Change results in Inspection Point

Dear All,
I did the results recording using qe51n for three inspection points in one lot. i also did the force completion and the status is in 5. Now i want to change the result in one inspection point. How do i do that?
QA22 or QE71 doesnt do it?
Regards,
DTD
Edited by: TMDTDSL on Aug 17, 2009 8:18 AM

There would be Tab called Assigned Inspection Points, when you are doing Results Recording. Click on that TAB you will get to select the Inspection POint for which you want to record again and ther on you can Unlock and change the results.
To reach up to this, right click on the already assigned inspection point and you will have the option, as suggested above

Similar Messages

  • Runtime error for Inspection Point Results Recording

    Hi,
    I am changing the already done Results Recording for using already used Inspection Point.
    I am getting the runtime error. Anybody came across such error?
    Regards
    Ramakanth

    Hi,
    In the in-process inspection I am using Inspection Points. Initially I have done Results Recording once with quantities.
    And then again I wanted to change the quantities for the same Inspection Point. So, I went to Results Recording for same Inspection Point and changed the quantities and saving. At this event I am getting Runtime error.
    I  have even deactivated one BADI INSPECTIONLOT_UPDATE and tried again. Even then I am getting same error.
    Ultimately my requirement is this:
    My client wants UD at operation level. They want only quantity which is accepted in Results Recording to be moved to the next operation. In the operation level confirmation the system should only accept the quantity which is accepted in Results Recording.
    Any suggestion in this regard.
    Thanks
    Ramakanth

  • Multiple result recording for Manual inspection Lot using inspection point

    I want to record inspection result for inspection type 89 against *inspection point*. Then I create new inspection point and assign it in quality plan. Then I have done the multiple result recoding against one manual inspection lot in DEV server. But when it is going to QAS server then error is coming during result recoding. Error is "The results transaction cannot be used for
    inspection" Message no. QE094.
    Plz give me the solution to record the result.

    Reason is very simple : the  the inspection point definition in the task list header is incompatible with the sampling procedure assigned to the characteristic.Make sure that you select the appropriete radio button in QDV1 while creating sampling procedure and assign the same against each of the MIC's in the task list.
    Make sure that the sample tab in QA02 is pressed while assigning the inspection specification & status of the lot is REL

  • Inspection point results on characteristics tab QA11

    When you use multiple inspection points standard SAP shows the average of the results on the characteristics tab in transaction QA11. Is it possible to see all separate results instead of the average?

    My client wants to view all the separate results when maken the ud. I think the best way to do this is to click on the Charac data button.
    Edited by: Maarten_m4 on Jan 12, 2011 8:31 AM

  • Object Link to Inspection Point (QAPP)

    I am trying to set up a new obejct link to an inspection point.  So, to start with I am trying to create a bespoke screen that will perform exactly as screen 204 the Equipment master object link.
    I have created two new screens SAPLCVIN 9000 and SAPLCV00 9000 by copying SAPLCVIN 204 and SAPLCV00 204.  I have assigned these screens  to the new object type QAPP and assigned this to the document type.  I have copied the EQUI settings in the Key Fileds table and assigned them to QAPP.
    I have also copied the function module OBJECT_CHECK_EQUI into OBJECT_CHECK_QAPP but have not yet made any changes to the code in this function module.  When I try to view the new screens in CV02N I get a short dump telling me that DYNPRO 9000 is not found.
    Presumably this is because I haven't made any code changes to the function module.  At this stage I haven't even changed any of the fields from screen 204 I'm just trying to eliminate the abap dump. Can anybody help me with this please?

