Change Inspection typ and keep inspection stage of dynamic modification

Hello,
Our QC departement splitted into 2 departments and each got their own materials to check.
Now both material groups will get a different inspection typ B and C instead of the old insp Typ A.
We use dynamic modification rules and all materials have their inspection stages based on vendor and insp. typ. There is only 1 plant.
When I assign a new insp. typ B or C to a material the next inspection lot of course will generate a new record in QDQL starting with the lowest insp. stage. But I need the last stage of the old insp typ A!
Copies of records A to B and C in QDQL are not so easy because vendor and inspTyp are not part of the key and SAP uses a counter instead.
Any ideas how to get the old insp. stages to the new insp types in the quality level?
br Gerold

Well, then youmight consider to rethink if this approach is the best option, as you can see that it limits your way of modifying your processes. If one time you have ten different departments you would need ten different inspection types...for one inspection lot origin. This then would even increase if we think of different lot origins (returns, recurring inspection, ....).
Regards
MH

Similar Messages

  • Inspection types and Specifications

    Dear Experts,
                       I am new to QM. My scenario is, during the process, in-process inspection will be done and finally finished good will go to finished good stock. In the finished good stock everyday at random some materials will be taken up for testing. Apart from this when a customer wants a material, that material will be checked again before dispatch and often with added specifications.
    My question is-
                a) what inspection types should I maintain in QM view of material master for the random checking of finished good in finished good stock and pre-dispatch special checking for a customer ?
               b) How can the requirement of checking added specifications for some customers be addressed ?
               c) Do I have to create the inspection lots in above 2 cases manually or is it possible to automate to some extent like automatic generation of inspection lot whenever a finished good is transferred from finished good stock to say, a storage location created for stocks to be supplied against customer orders ?
    Regards,
    Sunit

    Dear Sir,
                  I tried as suggested by you and faced following problems.
    u201CYou can take auto/mass UD for the rest of lots & inspect only those which you want to inspect Randomly__u201D
    When I use 04 inspection type and do final inspection, from u201Cedit/copy inspection resultsu201D I am only able to copy inspection result lot by lot and then do usage decision. How can auto result recording (f possible) and UD for multiple lots be done at same time?
    u201Cu2026or for inspection lot origin 89 design 90 inspection type as :Random lot from Production.u201D
    I could not find design 90 inspection type. I found inspection type 89 and assigned it to the finished material . Then I made a process order for the material , did final inspection (through inspection type 04) and took the material in unrestricted stock. Thereafter I transfer a part of the the material to another storage location in the same plant through mb1b (movmt type 313). In the new storage location that part of the material is available under u201Cstorage location transferu201D heading but it is not coming to u201Cquality inspectionu201D under that storage location. Naturally in qa32 no inspection lot is seen. How to ensure that the material comes to quality inspection under the new storage location and inspection lot is seen in qa32 for testing?
    u201CHow can the requirement of checking added specifications for some customers be addressed ?
    This can be achieved by either 10 or 02 Inspection type.
    A lot is generated after you carry out the outbound delivery to customer that is during dispach.u201D
    I am using strategy 40and MTS (order made without refernce to sale order), so can I use inspection type 11 to get same result ?
    Also, even if the lot is generated during dispatch how can I add the u201Cextrau201D specificns relevant to that customer ?
    Please suggest.
    Regards,
    Sunit

  • Quality Mgt - can I create a new inspection type for source inspection

    I want to create a new inspection type for surce inspection and I will assign it to Miscellaneous insp lot origin.
    What is the application of vendor inspection lot origin ? Can be used for source inspection ?

    HI,
    For source inspection.
    If existing insp types are not going to solve your purpose , you can create insp type & assign it to insp lot origin 01.
    But before that , check whether you can use  the existing insp type 01 / 0130.
    You need to assign that inspection type in the Q-info record , in the source insp field of insp control.
    Also go through the help tips provide by SAP
    Inspection Type for Insp. Lot Origin (Source Inspection)
        Inspection type for the source inspection
    Use
        If you enter an inspection type for inspection lot origin 01 in this  field, you can create an inspection lot for the source inspection within the lead time before the (scheduled) delivery date.
    Dependencies
        The inspection type must be active in the inspection setup (Quality Management view) of the material master.
        If a status profile is stored in the quality info record for the supply  relationship, a goods receipt inspection takes place instead of a source  inspection.
    Regards
    K.M.Arun

  • How to change material type and industrial sector of the exsisting material

    Hi,
    There is an issue where user wants to change material type and industrial sector of the exsisting material .Is  it posible to do so??
    IF not ,how can we delete that material from material master so that another material with same number and required material type and industrial sector  can be created.
    Points will be definitely rewarded.
    Thanks
    Rohit

