Change Mrp Element Data of Production Order in MD04

Dear guru ,
In the mrp element data of the stock/requirement list for the production order I see the
Production order number , the order type , and the system add /RE if production order is released or
/PD if production  order is partial delivered. No other information about others production order status.
How can I change mrp element data using Customizing or ABAP in order to recognize in MD04 if production order is confirmed or partial confirmed ?
Thanks.

Dear Cris ,
I am not sure if CNF/PCNF will show up in the MRP Element data in MD04.I have checked PO which are also CNF/PCNF and i looked the same order in md04.It is not showing .U may need some ABAP help .
But if you really intersted to see the list PO status together , then go to COOIS and give plant , order type .It will give you all the order under that plant irrespective of material and also Status.U ave lot of option to filter the PO status under Status Profile or System status ok.
Hope this will fullfill your requirement
Reward point if useful
Regars
Jia

Similar Messages

  • How to change operation dates in Production Order /Capacity Leveling

    Dear Experts ,
    We are using ECC 5.0 .In production order , scheduling happing as Backward  based on the Sales Order Delivery Date .I am doing the following :
    1.Demand as Sales Order with Delievery date : 20.03.2010
    2.Running MRP with Lead Time Scheduling -2  in md02 and converting the Planned Order to Production Order .
    4.Production Order have following dates :
             Basic Finsish Date : 21.03.2010
             Basic Start : the day Pl.Or--Pr.Ord
             Schedule Start : 15.03.2010
             Schedule Finsish : 17.03.2010
            Schedule Release : 13.03.2010
    5.In schedueling margin key :  Float Before Production : 3    , FAP : 3 , Release Period : 2
    6.In material master : Work Scheduling View : Setup : 3 days , Processing : 4 ,Interoperation : 2 for one Base Qty 1
    7.In operation : Op1  : Start Date  : 15.03.2010    Finish Date: 15.03.2010
                             Op2 : Start Date : 16.03.2010      Finish Date : 17.03.2010
                             Op2 : Start Date : 17.03.2010      FD : 17.03.2010
    Question :
    1.How to change the Operation dates  in Production Order Operation over view screen ? Today,  operation over view screen , Start date and Finsih Date  of individual operation are not changable with in Production Basic Start /BF date  or beyond .It is only changing based on the Standard Value : Labor
    2.How to change/re-schedule operation dates d in CM21 (Graphical view -Work Center Capacity load as per   Production Order and Operation combination ) based on capacity availale in advance dates? I am using  Time Profile : SAPSFCZ002 -SFC Graph midterm-3 motnhs and Planning  ,
    How to solve this above issue in scheduling operation and capacity distribution .
    Regards
    JH

    Closing the thread

  • How to get change date in Production Order ?

    Dear Friends,
    I want to know it, how to get change date in Production Order "Administration-TAB".
    F1-Help, It is displayed with "Change date for Order Master". and Structure table "CAUFVD".
    But, CAUFVD is not Transp. Table.
    Which table should I read ?
    Thanks in advance
    Yamazaki-H

    Dear Friend
    Thank you for an answer.
    It was settled.
    Best regards.

  • Stanging indicator change in control cycle after production order released

    HI
    We have MM PP interface active
    i setup staging indicator 4 for one material via control cycle
    Production order is created and released
    now we would like to change staging indicator to 1 [pick parts]
    how we reread control cycles data in production order
    Thanks

    Try: CO02 > Functions > Read PP master data

  • Bapi for update Master Data in Production order

    Dear All ,
        I am working in a car manufacturing company here production order is made month wise planning qty , but every day its Bom is get changed by Autocad/PLM interface and all changes are being recorded through ECN .
       I have to  generate daily reservation for assemblies for a perticular finish vehical ,so I need to update the Masterdata in production order no through the PLM( VB platform) interface .
      So please suggest me any BAPI so that I can update the master data regular basis in monthly production order  or if you have any better way to map this process into SAP please suggest .
    Thanks in advance .
    regards ,
    Pralay ..

