Change Inspection Plan

Hello everyone,
I have a problem, I change a control indicators of characteristic in the inspection plan, but it doesn't take effect.
whether I need to set other setting? Thanks in advance.
zhigang
Edited by: zhigang lu on Oct 16, 2009 5:29 AM

Hi,
Please also check under QM client settings in SPRO to ensure that the "replace master inspection characteristics" box is ticked as this will allow changes in the MIC to update the references in the inspection plan. Also check the QM settings at plant level if you have ticked master inspection characteristics with history then if you do a change in the MIC it will create a new version and not update the inspection plans. If this is ticked you will have to manually go into the inspection plan and assign the new MIC version.
Regards,
Roderick

Similar Messages

  • Master data changes not updated in Inspection Plan- QP01

    Hi
    We created all the QM master data . After that we did some changes in inspection chars and in the sampling master data.but the values are not reflecting in the Inspection plan . How to update the changes in the inspection plan. We are trying to find indIvidual as well as Mass update
    Any input will he highly appreciated
    Thanks
    JJ

    Dear JJ
    Another easy method will be maintaining MIC as referenced mic. instead of maintaining it as complete copy model you can make it referenced. any changes in the mic can be updated automaticalyin the inspection plan using the referenced functionality.
    The issue being wherever the mic goes will be changed,
    Regards
    gajesh

  • FM/BAPI for changing the inspection plan

    Hi,
    I need to change the inspection plan.
    Can anyone suggest any FM or BAPI please.
    When I am trying to use BAPI  BAPI_INSPECTIONPLAN_CREATE for this purpose,
    I am getting the below mentioned errors:
    E  BAPI                001
    A CPCL               006 Task list Q Q0000171 1 already exists
    A CPCC_DT         210 For further processing, the routing entry is missing
    Thanks in advance.

    Hi,
    Could you please help me with the fields that need to filled for this purpose ?
    I am currently filling the TASK and INSCHARACTERISTIC structures with the following fields filled:
    TASK:
    TASK_LIST_GROUP
    GROUP_COUNTER
    VALID_FROM
    VALID_TO_DATE
    TASK_LIST_USAGE
    PLANT
    TASK_LIST_STATUS
    TASK_MEASURE_UNIT
    LOT_SIZE_FROM
    LOT_SIZE_TO
    INSPCHARACTERISTIC:
    TASK_LIST_GROUP
    GROUP_COUNTER
    ACTIVITY
    INSPCHAR
    QUANTITATIVE_IND
    MSTR_CHAR
    PMSTR_CHAR
    CHA_MASTER_IMPORT_MODUS
    CHAR_DESCR
    UP_TOL_LMT_IND
    LW_TOL_LMT_IND
    TARGET_VAL_CHECK_IND
    TARGET_VAL
    UP_TOL_LMT
    LW_TOL_LMT
    But still I am getting the error mentioned above(previous message).
    Thanks
    Shilpika

  • MIC changes in routing/inspection plan

    Hi, we have created qualitative inspection characterisics (without characteristics attribute control indicator) with incomplete copy model type. This is already assigned in inspection plan and in routing. Now our users want to assign characteristics attribute.  We changed the MIC control indicators. this is not reflecting in the routing/inspection plan.
    Could anyone suggest the best way to update the inspection characteristics in inspection plan as well as in routing.

    Dear !!!!
    Please Follow this steps
    1.Check Inspection Setup What u have given
    2.Create a Quality Work center with control Key QM01
    3.Create Master Inspection Characteristic in QS21
    4.Create Quality Plan QP01 make sure your usage type 5 0r 6
    5.Assign inspection characteristics in master inspection whatever u have created in QS21 save
    6.Go to QA32 check with selection by material or by plant
    7.Then go to QE51n and run by selection condition by material or by plant Results recording starts
        Then click on the Inspection lot make the inspection and save it will prompt saying that results save under operation
    9.Then go to Usage decision QA32
    10.Move Material From Quality To Unrestricted.
    Thatu2019s all the Steps
    With Regards
    Pushpalas

  • Inspection Plan - Change order date Combination issue

    We are facing 1 issue in our system.
    The Inspection plan assignments with new change orders is not assigning the correct inspection plan.
    Example:
    Plan                       Change Number               Valid from Date
    1                              CO-1                                1/01/2007
    2                              CO-2                                1/01/2008
    3                              CO-3                                1/01/2010
    The plan selected when Change order CO-2 is cut in, is plan 1 but should be Plan 2. We believe the date on the CO does not drive the selection of the most current plan. When plan 3 is implemented after plan 2, Plan 2 is selected.
    Any one has faced this kind of issue in your exp?
    Edited by: Tom_Eric on Apr 28, 2010 10:49 PM

    No reply

  • How to display changes of inspection plan via t-code :CBWQM ?

