Change order of pictures

Hi,
I have a Smart Album for a trip. Friend on the same trip gave me their pictures too which I want to include in the same smart album.
Unfortunately, when I download their pictures, the date is the day of when I downloaded the file i.e. after the trip. So when I do a slide show of the SA, the last pictures added are out of chronological order. Not good for a slide show...
How to get around that?
Thanks

Click on the "i" symbol at the lower left to display the Information pane. Select a picture or pictures and change the date.

Similar Messages

  • How to change the order of pictures on Apple TV

    The pictures shown on the TV are not in date/time or file number order.  How do you change the order of the pictures on the screen?

    I have struggled with this last year. The sort order of pictures is different in iPhoto, iPad, Apple TV. There are some tricks to get the desired order, but I never managed to get this consistent. The Apple TV has no option for sorting unfortunately.
    Maybe things are better now, but I have given up on showing photos using iTunes.
    Nowadays I am streaming photos from my NAS and I can show them in any order I want.

  • Fragents and Change Orders

    I'm new to P3. I need to manage a large 2 year public
    works building construction schedule in downtown Los
    Angeles, with numerous and frequent changes to the
    schedule due to change orders, RFI's etc. Of course, these
    changes result in increases/decreases to cost and time,
    which need to be monitored and dealt with as part of the
    overall project. Some say that fragnets are the best way
    to insert these changes into the schedule. Some say
    fragnets are problematic. I have no experience with
    fragnets and I want to get off on the right foot. What
    have you project managers and project engineers found most
    effective for inserting and managing change order and RFI
    items?

