With ME21N, i'm doing STO and giving supplying plant and receiving plant and saved.
immediately with ME22N, I have opened same STO and found supplying plant field disabled.
I want to change supplying plant.
Can anybody guide me for this?
Regards,
Samir Wadajkar

Dear,
This is not SAP standard practice. e.g. If you once create sandard purchase order with vendor 'X' and save the PO. And after some time can u change the Vendor 'X' to 'Y'. It is not possible becoz of whenever u create PO that time SAP system give the PO document number. In that Document number it cantain master data like vendor master & material master. U can change material master but not the vendor master that is maintained on header level. This is not standard practice in Material management. If this things are open then everybody change the vendor code after creation of PO.
So create another STO and block or delete first one.

Similar Messages

  • Vendor creation for supplying plant in STO

    I m trying to create a Vendor for the Supplying Plant for Intercompany STO scenario.
    When I go to the Purchasing data (Extras - Add purchase data) of Vendor master to assign Plant, I m not getting the field to assign the Plant.
    I do I have to do to get this field, am I using wrong vendor account group. Please help.
    Thanks in advance,
    Ashish

    Hi,
    Go to OMSG,
    Double click on Vendor A/c Group and then double click on "Purchasing Data" under Field Status sub screen.
    Then double click on "Add. Purchasing Data" under Select group, here Mark field "Plant" as optional if it is suppressed

  • Determination of Supplying Plant in STO

    Hi,
    Let's say there are 3 Plants A, B and C. Plant C normally receives Parts from Plant B. I want to set a condition that when Unrestricted Stock in Plant B is 0, then system should perform availability check at Plant A and if available, should choose Plant A as the Supplying Plant.
    I came across "Set up Determination of Supplying Plants via Availability Check" in customizing (Materials Management --> Purchasing --> Source Determination). Is it anyway relevant to my requirement. If Yes, how do I go about configuring it? Or is there any other way to handle it in SAP R/3 4.7 ...?
    Thanks.
    Raj

    Hi Raj,
    I have the same scenario. Have you found a solution?, Could you share it?
    Thanks!

  • Excise tab missing on supplying plant for sto

    Hi expert
    i am doing sto, where i have maintian excise duty in pricing procedure, while doing 641 previously my excise tab was coming, now i am making a new STO PO, while doing 641, excise tab is not coming.
    is i am missing any customising
    Regard
    Nabil

    HI
    Check the below note
    Note 1079123 - Excise tab is not getting displayed in transaction MIGO
    regards
    Prashanth

  • Vendor as a Plant in STO

    hello guys,
    I have a small query like can we use Vendor as a Supplying plant for STO as we have to use this on day today basis and client dont want to go for Consignment.
    is there any field in vendor master that can help me to use the Vendor master as a supplying plant in STO please tell me the needful.
    have a great Day.
    regards,
    ninad kshirsagar

    Exactly i was thinking like When will pick the STO in ME21N it will show the supplying plant and blank field at that point i want to use the vendor no. but in the manner like i dont want to prepare a new Plant at the name of vendor.
    so whenever i use STO with vendor ID system shouldn't show the error message.
    that's my requirement.
    regards,
    ninad

  • Customer PC3000 does not exist (please change entry in plant 3000)-INT STO

    Hi All,
    Iam getting error message while creating intercompany sto PO in my QA clinet.
    (Customer PC3000 does not exist (please change entry in plant 3000)
    Vendor maintained both the plant(supply and receeving plant)
    Customer maintained both the company code and sales org.(supply and receeving plant) then also Iam getting same error.
    I had checked OMGN t-code setting looks good.
    Same setting I had tested on DEV and SANDBOX its wokring fine.
    Please help me out how to solve this problem
    Thanks
    Raj K

    Hi,
    I am facing similar problem, When trying to create a PO for Intercompany stock transfer, I am getting the error message Customer XXX does not exist (Please change the entry in Plant XXXX).
    This error is appearing only in the Production system, but PO is getting created in Quality system. All the Master data, Configuration in both systems appears same. If you know any solution, kindly post.
    Regards,
    Onkar

  • STO-PO-Vendor (supplying Plant) pickup in condition Type (Freight)

    Hi,
    I am doing STO PO, system is automatically picking the vendor code (supplying Plant) in condition type (Freight) in condition tab.
    I want to system should not pick the vendor code in condition type (freight). It should be shows blank.
    Please guide me.
    Regards,
    Devendra

    Hi,
    Check transaction variant  is used which inturn you cretae STO PO, system is automatically picking the vendor code (supplying Plant).
    NOTE:Transaction variants  is used for to hide fields, menu functions, screens, to supply individual fields with default values or to change the ready for input status of one or more fields.Check in T.code: SHD0
    Regards,
    Biju K

  • Route Determination on STO (Receiving plant and supplying plant same)

