Hi all, does anybody have a detailed document on all changes for source systems to work correctly after a P to D copy.
Thanks

Hi,
Here you will find all the details go through the link below
http://help.sap.com/saphelp_46c/helpdata/en/2e/d9530294f911d283d40000e829fbbd/content.htm
http://help.sap.com/saphelp_nw04/helpdata/EN/26/4b0d0930034b73aa3332ddc8c75e9d/content.htm
It may help you
Regards,
Marasa.

Similar Messages

  • Source system assignement in production

    Hi all
    Before importing any requests which are related to infosource , cubes and update rules into production, do we need to make any source system assignment in production system?
    I have directly imported into production but there were no source system / data source assignments to these infosource.
    can you please suggest what to do for these souce system assignments in production.
    thanks in advance
    AN

    Hi,
    you have to assign the production source system to your BW system. After replication of the DataSources, you can import your development from the BW development system.
    Important is the conversion in the SPRO Transaction - Change source system name after transport. In this view you have to type in the source system name of the source system linked to your development system and the name of the source system linked to your production system. During import to production system, BW will automatically change the source system names.
    regards
    Juergen

  • How to change source system in process chain

    Hi All,
    In our Bw quality system, process chain is pointing to the Production system ,
    I want to keep the process variant name same as production but want to change the source system
    For example.. let us say currently process chains(All DTPs) are pointing to the Production server (PD001) ip (200.12.23.22)
    now i want to keep the Server name same but want to point it to the quality system..so after change Process chain will show same name but it should point out to quality system.(let us say bwq 200.12.23.232).
    Can you please help me on this

    Hi Pravender,
    In our BW system , we have same process chain in all the system (Dev, Quality and production)..and naming convention is also same ..(all process chain points to Production system only)..
    So when I want to load data from development i just need to change the source system ip adrress  to  the Development Server  (So names in process chain will indicate production but  it will point to the development server), .
    I want to know how can i change the source system mapping.
    Hope i am clear now

  • Can we have two R/3 Source Systems(Dev & Test) in BW Development....?

    Hi All,
    Till now we have only BW Development box..
    Our Landscape for R/3 side is R/3 Development, Testing and Production.....
    Already we have connected R/3 Development with BW Development... It is working fine as now... We have finished our task at Development...
    My doubt is <i><b>Can we Configure R/3 Testing to BW Development</b></i>....eventhough R/3 Development is already configured with BW Dev....
    <b>Can we have two R/3 Source Systems(Dev & Test) in BW Development....?</b>
    Please help me out in this issue....
    Your help will be appriciated...
    Regards,
    Kiran Telkar

    Hi Kiran,
    You can create second source system which will point to SAP R/3 Quality .
    If you have transported all datasource activation requests to QA environment then all datasources are available in R3QA as well.
    After creating source system , replicate datasources.
    Only thing you need to do is to replicate efforts of assigning source system (R3QA)-> creating transfer rule -> Create info package and load data.
    Hope that helps.
    Regards
    Mr Kapadia
    Assigning points is the way to say thanks in SDN.

  • Mapping new product code from source system to old product code in Oracle COA

    Mapping new product code from source system to old product code in Oracle COA
    Here is the situation:
    One of our legal entities is changing their product codes in their COA segment. We are not changing the code structure in the global SOB. Is there a workaround to pull the source system information into ADI (or any other tool) and map it to the current Oracle product code?
    Thanks and regards,
    [email protected]

    Only The  Data of Your Code will Change
    then if you are trying to copy a standarad sap-code , you need to copy
    every include, FM
    there is a Copy option over there in program
    you can do tat
    thnkx bhanu

  • Test System (BQ1) Objects showing up wrong Source System after Transport.