    Hi Rohit,
    You can change the material type in MMAM trxn code if the material dosenot conatain any open purchase requisitions, open reservations & open purchase orders. Also material stock should be zero.
    Remember the new material type should have same attributes same as old material type.
    OLD Material New Material
    1) Standard Price 1) Standard Price
    2) Manufacture part 2) Manufacture part
    profile actvated profile actvated
    3) Quantity & Value 3) Quantity & Value
    Updation in all areas Updation in all areas
    4) should have same GL 4) Should have same GL acs
    acs
    It is not possible to change Industry sector once created.
    If you want to delete the Material, you can flag it in MM06 trxn code.
    Reg,
    Ashok
    Dont forget to Assign points if useful.

  • Change material type and valuation class

    hi
    my client want to change material type and valuation class in their production system. but the material no. and some transaction had done by this material. anything i need to concern? especially, in FI part. thank

    Hey Changing of Material Type is one step
    Changing of valuation class is other
    and underneth that changing of account is another attached to the valuation class.
    The basic requiremnt will be that client want to change the G/L code attached to the valuation class.
    If you have already done some transaction it is not fininacialy right to move valuation classes.
    Tell in detail what is the requiremnt.

  • How can I use srvctl command line for change "Failover type" and "F method"

    Hi all,
    I am using Oracle One Node (11.2.0.3), and I have a service:
    /u01/11.2.0/grid/bin/srvctl config service -d orcl
    Service name: orcldb
    Service is enabled
    Server pool: orcl
    Cardinality: 1
    Disconnect: false
    Service role: PRIMARY
    Management policy: AUTOMATIC
    DTP transaction: false
    AQ HA notifications: false
    Failover type: NONE
    Failover method: NONE
    TAF failover retries: 0
    TAF failover delay: 0
    Connection Load Balancing Goal: LONG
    Runtime Load Balancing Goal: NONE
    TAF policy specification: BASIC
    Edition:
    Preferred instances: orcl_1
    Available instances:
    I would like to change "Failover type" and "Failover method" to:
    Failover type: SELECT
    Failover method: BASIC
    How can I do that? Is there any graphical tool for it? Or, How can I use srvctl command line for change it?
    Thanks in advance.
    Leonardo.

    user10674190 wrote:
    Hi all,
    I am using Oracle One Node (11.2.0.3), and I have a service:
    /u01/11.2.0/grid/bin/srvctl config service -d orcl
    Service name: orcldb
    Service is enabled
    Server pool: orcl
    Cardinality: 1
    Disconnect: false
    Service role: PRIMARY
    Management policy: AUTOMATIC
    DTP transaction: false
    AQ HA notifications: false
    Failover type: NONE
    Failover method: NONE
    TAF failover retries: 0
    TAF failover delay: 0
    Connection Load Balancing Goal: LONG
    Runtime Load Balancing Goal: NONE
    TAF policy specification: BASIC
    Edition:
    Preferred instances: orcl_1
    Available instances:
    I would like to change "Failover type" and "Failover method" to:
    Failover type: SELECT
    Failover method: BASIC
    How can I do that? Is there any graphical tool for it? Or, How can I use srvctl command line for change it?
    Thanks in advance.
    Leonardo.srvctl modify service -d database_name -s orcldb -q TRUE -m BASIC -P BASIC -e SELECT -z 180 -w 5 -j LONG
    Also see
    11gR2(11.2) RAC TAF Configuration for Admin and Policy Managed Databases [ID 1312749.1]

  • Dynamically changing the height and width of Stage

    Hi,
              I would like to know how can I change the height and width of stage dynamically. I tried it with the following code:
                             Stage.height = 250;
                             Stage.width = 250;
    during the run time. Initially the Stage is at a height and width of 370 and 450 respectively. Also when I tried to trace the height and width of Stage after resizing the stage width and height, its showing the old value of width and height. That means the width and height not chnaging. Anybody have any idea about this.

    Hi Ross,
                I could understand something about the problem after making a research on this topic. We can't change the width and height of stage from actionscript itself, right? I will explain the way I am planning to do. I don't know whether its right or not. Anyway you just go through it. First the player need to be resized, according to the specified height and width. Then in the object tag, there are two fields named height and width. We should change these value according to the specified height and width of video controller, dynamically. Am I right? But I am confused with two properties of Stage such as: align and scaleMode. The code was actually developed my trainer. There, the scaleMode is set to "noScale" and no align property is used. My doubt is how should I set align and scaleMode properties of Stage. Hope you understood what I meant.
    Regards,
          Sreelash.S.

  • I have Lightroom 3 and have installed it on my Retina iMac running Yosemite. It will not show me any of the modules..error when attempting to change modules.. and keeps asking for my serial number every time. Is it compatible?