    Not sure what master data in production order you want to change. Anyway if it is at header level, then evaluate BAPI - BAPI_PRODORD_CHANGE.
    Alternatively evaluate the usage of Order Change Management if it is feasible in your solution. Do a search in this forum you will find many threads on it, also read SAP help & do a test a test in your sandbox. If you face a specific issue then do revert

  • All default routing value has to be changed, while changed the work center in production order

    Dear friends,
    our client they want to change the work center in production order.according to production version work center also they are changed.so while change the WC,all the default value has be changed as per routing what we maintained in routing.At present we have to enter the manually change the W.C as well as set up time and operation time enter manually.Any other option to do the automatically capture value from routing while change in Work center in production order.pl help me on this.
    Thanks&Regards
    Sabhapathy R

    Hi Rahul,
    Thanks for reply. I am maintained in diff value  maintained routing , Ex :First routing i have  work center 'X' value maintained as a setup time in 15 Min's and operation time 10 Min's
    second work center 'Y' I have maintained as set up time 10 Min's and operation time 30 Min's,
    Now I want to change the work center in production order as a 'Y' so whatever value maintained in routing , it has to be changed automatically (10 min's and 30 Min's), but system will not change only old value only picked (15Min's AND 10 Min's).
    Now I think you get to know what the client requirement, kindly do the need full.
    Regards,
    Sabhapathy R

  • Changing proposed delivery date in sales order for one specific sales org

    Hi All,
    I want to change proposed delivery date in sales order automatically for one specific sales org only without changing lead time in VOV8.
    For that can I use MV45AFZZ. But it is asking access key to make changes. Is there any other user exit for the same. And how does exactly change it.
    Thanks in advanced.
    Points will be awarded.
    Regards,

    EXIT_SAPFV45E_001 has nothing to do with this - it is meant to update the purchase order from a sales order. It might not even be triggered if the sales order has no link to a purchase order.
    USEREXIT_SAVE_DOCUMENT is not really good for this either, because the delivery date has to be changed before that. If memory serves, it also influences the schedule lines and probably the ATP check and such. I would strongly advise against it. One of the other routines in MV45AFZZ should do just fine, USEREXIT_MOVE_FIELD_TO_VBAK for example.

  • How to change the status of a production order

    Dear All,
    May i know how to change the status of a production order.I want to de-active the status like OPGN (Operation generated).This status is updated as there was no routing assigned to that particular production order during its creation
    Thanks and Regards,
    Varun Siddharth

    Dear,
    When you create a production order, an operation created by the system is generated automatically if no routing is used for the creation. As a result the order header receives the status HOGAN; the operation created automatically also has this status.
    If you delete the operation created automatically and then do not have the status HOGAN.
    To avoid this maintain the Routing for the material or delete the setting of default operation from OPJG.
    Regards,
    R.Brahmankar

  • User exit to change item level data in purchase order

    Hi,
    Can anyone let me know the user exit to change item level data in purchase order . there is a badi ME_PROCESS_PO_CUST for this but the issue is its method process_item gets triggered only when the item is changed. My requirment is
    For purchase order document types u201CZSOu201D and u201CZCOu201D, where the purchase order is a u201CLimits Orderu201D only i.e. no materials or services on the purchase order, the print price indicator field should be set to u201Cblanku201D (unchecked).   now i cant use ME_PROCESS_PO_CUST  because process_item wont get triggered if there is no change in itemlevel data.
    Regards,
    Rahul

    Hi Rahul,
    Probably EXIT_SAPLMEKO_002.
    hope it helps,
    Edgar

  • Change input quantity of a production order in SAP - PP

    Hello,
    I am working in a custom code where one of the steps is to create production orders basically based on a product, workcentre and quantity for what I use 'COXT_BAPI_ORDER_CREATE' function module.
    Now I have a new requirement which is to be able to change the input component quantity to a different value than the output (similar to what you can do in transaction CO01, and like what the on-line help claims you can do).
    This new value should be on top of the ratio that is possible to specify in the BOM (i.e substract 5000 KG to what ever is in the input node after creation of the order).
    The GUI allows for this so I assume there is a way to do it in custom code as well, but has not find the way to do it or function to call.
    Can you advise on how to change the input quantity value without affecting other info of the order?
    Thanks
    Regards,
    Update: found this other thread Change components and Routing of production order
    Edited by: Mauricio Pego on May 3, 2011 6:00 PM

    Hi,
    The requirement can be met via BADi - MD_DISPLAY_ELEMENT (method - CHANGE_MDEZX_EXTRA).
    Give the specification your technical person & the same can be done.
    Regards,
    Vivek

