Change Document (CV02N)
I have an issue when using CV02N. When I click on the descriptions tab and try to insert a new line (one line already exist with the Language set to EN). I hit the save button and I get this error message Entry Already Exists. If I go back and change the Language from EN to some other language, it will take the new entry. I am trying to find out where the setting is that will allow multiple entries for the same language in this field.
Thanks!!
> I have an issue when using CV02N. When I click on the descriptions tab and try to insert a new line (one line already exist with the Language set to EN). I hit the save button and I get this error message Entry Already Exists. If I go back and change the Language from EN to some other language, it will take the new entry. I am trying to find out where the setting is that will allow multiple entries for the same language in this field.
You can't use more than one short text (40 chars) in one language.
Doubleclick the entry to enter more text.
Markus
Similar Messages
-
CV02N Change documents Basic Drawings
Hello Friends,
I want to delete the attachemnts in CV02N from icon (at left hand upperside) Services for Object .
When you select the icon we can find the Attacments option, if u select the attachemnets you can see the list of attacments available for that drawing. My requirement is write a BDC to delete these attachments, but while doing BDC recording this process is not recording, can any one tell Function module, BAPI to delete the attacments in CV02n.
Thanks,
RaviGert,
The change done in the project profile will only affect newly created projects.
Have you checked if change documents are created for new projects?
Hope this helps
Rgds
Martina -
How to display list of TCodes with Change Documents enabled
Hi
I have 42 transaction codes (e.g. QA11, QA12, QE51N, QE01, QE02, MM01, MM02) and I want to verify if "change document" logging is enabled for the critical data elements in these transactions.
I'm aware that you can individually check "change document" setting per table via SE11 > Enter Table Name > Technical Settings > “Log Data Changes” option. Given the number of transactions (with multiple data elements) I need to check though, is there a table in SAP where the field, table, tcode and existing change document setting can be viewed?
Thanks
T-code
Description
MM01
Create material
MM02
Change material
ME01
Maintain source list
MSC1N
Create batch
MSC2
Change batch
QA01
Create inspection lot
QA02
Change inspection lot
QA11
Record usage decision
QA12
Change usage decision
QA14
Change usage decision without history
QA16
Collective usage decision for OK lots
QA32
Inspection lot selection
QAC1
Correct actual quantity in inspection lot
QAC2
Transfer inspection lot quantity
QAC3
Inspection lot – reset sample calculation
QE01
Record results
QE02
Change results
QE51N
Work list: results recording
QM01
Create quality notification
QM02
Change quality notification
QP01
Create Inspection Plan
QP02
Change Inspection Plan
CS01
Create BOM
CS02
Change BOM
CC01
Create Change Master
CC02
Change Change Master
SU01
Maintain authorizations
SE38
Execute program
COR2
Change process order
CC22
ECM Change Object Management Records
MMDE
Delete all materials
COR1*
Create process order with material
QA08*
Mass change of quality management inspection data
C201*
Create Master Recipe
C202*
Change Master Recipe
C298*
Deletion of Task Lists without Archiving
QPR4*
Process Physical-Sample Drawing
COEBR*
Batch Record Approval
QPR1*
Create physical sample
QPR2*
Change sample
CV01N*
Create Document
CV02N*
Change Documenthi Raphael,
you can also use following two table to view the change log at data element level:
CDHDR - Change document header
CDPOS - Change document items
e.g. give the table CDHDR in SE16N enter your transactions field "TCODE", and date parameter, you can see the results.
Regards
Javed -
Issue in generation of Change Document - ChaRM
Dear All,
We are implementing ChaRM, I have copied the standard transaction type to z.
I am able to create request for change with transaction type zmcr but when the normal change or urgent change document are created they have standard transaction type.
I have made the changes in SPRO (Defining copy control of transaction type) but still document are getting generated with standard transaction type.
Please attached document of copying control.
Thanks in advance
Regards
SushantI have removed zmcr - smmj but now the change document is not getting generated. Please see the screen shot attached.
Regards
Sushant -
How to use change document object ?
Friends,
I am learning to use the Change Document object for one of my Z table. I have created a change doc object using SCDO. I have now written a test report in which i am issuing the SELECT statement for fetching old and new values from the Z table and passing them to the FM generated by SCDO.