    1.  Copy FM QAPP_CUST_IP_PROPOSAL and use this in your inspec. point identire conguration in the Default for user fields in results recording.  You have to provide all the logic in the FM to identify the next serial number.    You can also us a copy of the FM QAPP_CUST_IP_CHECK in the verification of user fields to check to make sure the serial number wasn't already specified in an earlier lot is the next in the series.  Again, you have to put in the correct logic.
    2.  I think you are looking for the drop down list in this question.  Use FM QAPP_CUST_IP_F4 for this.  You can either develop a new new FM for each inspec point identifer you use, and hard code the values into the FM, or create a Z table that your FM references to look up the appropriate values for the insepction point and user field.
    3.  Same as number 2 above.
    FF

  • Inspection point in SAP QM

    Dear  Sir
    My query is related to SAP-QM
    1,How to define INSPECTION POINT in Inspection planning?
    2.Where is default setting of Inspection point like at Plant level & material level?
    3. If inspection point of material is changed in Tasklist and a new inspection lot is generated then it again reflect both the Inspection point (the new one & the old one).So how to aviod this problem so that it shows only the new inspection pont at the time of Result recoding.

    Hello Alpana,
    question 1 How to define INSPECTION POINT in Inspection planning?
    In the transaction QP01 or QP02 you can define an inspection point at header level.
    This can also be done for production plans and process instructions.
    The inspection point definition is done in the customizing of the Quality planning.
    question 2 Where is default setting of Inspection point like at Plant level
    This can be found under the customizing point Basic settings in QM.
    Using the settings at plant level it is possible to define inspection points at plant level.
    If you want to use the setting at material level then this would be done in the inspection plan.
    question 3 If inspection point of material is changed in Tasklist and a new inspection lot is generated then it again reflect both the Inspection point?
    The changing of inspection points is not possible (Inspection point definition)
    The changing of inspection points in inspection plans is not recommended create a new plan in this case.
    I hope that this information helps you resolve your issue.
    Regards
    Isabelle

  • Inspection Point at Operation Level

    In inspection plan of a material there are 2 operations.Out of these 2 operations, i want to assign inspection point only for 1 operation.and for 2nd operation i dont want inspection point.but as it is a header level data,i am not able to do it.so how can i do this?

    Hi
    Then by std method it is very difficult to achieve.This may need some enhancement in QP01/QE11/QF01.
    Here you have to make sure that for which operation you don't want Inspection point even if you have maintained in header of QP01.How will you differeciate this operation from other.
    May be you can try user exit :QAPP0001
    The user exit EXIT_SAPLQAPP_001 is called from module QAPP_IP_CREATE_1.
    This module is run through when you go into the create, change and
    display transactions for the results recordings. This is independent of
    whether the inspection point data screen is called up at a later time.
    Regards
    Sujit

  • Inspection points

    Hi,
    I am using Inspection plan with freely defined inspection point (100).
    Inspection type: 04
    I want to do 100% inspection. Material master setting is done for early lot creation.
    If I use freely defined inspection point in the plan and create an order of any quantity > 32767, I get a sample size of 32767. If create a order of 100000 qty still sample size is 32767 and I can't even change it during result recording. If I don't use freely defined inspection point I get a sample size which is equal to the order quantity.
    My Requirement:
    I want to use freely defined inspection point in the plan... and also I want to get a sample size equal to production quantity (not 32767 always when production quantity exceeds the this quantity).
    Please let me know how to control this fix sample size 32767 when my plan is with freely defined inspection point
    If its SAP's Limitation then please let me know how to hide inspect and inspected columns in result recording screen.

    SIr, I am repeatng my problem again,
    I have a plan for inspection type 04, i have used inspection points 100 as free inspection points.
    each mic have same sampling procedure as:
    Sample type 100 % inspection
    Valuation Mode   Manual
    Inspection Points Free inspection Points
    In inspection plan base quantity for each mic is 1 and unit of measurement EA
    Now  i have created process order of 50000 EA
    Whn process order confirmed lot of quantiy 50000 comes in quality
    Lot quantity come 50000 EA, Sample size comes 50000 EA
    but the problem is that when i do result recording, in the field of Inspect and inspected systm shows default figure 32,767
    as in inspected field it should come 50000 EA if i make PO of less than 32767 then it appears fine same, bt more than PO quantity 32767 it shows default value 32767.

