Change KANBAN Status Sequence in Control Cycle

Hi guys,
Can anyone please detail which are the implications if I should change the status sequence for a control cycle, which is in use now?
Regards,
Ileana

Hi
In the kanban process the actual sequence is
Wait>Empty>In process > Intransit> Full > In use>Empty.This is complete cycle
If ur present kanban bin status is "In use" then then u changed the sequence in the control cycle.
When ever u trigger the kanban card, then system  move to control cycle and checks the kanban sequence by referring the standard sequence it move to next status.  
Eg: Ur present sequence is like
Empty>In process> In -transit --> Full -->  Empty
Now ur bin status is "Full" then u have changed the sequence in the control cycle.
New sequence is like
"Empty--> In process > Full> In use -->Empty"
Now u triggered the kanban card of " Full" status bin, then system refer first sequence in the control cycle and then standard sequence then status is changing to " In use"
Means when ever u change the sequence in the control cycle system checks the sequence in the control cycle by reference of standard sequence it will changes the bin status.
So if ur bin is in the "In -use " status, then what ever the next  status in the sequence is taken when u trigger the kanban signal

Similar Messages

  • KAMBAN: Change Status Sequence in Control Cycle

    Hi guys,
    Can anyone please detail which are the implications if I should change the status sequence for a control cycle, which is in use now?
    Regards,
    Ileana

    Hi
    In the kanban process the actual sequence is
    Wait>Empty>In process > Intransit> Full > In use>Empty.This is complete cycle
    If ur present kanban bin status is "In use" then then u changed the sequence in the control cycle.
    When ever u trigger the kanban card, then system  move to control cycle and checks the kanban sequence by referring the standard sequence it move to next status.  
    Eg: Ur present sequence is like
    Empty>In process> In -transit --> Full -->  Empty
    Now ur bin status is "Full" then u have changed the sequence in the control cycle.
    New sequence is like
    "Empty--> In process > Full> In use -->Empty"
    Now u triggered the kanban card of " Full" status bin, then system refer first sequence in the control cycle and then standard sequence then status is changing to " In use"
    Means when ever u change the sequence in the control cycle system checks the sequence in the control cycle by reference of standard sequence it will changes the bin status.
    So if ur bin is in the "In -use " status, then what ever the next  status in the sequence is taken when u trigger the kanban signal

  • KANBAN control cycle quantity changes tracking -reg

    Hi,
    Which tables and fields are to be used to knwo the changes in the kanban quantities in the control cycle of a part number
    for a part number over a period of time what and all changes are done to the kanban quantity we would like to track
    how to go about ?
    pl guide
    regards,
    madhu kiran

    Hi,
    Try Table PKCH and field PKCMG.This would be your best bet.

  • Tracking changes to LPK2 (Control Cycle)transaction

    Hi,
    We would like to track the changes made to the existing control cycle data.
    The changes to the control cycle are performed through LPK2 transaction.
    The transaction takes material, plant and supply area as inputs.
    We would like to know for particular material, plant and supply area who,when and what data has been changed.
    I appreciate your quick help in this regard.
    Thanks in advance..

    <b>Transfer requirement</b>
         LTBK               Transfer requirement - header
         LTBP               Transfer requirement - item
    <b>Transfer order</b>
         LTAK               Transfer order - header
         LTAP               Transfer order - item
    <b>Master data - stock positions</b>
         LQUA               Quants
    <b>Inventory documents in WM</b>
         LINK               Inventory document header
         LINP               Inventory document item
         LINV               Inventory data per quant
    These are the tables which are affected when you make the modifications.
    Hope this helps you
    Regards,
    Pavan

  • BAPI /FM to create /change KANBAN control cycle

    Hi
    Is there any BAPI or FM to create or Change control cycle?
    Thanks.

    Check
    BAPI - BAPI_KANBANCC_ADDEVENTDRKANBAN
    Short Text
        Create Event-Driven KANBAN for Control Cycle
    Functionality
        With this method you can procure a material quantity for a control cycle. To procure this material quantity one or more kanbans are created in the control cycle and set to status EMPTY.
        The essential entry parameters are:
        o   Control cycle (if the function module is called as a method for the object kanban control cycle, this parameter is not available, but given by the object.
        o   Material quantity
        Information about the status change is issued.
        COMMIT and ROLLBACK WORK: the function module does not carry out any COMMIT work. Command off. This must be ensured by the initiator after ending the function module. Each time the function module is called, a COMMIT WORK must take place. It is not permitted to call this FM several times and to post the result with a COMMIT WORK. If, during the process,
        the FM comes across an error, in some cases the command ROLLBACK WORK wil be carried out. In these cases the kanban is either set to ERROR status, or in the parameter RETURN an error message is given.
    Hope this helps.
    Regards
    Vinayak