I am not able to see the changes in the CDHDR and CDPOS tables. I am doubtful abt the values being passed to the FM. Here are the values i am passing:
CALL FUNCTION 'YTEST_WRITE_DOCUMENT'
EXPORTING
objectid = 'YTEST'
tcode = 'se38'
utime = sy-uzeit
udate = sy-datum
username = sy-uname
PLANNED_CHANGE_NUMBER = ' '
OBJECT_CHANGE_INDICATOR = 'U'
PLANNED_OR_REAL_CHANGES = ' '
NO_CHANGE_POINTERS = ' '
UPD_ICDTXT_YTEST = 'U'
n_ztest_cle = wa_ztest_cle
o_o_ztest_cle = o_ztest_cle
UPD_ZTEST_CLE = ' '
tables
icdtxt_ytest = itab_cdtxt.
Is the object ID the same as the Change Document Object name ??
Please help.
Thanks,
Ram.Well, i found a way out for the problem i was facing. I was not setting the "UPD_ZTEST_CLE " FM parameter. When i set it to 'U', the changes got reflected in the CDHDR and CDPOS tables.
Can i reward myself as i solved this by myself ??? -
Problem with Change Document FM - Not all fields are tracked in CDPOS
Hello everybody,
Using transaction SCDO and following necessary steps described in forum, I have created a change document ZFBR to track changes of a table ZFBR. The problem is, the generated FM ZFBR_WRITE_DOCUMENT does not track changes of some fields of the table (inserts are always ok, problem is with updates). After some debugging I realized that the FM DDIF_NAMETAB_GET was returning the table DFIES_TAB where the LOGFLAG was empty for some fields (which are not tracked) so that changes of these fields were not visible in table CDPOS. However, fields with LOGFLAG = 'X' are tracked succesfully (changes are visible in table CDPOS).
I did not specify any fields to be get logged or not during the steps in SCDO (can we do such a specification anywhere?), does anyone know why the field LOGFLAG has the value '' (space)?
Best regards;
Ozcan.Hi again,
The problem has been solved.
The data elements used in a table are the reason for the problem I have described above. When displaying the details of a data element, under tab "Further Characteristics" , the "Change Document" checkbox has to be selected to enable change document tracking. I have copied the problematic data elements with Z prefix and made the necessary enabling. I have replaced the data elements with their Z equivalents.
Best regards.
Ozcan. -
Table to look for change documents for users
Hi friends,
Is there any standard table to look for change documents for a user?change document through SUIM does not give the correct log.
Thanks for you support.Julius
Looking at another of Tracy's other post (http://scn.sap.com/thread/3598947) she's trying to use ACL. Hence needing to know the tables to write joins/queries to hit tables within ACL
I've seen ACL used and have had the fun experience of Auditors using Google to find tables to perform checks on without context of what has actually been implemented in their particular system.
Regards
Colleen -
F150 dunning- create change documents in FI journal
hi all,
when running F150 in update mode the dunning information is updated in the FI posting.
however, no change documents are created for the FI posting.
Is this possible to achieve and how?
If I change dunning fields manually via FB02 I get the change document for those fields. I would like to get this also for the F150 program execution.
Thanks in advance
HeinHi,
maybe SAPNET note 609773 is helpful (depending on your SAP Release).
best regards, Christian -
Change Pointers - adding a new field to existing Change Document
Hi,
We have a requirement to capture the changes made to the Material object through the transaction C223. The changes to field MKAL-PRFG_F have to be captured.
There is an exisitng Change Document Object - MATERIAL. This is included in Message Type MATMAS. These are the steps we have done:
1. In SCDO - added the Z structure to the Change Document Object - Material. [Z structure contains the field MKAL-PRFG_F. Change pointer option is checked for this Data element.
2. Created a Z Message Type with reference as MATMAS.
3. In BD52 - we have listed the fields for the new Z Message Type created.
4. The Change Pointers - reactivated after the steps are done.
The changes to the field MKAL-PRFG_F through C223 Tcode are not recorded in BDCPV table.
Have we missed any steps here?
