Change of Bin while confirming TO (Picking strategy FIFO)

Dear WM experts,
We use FIFO strategy for picking. Now for an outbound delivery we have the requirement to generate TO automatically. During confirming of the TO we should have option to change the suggested Bin (in the source storage type).
Could you please confirm what settings in IMG should I take care of for achieving this.
Thanks a ton.
Kamal

Hi,
I'm afraid it isn't possible...
You can set destination storage bin change for your storage type in SPRO:
Logistics Execution ® Warehouse Management ® Master Data ®  Define Storage Type
You can find a field called 'Dst bin ch. during confirm'...BUT SAP help says:
'No destination bin can be entered during confirmation for
- dynamic coordinates
- return items
- Lean WM (if the destination bin is defined in the movement type)
- posting change TOs
- inventory based on putaway
- additions to existing stock in storage units
- transaction Confirm single item'
I guess you are using dynamic bins for outbound deliveries...
http://help.sap.com/saphelp_46c/helpdata/en/c6/f83e5a4afa11d182b90000e829fbfe/frameset.htm
Just my opinion...
BR
Csaba
Edited by: Csaba Szommer on Jun 3, 2008 8:38 AM
Edited by: Csaba Szommer on Jun 3, 2008 8:38 AM

Similar Messages

  • Cannot change destination bin during confirmation

    Dear SAP experts,
    We are in SAP ECC 5.0. We read that we can change the destination bin during confirmation of TO. We have done the pre-requisite:
    1. In relevant storage type (001) we input '1' for dst bin ch during confrm field
    2. Untick physical inventory during placement to bin
    Then we do GR to PO, which generate TR. We create TR into TO and specifying bin INTERIM in storage type 001. During confirmation in tcode LT12, I cannot change the destination bin. What else do I miss in here?
    Best regards,
    John

    Hello John,
    Even though config mentions change of destination bin, there are quite a few limitations.
    Have a look at below documentation from SAP
    http://help.sap.com/saphelp_47x200/helpdata/en/c6/f83e5a4afa11d182b90000e829fbfe/frameset.htm
    Snapshot of some imp content.
    No destination bin can be entered during confirmation for
    dynamic coordinates
    transfer orders with return subitems
    Lean WM (if the destination bin is defined in the movement type)
    posting change TOs
    inventory based on putaway
    additions to existing stock in storage units
    stock removal from or putaway into bulk storage
    two-step confirmation
    transaction Confirm single item
    the case where you are using a putaway strategy
    all other items in a TO with storage units, if you have already confirmed the first item for the storage unit. The system changes the destination storage bin for all dependent items during confirmation of the first item.
    stock removals from a bulk storage managed with storage units
    Check if your putaway falls in any of the criteria.
    Cheers,
    Nag

  • WM: Change source bin confirm transfer order

    Hi guys,
    Do you know if I can change source bin when confirming the transfer order.
    I know I can customize the system if I want to change destination bin when confirming the transfer order.
    Thanks,
    Fatih.

    Hi,
    Hope you cannot change the source bin but as per the configuration in the picking strategy in the customizing you can define the picking sequence for the souce bins.
    example: like check bin " A" if ......(condition)...then pick from bin " B " or pick from bin " C".
    Regards,
    Ravindran

  • Change of bin not possible during TO confirmation

    Hi all.
    I am trying to change the destination storage bin during transfer between bins (WM movement 309).
    The strategy is fix bin (maintained in material master), so the TO is created with fix destination bin and operator must change it before confirmation.
    For example, in GR it is possible to change destination bin during confirmation in transaction LT12 but not for transfer. The receiving storage type is the same in both cases. Is there any customizing missing?
    Apart from this, is there any way to confirm items separately inside a TO? For example, during GR I try to confirm a TO in transaction LT11 for just one item and waiting for the rest to be placed physically in order to confirm all the TO but destination bin can not be modified in LT11. Is there any way to confirm item per item but allowing changing destination bin? it is possible to do it in LT12 but not in LT11.
    Many thanks in advanced and best regards.

