "070 MIC/Material" in insp. plan, the control chart shows multiple insp. lot result successfully.
    But the system auto collect all the corresponding MIC/Material in one item (ex. 19th). Is there any way to separate the result by every month?
    Thanks.

  • Dynamicall​y Changing Number of Channels in Chart

    Hi,
    I have a simple question about a labview programming issue. I am
    trying to modify an NI Example program for demonstrational purposes.
    I am using the Multi-plot real-time chart example program (link below)
    from the NI website. I have changed your example for the chart to
    display the data in the stacked plot mode. How could I modify it to
    vary the number of traces dynamically. Is this possible? My goal
    would be to use a series or radio buttons to control viewing 4, 8 or
    16 channels, in real time. All of the code and programs I have seen
    have channel display statically in the begining setup. Is there a
    property node of the chart that controls this?
    Thanks
    John
    http://zone.ni.com/devzone/explprog.nsf/6c163
    603265406328625682a006ed37d/5ac3fd88cb3815f0862566​57007542ee?OpenDocument

    Mark,
    I would appreciate if i could see some code. Would you please email
    it to my hotmail address.
    Thanks
    John
    On Mon, 4 Feb 2002 07:40:27 -0800 (PST), markwysong
    wrote:
    >There's not really a property node. I've done this before, but it's
    >not exactly straight forward. If you stretch the window that shows
    >the trace names and colors, you can show more trace names and colors.
    >Make sure that this is big enough to handle the max number of traces
    >that you'll need.
    >
    >Next, in your code, make a property node for the chart. You'll need
    >to set all the trace colors to transparent to begin with, then change
    >them to a predefined color depending on how many traces you have. You
    >do this by using the property node, setting the active plot, then
    >
    changing the color (and name, too). Then you just wire the plots to
    >the chart, and it should display it. I can show you some of my code
    >that performs these functions if need be.
    >
    >Mark

  • Dynamically Changing Number of Channels in Chart

    Hi,
    I have a simple question about a labview programming issue. I am
    trying to modify an NI Example program for demonstrational purposes.
    I am using the Multi-plot real-time chart example program (link below)
    from the NI website. I have changed your example for the chart to
    display the data in the stacked plot mode. How could I modify it to
    vary the number of traces dynamically. Is this possible? My goal
    would be to use a series or radio buttons to control viewing 4, 8 or
    16 channels, in real time. All of the code and programs I have seen
    have channel display statically in the begining setup. Is there a
    property node of the chart that controls this?
    Thanks
    John
    http://zone.ni.com/devzone/explprog.nsf/6c163603
    265406328625682a006ed37d/5ac3fd88cb3815f086256657007542ee?OpenDocument

    To accomplish your goal, the example VI needs to be modified a little bit. I've made one such modification and attached the modified file. I hope it helps. Please note that nothing shows on the Front Panel Until you press one of the control buttons.
    Attachments:
    Modified_Multi-plot_real-time_chart.vi ‏138 KB

  • How can I take the photo by capture the photo, plot the graph(control chart) in the same times and export to Excel File

    I want to do my sample of the project  following these steps.

     1. Create the template for compare other objects.
     2. Save the template and ready for compare realtime with other objects  
    II 
    1. Use the CCTV video camera Sony capture the picture of the object (lego toys).
    2. Calculate the size of the objects and change to mm.
    3. Compare with the template and plot graph(Control chart) by length
    4.  Export the data to Excel Files
    Solved!
    Go to Solution.

    Nice project !
    I sincerely hope you are not expecting us to do your homework.
    What is your experience with LabVIEW ? 
    May be you should try to start to code something and then come back later with some more specific question ?
    Message Edité par chilly charly le 01-02-2009 08:40 AM
    Chilly Charly    (aka CC)
             E-List Master - Kudos glutton - Press the yellow button on the left...        

  • Control Chart capabilities

    While we were reviewing requirments for our dashboard one element
    that was requierd is show Delivery performance in a form of a control
    chart. Currently we use minitab to produce this control charts. Minitab
    is capable to produce this control chart calculating average,UCL,LSL and
    show "error types" when a point is out of UCL LCL limits. Question is that
    if oracle tools will be able to produce such control charts or something
    similar and determine if we will have to reproduce calculations that
    minitab does using custom processes that will be part of the Dashboard.

    Hi,
    It is the date on which the SPC characteristic is first assigned to the lot. It gives the reference of the lot for which it was assigned first.
    Hope this is helpful.

  • QM-Control charts

    Dear all
    i have checked all the parameters required to maintain control charts. but when i enter data for in process insp. lot and display control chart an error message occur
    "track 1 of the control chart does not contain any data"
    so please guide me how can i see the control chart and explain me to rectify that fault.

    Hi Shoaib,
    Check the following.
    Condition 1:
    In sampling valuation mode should be SPC Inspection and Control choose any control chart type.
    Condition 2:
    In result recording your MIC should be single result entry as well as you have to enter more than one result.
    Check and revert.
    Regards,
    Babu

Maybe you are looking for

  • How to start with JMS?

    Hi All I am new to JMS, i know about java basic stuff.... what do i need to start with JMS? i mean.. what software/applications/servers? I have J2SDK 1.4.2_03, what concepts should i know as pre-requisites... ? Thanx..

  • Export RAW file from iPhoto to Aperture

    I want to start using Aperture 2 for my photo editing, so I need to import a number of RAW photos that are currently stored in iPhoto. This seems like it should be a simple enough process, but the different methods I have attempted have only resulted

  • Crystal Reports 8.5 not saving report criteria changes

    I am a relatively new Crystal user, but have noticed that my version 8.5 doesn't always save changes to the report criteria that are made in the formula editor.  The program says that it is saving the changes, the when the report is closed and reopen

  • Adding elements to a Dialog after it's been created using a resource string

    I can add elements using add but not with a resource string. The following works in ExtendScript Toolkit but not in Photoshop. Any idea why? var window_res = "dialog { \      orientation: 'row', \      alignChildren: 'top', \      preferredSize: [500

  • Mismatch between sound and video

    When I watch a movie in iTunes of Apple TV (2gen) and I want to move it few seconds/ minutes and more backwards then it like "losing its mind", the video jumps forward (a lot forward) and the sound stays the same, so ther is mismatchment between soun