Change of Excise Basic Rate from 8% to 10%

Hi Every Body,
Our basic excise rate changed from 8% to 10% now in our Indian scenario for condition types JMOP from 27.02.2010 and now we can mantained JMOP at plant , material & vendors level in FV11 10% .
But now we face the issue for the previous bill to be passed at previous rate 8% but system picking 10%  because of changed rate.
Ultimately we require both the rate at same plant , vendor and material level then we mean to say that there is any provision in SAP so we can maitain both the rate at time and whenever invoicing  requires depending upon old and new case , accordingly we pass..
Thanks,
Dharmveer

There is solution for it
1. First You need to retain old tax code combination with excise rate - 8%
2. Second you need to create new tax code combination with excise rate - 10%
or
You can GR material ,manually enter excise amounts,
capture excise invoice,refer it in migo,post excise invoice,do bill passing(MIRO) without tax code,
Note: Add g/l acct tab in miro using customization,manually enter cenvat clearing amounts(but it not adivised,you can do it,if there is no change in stock or no price variation)
Also refer Note 1435105 - Master note for Indian Budget 2010 for Logistics (MM & SD)
Edited by: Jeyakanthan A on Mar 18, 2010 11:01 AM

Similar Messages

  • How do I output the smoothest video when changing or mixing frame rates from the original footage?

