Change of valid from date in routing

Dear All,
How can i change the routing "valid from date".
When i am creating a prod coder in co01 its throwing a message that routing is not found so when i wwent to co02 it is showing that valid from 09.01.2012 but i need production order from 01.01.2012.
Plz help.
Thanks.

Hi,
There is a work around to change the validity of routing without using ECM in this particular situation
1) While creating routing in CA01 you can change the key date to some past date say 01.01.2012.
2) If already routing exists (one GC available) for same material and group number you can create another GC with past date and use the new GC for Production order by changing the old GC status to 1
Be sure of implications of creating master data in past and may not be a standard practice.
you can try and hope useful.
Regards,
Brahmaji D

Similar Messages

  • Help reqd on Changing the Valid from "date"  for both BOM & Routing

    Hi all...
    Pls advise me how to do the changing of Valid from "date"....
    Is there any process in CC01 or ECM???....
    pls reply me in detail step format (step by step analysis)....
    I wrongly created in CS01 and CA01 as 05.10.2007 as my valid from date instead of 01.10.2007.....
    How to change to my actual one......
    I dont know how to change it exactly.....as im beginner in SAP...pls take this into consideration...and post ur replies imm.
    Pls reply me in detail....will be rewarded at the end while closing this issue.
    thanks & regards
    sankar

    Dear Sankarbabu,
    IF there's no setting for Date Check in OS54 - Engineering Change Management
    Control Data,then you can create a change number with past dates,and also to
    use the same one for changing BOM.
    Tell me one thing you are saying you want to use ECM.Was the earlier one
    created without BOM was created without an ECN?
    See already if you have created your BOM with an ECN,then remove the date
    check setting which I have mentioned in OS54.
    Now goto T code CC02 ,enter the Change number and give the valid from date as
    01.10.2007.
    After that check in CS03 whether this date(01.10.2007)is getting reflected or not.
    I'm sure this will solve your problem.
    Regards
    Mangal

  • Wants to change the validity from date in BOM

    Hi,
    We have created BOM by mentioning valid from date 21.08.2018.
    Now we need to change that valid from date 21.08.2018 to 21.08.2008.
    How can we do that?
    thanks/regards
    vish

    Hello,
    If you are creating the BOM wr.to change number & if the change number date is lying in future. System allows you to change the effective from date for the ECN, which in turn BOM effective date also get change automatiocally. T code CC 02 for changing the date through ECN
    Maruti

  • How to change the valid from date of the bom header?

    ECM is active in the system.
    I want to change the valid from date of the BOM header with the help of a change number.
    How can I change it?

    Hello
    Lets assume that, we are going to change Management for controlling Valid From date
    Steps to be followed for creation of Change No
    Tcode CC01 for Change No
    Click on Change Master
    Once you enter into Change master, maintain the description
    In the Valid from Date, maintain the date from which you BOM should be current
    Maintain the Status (01)
    Click on Ojbect Type, maintain for which Object types is the Change no needs to be active i.e. for BOM, Rtg, etc
    save the Change No
    After the change no is created
    Enter the Change No during the creation mode of BOM
    THe system copies the Valid from date from Change No

  • Business partner change Valid From Date field

    How can I change the Valid From Date field in tables:
    BUT000
    BUT020
    BUT0BK
    BUT100
    Currently the of date of creation of the business partner is in this tables' Valid From field.
    In transaction BP the Address of the Business Partner is  valid from 01.01.1990 but still I get a warning that the business partner is not valid for date 01.11.2011.

    Sounds like the problem is the valid to date.  What is that date set to?

