Change the color of the outer line of a shape

Hello I'm trying to create a rectangle with a red border and no inside fill. It's only to highlight some text of a bank form.
I know i have to right click the layer and choose blending options and stroke. But I've tried to change the color so many times and no matter what I do, the outer line remains gray and with rounded corners.
I want the corners of the rectangle to be squared, not rounded but I'm having a hard time changing this.
Please help
I'm using Photoshop CS3
thank you
Could anyone please show a picture of where to change the color of the outer line? I've tried everything.

Hi,
With Ps CS3, you'll probably want to define a Layer Style for a Stroke and then use that with the Square Shape Layers.
This is a Stroke of 4 px, 'Centered' (so a very slight corner rounding on the outside edge. 'Inside' will give you square corners for both inside and outside edges). To change the color of the stroke, go to Layer> Layer Style> Stroke and change the color by clicking on the color bar.
regards,
steve 

Similar Messages

  • Change the colour of the outer line of a circle

    Hello everyone,
    I drew up a circle with no fill inside, to show where the location of my highway storm culvert will be.
    I changed the thickness of the outer line of my circle shape by creating a stroke effect at layer → blending options → stroke; then I changed the thickness of the line by right clicking in stroke at the layers panel and then choosing "scale effect."
    But the problem I have is that the outer line is gray, and I want it to be black.
    The outer line was originally red though so I changed my image → mode to grayscale, because I couldn't find a way to change the colour while keeping my image in RGB colour.  So I've managed to make the outer line gray by changing the image mode but I still can't change the colour of the outer line to black.
    I'm sure there must be other ways of changing the outer line colour without having to change the image mode, but I'm clueless.
    Here is my drawing:
    The text next to the circle says «Obra de desagüe». That's spanish for "drainage construction site."
    You see, I can't change the colour because I have no clue at where the "change colour option" is. I tried going to layer → layer properties, but in there there's only 7 colours to choose from. I chose a random colour, just to see what happens and what truly changed colour was the layer, within the layers panel; not the shape contained within the layer.
    So I'm lost here, any help please?
    Unfortunately I'm still not an expert in Photoshop just yet.
    Thank you for reading my post.

    Set shape layer opacity 100% Fill 0% to make fill transparent or add an empty layer make a circular selection stroke it black.

  • I set up an autoreply but i cannot work out how to change the subject line to the one I want

    I set up an automatic reply but the subject line come up as re: and what the other person wrote. I want to change the subject line to a set one to all emails. How can I do that?

    What email program are we referring to?

  • Can I change the Subject line of a saved email?

    Sometimes I save an email and want to revise the subject line so it's more descriptive of what's actually in the message. I remember being able to do this in Outlook, but can't quite figure out how to do it in Apple Mail. (And I don't want o have to forward it to myself, as that changes the From line.)
    Is there a way to simply edit the Subject line of a saved email?

    Actually, MailTags will kind of do what you want. You can tag a message in a number of ways, and one of them is to make a note, and display that note as the subject of the email. For example, I have a message:
    Re: Re: Initial generic topic
    Which actually contains useful information, so in MailTags I make a note "Pablo's Thesis Results" and click "Show as Subject", and now I see the subject as
    Pablo's Thesis Results
    Matt

  • How do I change the subject line on incoming email

    On my old PC I could easily start typing in the subject line of a received email.  This would allow me to search for a name later on when looking for an invoice.  I dont know how to change the subject line of an incoming email to my imac?

    This site tells you how to edit the subject of a message.  I just tested using OS X 10.8.5 and it worked, without altering the time & date stamp, or the original sender info. 
    http://email.about.com/od/macosxmailtips/qt/et_edit_receive.htm
    Steps copied below:
    Drag and drop the desired message out of Mac OS X Mail onto the Desktop.
    Ctrl-click on the message copy on the Desktop.
    Select Open With | TextEdit from the menu.
    Make the desired changes to the message source.To change a message's subject, look for "Subject:" at the beginning of a line starting from the top.  (hint, you can use 'Command-F' to bring up a search window to help you find the "Subject").
    Close TextEdit saving the document.
    Ctrl-click on the message on the Desktop again.
    Select Open With | Mail from the menu this time.
    Now select Message | Copy To followed by the message's original folder from the menu in Mac OS X Mail.
    Close the message window.
    Delete the message copy from your Desktop.
    Optionally, delete the original message in Mac OS X Mail.  (when I tested this, the original message was no longer there.  Not sure what happened to it, but the changes worked without editing the time, date, or original sender information.)