Thanks,
PallaviHI,
I don't think a new zmessage type is required in this case.. is the structure added to MARA table??The change document programs are there which triggers the iodcs... In SCDO transaction code , click on generation info for MATERIAL.. You will find the includes. The FM MATERIAL_WRITE_DOCUMENT creates entries in CDHDR and CDPOS, if we maintain entries in BD52 , the entries wil be written in BDCP and BDCPS tables.
Try to add your structure in MARA table as append strucre and then you can debug the IDOC from WE19 and use the FM "MASTERIDOC_CREATE_SMD_MATMAS" and then you also need to switch on Update Debugging on, to debug the changes in update FM MATERIAL_WRITE_DOCUMENT.
Please see if the change is reflected or not....
ELSE.
may be you need to create a new entry in SCDO and do all the ALE configurations for change pointers.
Please find the link for change pointers and also you can get lot of information on change pointers in SCN.
http://help.sap.com/saphelp_nw70/helpdata/EN/12/83e03c19758e71e10000000a114084/content.htm
Regards,
Nagaraj -
Decimal places for JPY currency in change documents
Hi Gurus,
For opportunities in SAP GUI the change documents for JPY show incorrect numbers.
The number is divided by 100 (two decimal places added).
Checked the CDPOS table and found the values already divided (two decimal places added).
SPRO->General Settings->Currencies->Set decimal places for currencies is set for 0 decimals for JPY.
Is there any way I can get correct values in the change documents?
Please advice. Any hint is useful.
Thx,
Martin KumaHi Naren,
Thank you for the tip, however the TCURX table is changed via customizing and should be changed only during the system initialization.
What I would like to do, is to assure that the system displays the values in change documents correctly. It should apply the currency conversion for the data displayed the same way it does for all the tables.
Do you have any idea, how should I do this?
Regards,
Martin Kuma -
Error releasing transport request for change document object
Hi Gurus,
I created a new change document object for a Z-table. When i try to release the transport request in the development system it terminated with a message "Export application-defined objects 17.12.2009 11:07:45 Not yet executed". The transport request continued to be in the "Release started" status and i am not able to release it.
I checked in the co file & data file directory for this request, The co file is available but the data file is not created.
Could you please let me know how to solve this?
Regards,
Immanuel.It was a problem with some basis settings. Was rectified by the basis team.
-
Error while approving change document(TR lost project code)
Hi All,
I am having issue in change document approval, when we are approving change document for unit testing or if release management approving change for pre-production or production approval, we are getting error, I started coming from last two days only,\
when I did detail analysis, in all transports project code related to change document, disappear
although if I create new change document, project code appear,
Do we have way to solve this issue?, I even not able to decouple the transport from change document, it giving error, do we have way where we can resync change document and transport?
DineshHi All,
Do anyone have some solution for this issue?, it is bigger than I thought, I can check it impacted all systems, and all transports, all transports seems to issue they lost project code in it we rollover maintenance cycle last week and this problem started from their, we put charm master note and few other charm fixes(notes) last week,
this problem not coming any new change document, but all change document created before rollover impacted
Dinesh -
Problem while generating Update progam for a Change Document Object
Hi,
I'm trying to deal with Change Document concept in a R/3 4.6C environment and to establish new Change Document object for my (Z)-table. I haven't using any namespace and created object with name ZTEST. Following the online documentation I came to the point, where I have to generate include program. I made all the nessesary inputs (using Z prefix) but faced
"Function module name is reserved for SAP"
Creating everything similarily using some of our registered namespaces (/somenamespace/) I succeed to generate the Update program and to integrate it in my Z-programs as well.
My question is: is it possible to use Change Document Object-names without predefined namespace - being a regular customer developer, but not an SAP developer - means, if I am allowed to manage programs in the customer namespace (Z,Y, X) only. If yes, how to do this?
Further (I decided not to open a new thread) - generated Update program uses
CALL FUNCTION 'xxxxx' IN UPDATE TASK
for creation of Change Numbers for generated Change Document Object. This CALL doesn't work when I implemented it in my Z-program, but when changed (IN UPDATE TASK was commented) - everything goes well and the system creates records in CDHDR/CDPOS tables for my object class and table.