    Hi,
    Generally, it is possible to change the destination bin during TO confirmation. However, this is not possible under the following conditions:
    o  With dynamic coordinates                                                                               
    o  If the destination bin location is specified in the movement type
    o  For posting change transfer orders                                                                               
    o  For the physical inventory using a putaway                                                                               
    o  For the addition to existing stock for storage units                                                                               
    o  For the transaction Confirm Single Item (transaction LT11)                                                                               
    o  If a bulk storage type is involved in the stock movement                                                                               
    o  In the event of an individual putaway strategy                                                                               
    o  If the first item of a TO with storage units is already confirmed
       since all the other items of the storage unit relate to the same 
       storage bin. When you save the first TO item, the system changes 
       the destination storage bin for all dependent items.                                                                               
    o  If this is a replenishment transfer requirement for a fixed      
       storage bin.                                                     
    Please see SAP Note number 443916 for an explanation.
    Thank you.
    Patrick

  • Change Storage Bin Number in 309 movement type

    Hi Gurus,
    I have problems with creation TO for movement type 309(material to material posting), when i want to create the TO for that movement type, i can't change the destination bin.. The destination bin field in that TO is disable, how to make that field enable?
    I try to add an user exit after creation of that TO, the user exit is MWMTO001.. so the user exit used for change the storage bin number after the TO created.. but that user exit never triggered after TO created.. How it could happen?
    Any suggestion, how to change the storage bin number when i want to create TO from 309 movement type(material to material posting)?
    Kind Regards
    Ken

    Hi Kris,
    Ya, i already create the bin number, for example i material A fixed to bin 00001 and material B fixed to bin 00002, when i do movement 309 from material A to material B, why the bin goes to 00001? why not goes to bin 00002? Because material B is fix to bin number 00002..
    For your solution, i just can change the bin during confirmation of the TO? Because, in this case, confirmation of that TO done by external system, so the external system will send idoc to SAP to confirm that TO..
    Regards
    Ken

  • Change of storage bin while cancellation of production order.

    Hi Gurus,
    The problem is while confirming the order the stock for that order is consuming from one storage bin (say  1ECMEL) , but when I cancel the same  production order the same stock was returning to another storage bin (say 1MD01A) instead of the 1ECMEL from which it is consumed.
    We want to re-move the stock after cancellation of production order to the same storage bin that from which the stock was consumed during the confirmation.
    Please advise...
    Thank you.
    Naveen.A

    Hi,
    Please check the material master (mm02) in that if u have maintain default storage location in purchasing view for raw materail and workscheduling viewe for fert system will consider that as default storage bin at the time of confirmation and also for cancelation.
    Please try with this.
    Regards,
    Nilesh

  • Confirmation (Separate Pick and Transfer)

    Hello,
    I want to do my confirmation in 2 steps i.e. separate pick and transfer.
    I am doing the same with transaction LT12 but system gives an error:
    "Separate confirmation of withdrawal and material shipment not allowed".
    Could you please let me know the relevant settings required to proceed with this?
    Regards
    Karan

    Hello,
    You would need to the confirmation control for this activity: LE>WM>Activities>Transfers>Confirmation
    1) Define the warehouse to allow for 2 step picking
    2) Define the source and destination storage type as picking confirmation required
    3) Define the movement type that is being used to allow for seperate confirmation or just force the system to confirm even in case of 2 step.
    once you do that you shouldnt get the error that you are getting.
    Also, this is on IMG help :
    At the warehouse number level you define:
    whether there is to be separate confirmation of pick and transfer
    At the storage type level you define:
    whether putaways to this storage type require confirmation
    whether picks from this storage type require confirmation
    whether a zero stock check is to take place for a bin that becomes empty through the pick
    whether the destination storage bin can be changed during confirmation
    At the movement type level you define:
    whether transfer orders with this movement type can be confirmed immediately
    whether the confirmation requirement is to be proposed during transfer order generation
    whether single-step confirmation is to be applied although two-step confirmation is set for the source and destination storage types
    through which screen the transfer orders are to be cofirmed.
    Confirmation Requirement
    As soon as one of the above parameters calls for a confirmation requirement for a transfer order item, the item must be confirmed.
    Immediate confirmation of a transfer order item only works out if
    the respective movement type does not disallow this
    if the storage type from which the materials are picked is not subject to pick confirmation
    if the storage type into which the materials are put away does not have a putaway confirmation requirement.
    Two-Step Confirmation
    For two-step confirmation, both storage types involved in the transfer order must be subject to confirmation.
    At the warehouse number level, you define whether transfer orders or TO items are to be confirmed in two separate steps.
    During the confirmation of the first step, you confirm the pick process from the source storage bin. The source storage bin and the quant are automatically updated. In the quant of the destination storage bin, only the open transfer quantity is updated at this point.
    During the confirmation of the second step, you confirm both the transfer process and also the receipt of the material at the destination storage bin. Here the source storage bin and its quant are no longer updated, but only the destination storage bin and the quant stored there.
    Thanks,