  • QM: Sample Size is 32767 if freely defined inspection point is used

    Hi,
    I am using Inspection plan with freely defined inspection point (100).
    Inspection type: 04
    I want to do 100% inspection. Material master setting is done for early lot creation.
    If I use freely defined inspection point in the plan and create an order of any quantity > 32767, I get a sample size of 32767. If create a order of 100000 qty still sample size is 32767 and I can't even change it during result recording. If I don't use freely defined inspection point I get a sample size which is equal to the order quantity.
    My Requirement:
    I want to use freely defined inspection point in the plan... and also I want to get a sample size equal to production quantity (not 32767 always when production quantity exceeds the this quantity).
    Please let me know how to control this fix sample size 32767 when my plan is with freely defined inspection point.
    Regards,
    Abir.

    Hi,
    Sample size under 'Inspect' column in result recording screen is always 32767, if order quantity >32767.
    I use EARLY lot creation (through material master setting), because I want one lot for one production order... do partial confirmation. Lot is created with production order release, before actual GR takes place.
    Say I have an order with qty 100,000 and if I open the lot after REL of order I see,
    inspection lot quantity: 100,000
    Actual Lot Qty:             0
    Sample Size:                100,000
    Even if I do confirmation and GR for say 100,000 qty and open the Lot I can see,
    inspection lot quantity: 100,000
    Actual Lot Qty:             100,000
    Sample Size:                100,000
    When I go to result recoding screen, against every MIC there is column 'Inspect' (there I get 32767), there is another entry field 'Inspected' (here system don't allow to enter more that 32767)
    Sampling procedure I have used:
    Sample Type:     200    100% Inspection
    Valuation Mode: 500    Manual Valuation
    Free Inspection Point
    May be I made mistake in pointing out the issue; the problem is with 'Inspect' quantity in result recording  - which always appearing 32767. For smaller quantity order its equal to order quantity.  How change the 'Inspect' quantity.
    Also not if I remove Inspection Point from the plan I get "Inspect' quantity equal to Production order quantity.
    Best regards,
    Abir.

  • Login change results in problem

    I changed my web .asp web site to use levels when I log in and now I cannot log in at all. If I change it back to use username and password only it still works.

    There would be Tab called Assigned Inspection Points, when you are doing Results Recording. Click on that TAB you will get to select the Inspection POint for which you want to record again and ther on you can Unlock and change the results.
    To reach up to this, right click on the already assigned inspection point and you will have the option, as suggested above

  • BAPI for inspection point

    Hi,
    I am trying to find BAPI through which i want to do inspection point and result recording. If anyone has done then let me know which bapi is suitable and provide what are all data's need to pass.
    Regards / US

    Hi,
    Check the documentation for function BAPI_INSPOPER_RECORDRESULTS. That gives a pretty detailed description of all the import requirements
    Functionality
    You can use this method to confirm the result of a quality inspection for an inspection operation or inspection point. The following functions are supported:
    Creating an inspection point 
    Closing an inspection point 
    Changing inspection point data 
    Recording inspection results at characteristic level (summarized) 
    Recording inspection results at sample level (summarized) 
    Recording inspection results at single value level
    You define within an inspection operation whether you work with or without inspection points. In accordance with this specification, the parameter INSPPOINTDATA is required or optional.
    Regards,
    John

  • Request tcode for create inspection points

    Hi  Experts,
    We uses inspection points to record muiltiple result,
    Because there are different persons to create inspection points and record results,
    if there are tcode for create inspection points, we can do it more convenience。
    Thanks .
    Denis.
    Moderator message: too vague, help not possible, please describe problems in all technical detail when posting again.
    Edited by: Thomas Zloch on Feb 18, 2011 5:10 PM

    Hello Mr. Amorsen,
    Follow Charm_create step by step using customer name:
    1- Create a new transaction using t_code SE93 (E.g.: ZCHARM_CREATE )
    2 - Copy the program : CHANGE_REQUEST_CREATE_SOCM to Z using SE38
    3 - In SE93, change the program to Z created in step before
    4 - In SE80 Copy the function group Change-request_socm to Z
    5 - copy the function modules too (will appear a pop-up asking for this)
    6 - Change  the include ; LZCHANGE_REQUEST_SOCMTOP
         IN LINE 30 : gc_processtype(4) TYPE c
                VALUE 'ZDCR',  "process type for change request
         Change value to ZDCR
    7 - Activate all
    8 - In SE38 report: ZCHANGE_REQUEST_CREATE_SOCM , change the call function SOCM_CHANGE_REQUEST_CREATE to Z
    9 - activate.
    Done !!!
    <<text removed>>
    Regards
    Claudenir Bispo
    Edited by: Matt on Oct 5, 2011 9:39 AM