    Nat:
    Thank you very much for
    your response.
    Your
    explanation of fragnets was very useful. I will make a
    point of saving and reusing repetitive groups of
    activities. In my case, SOMD (slab-on-metal-deck) is
    very repetitive. Also, exterior building finishes such
    as plaster (exterior sheathing, lath, scratch coat,
    brown coat, cure, finish coat, cleanup). Interior
    finishes activities are also often identical from
    floor to floor.
    The issue with
    RFI's is usually not so critical. I mentioned 1200
    RFI's but relatively few impact the schedule and must
    be coded in. But it is more than 48. In my case, the
    most common reason for entering an RFI into the
    schedule is when the
    consultant/Architect/Engineer/State Agency exceeds the
    contractually agreed upon time limit for response to a
    design-related RFI, or his response is irrelevant
    requiring a second round of RFI's to resolve the
    problem (revise and resubmit for title-block
    exceptions, for example, happens frequently). <br
    />
    It is easy to ignore these delays,
    and recording them in the schedule can really irritate
    the consultant, but when they become a habit, the
    cumulative impact on the schedule can be significant.
    Therefore, I need to be able to track these RFI delays
    effectively within the schedule. Of course, an RFI
    always has a number that is tracked inside Expedition
    as well.
    The bigger problem is
    Change Orders. As you know, when the Owner wants
    something added to the work, or a problem in the
    design results in an increase in the scope of work
    (there are many other possible reasons of course) a CO
    is requested. As a general rule, most change orders
    contain both a cost increase as well as a time
    extension. This time extension is the problem,
    because, especially on public works projects, the
    Owner/CM does not want to grant time an extension, and
    even when they do, they will only grant it when it
    impacts the critical path, and only after there is no
    float remaining (you will see why this distinction is
    important as you read further). The critical path
    condition makes sense, but the idea that my float is
    the Owner's to eat for his CO work is grating,
    especially when facing potential LD's. <br
    />
    To top it off, some Owners/CMs insist
    that all time delays be dealt with at the end of the
    project, when the actual time delay resulting from a
    CO can be calculated, instead of simply estimated, as
    is common practice (corresponding language is inserted
    into the CO to that effect instead of a defined time
    extension). My position is that if they refuse to
    grant a time extension based on an estimate, then the
    cost given in the CO, which is nothing more than an
    estimate, should also be replaced with T&M, and
    the budget be damned. Needless to say, that position
    has not won me many friends in the trailer across the
    way.
    You might suggest that we
    should refuse the extra work if a time extension is
    not granted up front. If we did that, they would hit
    our bond in a heartbeat. A contractor's lot in life
    seems to be to make lawyers (Deo volente, may the burn
    in hell) wealthy.
    In the case
    of the Owner/CM refusing to grant time for
    non-critical path CO's, my position is that, while the
    CO work may not be on the critical path this instant,
    in many cases, the critical path can change
    dramatically, sucking CO work into it that was
    previously separated from it by weeks. That very thing
    has happened on a school project located in a major
    city we are doing.
    The project
    has extensive tubular secondary steel at the exterior
    of the two buildings. This tube steel, ranging in size
    from 4" diameter to 20" diameter curves around, and up
    and down, the exterior of the structure. I do not
    exaggerate when I say that it is more complicated than
    a roller coaster. I will send pictures if you are
    interested. It supports curvilinear LG framing, which
    in turn supports a combination of plaster, brick
    veneer and metal panels. Very phantasmagorical stuff.
    Being a complicated 3-D arrangement of rigid steel,
    the architect's drawings were incomplete, (we should
    have expected that) and changed frequently (4 times)
    during fabrication, resulting in detailing problems
    and a two month delay in erection. Lots of unforeseen,
    fit-scribe-cut-repeat of long, heavy, curved, twisting
    pieces of long steel hanging from crane hooks has been
    required.
    We have recovered
    most of that time, but only by doing a great deal of
    out-of-sequence work.
    As you
    can imagine, this mess generated a ton of CO's, but
    the Owner would not agree to grant time extensions
    until the end of the project, and even then, only on
    CO's that are provably on the critical path. When
    combined with electrical changes impacting utility
    buildings, cable pulls, elevators, manlift and even
    exterior finishes, and then with added off-site work,
    topped off by submittal-review delays by State
    agencies, the critical path has flapped around like a
    flag in the wind, with CO's going in and out of it. In
    many cases, this means that a particular item of
    ongoing CO work has delayed the critical path for a
    period of time, but not for the entire duration of the
    CO work. So calculating the exact impact of the CO
    during the period it was on the critical path has not
    been easy.
    I anticipate there
    will be huge disagreement about these calculations at
    the end of the project when we have the "come to
    Jesus" time/money resolution meeting with the
    Owner/CM.
    BTW, the CM always
    insists that CO's be dealt with as fragnets, but that
    doesn't always make sense because the nature of CO
    work is often one-of-a kind, not repetitive stuff. But
    he has fragnets on the brain, it seems, so we call
    them fragnets to humor him.
    <br
    />Anyway, as you can imagine, tracking the dynamic
    (vs. static) effect of CO's on the schedule has been
    difficult. I am almost tempted to try calculus methods
    to calculate time consumed over time (if you get my
    meaning). Any experience analyzing schedules using
    differential equations? Someone must have done it
    before....
    Right now I am
    using activity codes to track them, but I am wondering
    if there is a better way.
    <br
    />
    I have other projects, without the
    same delays, but similar Owner/CM mindset regarding
    CO's
    Now you know the long
    story. Any suggestions?
    <br
    />Stan

  • Change order of key figure is not working in Web report output (using WAD)

    Hi,
    We are using BI 7.0, release 701 and level 008. We are facing problem in WAD (web report output). When ever we do 'Select filter' for key figures and 'change the order' of key figures, it does not get reflected in new order. Though drag and drop of key figures is working.
    Though same change order is working fine in Bex Analyser.
    Kindly suggest some inputs.
    Thanks.

    Hi,
    On Which Service Pack are you on?WAD has this feature of re arranging the keyfigures in BI 7.0 for SPS 14...
    Regards,
    Bhagyarekha.

  • How do you prevent the organizer from mixing the order of pictures when down loading off the memory card?

    @How do you prevent the organizer from mixing the order of pictures when down loading off the memory card?

    This sounds like you are using Photoshop Elements, and the Photoshop Elements forum would be best at answering that.
    Photoshop Elements
    Gene

  • How do I change my Desktop Picture to a solid color?

