Change sequence frame rate when there are clips in it.

Hi,
I finished a three minute video (1444x1080, 29.97fps), then I had to do a slightly different version (first was for corporate clients, 2nd for regular clients). I opened a new sequence, then selected all of the clips in the first timeline, copied, then pasted them into the second timeline. As I started to make the changes I noticed that some of the clips had moved around and the lengths were slightly different. Since I had to make changes anyways, I didn't worry about it too much. Then, just as I finished, I realized the problem. The new sequence was 23.98fps. Ah! 
I've already learned that you can't change the timebase of a sequence that has clips in it. I tried creating a third sequence (making sure the settings were correct) and then copying and pasting the clips from sequence 2. However, they go completely wonky in the new timeline. The various tracks don't line up and the in and out points of the clips have changed.
Is there a way to get my 24fps sequence into a 30fps sequence without having to fix or redo most of it.
Thanks.

Ha. Thanks. That's good to know. I won't waste my time trying.

Similar Messages

  • Changing animation frame rate when rendering in photoshop does not change the length of the video?

    I made a walk cycle animation in Photoshop CS6 and want to render it into a quicktime format. I'd like it to be 12 fps, but when I rendered it at 12 fps the video seemed to be missing frames, and the video was 3 seconds long. I have 98 frames to my animation; doing the math, at 12 fps it should be 8 seconds long. Not 3.
    I was confused and for curiosity's sake I rendered the video at 6 fps, trying to really slow it down. The video ended up being STILL 3 seconds long and only maybe 20 frames. I was missing literally 70 frames. I'm so upset with this rendering thing, I could chuck my computer at the wall.
    Does anybody know of a solution to this?
    edit: If it means anything, I've tried rendering it straight from the frame view and the timeline view. Each time I render it I have the timeline frame rate match the rendering frame rate as well.

    floriannaart wrote:
    Changing animation frame rate when rendering in photoshop does not change the length of the video?
    Photoshop CS6 and CC support two types of animation Frame animations and a Video Timeline
    Changing the frame rate should not change the length of a video timeline. It should just change the number of frames that are rendered.  To change the length of a video you need to change the length of the video timeline.  If you increase the length of the timeline and there is audio I'm quite sure there will be a problem with it,  The Video part will most likely be better then the sound. The required number of extra frames can be generated however the video may look like slow motion. If you decrease the length the motion will speed up.  The length of a video is normally done be editing video clips which are trimmed and stitched together to get the desired duration. Not normally done by altering the duration of a clip.
    The duration a of Frame animation is the sum of the times each frame is displayed.  In a frame animation the length of time a frame is displayed can be varied it not a normal motion picture video.  To have a smooth frame animation you need a sufficient number of frames that are different from each other to show smooth motion.  You can use Photoshop Frame animation tween feature to have Photoshop manufacture frames to help with a smoothing the animation.   Once you have a frame animation the length with the motion you want you can have Photoshop convert it to a video timeline and render a normal motion picture video.  It will not have audio but you can add audio to it.

  • How to change the default JRE when there are several version of JRE in Sys

    How to change the default JRE when there are several version of JRE in System?
    i have installed j2sdk1.5.0 then installed j2ee1.4,then installed Weblogic6.1 which use jdk1.3
    Now the JRE is jdk1.3\bin
    When run class that was compiled with jdk1.5,throw:
    java.lang.UnsupportedClassVersionError
    How can i change the jre to 1.5?

    There is a workaround to move from 1.5 version to the older 1.4 version. But this could be specific to the browser setting the JRE version.
    Excerpts from sun docs:
    However, a user can still run older versions. To do so, launch the Java Plug-in Control Panel for the older version, then (re)select the browser in the Browser tab.
    Example:
    Assume you are running on Microsoft Windows with Microsoft Internet Explorer, have first installed version 1.4.2, then version 5.0, and you want to run 1.4.2.
    Go to the j2re1.4.2\bin directory where JRE 1.4.2 was installed. On a Windows default installation, this would be here: C:\Program Files\Java\j2re1.4.2\bin
    Double-click the jpicpl32.exe file located there. It will launch the control panel for 1.4.2.
    Select the Browser tab. Microsoft Internet Explorer might still appear to be set (checked). However, when 5.0 was installed, the registration of the 1.4.2 JRE with Internet Explorer was overwritten by the 5.0 JRE.
    If Microsoft Internet Explorer is shown as checked, uncheck it and click Apply. You will see a confirmation dialog stating that browser settings have changed.
    Check Microsoft Internet Explorer and click Apply. You should see a confirmation dialog.
    Restart the browser. It should now use the 1.4.2 JRE for conventional APPLET tags.
    Details are here
    http://java.sun.com/j2se/1.5.0/docs/guide/deployment/deployment-guide/jcp.html
    My system (Windows XP) has the version 1.5_09 set as the default. However i just installed JRE 1.5_06 and would like to revert back to _06 as the default JRE..
    Will update if i find more information

  • Is there a way to change the frame rate on an audio clip in the source monitor?