  • Component - Change valid from date

    Hi Experts,
    I am using function module CRM_IBASE_COMP_CHANGE to change the component data. I am able to make all the required changes in the component except valid from date. Even though I am specifying it in VALFR of the structure IBAP_COMP3
    Can you suggest me how do I change the valid from date of the component.
    Regards,
    Abdullah

    Hi Abdullah,
    Valid-from date cannot be modified. If you go to IBase Display or if you create a new IBase with one Component, then you can observe there, that Valid-from date is only a Display field which takes current date by default (during creation) and not an input field. Hence i think you cannot modify.
    Thanks,
    sksingh

  • Changing valid from Date in MDG Finance

    Hi,
    We have a valid edition say E1 that has the validity of 08.08.2014 to 31.12.9999. We have assigned few master data objects (Cost centers, profit centers etc) into this edition. Now we have to change only the Valid from date (say to 10.10.2014) of few cost centers that are part of the edition E1. How do we achieve this? I tried creating a new edition say E2 that has the validity of 10.10.2014 and tried including into it. However I see even after including the cost centre into the new Edition E2 the cost centre still shows as having validitity E1.
    Please help.
    Regards,
    Ponraj M

    Hi ponraj
    You can change here as per sceeen snap ( Available in MDG 7.0 and future versions)

  • Updating Cube in the End Routine based on the incoming Valid From Date

    Hello Experts
    Here is my scenario.
    We are using BW 7.x.  There is DSO and from DSO it goes to the Cube, the promotions information.  These data targets will have Material (Article), Plant (Site), Promotions Number, Valid from and Valid to dates.  The Valid To date will come in as 12/31/9999 all the time.
    If I receive a new record from ECC with same Material, Plat and Promotion combination again, I need to get the Valid From Date from the new record and Update the existing record' Valid To date in DSO/Cube as Valid From of the new record - 1.
    So Valid To date of the existing record = New Record's Valid From date minus - 1.
    I would like to do the update in "End Routine" of the Cube.
    Would you please suggest if this can be done and if so would you please provide the sample code.
    THANK YOU in Advance.
    Nag.

    yes, you can do this...
    just use a RESULT_PACKAGE in end routine.
    and using RESULT_PACKAGE fatch the existing records from DSO and append that into RESULT_PACKAGE after your desired changes,
    just try to create a code using this l;ogic. if you can't then i will provide you a code.
    Regards,
    Ashish

  • Valid From Date in CT04

    Hi,
    We are on ECC 6.0. When I try to create a Characteristics in CT04, the Valid From date defaults to the System Date. If I change this date to any other date in the past, it saves the system date only.
    How do I make the Valid From date to something else?
    Regards,

    Dear Shameek,
    why do you want to create the characteristics for a past date?
    This is possible by creating a change number in CC01 with the valid from date as say 01.07.2011 and include the check box for
    characteristics in the object type(active) and use the change number in CT04 and check the results.
    But the drawback in this procedure is the system always expects a change number during the next change for that
    characteristics.
    Check and revert back.
    Regards
    Mangalraj.S

  • Valid from date in ECM and BOM.

    Hi All,
    I create a Change master with release key and assign a material as an object whose BOM will be changed. I save the Change number.
    I go to change BOM main screen of the same material and enter the change number created, by default the valid from date comes as todays date. But when i hit enter to go inside the change BOM screen then the date dissapears from the field and i get an error as "please enter valid from date" even if the date of ECN is valid and that of BOM is also valid.
    Can somebody help in this?
    Thanks
    Shailesh.

    Shailesh,
    While creating the BOM have you used the change number ...? if yes then display that change number and check wheather do you have any alternative date mention in it.
    check validity date of change number as well as BOM validity.
    another reason can be you need to apply SAP note 1278790.
    https://websmp130.sap-ag.de/sap(bD1lbiZjPTAwMQ==)/bc/bsp/spn/sapnotes/index2.htm?numm=0001231930
    check it out and revert back for further discussion.
    Hope it helps you.
    Regards
    Ritesh

  • BOM "valid from date" in transaction CSKB

    The business process is like this -
    1. We create sales order ( VA01)
    2. In sales order, we enter configurable materials as items.
    3. Then we freeze/change the BOM for sales order and line item through t-code CSKB.
    The problem is in CSKB, "Valid from date" of order BOM components is defaulted using the "required delivery date" in Sales Order. We want to default current date (system date) as the "valid from date". Please suggest how it can be done.
    Regards,
    Bijay

    Shailesh,
    While creating the BOM have you used the change number ...? if yes then display that change number and check wheather do you have any alternative date mention in it.
    check validity date of change number as well as BOM validity.
    another reason can be you need to apply SAP note 1278790.
    https://websmp130.sap-ag.de/sap(bD1lbiZjPTAwMQ==)/bc/bsp/spn/sapnotes/index2.htm?numm=0001231930
    check it out and revert back for further discussion.
    Hope it helps you.
    Regards
    Ritesh

  • Start up date and valid from date in equipment

    Hi,
    If we put start up date before valid from date in the equipment master record,will there be any significance?