  • On the login screen on my mac says a property name, the laptop changed hands and I'd like to change the property line name to my own, how do I do that?

    On the login screen on my mac says a property name, the laptop changed hands and I'd like to change the property line name to my own, how do I do that?

    Open Accounts preferences. Create a new user account with the name and username of your choosing as well as your own password. Be sure to give the new account Admin status. Log out of the old account and log into your new account. Now, delete the old account.

  • How to change the schedule line date in SO with reference to value contract

    Hi SD Guru's,
    I need to change the schedule line date in the sales order with reference to the value contract by using some algorithm that i will write. The problem that i can't find the suitable place to add the algorithm. I can't add it to the Copy control because there is no schedule lines in value contract and copy control for schedule lines does no exist.
    I can not add to user exit MV45AFZZ  , because order that was created with reference to the value contract, does not go through this user exit.
    Do you have some ideas where i can add it?
    Thanks and Regards
    Viky
    Edited by: Viky Sloutsky on Oct 20, 2010 12:43 PM

    Hello Viky
    How about using program MV45AFZB- USEREXIT_CHECK_VBEP or USEREXIT_MOVE_FIELD_TO_VBEPKOM
    or program FV45EFZ1- USEREXIT_CHANGE_SALES_ORDER
    Does the program go through these exits when an order is created with ref to a value contract??
    Also I am wondering why you need to change a Schedule line determined by Availability check and/or delivery scheduling?

  • How do i change the time line in Au from time since recording start to the actual time?

    how do i change the time line in Au from time since recording start to the actual time? I have a recording that was started at 10:00 but obviously in Au it starts at 0:0:00. Basically i want to time shift this to 10:00:00

    In the Properties panel, modify the Start Time parameter.

  • Buyer change the PO line items and end up with Awaiting Approval status.

    Can you please help to look into this issue.
    1.Buyer change the PO line items and end up with Awaiting Approval status.
    2. But user claim that she got enough limit and should not route to her manager's approval. Also check with her manager and this PO do not exist his queue.
    Any clue or tips on how to investigate on this issue. All your tips are appreciated,
    -Rick

    You cannot change these POs because their changed version has status
    'Deleted'. My proposal to fix them will be the following:
    You will have to set changed version as closed(DOC_CLOSED set to X)
    and in active version set DOC_CLOSED to space.
    __-For the above statement, Can you guys please let me know, which table DOC_CLOSED belongs to and what are the steps to do this, as i come from a functional back ground.__

  • How to change the registration point on a shape

    Hi,
    Is there a way to change the registration point on a shape
    created in Director? For instance, I created a filled oval, and by
    default Director sets the top left corner of the surrounding square
    as the registration point. Nevertheless, I need to place that
    registration point at the center of the oval.
    Best regards.

    Hi, if you create a shape vector from director, the reg point
    is in the center of it; if you import a vector created in other
    aplication (flash), the regpoint is in the top left corner. To
    change the regpoint of an imported shape, try this:
    put your shape in the stage in x,y = 0,0 position, then, if
    your shape rect is 12,8 pixs, and if you want to move the regpoint
    to the center of it
    on preparemovie me
    member("yourshape").regpoint = point(6,4)
    end
    play and stop the movie, your shape will change the regpoint
    to 6,4
    remove the script, and that's all.
    Best regards.
    sayeg

  • Can I change the dashed line between pages in 2up Display mode?

    Did anyone ever figure out an answer to this query: Remove dashed page lines in two up mode?
    Or did it get fixed or modifiable in a later version?
    I'm viewing a pdf in two-up mode and I hate the dashed line Acrobat uses to indicate the gutter line between pages.
    I don't want to export as spreads from the indd doc because it ruins pagination.
    I wouldn't mind changing it to a solid hairline. the dashes are really distracting.
    I don't like Showing Gaps between pages either.
    Anyone have a way to modify that dividing line in regular two-up mode?
    Thanks.