    I have Lightroom 3 and have installed it on my Retina iMac running Yosemite. It will not show me any of the modules..error when attempting to change modules.. and keeps asking for my serial number every time. Is it compatible?
    David

    This is a duplicate thread - see here

  • Inspection type and movement type

    how is the movement type related to the inspection type? i.e. when doing a UB_stock_transfer order, what movement type it uses and to what inspection type it assigns? also what other movement type uses the other inspection type?

    Hello Cedrick
    first you need to maintain the view Quality Management for your material. Inspection type assignment to movement type you can see on the following customizing path: Quality Management -> Quality Inspection ->Inspection Lot Creation -> Inspection for Goods Movements
    Hope this helps.
    Michael

  • Inspection Type and Inspection Setup

    i want to check whether the inspection setup is active or not..and also whether inspection type is active or not.. if it is active than for which inspection type it is active...
    for all my plants
    please can any one tell me the solution
    thanks in advance
    Edited by: ravi@mm on Mar 2, 2012 7:25 AM

    TQ30 table is the configuration table for the inspection types.  It will not show material level data.
    Use SE16 and look at the QMAT table.
    You can use SQVI to generate a report from this table if needed on a regular basis.
    If there is a check in field QMAT-AKTIV the inspection it active.
    FF

  • Inspection lot with inspection type 03 - Using Inspection plan

    Dear friends,
    I want to create an inspection lot at the time of production order release (ideally - insp type 03). But I want to use inspection plan as a task list instead of routing for that lot.
    Is it possible?
    Best Regards,
    Avinash

    Hi Swapnali,
    Was expecting this re-question.
    We are at a stage where system is already ready. The routing master data contains large number of alternatives and huge number of parallel sequences. We were looking for a solution in which we would make an inspection plan without touching routing master data. Second I want to create the lot at the time of order release (basically one lot per production order) so don't want to use insp type 04.
    In config, I assigned task list type Q in front of lot origin 03 (Maintain Inspection Lot Origins and Assign Inspection Types).
    But still system is picking the routing and not inspection plan. Is there a way out?
    Regards,
    Avinash

  • Re:inspection lot not moving from 03 inspection type to 04 inspection type

    Hi all,
    I am in a issue. I have done UD for in process inspection. i.e 03 type. Now when I am looking for the inspection lot updateion to inspection type in QA32 I am not able to find it.
    This is a live issue,
    Please advice as soon as possible.
    I have chaecked all the setting ,I dont think there is any issues in it .
    Regards

    Hey Vivek you ask too many questions at once.
    To check the follow - up action. See in the UD screen itself below the ud code you enter.
    I checked this & I found :for each order item
    batch storage location.
    It means it will create inspection lot if any of the mentioned condition changes either order,batch,or storage location. In other words it will create unique inspection lot for Order,Batch and storage location combination.
    Now, remember  why I have directed to this field because Craig has furnished that it will create a lot with 04 type as soon as you release the order but for that you need to select the option for "Early Lot creation". Correct?
    And you were not able to find the way how and where to do. So I just guided to you but sorry dear I have never ever used this functionality.
    Now what are you doing? waiting for another two hrs to have the lot? Simultaneously you should check what is happening with the Order from where the lot is generated.
    Have you completed UD for Lot 03 this time?
    Most importantly pls let us know what is the Inspection points you have selected for the inspection plan for 04 type lot and at the Routing/Master Recipe from where the 03 lot get the MICs?
    It may possible as you described the lot is getting triggered after 2hr from UD of 03 lot then the inspection points for the lot 04 or 03 would be time based inspection.
    Regards,
    Shyamal

  • Inspection Type - Default Values - Inspection for HU

    Hi Gurus:
    In SPRO >QM > QI > Insp. Lot Creation > Define Default Values for Inspection Type
    I am trying to check the Inspection for HU box under the Inspection Lot Creation section.  It checks fine, but when I save, the check disappears.  I have others where I have set this, so I am unsure why it is not letting me.  There is no error message appearing...Only the check disappears upon Save.
    Thanks for your help in advance.
    Nic

    Hi
    U r right. This is Happening to the Insp types 05 and 08 as per the coding written in the standard Program. It is checking the Insp lot origin in the table V_TQ33 and clearing the Tick for the Inspection for HU field if the insp lot origin is 05 and 08 while saving.
    Regards
    Brahmaji

  • Changing default picture viewer via GPO without changing image type and icon (Windows 7)