    Dear all,
    We are using ECM for inspection plan updating, Is it possible to see changes in detail like QP60,QP61 via T-code : CBWQM ?
    Regards,

    QP61    Display change documents insp.plan?

  • BAPI or FM to change an inspection Plan

    Hi everyone,
    I have a requirment,when a specification (Recipe managment) is changed ,the data accordingly should be updated in the inspection plan that is linked with that.
    Can you pelase let me if i have any function module or BAPI which can be used to update the existance inspection plan.
    I have a BAPI to create INSPECTION PLAN but i didn't find any bapi to change INSPECTION PALN.
    Thank you in Advance.

    Hello Parankusham,
    Unfortunately, there is no BAPI for changing the please.You can look into the engineering workbench CWBQM and which possibilities it offers you in your case.
    Thanks
    Amber

  • Inspection plan validity change

    Dear Gurus,
    I have uploaded my inspection plans with valid from date 01.07.2010, due to certain reasons I need this valid from date to be earlier, how can I change it?
    Regards,
    MaX

    Hi,
    functionally it is not possible to change the valid to date. but technically , by table entry it possible. table name plko and field datuv.
    partha

  • Change of inspection Plan

    Dear all
    a lot with the insp. type 04 is created.it has status REL and it has a plan. Now please guide me how can i change its plan with some other usage.is it possible

    Hi Ahmad,
    As you have described the lot status is REL not INSP ok then you can revert it from REL to CRTD again.
    Follow the steps.
    - Run trx QA02, Enter the lot number.
    - Now follow the path Inspection Lot->Function->With Draw Approval---> Click over it and save. The lot status will changed from REL to CRTD.
    - Now the cancellation of samples is also mandatory.
    - So run trx QAC3, enter the same lot number enter the trx. and save
    - Go back to QA02 and assign new Inspection plan
    Regards,
    Shyamal

  • How to use Same Inspection plan for Multiple Plants?

    Hello,
    When I create a Process Order for material (M1), release and save it for a Plant A then I get the Inspection lot automatically.
    Now I have another Plant B that we have created. We would like to use the same Inspection plan that has been created for Plant A and M1
    So in the changed mode(QP02) of the Inspection plan for Plant A in the material assignment tab I added the Material M1 and the Plant B. I am assuming this means when I create the Process order for M1 in Plant B then it should use the same Inspection plan.
    But when I create the Process Order for M1 for Plant B, release and save it then it does not created the Inspection lot automatically(though I can create Inspection lot manually)
    Can you tell me if there is setting that will allow me to create the Inspection lot automatically on saving the Process order which should use the Inspection plan that I just assigned.
    And also let me know if there is a better way to handle same Inspection Plan for same material but multiple Plants.
    Thanks
    SAP Fans...

    Dear,
    For your message my understanding is that you are not getting Inspection lot created in Plant"B". Inspection lot for a material would get created based on the Inspection Setup for the material master "QM View", so compare the QM for the material in both plants and correct it for Plant "B".
    Probably I feel Inspection Setup is not complete for the material in Plant "B" - Generally when extending material by copying referance, in the QM view you need to click the Inspection Setup Button, for the data to be copied...otherwise it does not copy the Inspection setup from the referance plant.
    Regards,
    Prasobh

  • Inspection lot creation based on "right" inspection plan version

    I manage inspection plan ( inspection lot origin 01 ) with Change number; in this way I have differents inspection plan version based on date.
    When I do a Good Entry based on purchase order , I need that system creates inspection lot version based on the purchase order creation date and not , as now, based on good entry date
    Is it possible ?
    When I create the purchase order I send to vendor also the inspection plan characteristich that have to be maintened ; for this reason I need to find same characterist during good entry inspection
    Regards
    Silly

    You need to use one of the enhancements that Do-Wook has suggested.  There is no standard SAP way to suppress the inspection based on the vendor batch number.
    With the first enhancement you use the system to check for a previously received vendor batch and if one is found, then that batch number is proposed and not the next one from the numbering series.  In this case, the lot isn't created than due to the inspection lot control of the inspection type.
    With the second enhancement you check the vendor batch number and if it's been received you suppress the inspection lot creation and the stock goes right to unrestricted.
    You'll probably need to do one or the other.  Myself, I prefer the first enhancement.
    Craig

  • Inspection plan selection based on production workcenter for Inspection typ

    Dear QM Guru's,
    I have requirement of automatic inspection lot creation based on production work center.
    For example :- I have Inspection Plan A, Plan B and Plan C for Material XYZ. My requirement is that, when inspection lot created for material XYZ ,when we release production order (Early lot creation) , it should create inspection lot based on production work centers in the order. In this case, if production workcenter A is in the prodiction order, system automatically assigned inspection plan A, when workcenter B,it should choose inspection plan B and same for C workcenter.
    Can we have this set up in the system?
    Let me know if u need any other details.
    Thanks in advance.

