Change message subject created from a job

Hello everybody,
i have a little problem:
i have a job that sends an attachment(pdf) by email.
Sap automatically creates the message subject with 'Job' + job_name + ', step 1' and the file attached have the same name.
If i access to the email with a PDA, it doesn´t recognize the ',' in the pdf filename and i can´t open the file.
I need to know if there is any way of change the standard subject of a message and the filename attached, created by a job.
Thanks in advance
António

Hi António!
I haven't found a default value for subject or attachment.
There are two work-arounds:
- Save the attachment without space (or ,) on your PDA, then you should be able to open the document.
- Use a special 'mail' printer, here is an instruction:
http://help.sap.com/saphelp_erp2004/helpdata/en/ae/16193ce8fac413e10000000a114084/frameset.htm
Regards,
Christian

Similar Messages

  • PR can be changed after PO created from the PR(by adopting) .. need to stop

    Dear experts,
    In our current system PR can be changed after PO created by adopting the PR. How can i block this change.
    Kindly help
    Regards,
    Zusen

    Badruddoza Zusen wrote:
    Hi
    >
    > Thank you for your reply.
    >
    > I have set message 06608 as error but problem still is there. After creating a PO 4500013405 w.r.t a PR 100018999 and can add new line in PR 100018999. How can i stop this..
    >
    > Kindly help.
    >
    > Thanks and regards,
    > Zusen
    Is that really a problem?  the second item has has the same PR number. but if you look at the technical structure of the purchase requisition table, then this table does not have a header table and no item table, it is just one table --> EBAN
    if you create a second item, then you have the same PR number but different item number
    otherwise
    you have a different PR number but same item number.
    It is really just one field which is different.
    And 06608 message prevents the change of the item which is already used in a PO.

  • Why do colours change in PDF created from InDesign book?

    Please help.
    I've created a Book from 5 InDesign documents that have images text and some Illustrator drawings in.
    When I export the Book to PDF some of the colours in the Illustrator graphics are different (the graphics are all vector based maps with some text). Not all colours are changing, seems to be different blues showing as one green in the PDF.
    Same thing happens when I print the Book from InDesign.
    Could anyone tell me what I'm doing wrong.

    Help!  I too am having problems when creating a pdf in InDesign.  My colors are all Pantone process colors.  My specific problem is that when I export my book cover to a PDF, my process black is changing to gray.  This ONLY happens with pdfs.  When I save as a jpg things are fine.  It will print fine.  I have been scaling it down, but i prints black.  Help!  This is a project due for a typography class on Monday and must be printed and mounted for class.
    Mary

  • Can we change WSDL file created from Function Module wizard??

    Hi everybody!
    I have created a web service from function module using SAP wizard.
    Now the consumer side want me to change <wsp:UsingPolicy wsdl:required="true"/>
    Is this possible???
    If so how?????
    Thank u in advance!!

    Hi Muhammad!
    As soon as you open WSDL for selected binding in the URL are of you explorer change the ws_policy with "standard" . Then simply save the wsdl and send it to the other party.
    Hope this helps!

  • Change message text generated from Sourcing Cockpit

    Hi,
    This is the scenario where the Buyer completes the Shopping Cart (complete requirement) from the Sourcing Cockpit. After this, the Shopping Cart is removed from the Sourcing Cockpit and also the system sends an email notification to the requestor of the Shopping Cart stating that the purchase department cannot procure the item.
    We changed the text (Template with headers) to meet our business requirement using the transaction SE61 and document BP_SOCO_APP_ITEM_COMPL_MAIL while keeping the variables &SC_ITEM& and &SC& in the text.
    Now we notice that the changed text is appearing in the notification ,but the variables are not appearing now ( i.e the Shopping Cart number and the Shopping Cart line item are missing in the new message). These variables were appearing in the standard .
    Do we have to anything else.
    Thanks
    Sukumar