    Premiere CC6.  I am trying to sync audio and video by using "Merge Clips" but the audio seems to be counted in a 29.97 rate while the video is 23.98.  The sound person on set swears the audio TC should match the smart slate and that the frame rate is 23.98.  Any help or insights would be greatly appreciated.

    I think I may have solved it, actually.  I find that if I switch the timecode to NDF in the source viewer, it seems to work.  I have tried it on three clips and they have sync'd without problems.  Hopefully this will continue to be the case.

  • Premiere elements 13 changing the frame rate of the original clips

    Hi,
    I'm trying to make a gameplay video for YouTube... The clips I'm using are at a low frame rate (13-15 fps). When I put these clips into the editor, they get sped up to 30 fps. This increases the speed of the video and the preview window jumps back and forwards in the video.
    This is highly frustrating because I can not change the speed of my video, and I can't see what I'm editing... I've tried rendering the video but this makes no difference... Is there any way of getting around this problem???

    Excellent! I'm pretty sure that will solve the problem. The files are in raw "movie clip" format. That usually causes problems. I can't beleive I didn't think of that before! I'll convert the files to mp4 or avi and post again to comfirm that that really was the problem.
    Thanks for the quick response
    --> Just to comfirm, changing the format to mp4 worked!
    THANK YOU!!!!!!!!!!11

  • Changing frame rate when exporting from iMovie '09 using quicktime has no impact on duration.  Why?

    Changing frame rate when exporting from iMovie '09 using quicktime has no impact on duration.  Why?
    I have a file created by digitizing an 8mm film at a rate of 24 fps. I would like to create a downloaded movie at a frame rate of 15 fps.  The Export using Quicktime option seems to provide that capability but the resulting file has the same duration as the original 24 fps file.  How can I get the exported movie to be slowed down?

    joegez,
    There is a feature you can use to slow down the video. In the project, move the mouse pointer over the clip, then click the gear icon. That brings up the Inspector. Click the Clip tab. Then you will see a feature there called Speed. Move the slider to the left to slow down the clip. Or you can enter a percentage in the box on the right.
    Hope this solves the problem for you.

  • Avoid marking files as modified by Git when there are no changes

    Hello,
    I am working on a project using Visual Studio 2013 Ultimate and Enterprise Architect 9.0 (a UML tool). I am using Git for Source Control in Visual Studio.
    I have set up the programs so that I can synchronize code from Enterprise Architect (EA) to Visual Studio (VS) and vice versa using MDG Link for Visual Studio (an Enterprise Architect add-in). I first synchronized all the existing code from VS to EA.
    Now I have the following workflow:
    Create UML models in EA;
    Add necessary attributes and operations to the class models;
    Synchronize models with the code, which will add the added attributes and operations to my source;
    The last step will regenerate all my source code files, but even if there are no changes Git marks the files as modified.
    How can I avoid this behaviour, because now all my files are modified when Enterprise Architect synchronizes the model with the source code.
    I only want Git to mark it as modified when there are actually things added or modified in the file.
    Any help will be appreciated.
    Marcel

    Hi,
    I think it's more VS which detect the file was modified, and by default it mark the file as modified in Git. 
    But normally when you want to commit your work these files are removed because Git detect the files are not really changed.
    Did you try to refresh the pending changes in the team explorer (F5). Perhaps Git recalculate all the differences, and then detect the real changes.
    Regards,
    Yan Grenier
    Merci de bien vouloir "Marquer comme réponse", les réponses qui ont répondues à votre question, et de noter les réponses que vous avez trouvé utiles.