  • Goods Movement Qty While Confirming the Order

    Hi Friends,
    While confirming the order The end user Will go to the goods movement screen and enter the actual consumed Qty (When all BOM components Are marked with automatic Back flush) For the components with 261 movement type and will enter the storage location and batch no if required .
    Now my requirement is the user should not have the access (it should be in gray) to the BOM Components qty to change
    OR
    He should not be able to change beyond the qty As per scrape % Given in Material Master or BOM.
    The Reason for this is
    Even When there is a shortage for BOM components in SL location, he is reducing/Adjusting  the required quantities as per the existing Qty ( If there is no stock then making it to ZERO also)  and confirming the order.
    Pl suggest me is there any user Exit for this or can I do it thru Standard SPRO settings.
    hari

    Hi,
    You  can make screen variant SHD0 for CO11N and hide it.
    In t code SHD0, give the transaction variant name ( say ZCO11N )of ur std CO11n.
    CO11N screen will appear, when u will save the variant, u will getgood movement tab , it will hide now.
    Activate the transaction variant.
    Regards,
    R.Brahmankar

  • Change detector failed while scanning for changes to type User

    I'm receiving lots of system log warnings in IdM.
    These warnings are not bound to any particular action in IdM, they just do appear while IdM is on.
    Almost one warning per one second.
    Change detector failed while scanning for changes to type Server
    Change detector failed while scanning for changes to type UserForm
    Change detector failed while scanning for changes to type User
    Change detector failed while scanning for changes to type Resource
    SysLog detail:
    Timestamp 123
    Event
    Server server11
    Severity Warning
    Component Repository
    Error Code OCDT00
    Message Change detector failed while scanning for changes to type User
    Reported cause java.lang.NullPointerException
    java.lang.NullPointerException
    at com.waveset.repository.ObjectChange.equals(ObjectChange.java:112)
    at java.util.HashMap.eq(HashMap.java:299)
    at java.util.HashMap.containsKey(HashMap.java:381)
    at java.util.HashSet.contains(HashSet.java:182)
    at com.waveset.repository.ObjectChangeManager$RemoteChangeDetector.dispatchChanges(ObjectChangeManager.java:398)
    at com.waveset.repository.ObjectChangeManager$RemoteChangeDetector.run(ObjectChangeManager.java:314)
    at java.util.TimerThread.mainLoop(Timer.java:512)
    at java.util.TimerThread.run(Timer.java:462)

    same here, just deployed 8.1 with oracle as db. It results in syslog table growing into 10+G and still growing.
    wonder if there are others who are seeing this.
    my "syslog -d 1" output looks like this...
    2009-12-02 04:52:55.972 null W xxx RP OCDT00 Change
    detector failed while scanning for changes to type Account
    2009-12-02 04:53:06.400 null W xxx RP OCDT00 Change
    detector failed while scanning for changes to type Server
    2009-12-02 04:53:06.578 null W xxx RP OCDT00 Change
    detector failed while scanning for changes to type User
    2009-12-02 04:53:06.914 null W xxx RP OCDT00 Change
    detector failed while scanning for changes to type Account
    2009-12-02 04:53:17.479 null W xxx RP OCDT00 Change
    detector failed while scanning for changes to type Server
    C:\Program Files\Apache Software Foundation\Apache Tomcat 6.0.18\webapps\ims\bin
    lh syslog -d 1

  • RF screen : how to change the bin using LM63...

    Hello,
    We use LM63 to create transfer orders (TO) from the shipment.
    In some case, we need to change the bin wich is proposed by the system.
    Is there any solution to change a bin or cancel the TO and create it again using a new bin ? We need to do it from the Radio frequency screen.
    thank's for your help and your contribution...
    Mathieu and Hughues..