    Hello Ahmad
    I think you need to modify the standard FM CRM_INCOMPLETENESS_CHECK to archive the requirement.
    In this FM line 301, the field name which is used in the message is filled.
    I hope this could be helpful.
    Best regards,
    Maggie

  • Changing an Invoice Created From MIRO

    What transaction can I use to change an invoice which was created via transaction MIRO? Is it possible to do a change on the invoice? I can display the invoice using MIR4 but couldn't find the transaction for changing it.
    Thanks,
    Beth

    Hi Liz,
    to change an invoice depends on invoice-status:
    you can change it (MIR4-edit- display/change resp.
    with TA MIR6 )
    only if invoice is'nt booked (so only stati:
    parked,incorrect,held)
    regards Andreas

  • User exit to change Purchase requisition created from VA01

    Hi,
    I am using item categories ZRUI and ZRUD for which PR is created in VA01 while saving the sales order.
    I need to change address data in such PR. Can anyone suggest user exit to be used??

    Hi,
    You may use USEREXIT_MOVE_FIELD_TO_ME_REQ.
    You can find this in include MV45AFZB.
    <REMOVED BY MODERATOR>
    Regards,
    Sharad
    Edited by: Alvaro Tejada Galindo on Jul 21, 2008 12:37 PM

  • Change Message printout -

    Hi,
    When we change a field relevant for a change message in a purchasing document such as the delivery date,  a change message is created. If we do not printout the change message but save the purchasing doc (eg. PO) and then change the same field again, the change message still displays the data from the first change and thus does not contain the correct value of the changed field in the Old value --> New value.
    Does anyone know of a way to ensure that the change message always reflects the current values?
    Tom

    hi
    Check this out by making the Version Management Active.
    u can trace out the Changes to the External Purchasing Documents.
    Also u can define the Fields that u want to see that are subjected to a change.
    go to
    spro >mm>pur> versionmang
    Set Up Version Management for External Purchasing Documents
    In this step, you set up the version management facility for external purchasing documents.
    For a combination of purchasing organization, document category, and document type, you can:
    Activate version management
    If version management is active, changes to a purchasing document are managed in versions.
    Define field selection for versions
    You can specify the attributes certain fields of the version are to have: mandatory entry, optional entry, display only, field suppressed.
    http://help.sap.com/saphelp_srm30/helpdata/en/46/882fdd8bfc1743bd5ef8b532f94402/frameset.htm
    regards
    kunal

  • How do I change my user id from dsgence to dsgrence? Under the menu / title I keep getting where you would see a pop-up message title "know your rights" how do I get rid of that also?

    How do I change my user name from dsgence to dsgrence? Under the title bar where you would see pop-ups a message "know your right" keeps coming up every time I reboot?

    You can post a request in the contributors forum if you want to change the user name.
    *https://support.mozilla.org/en-US/forums/contributors
    Add [ATTN ADMIN] in front of the subject title to get the attention of a forum Administrator.
    See also:
    *http://kb.mozillazine.org/Preferences_not_saved
    *https://support.mozilla.org/kb/Preferences+are+not+saved

  • How to Create Linux-Cron Job  from a Java Program

    Hello,
    Can anybody help me to CREATE/EDIT/DELETE Linux Cron job from Java Program. Its Very Urgent.Thanks in advance..
    from
    Chakri