    I have been experimenting with various Media Encoder settings, and wondered if there was anything else I can try to get the smoothest video output possible, especially when changing frame rate and possibly resolution.  For clarification, let me start from the beginning and explain what I'm doing and what I've tried so far.  I'll try to be as brief as possible, but if I do go into too much detail, I apologize. 
    My original footage is AVCHD 1080p - 60fps.  (my camera only does 60fps...specifically 59.94fps)  We're not talking interlaced video here, I'm staying away from that.  This is definitely full frame, progressive video at 60 frames (not fields) per second.  My output will ultimately be for the web.  I have been keeping my output codec (H.264) and bit-rate (VBR 2-pass, relatively high-bitrate) consistent, and have been trying numerous output options and even sequence settings to see what would yield the best results.  I am using Premiere Pro CS5.5 along with Media Encoder.  Here's what I've done and the results I've observed:
    1.  I created a sequence with 1080p - 59.94fps settings to match my original footage.  I then output both 1080p and 720p versions at 59.94fps, and at 29.97fps.  The 59.94fps output files looked absolutely great, as would be expected.  Extremely smooth.  The 29.97fps output files were generally smooth, but not near as smooth as the 59.94fps.  This is expected since it's half the frame rate as my original footage.  However, my question is this:  What exactly is Media Encoder doing when "down converting" from 60p to 30p?  From a technical stand point, is it dropping every other frame?  I'm just curious to understand exactly what it does.  I tried the Frame Blending option as well, and that only yielded a bit more blur to the images which wasn't desirable for any of the output files. 
    2.  Just to see what would happen, I created a sequence with 1080p - 29.97 settings.  I then output both 1080p and 720p versions at 29.97fps.  The video was much more choppy in these cases, even with Frame Blending on.  Now, I know not matching my sequence settings with my original media isn't ideal, but I again just want to understand why this yields less smooth video than the 29.97fps options above.  Why does cutting the sequence settings frame rate in half from the original, then outputting the same frame rate as the sequence yield video that is not as smooth?
    3.  Next, I wanted to try mixing frame rates to see how Premiere and Media Encoder handled the footage and output files.  Premiere handled it great, no issues there.  However, I had some interesting things happen when I output the files.  Here's what I did:  I created a sequence with 1080p - 59.94fps to match my original footage.  Then I took the same exact footage that was in my sequence, copied it in my project panel and interpreted it at both 23.976 and 29.97 fps, yielding slow motion video.  The slow motion video looked great in Premiere, so I went ahead and just added it to my sequences, along with the original 59.94 footage.  I also created separate sequences for the 29.97 and 23.976 footage respectively, each with matching sequence settings, then added a nested sequence to another original footage sequence (with 59.94fps sequence settings) to see which yielded the best results.  Basically, I'm trying to output 59.94fps that match my original footage, but also throw in some slow motion footage at different framerates.  I'll explain my results in a moment as they are a bit convoluted, however, here is my question:  When mixing frame rates and trying to output the smoothest video, am I going about this the right way?  I would assume you would use your sequence settings that match the original footage (which is what the majority of the footage will be), then bring in a nested sequence for the slow motion (as oppose to just dropping the slow motion video directly into my main sequence), and then output to the same frame rate of the majority of the footage, in this case 59.94fps. Is there a better workflow for this?
    The results to #3 above were as follows.  Initially, it looked like it didn't matter if I nested the slow motion sequence into my main sequence, or simply dropped the actual slow motion video into my original 59.94fps sequence.  It seemed to produce smooth results either way.  Frame Blending blurred the video a bit, but didn't seem to make much difference, and quite honestly I like the footage without Frame Blending in general.  However, when I closed down Premiere, and opened the output files later (opening in Quicktime), the footage looked choppy.  In fact, it would go from choppy to smooth and back, almost like it had an irregular cadence (don't know if I'm using "cadence" in the right context here).  I would then open up Premiere again, import the output footage into my project panel, and play the footage in Premiere, and it would play back smooth again. Is this a Quicktime issue?  I was playing 1080p 59.94fps files when this happened, so maybe it's just because it's a large file.  Doesn't seem to have issues with the 720p files I created.  But it sure threw me off with my testing because I then started second guessing the settings I was using.  My iMac is the latest 2011 model with plenty of RAM, so I wouldn't think it's the computer.  Thoughts?
    4.  Next, I noticed on ALL my output files (again, using the H.264 codec from Media Encoder) that the color of my video seemed to flatten quite a bit.  It seems that the original footage has more contrast and saturation than the output files.  I figured maybe this was just how it was, but when I re-imported the output files back into Premiere, they looked IDENTICAL to the original footage.  And in Media Encoder's Source/Output windows, I don't see any difference there either. Is Quicktime again the culprit here, doing some odd things to the color of my videos?
    5.  Regarding Frame Blending, when is the best situation to enable this option in Media Encoder?  I've read it is when mixing frame rates, but I honestly didn't see too much of a change except for a bit more blur, which I didn't care for.
    6.  Lastly, my conclusion is that 60fps yields the smoothest video, which is an obvious conclusion.  However, I know that 60fps isn't the best or easiet frame rate for web delivery.  It seems 30p is more the standard.  Are there any integrated web players that would play 60fps?  Can you get 60fps video on YouTube/Vimeo?  If yes to any of these questions, can they do 720p and 1080p at 60fps? 
    Those are all my questions.  I hope I am clear enough without being overly wordy and hopefully I didn't put too many questions into one post.  Thanks in advance for any insight, I really appreciate it.

    Did you ever figure out which output worked the best? I have the same original footage; trying to determine the best output settings to make a dvd for tv.
    thanks!

  • Changes in Service Tax Rate from 12% to 10% from 24th Feb 2009

    Dear All SAP Consultants
        In our Company we are using JSRT ,JEC3 & JES3 Condition type, for calculation of S.Tax, Cess & H,Cess respectively, for Service Tax Calculation. We have maintain above Condition through FV11 [Maintain Condition Type for Vendor]  12%, 2% & 1%. to the Vendor, up to validity date 01-04-2008 to 23 Feb 09 and as per the changes declare by Government, we have maintain it 10% 2% & 1% from validity period 24.02.009 to 31.12.9999.
         But, when we post the entry through FI through the FB60 [Vendor Invoice] with Document Date which is before 24 Feb 2009 and Posting is Current date for Last month Invoices, which is include Service Tax Rate 12%. at that time system should have take the 12% service tax, but it is taking  10% as per new condition was maintain to the vendor.
    How, we post the Invoices which is include the 12% S.Tax through FI with Document Date  is before 24.02.2009 and Posting Date is Current Date.
    Thanks & Regards
    Abhijeet R. Walke