    Dear Experts,
    We have two different STO type,
    same supplying plant
    same receiving plant, receiving debit to PO assigned account, not inventory, so we don't maintain storage location
    same materials.
    The requirement from warehouse: They want the two types STO link to two different Route. ( we have many plants, which based on transportation zone, link to different route already)
    I tried maintained  shipping condition on the sales order type DL, which suppose copy to the delivery order type DL, but it seems not working.
    The shipping condition still copy from the ship to part (receiving plant).
    Any suggestion for this case.
    Thanks in advance.
    Jaeny

    Hi Jaco,
    Thank you to reply me. Delivery type is NL, rather than DL (sorry mistake)
    I am trying to use shipping condition which assign on sales order to separate the route.
    So create a new Stock transport Delivery order type ZNL by copy the standard one NL.
    And create a sales order type ZDL and assign the copy control (standard is DL link to NL), and set shipping condition type on new sales order type ZDL,
    but it turns out the shipping condition still come from the ship to party rather than sales order, and route keep no change.
    So if STO not follow the rules : shipping condition not from sales order , only from ship to party?
    Besides, any other suggestion for this case?
    Thank you
    Janey

  • Does STO create demand in supplying plant with Strategy 40 ?

    Hello friends,
    In our system, STOs do show up as a procurement elements at the receiving plant, but they do not create a demand at the supplying plant.  Supplying plant is using Strategy 40.  So my question is - Are STOs supposed to create a demand in supplying plant with Strategy 40 ? 
    Thanks,
    - Chetan

    STOs should create requirements in the supplying plant, no matter the planning strategy.
    There are though some possible definitions that will alter that, the business case being that you have created PIRs in the supplying plant, and you want these STOs to be included in the scope of your sales plan. In this case, especially with PS 40, STO will not create additional requirements (on top of the PIRs), but rather consume the PIR like a customer order.
    Regards,
    Mario

  • System should accept particular supplying plant only in STO

    Hi Experts ,
        There are 2 STO types used by one of our client . One is used to transfer from factory to depot .Another is for STO from depot to depot. Here , when users select Factory to depot STO types , system should not accept any other plant except Factory (Plant) as a supplying plant..  Please let me know if any possible ways to  achieve this.
    Thanks in advance.
    With regards
    S.Siva

    Hi,
    here you are telling that you are going to use  2 sto types for factory to depo and depo to depo. menas are going to use two document types Z configured ?
    I think it is normal scenario , at spro--purchasing POSTO, you are going to assign the sypplying plant with the receiving plant.
    I think this will be suffie
    Regards,

  • Donot want Planned Order to be created for STO in supplying Plant

    Hi Gurus,
    We have material A which in being produced in Plant 1000. This Material A is being used as a Component for a product in plant 2000. By Using Stock Transport order we get the material from supplying plant 1000.
    when we run MRP for the plant 2000, schedule line is generated for the plant 2000. at the same time planned order is generated for the Material A in plant 1000.
    My requirement is i dont want planned order to be created in supplying plant i.e plant 1000.
    Afzal

    Hi,
    Let me Clarify my requirement again.
    Material A is being Produced in plant 1000(supply). The same Material A is being used as Input material in plant 2000(Demand) for product B.
    <b>Master Maintained.</b>
    <b>Material Master</b>
    I maintained Procurement type as F and Special Procurement as 40 in Plant 2000 for Material A.
    I maintained Procurement type as E for Material A in Plant 1000.
    <b>Schedule Agreement</b>
    Schedule Agreement created in Plant 2000 referring plant 1000 as supplying plant and agreement type as LU.
    <b>Source List</b>
    Source List Created based on the schedule agreement and maintained MRP indicator as 2.
    <b>MRP Run</b>
    During MRP run for Product B in plant 2000, It creates schedule line for the Material A in plant 2000. At the same time it creates planned Order for material A in the supplying plant 1000.
    My Requirement is we don't want the planned order in supplying plant 1000. The reason behind is that we want to run MRP in plant 1000 seperately at a different frequency.
    Running MRP in plant 2000 should limit the requirements raising in plant 2000 only and the MRP run for 1000 should limit to plant 1000 only.
    Message was edited by:
            afzal ahmed

  • Supplying Plant field is not appearing in vendor creation of receving plant

    Dear Friends,
    Iam configuring Cross Company Scenario to my  client for the version SAP 4.6C as they implemented a new company code and want to transport the material from one company code to another company code.
    I made all the required customizations in the system
    while creation a vendor code in the reciving plant in Pur.Org.Data screen->Extras--> Add.Pur.data i am unbale to view plant field where we maintail supplying plant
    In OMSG at purchasing data at add purchasing data PLANT, vsr relevacne & plant relevance made optiional
    but while creation of vedor code the other two VSR relevance and Plant relevance indicators are populating but the PLANT field is not appearing.
    without this assignment while creating a STO, shipping data tab is not appearing
    Please Provide me input in solving this error.
    Thanks inadvance
    Regards
    Srini

    Dear Srini Behara
    The field selection is controled at Vendor accounting group.
    For Vendor account group (std 0001) , the field Plant in additional Pur data is supressed whereas for accounting group 0007 this field is activated.
    Please rfer the following path to activate the field
    SPRO--> Financial accounting --> Account receible and Payable --> vendor accounts --> Master data --> Prepataions for creating vendor master data --> Define account groups with screen layout
    Select the Vendor account group and go to Purchase org data and change the Plant filed option.
    Or create teh Vendor under accounting group Plant (0007 std)
    warm regards
    Ramakrishna