    Is there a way to change this?
    No.

  • Changing the starting line when printing on new page.

    I am using Reports 6i. I have a report with a master/detail ralationship. The columns from the master query prints once only at the beginning of the report followed by numerous detail lines. However, should the detail lines continue printing onto a new page .... I would like to specify a particular position to start the print.eg 5 or perhaps 7 line from the top. Can this be done in reports 6i. Thanx in advance!

    Reports allows you to position the objects anywhere you want on the page. The only reason that objects move up the page is because they are anchored to objects above them. When those objects don't print, the objects that come after move up.
    You can create an object that prints on all pages but has no line and no fill color. This can then be used to reduce the amount the master frame can shrink by. (Make sure it prints on all pages. You might need to create seperate frames to surround the fields you want to see and the transparent field - then another to surround them both).
    If you know the position that you want the details to print then you can position the detail objects in the appropriate location and change the properties against the frame that surrounds he detail section as follows:
    "Base Printing On" to "Enclosing Object"
    "Print Object On" to "All Pages"
    Alternatively, create an explicit anchor between the frame and the top of the report.
    Finally, if you want to parameterise the position of the detail records, you need to create field that dynamically re-sizes to push everything below it down by the required amount.
    - create a field object that is at the same level as the master objects
    - set the "print object on" propert to "All but First Page"
    - set the source of the field to something like "desformat".
    - then use the srw.set_field_char(0, "<some text with a number of returns>"); in the format trigger
    This allows you to push everything below the field down by any desired amount.

  • Change the schedule line committed qty in PO items using ME_PROCESS_PO_CUST

    Dear Experts,
    I want to make the PO item schedule line committed quantity MNG02 field to zero, for this purpose I wrote the logic as below.
    but its not changing the committed quantity to zero. Please advice me.
    method IF_EX_ME_PROCESS_PO_CUST~PROCESS_ITEM.
    DATA: lwa_po_header TYPE REF TO if_purchase_order_mm,
            lwa_mepoheader TYPE mepoheader,
            lwa_mepoitem TYPE mepoitem,
            lwa_mepoitemx TYPE mepoitemx,
            lwa_ekko TYPE ekko,
            lwa_ekpo TYPE ekpo,
            lwa_ekpv TYPE ekpv,
            lwa_eket TYPE eket,
            tp_minqty TYPE min_qty,
            tp_clabs TYPE labst,
            tp_kosch TYPE kosch,
            tp_werks TYPE werks_d,
            tp_tdid type tdid,
            ta_textlines type MMPUR_T_TEXTLINES,
            lwa_textlines LIKE LINE OF ta_textlines,
            lwa_minstk TYPE zminstk.
      DATA: schedules TYPE PURCHASE_ORDER_SCHEDULES,
            schedule LIKE LINE OF schedules,
            lwa_schedule TYPE meposchedule,
            tp_mtvfp TYPE mtvfp,
            tp_avqty TYPE BSTMG,
            tp_minqty1 TYPE BSTMG.
      if sy-tcode = 'ME21N'.
    Get PO Header data
        lwa_po_header = im_item->get_header( ).
        lwa_mepoheader = lwa_po_header->get_data( ).
        MOVE-CORRESPONDING lwa_mepoheader TO lwa_ekko.
    Get PO Item data
        lwa_mepoitem = im_item->get_data( ).
        MOVE-CORRESPONDING lwa_mepoitem TO lwa_ekpo.
    *-> Get schedule line data
                  CALL METHOD im_item->get_schedules
                    RECEIVING
                      re_schedules = schedules.
                  LOOP AT schedules INTO schedule.
                    CALL METHOD schedule-schedule->get_data
                      RECEIVING
                        re_data = lwa_schedule.
    *-> Change Committed quantity
                    lwa_schedule-mng02 = 0.
                    CALL METHOD schedule-schedule->set_data
                      EXPORTING
                        im_data = lwa_schedule.
                  ENDLOOP.
                    CALL METHOD im_item->set_data
                      EXPORTING
                        im_data = lwa_mepoitem.
        ENDIF.
    endmethod.