    Hi Abhijeet,
    It picks up on the basis of posting date and not document date.
    Enter posting date before 23 feb.
    Regards,
    Kiran

  • How do I change the audio sample rate from 48kHz to 44.1kHz for Mpeg2

    Hey all,
    I've been searching for a while but haven't found any direct answers in the forums or the user manual so here goes.
    I have to dispatch a file to Bloomberg TV and the file specs they have given me are as follows:
    Video Standard: MPEG-2, MP:ML, 4:2:0
    Frame Rate: PAL 25fps
    Video Size 720 x 405
    Aspect Ratio 16:9
    Audio Standard MPEG-1 Layer 2
    MPEG-2 Program Stream Mux rate 6mbs per second
    Bit Rate Type: CBR
    Video Bit Rate 5.7mbs
    Audio Bit Rate 192kbs
    Audio Sample Rate 44.1Khz
    Interlacing: Upper Field first (why they want interlaced for web streaming is beyond me)
    GOP Structure: IBBP
    I-Frame distance 12
    Now everything above is fine except the audio encoding because even though I have set up a new setting from scratch I cant find anywhere to adjust the audio sample rate. The Inspector tells me the Audio encoder is set to:
    Format: MPEG
    Sample Rate: 48.000kHz
    Channels: 2
    Bits Per Sample: 16
    Anyone Know how or even if I can change these audio settings? The only adjustments I can find are the filters or the transport/program stream option. I have it set to program as specified by Bloomberg.
    Thanks in advance
    J

    The only setting that I could find in compressor that lets your change the bitrate to 44.1 is when you create a new dolby digital setting and then under the inspectors audio tab/Target System button, change the button to Generic AC-3. When done, you can change the Sample Rate to 44.1.
    Hope this helps?

  • Excise Duty Rate change

    While doing J1iex how do I change the Excise duty rate; I donot want to change the PO everytime.
    I maintain the Exceptional Duty rate in J1id. Still that does not get effected in J1iex. It only takes the value from PO.

    Yes; I maintain the Excise Tax Rate and also Exceptional Material Excise Rate. In J1iex it only shows in the specific rate under Duty rate whatever we maintain in the excise rate; I donot want to change in Excise Rate as it is maintained on Control code wise. If I maintain the Exceptional Material Excise Rate then the changes should get effected in J1iex. How to do that?
    Regards,
    Sudha

  • How to dispaly excise tax rate in purchase order scapcript

    plz help me out
    actually i want TO display excise IM PURCHASE ORDER SACPSCRIPT
    MEDRUCK
    PLZ HELP ME OUT
    THANK U