    Hi...
    In the configuration of the storage type there should be a flag that allows the change of the destination storage bin (within a single storage type).
    This bin field should then be changeable in the transfer order confirmation screen and LM63
    However, this changeable bin is not supported as standard if you use handling units
    Regards
    Steve

  • Change Batch during TO Confirmation

    Hello
    I am looking at a problem regarding batches, we have a Warehouse with materials that are batch controlled, and they need to be that, but our problem is that there are several different batches in one bin, and the FIFO princip is not necesary, since this is mostly steel components like plates and pipes, and we need to now which batch went where, we trried the LIFO set up, but the handling of the materials are a bit random so this does not work, so I am trying to find a way to change the batch during confirmation Is there any way, or must i call in the abap man?
    Regards
    Ivar

    Hi,
    please refer below links...
    WM Batch change in Transfer Order
    Change batch during Transfer Order confirmation for Delivery
    Hope it may help you.
    Kuber

  • Termination error while confirming the transfer order

    Hi Csaba/Frenchy,
    I am getting termination error while confirming or deleting the TO (TO is created out of a posting change notice). Upon confirmation, the system is giving a message that the TO is confirmed but when I try to go out of the TO confirmation screen (LT12), I get the update termination error resulting in TO not getting confirmed.
    Could you pls advise how to go about resolving this issue. Matter urgent please.
    regards,

    One more idea: recreate the PCN (same number, ect) and set the fields via SE16N + &sap_edit as they are in the archived PCN. Else contact SAP AG how to solve.
    (I do not know what is the standard solution for this - maybe before archiving belonging data such as open TOs should have been checked...)
    Maybe other solution might be if you debug transaction LT12 and when it wants to refresh the PCN you eliminate this with the help of your ABAPer.
    Edited by: Csaba Szommer on Jul 29, 2008 7:43 PM

  • WM Bulk Putaway and Picking Strategy Query for a Scenario

    I have two Questions ( Putaway and Picking Strategy for Break-Bulk Handling) :
    Question 1) Break-Bulk Putaway Strategy
    In WM Putaway Strategy for Break-Bulk, I would like to Propose the Bin for Production Receipts based on following constraints relevant for OBD Process
    Scenario:
    SO-1 Production Order -1 Product -1 Ship-To Party -1  Destination -1 Loading Date 20 Days from Now  8 Levels High Product Stacking  Qty 500 MT Occupies 10 Bins total
    SO-2 Production order-2   Product -2  Ship-To Party -1 Destination -1  Loading Date 20 Days from Now 6 Levels High Product Stacking   Qty 1000 MT occupies 20 Bins total
    SO-3 Production Order -3  Product -1 Ship-To Party -2 Destination 2 Loading Date 20 Days from Now    8 Levels High Product Stacking  Qty 200 MT occupies 4 Bins Total
    So-4 Production Order -4  Product -3 Ship-To-Party -3  Destination -1 Loading Date 30 Days from Now Qty 10 Levels High Product Stacking  1000 MT Occupies 20 Bins Total
    S0-5 Production Order -5 Product -2 Destination -2 Ship-To Party-2   Loading Date 30 Days from Now Qty 6 Levels High Product Stacking 500 MT occupies 10 Bins Total
    SO-6 Production Order - 6  Product- 1 Destination-3  Loading Date 10 Days from Now  8 Levels High Product Stacking  Qty 2000 MT occupies 20 Bins Total
    The production receipts will come randomly into Bulk Area any sequence any day any time 24 X 7 basis . The constraints we need to use are:
    1) Materials should not be mixed
    2) Different Loading Dates of Same Product also should not be mixed
    3) Different destination of Same product or different products should not be mixed
    4) Different Ship to Party for same destination should not be mixed
    4) We need to reserve in advance maximum number of Bins that entire Sales Order occupies tentatively as soon as the First time material comes to Warehouse for the entire sales Order. Example SO Qty 500 MT assuming 50 MT occupies with different stack heights in one bin. I need to reserve 10 bins total closer to each other in bulk-area . When 2 Products comes, WM System should propose bins already reserved bin in the break-Bulk Area.
    5) Different SO-2 product when arrives warehouse, it should not occupy already alloted bin for SO-1
    Question 2) Picking Strategy
    1) Pick List needs to be generated based on Loading Date at Load Port for all SO's and the sequence of Loading will be first last Destination in the route ( i.e. based on which is delivered at last port needs to be loaded first in the vessel at Load Port )
    If the route contains 3 stages
    Stage -1 --- First Discharge port
    Stage -2  -
    Second Discharge Port
    Stage -3 --- Last Discharge Port
    We need to load in Ship, the SO Product which will be discharge last i.e. Stage 3 Destination.
    Next we need to Load Second destination and next we need to Load SO Product going to First Discharge Port.
    This Picking proposal needs to come from WM System
    How can we address this requirement in WM System?
    Thanks and Regards,
    Nagaraj