    Hello folks, I'm trying to change my desktop picture to a solid black color in Leopard. How do I do that? I went into the desktop preferences under System Preferences but under solid colors, they do not have black. And I have no idea how to add more colors to the few selections there. Can someone help me out please? Thank you.

    http://www.slashdotdash.net/articles/2006/12/19/mac-os-x-desktop-black-backgroun d-wallpaper
    That's one idea, they have a solid black .png file on there, and you can either set it as your desktop and tile it, or follow their instructions.

  • HOw do I change the desktop pictures on macbook air?

    I simply can not change the desktop pictures on my macbook air. If anyone  knows please help. Thanks.

    Right-Click Desktop, Choose "Change Desktop Background..."
    There you can choose the desktop image. If you want a custom one,
    Choose "Set Desktop Picture".

  • Change order of line items in a financial document

    Hello,
    Is it possible to define the order of the line items in a financial  document?
    For example, I have always a discount line with a discount account in the first place and after this line, the customer line, and the bank account and I need to have the customer line in the fist place, is it possible to customize this order?Or is this standard?
    Thank you very much!!

    Hi,
    You can change orders in FInancial Document. Just open the document from Menu select Settings-> Layout--> Current.
    change the position numbers as desired.
    Regards,
    JA

  • Changing Order of Songs in Album-iTunes 12

    Like the title says, how do I change the order of songs in a album? Before you could use get info and sort by track number.
    Thanks

    Hey Lando25,
    I understand that you want to change order of songs that are playing in iTunes. This functionality should still be available to you, as confirmed in this article:
    iTunes 12 for Mac: Edit song and CD information
    https://support.apple.com/kb/PH19618
    You may need to simply scroll in the information field in order to find the fields that you wish to edit. Thanks for coming to the Apple Support Communities!
    Cheers,
    Braden

  • In Photos, how can one control the order of pictures in an album?

    Is there any way, in Photos, to control the order of pictures in an album? Is there any way to sort, or order things manually?

    Thanks. Let me refine my question as follows: is there a way to keep the manual order in albums that I had in iPhoto when transferring to Photos?

  • How do I change the background picture that is shown when i start my Mac?

    On the iMacs in my school they have a different name for everyone of the after for example the band Queen and then there is a picture on the inlogg screen with queen on it. So then you log in and there is another background picture after that. I Have a macbook pro and I would like to change that "start-picture".
    Right now it´s kind of boring and grey. Can you change it somehow?

    It sounds like you're using Adobe Send for Outlook.  Correct?
    Unfortunately, there is no way to change the default text that is inserted into your message. You'll have to change it each time.
    I will pass along your request to the Adobe Send team.

  • HT201317 change order of photos in photo stream album

    How do I change order of photos posted in photo stream album?

    Send a feature request to Apple via
    http://www.apple.com/feedback/iphoto.html
    and
    http://www.apple.com/feedback/icloud.html
    OT

  • Apple Mail 7.3 - How to change my profile picture?

    Hi!
    I checked the old available posts, but none of them really solved my question, so here I go again with my question regarding the small picture shown on outgoing mails in Apple's Mail 7.3.
    Currently it shows a default 'green lightning' picture on my outgoing mails in the upper right corner.
    I did: System Preferences > Users & Groups, and selected Current User (Admin/myself), and dragged and dropped a new personal picture into the picture box showing the old 'green lightning' default picture which was then substituted by the new pic of my choice. All done.
    However, Mail 7.3 after numerous restarts and 48 h later now, STILL shows on outgoing mails the old 'green lightning' pic which I had substituted before via Sytem Preferences > Users & Groups.
    Can anybody help?
    Thanks!!

    Hey MN072012,
    Thanks for the question. The picture is actually pulled from your card in Contacts. If you open up Contacts and find the card that is associated with your email address, I suspect you will see that the “lightning” picture is still linked to that card. Try changing it there and sending a test email to yourself.
    Contacts (Mavericks): Set up your contact card
    http://support.apple.com/kb/PH15076
    Contacts (Mavericks): Add or change contact pictures
    http://support.apple.com/kb/PH15074
    Add or change the contact pictures that appear in contact cards and in other apps that use contact information, such as Mail and Messages. Your contacts don’t see the pictures; only you do.
    Thanks,
    Matt M.