    Hi
    First copy the MEDRUCK and do the changes in it
    first check the pricing related conditions data in the Main window
    check this code
    /: ITEM_CONDITIONS
    IC ,,&KOMVD-VTEXT&,,&''KOMVD-KBETR& &KOMVD-KOEIN&,,&KOMVD-KWERT&
    /:ITEM_CONDITIONS_UNIT
    IC ,,&KOMVD-VTEXT(16)&,,&KOMVD-KBETR&,,&KOMVD-KOEIN&,,&''KOMVD-KPEIN&
    &KOMVD-KMEIN&,,&KOMVD-KWERT&
    Here first know what is the condition type for excise Rate/tax
    check in table T685T for this
    and in debug of the script check whether that condition type values is coming or not. Mostly it comes, check and display
    If the values or not coming then
    Write a PERFORM subroutine in the script to bring the related Excise Tax rate from the program and display
    see the sample code for Subroutines
    The Form :
    /:PERFORM CDE_CENT IN PROGRAM ZKRPMM_PERFORM_Z1MEDRUCK
    /:USING &EKKO-EBELN&
    /:CHANGING &CDECENT&
    /:ENDPERFORM
    The report :
    REPORT zkrpmm_perform_z1medruck .
    DATA : BEGIN OF it_input_table OCCURS 10.
    INCLUDE STRUCTURE itcsy.
    DATA : END OF it_input_table.
    déclaration de la table output_table contenant les
    variables exportées
    DATA : BEGIN OF it_output_table OCCURS 0.
    INCLUDE STRUCTURE itcsy.
    DATA : END OF it_output_table.
    DATA : w_ebeln LIKE ekko-ebeln,
    w_vbeln LIKE vbak-vbeln,
    w_zcdffa LIKE vbak-zcdffa.
    FORM CDE_CENT
    FORM cde_cent TABLES input output.
    it_input_table[] = input[].
    it_output_table[] = output[].
    READ TABLE it_input_table INDEX 1.
    MOVE it_input_table-value TO w_ebeln.
    CALL FUNCTION 'CONVERSION_EXIT_ALPHA_INPUT'
    EXPORTING
    input = w_ebeln
    IMPORTING
    output = w_ebeln.
    SELECT SINGLE zcdffa FROM ekko
    INTO w_zcdffa
    WHERE ebeln = w_ebeln.
    it_output_table-name = 'CDECENT'.
    MOVE w_zcdffa TO it_output_table-value.
    MODIFY it_output_table INDEX 1.
    output[] = it_output_table[].
    ENDFORM.
    Reward points for useful Answers
    Regards
    Anji

  • Excise Duty rate updation in order

    Dear all,
    I have recently changed the Excise Duty rate in J1ID.
    Now I want to update the ED rate in the orders that were created before the ED change was done.
    I tried the following ways but none of them was successful:
    1- Update the prices on the condition tab
    2- Changed the Billing date manually
    3- Changed the Pricing date manually
    The thing that worked was changing the Req. deliv. date to a date after the ED change was done. This automatically redetermines the billing date and the orders are updated.
    But I am not clear on what  the ED (JMOD..) rate in an order is dependant upon? Is there any other method of updating ED rate in an order?
    Regards
    Sapshed
    Edited by: Sapshed on Dec 9, 2008 10:47 AM

    The suggestion whatever I gave you was only after testing at my end.  For me, the billing has taken the new excise duty value correctly.  Of course, I have not predated the Actual GI Date.  Since right now, I dont have access to SAP, please test a case without  changing the Actual GI Date. 
    Alternatively, you can process via VF04, where there is a tab "Default Data".   Select this tab and maintain the current date in the field "Date of services rendered"  and execute.  Post the outcome whether this suggestion has helped you.
    thanks
    G. Lakshmipathi

  • T-Code for changing the default Exchange Rate reference for creating PO?

    Dear All,
           Can somebody kindly give me the T-Code for changing the default
    Exchange Rate reference for creating PO? Is there a Step by Step
    procedure before changing the default exchange rate?
    Thank you in advance.
    Regards,
    Gopesh

    Hi
    There is not such Tcode to change the default exchange rate from the PO.
    If you want you can confugure the exchange rate in the following path in the IMG,
    SPRO>MM>LIV>Incoming Invoice>Configure How Exchange Rate Differences Are Treated
    Hope it helps you.
    Cheers
    Umakanth

  • How to change the default IDOC basic type from CREMAS05 to CREMAS04.

    Hi All,
    How to change the default IDOC basic type from CREMAS05 to CREMAS04 when sending Vendor Master Data.
    When I generate partner profile, the system will add the latest version of IDOC type which is CREMAS05 to the Outbound message. In my project, I'm asked to use CREMAS04.
    I want to use BD14 to send master data directly, but the program will generate IDOC using CREMAS05. Is there a way that I can change it to CREMAS04? And also for using Change Pointers, I want to use the report RBDMIDOC, but i have the same problem.
    Thanks
    Sai Krishna

    execute WE20 and edit the outbound parameters
    here is a pretty good example: http://documentation.softwareag.com/webmethods/sapr3_gateway/sap231/pages/sapdist.htm
    Edited by: Jürgen L. on Sep 7, 2011 9:49 PM

  • Re: Basic rate + excise duty.