  • Supplying Plant

    Dear Friends,
    Just small querry
    In EKKO table for purchase order does Supplying Plant field is only gets updated when PO DOCUMENT TYPE is stock transfer i.e. for PO DOCUMENT TYPE UB?
    If yes then no problem, else for what other documents type does it get updated and what config changes needs to do in document type
    Regards
    Vishal

    Yes, it is used in case of STO (intra-(UB) & intercompany(NB)). F1 help for EKKO-RESWK:
    Text
    Supplying (Issuing) Plant in Stock Transport Order
    Definition
    Describes the plant from which the ordered material is supplied.
    Use
    The supplying, or issuing, plant is only entered in the case of stock transport orders.
    Regards,
    Csaba

  • How to specify the vendor for supply plant in stock transfer oder process

    Hi experts,
    In the sceniro of intercompany STO, I want to know how to set up the link between supply plant and the vendor ?
    Thank you.

    Hi
    I think you are talking about Inter Company STO...if yes,
    Follow the below steps to to make STO between two plants belongs to  different company company codes.It is also called as Inter Company STO.....
    *1)Create one Customer Master in XD01 with respect to Supplying Plant Sales Area and assign this Customer no with Receiving Plant in OLME->PO-> set up STO->Define shipping data for plant and for the supplying Plant assign the above sales area.( Make sure,In Customer Master,sales Area Tab: you are maintaining shipping condition)*
    *2) For Receiving Plant Pur. Org and Co.Code Combination create Vendor master in XK01 and in this vendor master assign the Supplying plant in Pur.Org.Data screen->Extras--> Add.Pur.data
    3) OLME->PO-> Set up STO------>For your supplying plant assign document type NB, Delivery type NLCC and Checking Rule RP
    4)then For your supplying Plant and receiving Plant assign Document type NB
    5)Make sure you are maintaining Sales View for the material at supplying Plant and in Sales /Gen plant Data view maintain Availability check, Loading group and Transportation group.
    6) In SPRo-->Logistics execution> Shipping->Basic shipping functions->Shipping point Determination>assign shipping points-> For your Loading group,Shipping Condition and Supplying plant combination,Assign shipping point
    these are the configuration settings you have to do in background.
    Then Create STO from Receing Plant in ME21N with document type NB.
    Based on that STO, Create Delivery in VL10B from supplying Plant
    Do PGI in VL02N from Supplying plant
    Do GR in MIGO at Receiving Plant keeping Outbound delivery as a ref. document.
    Now your STO bet. two plants belongs to diff. Co.Codes will be completed.
    Reward if useful
    Regards
    S.baskaran
    Edited by: baskaran srinivasan on Feb 28, 2008 9:53 AM
    Edited by: baskaran srinivasan on Feb 28, 2008 9:54 AM

  • Excise invoice doesn't exist in the supplying plant. Message no. 4F281

    Hi Gurus,
    I am doing STO from Excisable depot to Excisable depot as
    1. Create PO at Receiving Depot
    2. Create Delivery through VL10B
    3. Issuing Material through VL02N
    4. Create Excise Invoice through J1IJ
    5. Do Goods Receipt at receiving depot.----here I am unable to capture the invoice
    I am getting error as" Excise invoice doesn't exist in the supplying plant. Message no. 4F281"
    When i try to capture J1ig with supplying plant excise number , the excise value is not flowing and it is showing "0" duty values.
    Any  plant level setting is missing,
    Searched in the forum but not got any solution..
    Please let me know how to solve this issue.
    Thanks,
    Muru..

    Hi,
       Sorry, I misunderstood it as plant to depot STO. Please ignore my previous comment.
       Please ensure that the excise invoice is posted in the supplying plant. Refer the similar thread: STO from Excisable Depot to Excisable Depot
    Regards,
    AKPT

Maybe you are looking for

  • Migrating from Bridge CS6 to CC

    Hi, is there a way to migrate labels, keywords and collections to Bridge CC?  It is impossible to do this to 30,000+ images.

  • XI/PI: File Adapter Configuration

    HI , I required  to generate multiple files(same format) based on the 5 unique combinations of  particular fields. At receiver side I required ,files should have different names and should be placed in different directories. Please suggest me how can

  • Is there the equivalent of smart art in keynote?

    Sorry. I am new to Keynote. In office 2007 for the PC there is a smart art feature where its templates for building graphics such as process diagrams, hierarchy charts, circle diagrams...you start with the template and add text. I can only seem to fi

  • Deposit process between branches

    Hello , Is there any solution how to manage the incoming payments and deposits between branches and the general office. My customer has few branches that all work with SAP Business one on the same DB They get payments from customers in every branch.

  • Vendor on PO and contract

    Hi SAP GURus, can anybody tell me whether we can have one vendor on PO and another vendor on contract, if we want to have the logical traceability? Thanks Anusha