  • Dropping frames in render.. How do i change export frame rate

    I have a film clip shot on the canon 5d which shoots only at 30fps. This was no issue in FCP as the preferences allow changing the frame rate.
    The project plays fine in color, but when it comes time to render the settings are locked at 25fps. This results in sync issues once sent back to FCP.
    Is there anyway to get around this? Is there a preference somewhere that allows me to change the frame rate in color?
    Any help would be greatly appreciated

    vink404 wrote:
    Ignore that i have worked it out
    Do share, please!
    Someone else is sure to have the same problem.
    - pi

  • Would you like to change the frame rate of the project to 30 to match to m

    I just now moved some film clips from the Event Library to the Project Library and a white message window appeared saying: *MISMATCHED FRAME RATES. The frame rate of t his cli is 30 and the frame rate of the project is 25. Would you like to change the frame rate of the project to 30 to match the clip? And two radio buttons: Don't Change and Change.
    First of all, the other day I set my Sanyo VPC-HD2000A to shoot film at 1280 x 72 at 30 fps SHQ. Now I just checked and it is set at the topmost red zone960 x 540 at 30fps. The only thing I can think of to explain this is that I selected it but did not "set" it.
    Thus now I have a message asking what I noted above. Should I click CHANGE?
    WHY IS THE FRAME RATE OF THE PROJECT SET AT 25? How did I do that? What did I do that caused me to have a project that is set at 25 fps?????
    Time for another snack. 8-(
    -L
    A side issue is to find out why I set my Sanyo VPC-HD2000A at one rate (above) but now see that all the footage was shot at a different rate. Very very frustrating.

    AppleMan,
    It all began inside the settings of my Sanyo VPC-HD2000A when somehow the selection got switched from 1280 x 720 to that other setting with so-called 25fps. Also, I don't know whether the mishap occurred before or after I took my new footage.
    I edited the clips last night and now they are on my blog and channel and they seem ok but slightly fuzzy.
    I used a Sanyo VPC-HD2000A .7x wide angle lens with macro and I notice that when I zoomed in to the little sun conure, the picture blurred. I think that might be something that happens when one zooms the focus.
    Also, I was born and raised to a teenager in Hawaii, but now Southern California has me in its grip.
    -L

  • How can I change the frame rate of a project in imovie 10?

    My problem is: I made a gopro movie with a frame rate of 50 fps. I imported it to imovie. So far so good.
    Scrubbing over the clip i found one single frame which looked amazing. So I draged some seconds of that clip into the timeline (the project if you will).
    The goal was to make a freeze frame out of this "spezial" frame.
    Unfortunately I could not find this frame in the timeline any more - it's gone.
    I think imovie dropped half of the frames to fit the clip into the projekt, which I assume is using 24-25fps.
    The only solution I found is to decrease the speed of the clip to let's say 50%.
    But is there a better way?
    Can I change the frame rate of the projekt somehow? I think it was possible in imovie 11.
    many thanks
    Rainer
    (from austria)

    iMovie 10 won't share at 50 fps and so for 25 fps output probably drops every other frame.  This is different from Imovie 9 which could handle 50 fps.  However, if you do 50% speed it will use all the available frames so that is indeed the way to find the frame you want.  After you have made a freeze frame I think you can switch the clip back to normal speed.  I am not aware of a better way in iMovie 10  By the way there is also no facility to export a still of a frame in iMovie.
    As a GoPro user I think FCP 10.1 would be the best choice.
    Geoff.

  • Is it possible to change the frame rate of a motion template?

    Motion has some very useful templates, but the majority are only offered in NTSC, not PAL. (including all in 3D TEXT PROJECTS).
    Is it possible to change the frame rate to 25fps before I start adding my own stuff, so that I can easily get the timing right for a PAL sequence in FCP.
    If not in Motion, how else could this been changed?

    Try dragging all the groups from one project into another instead - you'll need to open both project and rearrange the windows so you can see the layers tab for both of them.

  • How can I change the frame rate mode?

    Adobe Premiere Pro exports my videos with a variable frame rate. Because of this long videos are asynchronous. How can i change the frame rate mode? So Adobe Premie Pro exports my videos with a CONSTANT frame rate? The original video  has a constant frame rate...