    Hello,
    I am trying to change the default picture viewer for some file extensions (.bmp, .jpeg, .png and .tiff). Actually Windows Photo Viewer is the default viewer and we need to replace it with Microsoft Office Picture Manager.
    I managed to do that change via GPO using the 'open with' preference under User Configuration\ Preferences\Control Panel Settings\Folder Options. So now the files are opened with Microsoft Office Picture Manager (office 2010). The problem is that the image
    type became 'OIS.EXE' for all the specified file extensions. Moreover the icon is now the same (Microsoft Office 2010).
    When I change manually the associated program for a file extension, the icon change but no the image type... this is different using GPO.
    Is there a solution in order to change the default program but keeping the image type and associated icon ?
    I tried to do that modification using the 'new file type' preference under Computer Configuration\Preferences\Control Panel Settings\Folder Options. I specified the 'open' action for OIS.exe, selected file extension BMP with associated class 'Bitmap Image'.
    It solves the problem for image type, Microsoft Office Picture Manager opens the files ... but I have to specify the icon file path and icon index and I don't know where I can find the default icons for the file extensions ...
    What is the best solution ? Am I right ? Am I doing something wrong ?
    Thank you in advance !

    Hello,
    thank you very much for your answers.
    For the rollback, I will reimport the original/default keys for all the image types, this should be ok.
    Here are the problems I have trying to pu Microsoft Office Picture Manager as default picture viewer (I just want  .bmp, .jpg ... files to be opened with Microsoft Office Picture Manager by default).
    1 Using new file type under Computer Configuration\Preferences\Control Panel Settings\folder options. : I define a new file type (BMP for example), associated class Bitmap Image, I configure the icon (imageres.dll,65) and an open action where OIS.EXE
    is the application used to perform the action.
    Result : Icon is correct, file type is correct, image files are opened with OIS.EXE (correct) ... BUT now Microsoft Office 2010 appears twice in open or open with menu
    2 Using new open with under User configuration\Preferences\Control Panel Settings\Folder Options : new open with preference, action (update or replace same result), file extension BMP, associated program (path to OIS.EXE), i check set as default.
    Result : Office 2010 opens image files (correct) but icon is Office 2010 one and the file type is now 'OIS.EXE' for all image file extensions I have specified ... so it won't be possible to sort the file by image type if I select that method...
    3 Using ftype : OIS.EXE doesn't open the file when I double click on it but Microsoft Office 2010 appears twice in the open or open with list ...
    I am a bit lost ... what is the best method to put Microsoft Office Picture Manager as default picture viewer, keeping the image type (Bitmap image, JPEG image etc) and without having Microsoft Office 2010 twice in the open or open with list ??
    Last question : by default an image file is opened and previewed with Windows Photo viewer and edited with Paint. I would like just to open images with Office 2010 but keep Windows Photo viewer for preview and Paint for edit ... Is it possible ??
    Thank you in advance for any help and support !!

  • Customize Inspection type 09 Recurring Inspection

    Hello,
    Our customer needs to analyze how to customize Recurring Inspection. My question is the way of warking of this. I have seen on saphelp some questions, but it is not enough for us.
    It is possible to create automatically and inspection lot when we have any stock movement??
    Actually the customer have a pool Z, which show al the inspection lot created. Across this pool, the user select usage decision for the stock.
    My question is how to configure 09 Recurring inspection, in a similar way that 01,05 or 08.
    Hope your answers.
    Thanks

    Hi,
    For Recurring inspection
    1.In material master maintain inspection interval in days
    2.Maintain 09 inspection type
    3.Run the transaction QA07 (assign the initial run days and other fields etc., as per requirment).U will get inspection lots
    4. If u require automatic inspection lots goto t-code QA05 do the job planning.
    Regards,
    Vairavan

Maybe you are looking for

  • How can I transfer my DSLR pictures to my IPad.

    My incredible children gave me a IPad for Mother's Day and I love it?  Can someone tell me what I need to transfer my DSLR photos to the IPad?

  • Lock Entries - How to unlock

    Hi Gurus, I have an ID locking the Interactive Planning --> Demand Planning Area, this is not showing up in SM12, but showing up from the menu --> Edit --> Lock Entries. What do I do to unlock these? Thanks JS

  • Replacing nodes in JTree

    Hi, The following situation: I have a split pane with a tree view on the left and a panel on the right displaying detailed information related to the selected node in the tree. However, some nodes in the tree do not have associated any detailed infor

  • Need to knowe Latest SAP HR Certification

    Hi Experts, I m planing to take up a HR certification with in few months so i need ur suggestions: i) which version i should take and also ii)what are the various SAP HR version Thanks, Ashok

  • RAM is not showing up on Riser B?

    Mac Pro ... Early 2008 ... I don't know when it happened but I started having trouble with photoshop and I thought about changing the memory requirements ... which led to in asking 'About this Mac' memory and although I did have 2GB DIMMs in each slo