    Hi Siddu,
    Please finf enclosed with the suedo code.
    DATA: LS_MEPOITEM TYPE MEPOITEM,
                LS_OBJ TYPE REF TO IF_PURCHASE_ORDER_MM,
                LS_MEPOHEADER TYPE MEPOHEADER.
    *IM_ITEM is ur importing parameter
    in order to get the  item details :
    LS_MEPOITEM = IM_ITEM->GET_DATA( ).
    *In order to get the current document type
      LS_OBJ = IM_ITEM->GET_HEADER( ).
      LS_MEPOHEADER = LS_OBJ->GET_DATA( ).
    Now you have your document type in LS_MEPOHEADER-bsart ...
    IF LS_MEPOHEADER-bsart ... = ur custom doc type .
    *Set the return item = 'X'.
    LS_MEPOITEM-RETPO = 'X'.
        CALL METHOD IM_ITEM->SET_DATA
          EXPORTING
            IM_DATA = LS_MEPOITEM.
    ENDIF.
    Hope this helps you,,,
    Regards,
    Deepak.

  • VA02 changing the Schedule line

    Hi All,
    I have an issue where in one Sales order is created. after saving the order whenever you open in change mode(VA02), and though you do not make any changes, when it prompts for Save you say yes. Then if you see the changes made for the order in Environment-> chnges,  for a perticular line item the schedule line two is deleted and created agian. It will be saved by the user id of the user who opend the order in the change mode.
    when it promts for save, If you say NO, then no changes will be recorded.
    Kindly help me with the issue.
    Please let me know If any OSS notes exists for correction. Its happening only with a perticular order.
    Thanks
    Swathi

    Dear Swathi,
    Not sure if this is a standard issue. Could you please check with your ABAPer if they have done any changes in the user exit specific to orders?
    thank you
    Venkatesh SP

  • I want to change the time line in Audition CS6 to display a 24hr time

    I have a file I need to aline to a particular time in a 24hr time format. I can see that I can change it many ways to do with music and video but I use Audition for a different purpose. I need to set the time line to display something similar to a 24hr clock so I can edit a file. Is this possbile?

    Ryan, the decimal format in Audition reads mm:ss.ddd where I need it to read hh:mm:ss:ms - and with a repeating 24hr period. Adobe is aware that it's products are used for more than editing design, film and music...it would be nice for them to have something more suitable.
    My solution it to upload the audio file into Premier, add markers where the relevant times are (after calculating the times to a straight time line) and then export to Audition. It's a lot of work for a large number of files.
    If the time line was more adaptable it would have saved me hours of extra work!
    Thanks for your help anyway.

Maybe you are looking for

  • "Account Information Not Found"

    I'm getting a weird error that I just don't know how to troubleshoot it: For some, but not all, users, I'm getting this error when I try to add an iCal server to a client machine: "Account Information not found" Access to https://ourserver.edu:8443/p

  • Using Adobe Captivate with Other Applications

    This question was posted in response to the following article: http://help.adobe.com/en_US/captivate/cp/using/WS5b3ccc516d4fbf351e63e3d119e9582981-8000.h tml

  • Result_cache_max_sizeis 0  after enabling AMM

    I am using. Oracle Database 11g Enterprise Edition Release 11.2.0.2.0 - 64bit Production. After enabling AMM, the result_cache_max_size has become 0. SELECT dbms_result_cache.status() FROM dual; Returns "BYPASS" Following change was done to enable AM

  • Calling an EJB throws an UNKNOWN exception

    Hi EJB experts! I`m trying to call an EJB on OAS from Java application running within a JDeveloper. After several calls of remote method the application invokes the remote method again but exception java.rmi.UnexpectedException: CORBA: org.omg.CORBA.

  • G510 - conexant audio driver update won't install - no sound

    I have a Lenovo G510 running windows 8.1 64 bit, bought about 6 weeks ago. Installed windows updates on 18 August, including an optional driver update for the Conexant SmartAudio HD, and now there is no sound. There is an exclamation mark next to the