  • BAPI_KANBAN_CHANGESTATUS - Control cycle correction (Change status and qty)

    Hi Experts,
    I have a requirement to upload the kanban status change and actual quantity to SAP either through PK31 or calling BAPI_KANBAN_CHANGESTATUS. In online transaction, I can change the status from "WAIT" to FULL or any other statuses and i also can put in the actual quantity, there is no issue as long as i entered through transaction. But when i try to do the same thing using BAPI, the system actually prompt me several restriction; I can only change the current status to the next status E.G.: current status is WAIT, i can only change it to EMPTY but not In Process or Full.
    My question is: Is there any other more flexible ways to change the statuses? If need to use this BAPI to change status WAIT to FULL (01 to 05), i need to do several BAPI calls before i can change it to FULL!
    And even i specified the change of actual quantity through the BAPI, it does not update into SAP (no matter how i tried). It strikes me that we could not possible change the actual quantity manually through BAPI, instead the actual quantity is only reflecting the available amount of the material in the stock (something like that). But the thing is i can change the actual quantity in PK31. To me, it seems like the online transaction bypasses some of the business checking.
    Anyone successfully changes the actual quantity through the same BAPI? shed some light please.
    Hopefully someone can answer my question, thanks.
    Regards
    Jay

    Hi,
    I use BDC to do this one, BAPI has too many checking which is not necessary in my case. However i also hit problem with BDC, which is the screen problem (Selecting row in table control). I jsut copied the transaction and made slight change to it, the BDC work like charm.
    Regards

  • Kanban with status sequence WAIT EMPTY FULL shows '-' neg. sign after GR

    Hi PP
    I am using one control cycle in kanban with replenishment strategy
    stock transfer where in stock transfer using "stock transfer with
    reservation".
    I made one bin empty at the demand source using t code PK13N
    But when i am doing transfer posting using migo against the
    replenishment element created by emptying the kanban , i am getting
    messge "NO KANBAN EXIST".
    why system is behaving abnormal i mean trnasfer posting not happening.
    system is not behaving normal.If i forcibly do the posting ignoring
    warining message above mentioned it shows no change in bin status ,
    then if i manually change status to green by PK13n it makes it green
    but wth negative sign.This behavior is quite abnormal as i have
    sufficient stock to get transfered too.
    status sequence is with three statuses WAIT EMPTY FULL
    Please help in this regard
    Even if i use  this status sequence for inhouse production also same problem is their

    Hi,
    Check the settings for replenishment strategy u have selected for the material.
    OM11 - Production Relenishment strategy
    OM12 - Procurement Replenishment strategy
    as in ur case u are now procuring that element so, check order type in ur replenishment strategy
    Regards
    Samunder Singh

  • A trigger blocking function  for control cycle in Kanban

    Hi,
    I wantet to change the status in Kanban. I get this error u201CA trigger blocking function was defined for the control cycle in the replenishment strategyu201D. I don't want to set a period of blocking function. how can I deactivate it.
    Thanks

    Hi,
    Pls. check the following setting :
    First in PK13n ( KANBAN Board) check whether X is marked with KANBAN Number e.g. 1X.
    If so then replenishment will not be triggered because KANBAN is locked.
    To unlock the KANBAN pls do the following :
    Go to -
    > PKMC ( Control Cycle Maintanance) in Change Mode----> Select Control Cycle -> Go to Display Control Cycle ( Glass Icon)--> on top of details of kanban cycle choose option ---> Display Kanbans ( Spectacle Icon )
    Select it and go inside : Inside pop up appearing check first Column : Lkln ( Lock Indicator).
    Remove the tick in check box of lock indicator for respective KANBAN for which  you want to trigger replenishment.
    Pls. try above settings and revert back if still problem persists.
    Reward if problem solved.
    Regards,
    Tejas
    Edited by: Tejas  Pujara on Aug 1, 2008 12:25 PM

  • Kanban status change trnsactionwise

    Dear all,
    I would like to know, can we control the GR through transactions for kanban production orders? I mean, when i confirm production order through CO15 transaction, i should do confirmation, auto GR  (Using control key) and kanban status change.
    But when i want to force kanban status change through "PK31", GR should not happen for the production order.
    In this case i am converting a In Process Kanban status to Full. Sequence is from 3 to 5.
    If anyone knows of kanban status change control through trnasactions, please let me know.
    Thanks,
    Sharat

    No Answer received yet

  • Control cycle for KANBAN.