    Hi guru's.
    My enduser want to have a list of basic rate & its excise duty, for a particular vendor.
    its urgent please.
    thanks
    tuljasingh.

    Hi,
    There is no standard report, you need to do Zdevelopment repot with help of your abaper.
    Subrahmanyam

  • Changing bit rate from 128 to 192

    I'm getting shure e4 headphones and want to experience the full potential of its sound, so i want to change the bit rate from standard 128 to 192. Can anyone give me directions on how to do this? also can you adjust bit rate to higher than 192?

    You don't say which file format you are using but regardless, this is how to change your Import settings. Open iTunes go to iTunes>Preferences>Advanced>Importing. Once there, from the "Import Using" menu pick the encoder you want to use and below that from "Setting" choose "Custom" and in the box that appears choose the bit rate you want. Both MP3 and AAC formats will let you choose up to a bit rate of 320 kbps

  • Change frame rate from 23.976 to 24

    Hi all,
    I have a Quicktime render of a project I made a few months ago that was originally created at 23.976 FPS.
    I now need to prepare this Quicktime render for digital projection in a movie theater -- the file I need to give my client has to be 24 FPS progressive.
    I'd like to try and convert my Quicktime and audio without going back to the project itself, as this is a complex project and would take a really long time to re-render at 24 FPS.
    Can anyone recommend the best method to convert my 23.976 Quicktime movie? Are there specialty plug-ins I should look into?
    Thanks so much!
    Dan

    Digital projectors will pretty much playback what is sent to them. The pitch change and motion difference between 23.976 and 24 is undetectable as far as audio goes and a frame is a frame.
    If it really must be 24, and I'd check the specs carefully for the theater because the standard in the us is 23.976, then you could convert it with QuickTime Pro, Adobe Media Encoder, or any other encoding software.
    If your original is highly compressed h.264 or other MPEG stream I would suggest re-rendering the project in AE. There will be a significant quality loss if you recompress an MPEG stream.
    To change the project in AE from 23.976 to 24 and maintain frame accurate sync all you have to do is change the comp settings and change the interpretation of the footage from 23.976 to 24. If you are using a separate audio track and the project is more than 10 minutes long you may have other audio issues but under 10 minutes there's not going to be much of an audio sync problem. If the audio is in a video track then there is usually no problem and the pitch change is insignificant. There usually is no need to adjust any of the keyframes.

  • How do I find out what Verizon's basic rates are without a promotion?

    I am a long time (perhaps since the inception of the name Verizon) Verizon customer, and moved to fios services several years ago when they offered an excellent promotion. Unfortunately, the promotion that the sales person offered was never delivered to me by written contract, only as a promotional flyer, for which Verizon seemed to have a strange interpretation. But that was long ago and I figured Verizon came "close enough". Once the promotion time was up, my bill escalated.
    I went on line to try to find anywhere that listed how much the fios Double Play Bundle of Internet and Freedom Essentials would cost at the non-promotional rate. I didn't find the information, so I called service and asked what they could do for me. I received a "valued customer" discount for $30 a month off my bill, but was never told where to find actual service rates. Now that the discount is no longer being applied, my bill has risen again.
    So again I went online and searched in at least a dozen ways for the actual cost of my bundle without consideration of promotions. The information is not to be found. The only price I see are promotions for $74.99 or 79.99. I am being charged 112.99 before fees taxes etc. It doesn't actually say those are promotions for new customers only. When I called customer service, the agent informed me that they were, in fact,  for new customers. The only way to get any kind of discount again would be to upgrade to triple internet speed at $99.99 per month. So Verizon's idea is to keep enticing you to increase your service level.
    But what happens when you reach the end of the line. How much will those services actually cost when you've reached the top of the ladder? Sure I can check my bill, but the point is to see if I am being over charged. I want to know where the true basic rates are listed. The service person said that I would have to sign in to find them. So I signed in and still find only promotions.
    It's important to have basic rates in order to know how to evaluate the promotions and to plan for future costs. It's also important to be able to understand when one is considered a "new" customer. Evidently, if I change my service I am once again new. If I go to triple play, I get a bundle deal. If I get a deal with less service, do I also get a promotional rate? Nowhere is that explained. Somehow a contract fits in with all this confusion. I've been a customer for ages, but without a contract. There is no explanation of how a contract differs from getting a 2 year promo without a contract.
    I might not necessarily change my plan even with full disclosure, but at least I would feel that my decision is based on rational choice rather than trickery.
    Has anybody found this secret information?