    The workcenters in QM and PP don't have to be the same.  In the user exit your going to code in the logic you want to use to select the inspection plan.
    I suggested creating the workcenters the same and the code can use that info to match up the correct task list group to assign the inspection lot. But if that doesn't work pick something else.
    Your code can use any logic you want.  You can put a description in the short text if you want. 
    You can just have an understanding that task list group 10 is always used for production work center XYZ and task list group 20 is always used for production work center ABC and task list group  30 is always used for production work center 123.  In the user exit you check which production line and just change the group to 10, 20 or 30 then.
    I don't care what you pick or how you do it, neither does the function module.  I believe the function module will pass in the parameters of the task list it is planning to assign.  You then have the ability to use the code to pick a different one and pass back new parameters for the task list.
    Craig

  • Measuring Instrument Needs to be added in inspection plan for each part

    Hi
    How to assign the Measuring Instrument in the quality inspection plan for all the materials.
    Whether i need to assign as material assignment or as PRT.
    how to use prt to assign to the operation in the quality plan (task list)
    Thanks
    VRAJ

    Hi,
    when i try to assign the Equipment for first Inspection Characteristics.
    the system thru the ERROR as,
    Production resource/tool is not intended for this type of task list
    Message no. CF230
    Diagnosis
    You want to use the production resource/tool in a task list or work order with task list type Q. However, according to usage 004 of the PRT, this task list type does not exist.
    Procedure
    Change the usage of the PRT in the master record or select a PRT which can be used in this task list type.
    How to resolve this issue.

  • INSPECTION PLAN ALE SETTINGS

    Hi ,
    Its a Migration Project and we have to Transfer all the Inspection Plans from the Old System to a New System.
    We are tryin to go by the Idocs Approcach.
    But i donnt know the MASS SEND Prog. for the same eg. BD10(RBDSEMAT) for Material , also i am stuck in the ALE Settings too ...
    In Outbound Side Distribution Model i have added the following BAPI :
    Object name        InspectionPlan
    Method name       Create
    Object type          BUS1191
    Method                CREATE
    Description          Create inspection plan
    and in the Outbound Partner Profile :
    Message Type INSPECTIONPLAN_CREATE
    Basic type        INSPECTIONPLAN_CREATE02
    I am also not able to Find the Inbound Process Code for the message type INSPECTIONPLAN_CREATE.
    Although i guess the Inbound Function Module is IDOC_INPUT_INSPECTIONPLAN_CREA .
    Please help me with the issue.
    regards
    Vikas.

    Thanks... but i am still in need of a mass send program ... or can i send the inspection plans via change pointers ?
    while creating the entries in BD52 (Change Document Items for Message Type) i am not sure what should be added for this message type (INSPECTIONPLAN_CREATE)?

  • Inspection Plan/Revision level

    Hi PP Gurus,
    I have a Problem in Inspection Lot.The system is not reading the new Inspection Plan.
    The material is assigned to a Revision level with valid from date 10.12.2007 and the earlier Inspection Plan(Group 21) was also created on 10.12.2007.Now this inspection Plan( Group 21) is deleted and New Inspection Plan(Group 100) is created with the Valid from date 10.04.2008.
    I have created an Inspection Lot dated 12.04.2008, Now the system is not reading the new Inspection Plan(Group 100).And the system is giving error "No Insection Plan found" while recording result on the inspection lot.
    We cant change the material ECO revision date as this would contravene our traceability record and  since, the Revision Level is maintained at Global level so cant afford this to change for other Plants.
    Kindly help me to assign the new Inspection Plan to the Inspection Lot.
    Thx in Advance
    Regards,
    Rakesh wade

    Hi,
    I do not know the impact of revısıon level on İnspaction lot.
    But, with reference to the Revısıon Level only the Confırmation wıll work both in Descrete and aswell as in REM.
    Say ıf yor Revesıon Level ıs AB, and the date ıs 01.03.2008, then during confirmatıon the sytem will explode the BOM with referenec to this Date.
    It may be possıble that there may not be any BOM available on that date then there wıll not be any Components suggested for GI or backflush.
    Probably you can corelate the same thıng to your ınspectıon lot... ( inspectıon lot not available etc..)
    Hope thıs helps..
    Regards,
    Siva

Maybe you are looking for