    Hi Experts,
    We are working on IS-U BI7.0 Project. We have finished with our Development and have transported the DataSources, Transformations and DTPs from Development (BD1) into Test (BQ1) Systems.
    We have entered values in the Conversion of Logical Source Systems correctly.
    When we select the DataSource and Click Object Directory Entry from the Extras Menu, we found that the Original Source System is defined as BQ1 instead of BD1 (Development System), which is where the Object is getting Transported from.
    We have implemented an SAP Note:1008633 (Incorrect Source System after Transport (RSTRAN 514) but couldn't resolve the issue.
    We basically want all the Objects in the BQ1 (Test System) showing the Original Source System as BD1 (Development System) but only the DataSources and it's connected Transformations and DTPs are originating from the BQ1 (Test) System itself (The Transformations when Transported from BD1 to BQ1 are Transported with a different Technical Name which is very strange).
    Had anyone faced similar problem and if so, what was the effective solution implemented.
    Any help in this regard is very much appreciated.
    Thanks in Advance.
    Best Regards,
    Chandu.

    It is resolved by our Basis.
    Thanks,
    Chandu

  • Change Source system Tech.Name

    Production :   PRE -
    >  PRB
    PRE-Production    :   PPE -
    > PRE
    We make a copy of our production BI to Preproduction BI (PPB) we follow note # 886102. We want to connect this system to our pre production ERP (PPE).We already run BDLS change the logical system name we created new RFC created which is pointed to new R3 system .Problem is when we are going to run Tcode RSA1 in source system it shows old Tech name PRE600. We are unable to activate the source system.
    We can create new source system (PPE),but All our BI objects mapped with old source System (PRE600). I am afraid to change thousands of BI objects ( change source system from PRE600 to PPE600).
    Is there any work around we can change the Logical Source system Tech.Name? or some batch job which change the source system name for all BI objects.
    Appreciate your earliest reply.
    Nawab

    Hi
    Can you please check the Tcode BDLS
    Check the document it will be helpful
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/bff13df2-0c01-0010-6ba7-bc50346a6fd8
    Regards

  • Does not allow to change source system in Variant

    Hi Gurus,
    I am creating a variant for the program RSIMPCUST, but it does not allow me to change source system name. It is showing me gray color. Do you how to fix this issue ?.
    Thanks
    Liza

    Hello Liza,
    Did you try my solution?
    [Re: Change source system name in variant in BWQ]
    There are solutions to change variants properties, but that particular program has the logsys parameter not able to change, so you cannot change the value of that variant (only with debug).
    It's best to go for that solution I already provided to you...
    Diogo.

  • Change source system name in variant in BWQ

    Hi Gurus,
    I created a process chain for global seetings for unit of measurement and fiscal year variants and transported to BWQ.
    In BWQ, I found the source system name in variant is showing ERD source system name, but I need to change it to ERQ source system name. Any advice how to change source system name in variant in BWQ I would appreciate it.
    Thanks
    Liza

    Hello Again Liza...
    I had the same problem but I didn't need to include in process chain...
    So to execute periodically you can change it in debug mode, not the best solution...
    But since you need to use it in a process chain, you should copy that program to one of yours Z.
    Do this:
    Go to transaction se38 and insert the program name "RSIMPCUST".
    Click on the button of "Copy" (Ctrl+F5).
    Change the source program name to ZRSIMPCUST (or whatever you want)
    Click Enter
    Click the button to mark everything (F8)
    Click Enter
    On the next window of the name of the include click enter (leave it blank)
    Click on the button Change of your Source Code
    In line number 54 you'll find this in Selection Screen part:
    PARAMETERS:  logsys  TYPE rsa_logsys MODIF ID p01.
    PARAMETERS: logsysnm LIKE tbdlst-stext MODIF ID p02.
    Delete those two lines and insert this ones:
    PARAMETERS:  logsys  TYPE rsa_logsys.
    PARAMETERS: logsysnm LIKE tbdlst-stext.
    Now click on Activate button (Ctrl+F3)
    Now you have a new program just like the old one but you can change the source system to whatever you want!
    Please assign points,
    Diogo.