  • Help - User exit to change item level data in Purchase Order

    Hi,
    Can anyone let me know the user exit to change item level data in purchase order . there is a badi ME_PROCESS_PO_CUST for this but the issue is its method process_item gets triggered only when the item is changed. My requirement is For purchase order document types u201CZSOu201D and u201CZCOu201D, where the purchase order is a u201CLimits Orderu201D only i.e. no materials or services on the purchase order, the print price indicator field should be set to u201Cblanku201D (unchecked).   now i cant use ME_PROCESS_PO_CUST  because process_item wont get triggered if there is no change in item level data.
    Thanks,
    Rahul

    Hi Rahul,
    Probably EXIT_SAPLMEKO_002.
    hope it helps,
    Edgar

  • Mass change of LOADING DATE on Sales orders

    Hi
    Does anyone know how we can MASS CHANGE  the LOADING DATES on SALES ORDERS with MANY LINE ITEMS  - ALL WITH Different DELIVERY DATES
    So basically we are wanting to over-ride the loading dates which SAP suggests - which relates to the ROUTE
    I am aware that you can use EDIT > Fast change > delivery date  - but this would put all of the delivery dates then to be the same
    Your help would be much appreciated, as the Operatives are doing this line by line, order by order at the moment
    Many thanks
    Tony

    Dear Tony,
    Won't You able to change the same Via LSMW (or through BDC-Program)?
    Just check whether the T. Code: MASS, could be useful
    Best Reagrds,
    Amit

  • How to collective read PP master data in Production order?

    Hi: Guys
    Please tell me how to collective read PP master data in production orders. in COHV, I can find out some collective functions but read PP master data.
    Thanks
    Henry

    Read PP master data is only to update routing and BOM in production order if it is already created to effect the changesmade in routing and BOM.    I think in that collective option is not possible.  
    Regards
    KrishnamurthyDSS

  • Update of Sales Order Delivery Dates from Production Order Date Changes

    I work at a discrete made-to-order manufacturer. 
    When our factories maintain their production orders, they will often have to change their order dates.  Is there a way so that these changes can automatically update our sales orders so we can re-send sales order confirmations?

    hi,
    this comes under development part.
    please check the feasibility with your abaper because you will have to change standard code.
    regars,
    balajia

  • Retstriction of confirmation dates in past dates in production order

    Hi All,
    I have a issue with dates
    In our system production orders are created in advance at once in mass...suppose a production order is having start date and end date as 01.08.2014 and 07.08.2014. Now user taking this production order and proceeding with manufacturing execution in today's date say from 23.06.2014 to 30.06.2014 without  changing the production order planned dates ( basic dates  and scheduled dates ).. after completion of production they are confirming with actual dates as explained from 23.06.2014 to 30.06.2014...
    Now situation is like this...Now this is very difficult to explain to auditors..is there any way to prevent this through customization.
    Thanks
    Kumar

    Kumar,
    The user exit CONFPP04 can be helpful to check the details during order confirmation.
    Also implement OSS note 1523641 first (http://service.sap.com/sap/support/notes/1523641) if you go for this enhancement.
    Best Regards,
    Rajen

Maybe you are looking for

  • Apple ID on my computer no longer exists, so I can't sign out

    The Apple ID that is installed on my computer is no longer the email address that I use for my Apple ID, and the email account itself has been deleted so I cannot sign into it to change the settings. My current Apple ID works online on apple.com but

  • Oracle SQL Loader - External Table

    This is my code:- CREATE TABLE GLO_CUST_EXT (SOURCE_ID CHAR(3), BUS_DT CHAR(8), TRAN_CD CHAR(1), CUST_CD NUMBER(10), MNEMONIC CHAR(10), SHORT_NM CHAR(255)) ORGANIZATION external (TYPE oracle_loader DEFAULT DIRECTORY Source_dir ACCESS PARAMETERS (RECO

  • Do I need to uninstall old Download manager exe (Akamai?) file from past trial to install new one?

    I just purchased CS5.5 Design Premium (student edition) at Amazon. Everything went smoothly while validating that I am a student. I installed the 1st of 2 disks. Second one won't install. The PDF help sheet says to look for DesignPremium_CS5_5_LSx.ex

  • Accessing File Shares Over NAT

    Hello, I am working with a client that set up a new sub net that uses hide NAT. When I try to access a file share on a server in a different sub net, I can only browse for a few seconds and then an error such as "Server service not started" or "netwo

  • Deleting a Compound Clip from Finder

    Hi, I edited a couple of compound clips earlier this week and ever since then whenever I open FCPX it takes 30+ minutes to load the event and start up. At first I thought the problem was the size of the event, so I deleted some unused media and made