  • Help with fuzzy search (doesn't work if change order of certain 2 letters)

    Hi,
    need some help with fuzzy search. It's pretty simple - we use fuzzy search on varchar2 columns that contain first name and last_name. The problem is that i don't really understand why it can't find name in some cases.
    Say i want to search for 'Taekpaul'. Then
    where CONTAINS(first_name,'fuzzy(TAEKPAUL)',1) > 0 - works
    where CONTAINS(first_name,'fuzzy(TAEKPALU)',1) > 0 - works (changed order of the 2 last letters)
    where CONTAINS(first_name,'fuzzy(TEAKPAUL)',1) > 0 - doesn't work, finds 'Tejpaul' that is completely unrelated (changed 2nd, 3rd order)
    How can i make it find 'Taekpaul' even if i search for TEAKPAUL? Is it related to index? Like Text index should be created with some different parameters?
    Thanks!
    Edited by: Maitreya2 on Mar 3, 2010 2:08 PM

    Thanks, adding '!' worked :)
    Do you know where i can read more about '!' and other special characters? I think i didn't see anything like that here: http://download.oracle.com/docs/cd/B14117_01/text.101/b10730/cqoper.htm#BABBJGFJ
    I also started using JARO_WINKLER_SIMILARITY function that is actually better i think for what i do. But it's very buggy - sometimes Oracle crashes and kills connection when you try to use it.
    Ahha, it's here: http://download.oracle.com/docs/cd/B19306_01/text.102/b14218/cqspcl.htm
    So, ! is soundex. Whatever it means..
    Edited by: Maitreya2 on Mar 5, 2010 12:14 PM

  • How to look for SAP provided rules while changing orders ?

    Hi:
    we have a requirement to check for order type when the change order request ( in form of IDOC via EDI)  is passed to SAP and the requirement is such that we can only accept certain order types like TA and reject order order type........from a very high level though process the idea is to check if SAP has certain pre build code that can be called before the va02 is called.....
    I am new to sap and was told that we need to first look if SAP has a existing functionality if not then find user exit and customize it .....
    my question is where does one look in SAP for such code ...or out of the box feature..........which can be called ....I understand if nothing is found we can write ABAP program to do this.....but I am puzzled as I do not now where to look and eliminate that such feature is not already provide ......
    Thanks

    check which FM you use to post your IDOC (like IDOC_INOUT_ORDCHG) and then check in this FM ... you'll find exits like 'call customer-function'.... I'm sure you'll find one which is called to validate data passed in your segment (where actual order type is passed).... or just use the one which works always after the order number is known and then just check your order type & raise error to fail IDOC so it will not even try to update your order.

Maybe you are looking for

  • Musical Typing problem

    Hello there, I just started to use mainstage without a midi controller keyboard. I'm using the musical typing feature to listen to the bank of sounds. When i type something like a F#7 chord ("t", "u", "o", ";") i cannot hear the four notes together (

  • Hide folios with not entitlements

    Hi need to hide the folios for users that don't have rights to see them. Or if the user is not logged in. I'm implementing a custom library in android following the  Android Combined Library and Store  example found here DPS Configurator. I'm calling

  • Activation of InfoObject in Business Content

    Friends, I tried to activate the InfoObject 0SALES_UNIT in the Business content and got a green signal stating that it is activated but i dont see it under the InfoObjects in AWB. Please suggest what possibly may be going wrong. Thanks Mike

  • Need the Oracle Standard APIs for iExpense

    Hi , Can you please let me know the list of standard APIs that can be used for iExpese. The requirement is that we need to create new OAF pages which insert data into iExpense Tables and also we need to do validations like the standard functionality

  • How to upload photos from iPad mini to Win PC

    I would like to know the most simple way of uploading the photos stored in my iPad mini to my Windows XP PC. They do not have to be synced. Tx.