  • Change Source system ID

    Hi Experts,
        We did a system copy of BW system alone, and when we tried to restore the connection with the source system,  i am getting the following message.
    Source system cannot use any of the proposed connection names
    Message no. RSAR362
    Diagnosis
    Every connection to a source system is named using a unique two-digit identifier. Source system DEVCLNT030 does not accept any of the proposed values.
    The last proposed value was BA.
    System Response
    Source system has not been connected.
    Procedure
    If you want to recreate the source system from BI information, then you can only use a single value, namely BA, because the connection already has this name in BI.
    Delete the existing connections in the source system or contact a BI consultant.
    BDLS was successfull, and returned no errors.
    I checked the source ID in the RSA1 and it exists, how do i change this value.
    Thanks in advance
    Praveen

    Hi Praveen,
    Login to ur SAP R/3 or ERP  Source System and go to table RSBASIDOC.
    Put the R/3 logical System Name and BI logical system name as parameters and see the table values, i am sure the 2 digit unique identifier value will be the one giving u the problem.
    This error comes after system copy of source system as ur system still behaves as Production System (the one from which it is copied).
    Execute function module RSAP_BIW_DISCONECT  in SAp R/3 System with parameters as ur R/3 logical System Name and BI logical system name and option forced delete as X. to delete entry from RSBASIDOC table.
    now go to BW system RSA1 > Source System> restore ur system.
    Hope it helps
    Thanks
    CK

  • Mapping of Quality System (Source System) after the Transport

    Hi,
      We have two quality source systems like 300,400 in sync with the development ,to extract the data .    I am transporting Transfer rule mapping from the development .After the transport to Quality , the changes are reflected in 300 . But I want to change it from 300 to 400 i.e.Transfer rule mapping should be reflected in 400. What is the transaction code used to change this mapping in BW System?
    Thanks for your time.
    Thanks & Regards,
    Raja

    Raja,
    When you transport - you have a transport mapping in your dev system that tells BI which system connects to which system in the QA system for instance
    FLAT_FILE in DEV could be Z_FLATFILE in QA - accordingly the datasources are mapped. Also the transfer rules are source system specific which means that you change the source system - the transfer rules will have to be recreated.
    Instead what I am asking you is to maintain the mappings for client 400 in DEV and then maintain the mappings as 400 - 400 in the qa system and then transport the same. If your dev systems are linked to QA300 and your mapping says QA400 the same will hold good.. however if you have QA300 in dev to be sent to QA as QA300 and then change the source system .. it will not work since this will be seen as a source system change and you cannot change the same. You could try BDLS and try changing the logical client name ( I am not sure if it is BDLS ) or change the RFC connection parameters in SM59 but am not sure if it would work....

  • Change Source System RFC

    Dear All,
    we have 2 server ecc 6.
    1. production
    2. backup
    right now my sap bw connect to ecc production.
    we have plan to use backup instead of production
    is it enough just simply changing the IP and host name at the current RFC connection.
    from IP production to IP backup server ?
    without creating new RFC connection ?
    is there any procedure that we have to do before or after the changes ?
    please advice

    Hello Dady,
    You have to take care of RFCs, Logical system names and RSA1 stuff in order to use backup ECC server instead of Production.
    I suggest you to go through the following document for better understanding. It's strongly recommended to take offline backup before you attempt to modify source system configuration in BW system.
    http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/70a7b233-8be5-2c10-4190-aed723af5373?QuickLink=index&overridelayout=true
    Good Luck.
    Thanks,
    Siva Kumar

  • Change Source System

    Hi Gurus,
    My BW Production is linked to ECC6 Production box.
    I have copy my BW Production client to another box, (Sand box).
    Now this Sand box is linked to ECC6 Production box because it is the copy of BW Produciton.
    How can I change all my Source System so that this Sand box is pointed to my ECC6 Development box?
    Please help.

    YOu can do by this way.
    Create one more RFC connection in SM59 and source system connection for ECC development box in your sand box.
    there would be no problem if you have ECC production and ECC development both the source system connections in your BI.
    If you dont need of ECC production source system connection. you can delete it.
    But the data sources and everything you have to create for your new source system connection i suppose.
    Hope this would help you.

  • How to change source system in SAP BI

    Hi,
    In Sap BI we are having a source system ECC1CLIENT100, based on this we developed all the data modelling, now due to some reasons we made a copy of the souce system ECC1CLIENT100 to ECC2CLIENT100 and we removed ECC1CLIENT100 from SAP BI connections, Now what changes we have to do to connect the ECC2CLIENT100 to BI in the place of ECC1CLIENT100, please give me step to step what to do for sucessfull operations, Both the clients are having different IP, SYSTEM ID,
    Thanks in advance,

    Hi Bazi,
    -->you need to maintain RFC to the new source system
    -->delete old source system
    -->create source system connection from RSA1
    --> Run BDLS to point the data sources to new source system. This should be run on both BW and ECC.
    You will need to run this BDLS several times
    for more info check the below link
    How to change the BI source system
    http://help.sap.com/bestpractices/crossindustry/businessintelligence/v131/BBLibrary/documentation/B84_BB_ConfigGuide_EN_DE.doc
    Regards
    KP
    Edited by: prashanthk on Aug 18, 2010 6:22 AM

  • Reconnect R/3 source system after BW systemcopy ?