  • Setting up inspection point in a scenario require more than one inspection

    Hi all,
    Maybe I am still not very clear on the PP-QM conceptu2026 hope you can see my problem on the following questionu2026..
    According to SAP in the QM-production environment, we key in ONE inspection point in the task list header level (i.e. either the master recipe, routing, or rate of routing).
    Based on the following business scenario which is going to use inspection point for the inspection:
    u2022     Time-based intervals (for example, an inspection point every hour or for each work shift)
    u2022     Quantity-based intervals (for example, an inspection point for each container)
    u2022     Freely-defined intervals (for example, an inspection point each time a tool change occurs)
    Since each of the above scenarios require more than one inspection points to be created and to be assigned to the task list header.
    Thus, how to accomplish multiple inspection point assignment when the task-list header only allow me to assign one inspection point at a time?
    Thanks
    YY

    Hi guys,
    Thanks. However, in the SAP help portal it does said the system allows several inspection points to be assigned to an inspection operation whether it is in routing or recipe.
    Therefore, does it means I can assign more than one inspection points in the operation detail level for either recipe or routing if I will to click the u201CNo relationu201D radio button in the u201CQuality Management: Inspection Pointu201D section. (i.e. is this is the right place to allows this assignment)?
    For example, on the change master recipe screen at the Operation tab, I highlight one line item (i.e. one operation line item and zoom into this operation line item, I donu2019t see any field box that allow me to assign several inspection points to an operation? Instead, on the u201CQuality Management: Inspection Pointu201D section, there are the following fields appear:
    - Insp.pointCompletion dropdown box
    - 4 radio buttons on the inspection interval (ie. Time-related, Qty-related, No-relation) and its subseq time and quantity value input box.
    - Quan.pt. lot checkbox
    - Last Part Lot Assgmt checkbox
    Thus, where is the section in the operation overview screen at Master Recipe or Routing level that I can assign several inspection points?
    Thanks
    YY

  • QM Inspection Points

    Gurus
    I require that inspection points should be created automatically for inspection lots when i view QA32
    To do so i have done settings in SPRO > QM > Quality Planning > Inspection Planning > General > Define identifier.
    Here i kept 2 under field Time for field combination 150 assuming system will create inspection points every 2 hours automatically but i cannot see inspection points created
    Where am i missing? Please reply
    Regards

    Dear,
    Have have to assigned inspection characteristics in routing that will be your in process inspection
    When you Release the order the inspection lots will be generated.
    Please maintain the Quality management Inspection point on the operation details and select time related. For Inspection point completion select Quantity, Valuation and Confirmation(Production).
    mention the time as 1 and unit a HR (Hour).
    You can record the results for every hour.
    But if you are not doing inprocess inspection & inspection with GR in that case you have to create insepction plan for material assign inspection type as 04 in material master
    Now for hourly analysis this you can enter by selecting scope not fixed & single value in master inspection characteristics
    You can enter time & other deatils of sample by using inspection point in inspection plan.
    Or else QAPP_CUST_IP_CREATE for generation of automatic inspection points.
    Then it will work for you.
    Regards,
    R.Brahmankar

  • Auto creation of time based inspection points against in process required

    Hi
    We want system to create/generate inspection points automatically when process order is released and inspection lot is created. Currently we have to create inspection point manually using either QE71 or QE11. Previously when scheduling was active in PP, inspection points had been creating automatically for the duration of process order. But now PP scheduling is not required and as a results inspection points are not being created automatically.
    Please assist.
    regards
    Chris

    SAP provides a FM, (QAPP_CUST_IP_CREATE), to be used as a template to create your own FM for automatically creating inspection points.  There is documentation in the FM to explain it.  You then assign this FM in configuration where you define the inspeciton point identifiers.
    FF

Maybe you are looking for