    I want to cosume componenets using my KANBAN BINS.
    I maintained my supplying areas.  and when coming to the control cycle. Do I have to maintain control cycle for each component that I use in maufacturing against each supply area?  or is it only for FERTS

    Hi,
    1. When you tell consume compoenents means you are talking about Goods issue.
    2. Kanban needs to be done for a Inhouse prodcued material or externall procured material
    3. In both cases it does a Goods receipt and relevant goods issue posting.
    4. so if you only need to do consumption it is not possible.
    5. Genearlly it can be maitained for the FERT or halbs which has  bom, routing releavent master data
    6.For the inhouse manufacture kanban below is the highlevel step
    7. and wehen you do status cahnges like full to empty a planned order or prod order will be created.
    8. when you change status empty to ful then GR will be posted and GI will be done immediatelly ( based on the control cycle)
    9. Kindly refer the attached link for further details.
    [KANBAN|http://sap-pphelp.blogspot.com/2010/01/kanban-inhouse-production.html]
    also let me know if you have any specific querry
    Reg
    dsk

  • Change control cycle record

    Hi all,
    Can anyone please tell me the transaction code or if some config. required to change my control cycle record.
    I created one from PK01, now when I wish to edit it at PK02, it gives me the following error.
    Control cycle from WM/PP may not be processed here
    Message no. PK083
    Diagnosis
    Control cycles are created both for Kanban and for warehouse management. However, control cycles created for the warehouse management system may not be used in Kanban and vice versa.
    Any help is appreciated
    Rgds,

    HI
    I am also facing the same problem.
    I am working on r/3 4.7
    Please can any one help regarding this problem.
    Thanks in advance

  • User Exit for PKMC (Kanban Control Cycle)

    Dear Gurus,
    I need to know if there is a user exit in PKMC (kanban control Cycle) to create a extra tab next to the print control tab in the bottom.
    Best Regards,
    Kumar

    List of exits available.
    Enhancement/ Business Add-in            Description
    Enhancement
    MPKR0001                                Customer fields in kanban control cycle
    MPKP0002                                Customer-Specific Fields Call Interface
    MPKP0001                                Customer Defined Display in Kanban Board
    MPKD0001                                Kanban output as EDI
    MPKCCY02                                Customer Error in SumJC Control Cycle
    MPKCCY01                                User-Defined Fields in Kanban Control Cycle (PKMC)
    MPKC0001                                User exit for kanban calculation
    MPKB0002                                Customer defined display in kanban board
    MPKB0001                                User's own functions in the Kanban processing
    Business Add-in
    BADI_PVBE_UPDATE_APO      PVB Publish Changes to the APO
    MPKC_REQ_SELECTION           BAdI for Requirements Selection for Kanban Calculation
    PK_CALL_INTERFACE              Customer-Specific Fields Call Interface
    PK_CCY_SELECTION               Selection for Maintaining Control Cycles
    PK_REVERSAL                          BAdI during reversal of Kanban

  • PP Kanban control cycle

    Hi team,
    I was referring the below statement to understand the control cycle.
    The Kanban Control Cycle business object is used to control the flow of information and material between the demand source and the supply source in a pull environment. It controls the material quantities in production. It defines a loop between demand source and the supply source for recurring replenishment.
    In the above statement, it is mentioned that, it is linking the demand source and supply source. In SAP, how we are linking the the demand source and supply source?
    While creating the supply area in PK05, we are providing the storage location. Is this supply source or demand source?
    In SAP, where we are assigning the another source (supply / demand source)?
    Regards
    psk

    Hello Mario,
    Thank you very much for your detailed explanation on storage bin and container.
    1. So, if the storage location is not WM managed, there will not be any storage bin. The storage location itself will act as a storage bin. Am i right?
    You said that, Containers are the physical means in which materials are kept in this process. a container usually equals a KANBAN. Normally there are at least two (but can be more) containers in a control cycle.
    2. We are using pallets to replanish the supply area storage locations (production store which is near to work center). So in this example, the pallets are called as "containers". Am i right?
    Consider the below example:
    3. In control cycle i have maintained the number of kanban as 4. As you said above, i need to maintain 4 containers. But i have only one field to maintain the container. How to maintain 4 containers in one field?
    Thank you.
    psk

  • Stanging indicator change in control cycle after production order released

    HI
    We have MM PP interface active
    i setup staging indicator 4 for one material via control cycle
    Production order is created and released
    now we would like to change staging indicator to 1 [pick parts]
    how we reread control cycles data in production order
    Thanks

    Try: CO02 > Functions > Read PP master data

  • User exit or other enhancements to change the status of the kanban.

    The requested to trigger the movement when the kanban status changed from empty to full.
    if itu2019s possible to use user exit or other enhancements to change the status of the kanban.
    can you please guide me iam new for enhancements.

    I think you're seeing standard SAP behavior.  However, a discussion with your SD/LE functional team member might be beneficial. Personally, I don't think SAP supplies a way to "add back" to that quote.  However, you might develop something that changes the quantity on the quote (essentially adds to the original quantity), based on the fact that a SO line got rejected.