    We want to copy our BW 3.0b development system as a BW sandbox system in order to try out the BW 3.5 migration.
    Therefore, we performed a system copy of our BW DEV system to a new machine. On the BW-side we ran BDLS to get a new logical name for the system and defined a RFC connection to our R/3 Dev Source System (incl. appropriate RFC users).
    On the R/3 side we also defined an additional RFC connection to the "new - just copied" BW-system.
    While trying to reconnect our R/3 Devopment source system within the new BW we encountered the problem that the R/3 system recognized that there already exists a connection to a BW (the old BW dev). If we take this option, the old connection is deleted and a new one is defined. However, from the R/3 perspective we want two BWs connected. It seems the problem has to do with the IDOCs and TRFC port definitions, because the IDOC type ZRSBW010 seems to point to the wrong system.
    Unfortunately, we are stuck at the moment.
    Any kind of help or hints to relevant SAP documents would be much appreciated.
    In the OSS we found some notes on this topic (325525 etc.) but we still not sure how to proceed.
    However, in general, we think it shouldn't be a problem to have one R/3 connected to several BW's or is it?
    Frank Schülke, E.ON Ruhrgas IT, Germany

    Frank,
    It is possible to connect a copy of your BW dev. system to the same R/3 system. The problem you are experiencing is related to the connection ID from table RSABASIDOC. This is a unique ID in your system (normally the first two characters of your source system name). Tis ID is in RSBASIDOC in yuor BW and R/3 system. When you copy your BW and try to connect it to your R/3 system again, you will get the conflict you already noticed.
    The solution is to run SE37 --> RSAP_BIW_DISCONNECT in your new BW system (make a screen shot first of the RSBASIDOC entry!). This will be cleared by the function module. You will notice that the source system is not visible anymore is RSA1. However all the transfer rules etc. are still there (invisible). This would not be the case when you are doing a remove source system in RSA1 as suggested.  Now you can create the source system again via the normal way. Use exactly the same name for the source system mas you made it via the BDLS. During this process the BW and R/3 systems are "negociating" a new unique connection ID for this BW-R/3 connection. This creation of the source system will also make all the related info visible again (like transfer rules).
    Note in general: If you get a screen saying the connection ID is already used, ALWAYS choose DO NOT DELETE. After chosing DELETE there is no way of solving the issue other then restoring the system from backup! In this case you would delete everything in your R/3 system regarding the original BW system! When you get the message, check RSBASIDOC in both systems as there will be a conflict.
    Regards,
    Sander.

Maybe you are looking for

  • Google calendar in ical iPhone

    So I made a google calendar with my work email. I have it synced with my mac but I can't get it to show up on my iphone. In Ical on my mac, I added the calendar in preferences but on my phone it won't accept a non-google email. I am hoping i am missi

  • Select-options in SE51 with problem

    Hi! I´m trying to put select-options in screen by SE51. I create a subscreen: selection-screen begin of screen 9001 as subscreen. select-options: so_matnr for mara-matnr. selection-screen end of screen 9001. And i call this screen in PBO of my screen

  • Problem: Web.Show_Document with separate frame = True

    We run our application in a seperate frame, so the applet is running outside our browser. When I change the URL in the browser-window the Forms Built-In Web.Show_Document does not work anymore (no browser window will be shown). Is it possible to solv

  • Can't find  FORMS90_TIMEOUT key.

    Hi All , I'm running form10g on windows server 2003 OS , i want all the processes of Oracle Forms that has been aborted by users by clicking the X on the browser to be killed after 1 minute , i know that i have to set the FORMS90_TIMEOUT in the regis

  • N8 Has anybody actually been able to voice- call a...

    See subject pse. Solved! Go to Solution.