    I decided this didn't sound too tough so I played around with it a little. Basically because I'd never tried executing external processes out of java before, so I wanted to see how it was done.
    Just change whatever you like in the jobs ArrayList and call writeJobs.
    If you call writeJobs without putting anything in the list first you'll wipe out all of your crontab entries.
    import java.lang.*;
    import java.io.*;
    import java.util.*;
    public class cron {
        ArrayList jobs;
        Runtime rt;
        cron() {
         rt = Runtime.getRuntime();
         jobs = new ArrayList();
        void readCron() {
         String[] list = { "crontab", "-l" };
         jobs = new ArrayList();
         try {
             // Stick a job into crontab
             Process child = rt.exec(list);
             BufferedReader cronout = new BufferedReader(new InputStreamReader(child.getInputStream()));
             String cronjob = cronout.readLine();
             while (cronjob != null) {
              jobs.add(cronjob);
              cronjob = cronout.readLine();
             child.waitFor();
         catch(IOException e) {
             System.err.println("IOException starting process!");
         catch(InterruptedException e) {
             System.err.println("Interrupted waiting for process!");
        void listJobs() {
         Iterator iter = jobs.iterator();
         while (iter.hasNext()) {
             System.out.println((String)iter.next());
        void writeJobs() {
         String[] edit = { "crontab"};
         try {
             // Stick a job into crontab
             Process child = rt.exec(edit);
             PrintWriter cronIn = new PrintWriter(child.getOutputStream());
             Iterator iter = jobs.iterator();
             while (iter.hasNext()) {
              cronIn.println((String)iter.next());
             cronIn.close();
             child.waitFor();
         catch(IOException e) {
             System.err.println("IOException starting process!");
         catch(InterruptedException e) {
             System.err.println("Interrupted waiting for process!");
        void doStuff() {
         readCron();
         listJobs();
         jobs.add("* * * * 4 cronjob");
         writeJobs();
         readCron();
         listJobs();
        public static void main(String[] args) {
         cron c = new cron();
         c.doStuff();
    }

  • No messages created from split mapping   error .....

    HI XI Friends..
    In My XML to RFC scenario,,
    i am doing message splitting withput BPM.
    in message mapping ..i changed target message occurance to unbounded
    and same i did in interface mapping also..
    static test is OK..creating multiple target messages in static test.
    in interface determination,using enhanced option i given interface mapping.
    file is picking but in SXMB_MONI ...i am getting error like this
    <?xml version="1.0" encoding="UTF-8" standalone="yes" ?>
    - <!--  Request Message Mapping
      -->
    - <SAP:Error xmlns:SAP="http://sap.com/xi/XI/Message/30" xmlns:SOAP="http://schemas.xmlsoap.org/soap/envelope/" SOAP:mustUnderstand="">
      <SAP:Category>XIServer</SAP:Category>
      <SAP:Code area="MAPPING">GENERIC</SAP:Code>
      <SAP:P1>No messages created from split mapping</SAP:P1>
      <SAP:P2 />
      <SAP:P3 />
      <SAP:P4 />
      <SAP:AdditionalText />
      <SAP:ApplicationFaultMessage namespace="" />
      <SAP:Stack>No messages created from split mapping</SAP:Stack>
      <SAP:Retry>M</SAP:Retry>
      </SAP:Error>
    please guide me..
    regards
    ram

    Hi Ram,
    Check these..
    Split mapping created no messages
    Message Split without BPM - Error
    cheers,
    Prashanth
    P.S Please mark helpful answers

  • When attempting to create an SSRS Report in SharePoint 2010 Dashboard Designer and change the Server Mode from Report Center to SharePoint Integrated

    Hi,
    When attempting to create an SSRS Report in SharePoint 2010 Dashboard Designer and change the Server Mode from Report Center to SharePoint Integrated, I get the following unhandled exception:
    ************** Exception Text **************
    System.InvalidOperationException: There was an error generating the XML document. ---> System.InvalidOperationException: Instance validation error: '2' is not a valid value for Microsoft.PerformancePoint.Scorecards.SqlReportViewData.SqlReportViewDataServerMode.
       at Microsoft.Xml.Serialization.GeneratedAssembly.XmlSerializationWriterSqlReportViewData.Write1_SqlReportViewDataServerMode(SqlReportViewDataServerMode v)
       at Microsoft.Xml.Serialization.GeneratedAssembly.XmlSerializationWriterSqlReportViewData.Write3_SqlReportViewData(String n, String ns, SqlReportViewData o, Boolean isNullable, Boolean needType)
       at Microsoft.Xml.Serialization.GeneratedAssembly.XmlSerializationWriterSqlReportViewData.Write4_SqlReportViewData(Object o)
       --- End of inner exception stack trace ---