    Hi,
    Start up Date => Date from which the Equipment is used for operation or in any activities. This will be used for MTTR / MTBR analysis, as Thyagarajan told.
    Valid from date => Date from which that equipment is valid for the existing structure. In case, if Superior FL / Equipment has been changed for the equipment, valid from date will get changed according to that.
    Regards,
    Maheswaran.

  • How to get valid from date in KONH Table

    Hi ,
          I am sending COND_A idoc for MRP. Now when I create a record using VK11,the valid from date is fine.
    But while changing the same using VK12 changed date does not reflect in KONH Table (when the new valid from date is greater the the previous one) .I understand the SAP Logic behind this from previous threads .
    But my issue is this :
    Suppose I have a Material X created with Valid from = 10.01.2011 & valid to = 31.12.9999
    Now I change this Valid from = 28.01.2011 & valid to = 31.01.2011.
    Now how can I send the data for 28.01.2011 in my I-doc , as KONH still has 10.01.2011 as valid from date.

    even if you send the data for 28.01.2011, it should pick up the condition record because the start date for condition record is in past? why do you think it is a problem? now if your concern is that if your input date is 27.01.2011 and it should not pick this condition (that is a different matter altogether)...

  • Default Valid from Date in CS01 & CA01

    Hi PP Experts:
    Please give me the solution for:
    I am getting current date 17.04.2015 in valid from date field as default in CS01 and CA01 but i want to set 01.03.2015 as a default date.
    So, how can i do it?
    Thanks & Regards,
    Vivek Bhojak

    I have maintained all these things but getting error ''Change number 1 does not exist'' in CS01.
    BR,
    Vivek

  • MDG-F 7.0 Multiple Editions with same valid from date

    It appears that we are dis-allowed to create more than two editions with same valid from date in MDG-F 7.0.
    that tells me that i should be extremely careful of creating an edition with valid from date because once created, I have to group all financial master data change requests effecitve on the same date into this edition. If I am missing one in first place and later on I find one that should be also valid from the same date after Edition is released, there is no way I can catch up by creating another edition with the same valid from date. Correct?
    Should I create Edition with replication time option 2 - approval of change request then to avoid?
    Thanks,
    LUO

    Hi Luo.
    your finding is unfortunately not correct. It is true that there might be only one open edition for a specific valid from date. Nevertheless, if you release this edition, you can create another edition using the same date.
    Best regards
    Michael

Maybe you are looking for

  • My issue over ppc or intel (i know this topic has been done to death.. but.

    Ok...so here is my dilema. Recently at the new apple store up here in the great white north..... and I got to thinking.... that the new imac's are simply intel technology, wrapped up in a mac. Intel technology that CONSISTENTLY breaks down in PC's! O

  • Need Help with scrollbars

    hu.. i have this JFrane that has a table which has scrollbars... i have included in my code setResizable(false) so the user will not be able to maximize the page.. i have a function AdScroll()[that adds scrollbars] that will be called every time i ad

  • Connecting XML Gateway outbound to BPEL.

    Hello Folks, I am trying to use XML Gateway as a notification mechanism to trigger BPEL in Fusion middleware suite. For example XML Gateway in eBiz will publish a new hire event from XML Gateway to invoke a BPEL process. The problem I am having is ge

  • Change language of Apps?

    Can I change the language of my Apps, which is currently in German or do I have to uninstall and reinstall? This may have occurred several years ago, from the original install. However my Itunes is in English.

  • Invoice details display on the modified standard medruck script form

    i have copied standard MEDRUCK form to z form and modified. now i would like to display the tax details on the output of this form. in me22n transaction, we have invoice tab which has tax code and details. how do i get these details on my script. hel