    You've checked the purchase history on your account ? If you log into your account on your computer's iTunes via the Store > View Account menu option, you should see a Purchase History section with a 'see all' link to the right of it which you can click on (the most recent purchase will be above the list).
    Or did you have an auto-renewing subscription that was due : http://support.apple.com/kb/HT4098 ?
    If you changed your credit card details on your iTunes account then a small temporary store holding charge may have been made to check that the card details are correct and valid and that it's registered to exactly the same name and address as on your iTunes account - it should disappear off your account within a few days or so. Store holding charge : http://support.apple.com/kb/HT3702

  • Regarding Change in excise duty

    Hi Friends,
    At my client level , TAXINJ is being used as Tax Procedure.
    Now there are budgetary changes in excise duty from 16% to 14%.
    From Sales and Raw material wise.
    Also, there are some open orders to be delivered , what would be the process to change the excise duty in them.
    So Kindly let me know the procedure to change the same at the earlist.
    Thanks in advance
    Shailesh

    Hi
    Please maintain the Excise rate as 14% instead of 16% in J1ID and enter todays date in Valid from column.
    Cheers

  • J1iex duty rate tab calculate excise base rate check box is disable in impo

    Hi,
    We have done Import PO and wrt we have done the GRN as part 1 and we try to complete the part 2 as J1iex, but in j1iex duty rate tab calculate excise base rate check box is disable, we required is activate.
    its working in domestic scenario.
    Thanks
    shital

    Go to J1IEX- Change (Instead of Post). Try & change the rate.
    But why do you want to change it in J1IEX? as duties are flowing from PO-MIRO.

Maybe you are looking for

  • Outputs format in ALV grid

    Hi, I have problem with data mask in ALV grid. In itab I have data type TIMS, but in grid I want to see instad 15:00:00 just 15:00 and instead 00:00:00 just blank cell. I tried to solve it using field catalog with value: ws_field-no_zero  =  'X'  it

  • 10.0/Cheetah pseudo-problem

    Hello Mac Faithful. Well...I was able to load 10.0 (OK...I here the wincing from here!) on my 8500 with the help of Xpostfacto 2.2. No issues there. Yes...Cheetah, even though it refers to the fastest land animal is slow. No issues there, since 336 M

  • How to set src attribute of embed tag to a swf in resource ?

    Hi all, I'm working on a C++ project that uses Internet Explorer engine (through Microsoft Web Browser component) to render HTML pages. All HTML and images files are in the project resource, and the final artifact is a standalone*.exe. I have an embe

  • Printer not working since OS X 10.9.4

    Ever since installing the latest Mac softwear (10.9.4) on my iMac I can no longer print.  I receive a message saying: "Unsupported Operating System.  The Intsaller is not compatible with the version of the operating system on your computer.  It is co

  • Is it possible to combine JOptionPanes

    Hi, i'm trying to write a cute program for my sister to help her with her math, no anything fancy. However, i was wondering weather it was possible to combine an Input JOptionPane and an Option JOption Pane, meaning it has a text area for an Input an