Why is that? According to the documentation I shoud only fill appropriate variables for the Change Document Object (class, tr.code, etc.) and call generated FM, nothing is pointed out about any possible problems? Am I doing something wrong?
Well, to be precise, I think I have to give a sample:
1. I have a sample Z-table with few fields (their data elements are marked as Change-Document relevant).
2. Using own z-progam I created a new record for this z-table. Also fill all the nessesary variables included in the interface of generated FM for Change Document Object (for example - FM-mane CD_CALL_my_object).
3. I call the CDO FM.
4. Check what is happening (directly in both tables CDHDR/CDPOS or using FM CHANGEDOCUMENT_READ).
Further, I perfom the steps from 1 to 4 updating the created in previous loop record in my Z-table.
In both cases if the FM 'CD_CALL_my_object' is called IN UPDATE TASK nothing happens, but in case of direct call (without addition IN UPDATE TASK) the system behaves as expected. Well, obliously I can change the generated code for our production needs, but it doesn't seems to be the correct decision - in case of next possible modification of the Change Document Object definition, respectively in need of re-generation of the code.
Any hints are wellcome.
Thanks in advance.
Ivaylo Mutafchiev
Edited by: Ivaylo Mutafchiev on Jan 24, 2008 10:24 AM"IN UPDATE TASK" resolved by myself. The one should explicitly call 'COMMIT WORK' from Z-program after CALL FUNCTION '...' IN UPDATE TASK in order to get changes in the CDHDR/CDPOS commited. The key in this issue for me was to check the documentation of CALL FUNCTION :-).
Regards,
Ivo -
Report for Change documents in Solution Manager.
Dear Masters,
In Solution manager, we are monitoring the inbound support messages through the Transaction code CRM_DNO_MONITOR.
Here i can veiw the status of support message as of now, but i am not able to see the changes done throughout the process.
Is there any report where i can find the data for changes done on the support messages for the given period?
I can find the change documents where by entering into the support message in Menu bar under Extras > Change documents.
But my requirement is i required this report for the some number of support messages for the given period.
Your help will be much more appreciated.
Thanks,
Panneerhi
is this te one are you looking for
[http://help.sap.com/saphelp_smehp1/helpdata/en/43/2f40b6853e0d23e10000000a1553f7/frameset.htm|http://help.sap.com/saphelp_smehp1/helpdata/en/43/2f40b6853e0d23e10000000a1553f7/frameset.htm]
jansi -
Change documents of material master classification class type 001 and 300
Dear guru ,
I want to see the history of change documents of material master classification using MM02.
The system allow to see the history only for class type 023.
For class type 001 or 300 the change document isnu2019t available.
I must do some settings or the function for these class type arenu2019t available ?
Thanks.Dear ,
changes in values for a characteristic can be monitored in CL20N but as for MM02/MM03 transaction only for class type 023.
For class type 001 or 300 the change document isnu2019t available.
Thanks.
Maybe you are looking for
-
How do I get a mixer to show up in Soundtrack Pro?
The problem is not using a mixer but I can't get one to show. I see my sound track, (can play) and did analysis and cleaned up but clicking all mixer buttons and choosing a different layout all 3 choices never give me a mixer. The lower pane with the
-
I upload songs, but they dont show up on my ipod?
i have used itunes to upload my CDs and downloaded songs onto my ipod, i click the update ipod button and itunes SAYS its importing them to the ipod, but i disconnect and there is still nothing on it. Does anyone know what im doing wrong?
-
List of Values using WeCheckbox
I attempted to apply the same principles in using shared variables within a subreport to populate the values for WeCheckbox function. Although I was able to get the list of values to populate as desired, something strange happened when I tried to use
-
Bussiness Delegate vs Session Facade.
Hi, Please any one tell me what are the differences between Bussiness Delegate and Session Facade. I read some documentation in online but not clear in above two design patterns. Any help I will appricate. Thanks, CDulla.
-
I had to do a total reboot on my laptop
I had a do a full system restore (to the start of the laptops life) on my laptop & lost everything including all my itunes purchases, will i be able to get these back of itunes & how?