    Hi,
    According to your post, an error occurred when you integrate SQL Server Reporting Services with SharePoint.
    1. Please check the steps as the link below:
    http://technet.microsoft.com/en-us/library/ff724283(v=office.14).aspx
    2. Try to clean the configuration cache on all of your SharePoint servers and re-tested.
    http://blogs.msdn.com/b/josrod/archive/2007/12/12/clear-the-sharepoint-configuration-cache-for-timer-job-and-psconfig-errors.aspx
    Best Regards
    Dennis Guo
    TechNet Community Support

  • PO confirmation creates PO change message

    Hi.
    I have setup a SRM -> XI ->SUS -> XI -> SRM scenario.
    Everything is working fine accept that when the vendor confirms the PO and Sends the SUS PO confirmation the SRM automatically creates a PO change message back to the SUS system.
    This causes the PO on SUS to go to "in process" state again.
    Any idea why this is happening.
    I do see this in the tracking tab under Chnage documents:
    Status:
    "Variance in PO Response Newly Added"
    Many thanks
    Rodney

    Hi Neha,
                        Thanks for your quick reply.
    I want to enhance existing table control screen (Standard)where will come under PO item confirmation tab in ME2*N transactions.This table control reference from EKES table. Already i appended customized field in this table. Now i want to add  one more column in this table control screen using any screen exits or BADIs.Is it feasible or not? if it is feasible,Pls give me further steps..
    Thanks.
    Muru.P.

  • Howto change NLS_ENV variables when creating Oracle Scheduler jobs

    Hello,
    i have installed EMGrid 10.2.0.3 x86_64 and 10.2.0.3 agent on other computer. With standard NLS_LANGUAGE='AMERICAN' NLS_TERRITORY='AMERICA' settings.
    When I create DB job with EMGrid Oracle Sheduler interface, NLS_xx parameters are set as NLS_LANGUAGE='AMERICAN' NLS_TERRITORY='AMERICA'.
    How can I change the default settings to NLS_LANGUAGE='CZECH', NLS_TERRITORY='CZECH REPUBLIC' when creating DB jobs with EMGrid?
    Thanks for reply.
    Regards,
    Stanislav Studeny

    Hi,
    You need to call the create_job (or submit) procedure from a session which has the appropriate NLS settings set. I can think of two ways of doing this from EMGrid
    - create a stored procedure which takes in job parameters, does appropriate "alter session" statements and then calls create_job/subit with the passed in parameters. You can then call that stored procedure from EMGrid
    - create a job from EMGrid which as the action does the alter session statements and then creates the real job
    Hope this helps,
    Ravi.

  • Return Completion Message from DBMS Job

    I have an application that includes a button that creates a dbms job. Is it possible to display a message in the HTML DB application when the job completes on the back-end?
    Currently, if you add a success message to the button, it will come back right away with "Success" since the application successfully submitted the job. I would like for a message to be returned when the job actually completes (whether it be 1 minute or 1 hour from the time it was submitted.)
    Any ideas?

    Is this a one shot job or a recurring job?
    If it is a recurring job, you would probably have to create another job to poll the user_jobs view every so often to determine whether it has run or not. If it is a one shot deal, you would have to store the job number in either an application item or a database table. If you store it in an application item, the user will have to keep the app "open" (assuming it takes an hour) or else it will be cleared from session state.
    Storing the job number in a database table, along with the userid, and then checking to see whether the job exists in user_jobs would probably be the best way. You could create a "success" message on Page 0 and set it only to display when the job doesn't exist. That would allow the user to close the app and come back to it later. Of course you would have to delete the row in the table when it is displayed otherwise it will always be there.
    Anyway, just thinking out loud...
    chet

Maybe you are looking for