    Sorry my mistakes. I am from Germany.. so...I mean with asynchronous that the video file and the sound file are displaced. In the beginning of the Video it's normal, but if the videos is very long it goes VERY "asynchronous"
    I analyzed the video with "mediainfo":
    General
    Format                                   : MPEG-4
    Format profile                           : Base Media / Version 2
    Codec ID                                 : mp42
    File size                                : 2.00 GiB
    Duration                                 : 20mn 13s
    Overall bit rate mode                    : Variable
    Overall bit rate                         : 14.2 Mbps
    Encoded date                             : UTC 2013-12-11 13:56:13
    Tagged date                              : UTC 2013-12-11 13:58:30
    ©TIM                                     : 00:00:00:00
    ©TSC                                     : 30
    ©TSZ                                     : 1
    Video
    ID                                       : 1
    Format                                   : AVC
    Format/Info                              : Advanced Video Codec
    Format profile                           : [email protected]
    Format settings, CABAC                   : Yes
    Format settings, ReFrames                : 3 frames
    Format settings, GOP                     : M=3, N=30
    Codec ID                                 : avc1
    Codec ID/Info                            : Advanced Video Coding
    Duration                                 : 20mn 13s
    Source duration                          : 20mn 13s
    Bit rate                                 : 14.0 Mbps
    Width                                    : 2 560 pixels
    Height                                   : 1 440 pixels
    Display aspect ratio                     : 16:9
    Frame rate mode                          : Variable
    Frame rate                               : 30.000 fps
    Minimum frame rate                       : 30.000 fps
    Maximum frame rate                       : 30.030 fps
    Standard                                 : PAL
    Color space                              : YUV
    Chroma subsampling                       : 4:2:0
    Bit depth                                : 8 bits
    Scan type                                : Progressive
    Bits/(Pixel*Frame)                       : 0.127
    Stream size                              : 1.98 GiB (99%)
    Source stream size                       : 1.98 GiB (99%)
    Language                                 : English
    Encoded date                             : UTC 2013-12-11 13:56:13
    Tagged date                              : UTC 2013-12-11 13:56:13
    Color primaries                          : BT.709
    Transfer characteristics                 : BT.709
    Matrix coefficients                      : BT.709
    mdhd_Duration                            : 1213733
    Audio
    ID                                       : 2
    Format                                   : AAC
    Format/Info                              : Advanced Audio Codec
    Format profile                           : LC
    Codec ID                                 : 40
    Duration                                 : 20mn 13s
    Source duration                          : 20mn 13s
    Bit rate mode                            : Variable
    Bit rate                                 : 158 Kbps
    Maximum bit rate                         : 254 Kbps
    Channel(s)                               : 2 channels
    Channel positions                        : Front: L R
    Sampling rate                            : 44.1 KHz
    Compression mode                         : Lossy
    Stream size                              : 22.8 MiB (1%)
    Source stream size                       : 22.8 MiB (1%)
    Language                                 : English
    Encoded date                             : UTC 2013-12-11 13:56:13
    Tagged date                              : UTC 2013-12-11 13:56:13
    mdhd_Duration                            : 1213777
    And there i can read that the "frame rate mode" is variable... and that's the bad thing... I want to change that point to a constant frame rate mode. I use the H.264 codec 

  • How do you change the frame rate (or fmp) of a project once you have already started?

    I have been working on a project for a long time now, and I just reliezed that the frame rate of the project was 25 where as all my clips were in 30. Is there any possible way for me to change the frame rate even though I've already started the project? or do I have to start again?
    thanks

    Hi,
    I've had a really good search through our documentation and website but there's no previous record of that error code. However, a quick google search turned up lots of things on MatLab user groups and the MathWorks forums.
    MatWork's official stance is that the PCI 7342 is not supported in MatLab. They have a list of supported hardware here:
    https://www.mathworks.co.uk/products/daq/supported/ni-daqmx.html#PCI

  • Posterize Time VS Preseve Frame Rate When nested

    Hello Every one.
    When Nesting  Two Compositions with different Frame Rates, I heard Posterize Time, Is a old Effect that many people use it.  But It can cause Lots of problems.
    So, Is It better Inside Composition Settings- Advanced:  To Check Preserve frame rate when nested or in render queue ?
    Thank You.

    If you have to preserve the frame rate, I would just choose to preserve the frame rate. However, there are many times when you don't even need to preserve the frame rate. So, if you don't actually need to preserve it, don't.

  • Problem with XML Publisher report when there are no detail records.

    I am working on an Oracle XML Publisher procurement report (Oracle E-Business Suite R12) that starts with a budget amount that is imported from our financial system, then lists all requisitions and orders that are in process (not approved). The amounts of all those unapproved requisitions/orders are totaled using a Sum form field, to be followed by a field where the unapproved requisition/order total is subtracted from the budget amount (amount available). I am running into a problem when there are no unapproved requisitions. When I run the report for such instances, it completes with a warning -- here is what it states in the OPP log:
    oracle.xdo.parser.v2.XPathException: Extension function error: Method not found 'sum'
    I have altered my sum field on the RTF template to include an if statement in case of a null value...
    <?sum (EXTENDED_COST)?> <?xdofx:if sum (EXTENDED_COST) = " then 0 end if?>
    ...but this does not work.

    Hi,
    You are on right track. Simply put summary field in header group and remember to set reset at property to Header Group Not Child and now you can use this field in format trigger.
    Format trigger must be written on header frame.
    Cheers !
    Adinath Kamode

Maybe you are looking for