    Hi,
    Thank you for your attention to our question.
    We have a workaround for this problem. I have created a Special Movement Indicator with a corresponding WM Movement Type and attached these in the LE-WM Interface to Inventory Management. We will now update our Material Masters with the Special Movement Indicator and keep the Placement and Removal Storage Types the same (the Fixed Bin Storage Type). We have tested this approach and are satified that it meets our needs.
    Thanks and Regards,
    Mike

  • Changing source bin

    Hi,
    I want to change source bin once the transfer order is already created is it possible? and how? as far as I know it is not possible, but I want to know if some has done something similiar and how was it? And if you gave a RF solution
    Thx
    Edited by: Mariana  Hernandez on Jun 23, 2009 5:15 AM

    Hello,
    I do not think we can change the source bin but we can change the destination bin in case of RF solution.Also I guess it is possible to change the destination bin without RF solution. The destination bin can be changed by maintaining indicator in storage type master data for "Dst bin ch.during confirm".
    Regards,
    Prashant

  • Picking strategy M

    Picking strategy M (Large/Small quantities) has been configured.
    Search sequence: 003 - 002
    System should pick partial quantity from 003 and full pallet from 002.
    6 DU = 1 PAL
    Control quantity in material master has been set to 5.
    The problem is, when there is no stock in 003 and the quantity ordered is partial (say 1 DU), the system creates a transfer order for 6 DU from storage type: 002. According to configuration, the system should not be checking in 002 at all since quantity is less than 1 PAL, right?

    Hi Anushree,
    T_QMAT contains the list of Quants fetched by System based on your Search Strategy. In case you do not wish to pick from a particular storage type because the quantity being picked is not a complete Pallet, then you need to modify that particular Quant Entry in T_QMAT.
    Say for e.g. in your case no stock was found in 003, so system fetches the Quant from 002 for 1 DU. This particular entry should be deleted from T_QMAT as you don't want the system to consider it. Alternatively, if the Quantity had been say 10 DU and  you want 1 PAL to be picked from 002 but not the partial Pallet, then you need to modify the Quantity (AUSME or some other field-check in the table and you will find the correct field-as I am without SAP access right now) available in the Quant entry in T_QMAT (modification instead of deletion). So add the logic to check the Pallet conversion quantity and decide on modification or deletion of the particular Quant entry for the Storage type.
    I am not sure if you have to set the indicator for exiting the TO creation Process-need to test it in the system, once I am logged in. But you can make code changes and debug the scenario to arrive at the results.
    Alternative: Did you try making the storage type 002 a Pallet storage type with control quantity = Pallet quantity and see if it works.
    Let me know how it goes.
    Regards,
    Shashi

Maybe you are looking for

  • Error while running the Grid display

    Hi Experts,         I got one problem. I created an Z-report, the output type is as Grid display. After viewing the output and pressing back button, it is going to dump. Thanks in Advance, Srinivas

  • Need of Case insensitive searching

    Hi All, I have a prompt where user wants to search whatever letter case, But lov has to get loaded how can we achieve it? attaching snap. kindly give suggestions.

  • Auto accounting for deferred expenses

    Hi all I would like to know if there is a functionality in Oracle to perform auto accounting for Deferred Expenses. I'm giving below an example of my exact requirement for my professional colleagues to reply. Scenario: The school fee for an employee'

  • Skipped Slides Show On Presenter Screen?

    HI While building a presentation I'd like to  be able to create a group of slides that are normally skipped in during playback, but if I'm asked for more detail I can make them apprear. I figure that having them show up as ltiile thumbnails in the pr

  • Cannot access GNOME Keyring from Systemd Unit Service

    Hi ! I am using isync to download my IMAP mail to a directory in maildir format. I use the following line in ~/.mbsyncrc to fetch the mail password: PassCmd "gnome-keyring-query get mail_pw" My ~/.mbsyncrc is configured correctly, because I am able t