Change the infotype Data in 586

Hi All,
I want to change the data in 586 infotype. Currently i am using the FM, But i am not able to change the data.
    CALL FUNCTION 'HR_INFOTYPE_OPERATION'
      EXPORTING
        infty         =  '0586'
        number        = '0000111'
        validityend   = it_pa0586-endda
        validitybegin = it_pa0586-begda
        record        = ls_p0586
        operation     = 'MOD'
        tclas         = 'A'
      IMPORTING
        return        = return.
Where In operation INS,DEL are working MOD is not working.
Please let me nknow any other way also,
Thanks in Advance.

Ramesh,
Yeah thats is common practice in any organization in the infotype  0586  itself we have both columns which we need maintain proposed as well as Actual
This values you can change at any point of time during the financial year bcoz the system reads this infotype for all the periods every time when we execute the payroll driver for April to March
As the top of the screen you will find one selection option consider actual if you tick it the system will consider actual uptown that time system consider proposed
To select the actual filed to all employee  you can do by using the standard report
PC00_M40_S80 - Batch program for Section 80
PC00_M40_S88 - Batch program for Section 88
Hope it is clear now
Regards
Rajeshk

Similar Messages

  • Short dump while changing the end date of infotype 0167 through PA30

    Hi all,
    I am getting short dump while changing the end date of infotype 0167(Health Plans) through Tcode PA30.
    dump descript is as below
    An exception occurred that was not caught.
    Runtime Errors         UNCAUGHT_EXCEPTION
    Except.                CX_HRPA_VIOLATED_POSTCOND
    Date and Time          11.03.2010 07:06:26
    What happened?
        The exception 'CX_HRPA_VIOLATED_POSTCONDITION' was raised, but it was not
         caught anywhere along
        the call hierarchy.
        Since exceptions represent error situations and this error was not
        adequately responded to, the running ABAP program
         'CL_HRPA_SAPUP50R_ADAPTER======CP' has to be
        terminated.
    thanks
    shahid

    Search OSS Notes for that.

  • Table for the report RPUAUD00  Logged Changes in Infotype data

    Hi
    I have a query with the program RPUAUD00 Logged changes in Infotype Data.  In which table stores the details of the program RPUAUD00.  for example in the 1st period there is a LWP record for the employee.  If in the 2nd period the LWP entered in 1st period has deleted, in the log the LWP displays for 1st period  new field contents, Action Indicator I.  The deleted information displayes in Old field contents with the Action Indicator D. We want to know in which table the LWP insert and LWP delete (d) details are stored.
    This information required to create a report for ESI.  In the report No of days (payroll processed for) has to mention.  To know the no of days need to access the report RPUAUD00.  From the RPUAUD00 the details of LWP insert and delete can be known.
    Request to help in solving the issue
    Thanks & Regards
    EKP Yadav

    Hello:
    Logged changes in Infotype Data are stored in cluster table PCL4 ID  LA and SA for employee and LB and SB for applicant. Maybe L is for longterm and S for shorterm
    Cheers.
    Antoine

  • Error: while configuring logs for changes in infotype data

    Hi All,
    I am configuring the following Tables for maintain logs for changes in infotype data.
    V_T585A, V_T585B and V_T585C
    While configuring V_T585B, when i input * in 'field name' column it gives me an warning message " All data fields in **** infotype 31 will be deleted.
    Please let me know, what does this warning message means?
    Also, How is the report RPUAUD00 read?
    Regards
    Simran

    Hi Simran,
    you are not suppose to give the IT 0031-Reference Personnel Numbers in these tables. why because this will done at the time of Employee hiring only and we don't change this. if you change you will lost the old data in the IT.
    Normally we assign only the IT which we change frequently for the master data. example like 0 1 2 7 8 9 27 582 - 589 2001 2006.
    if you are configuring today means from today on-wards any changes had made to these IT's you can see in the report. before changes will not be seen. in the report you have to choose either long-term document / short-term document and remaining fields as per the requirement.
    Regards,
    Praneeth kumar

  • S_AHR_61016380 - Logged Changes in Infotype Data-Restrict Authorization

    Dear friends
    I am facing a problem in S_AHR_61016380 - Logged Changes in Infotype Data.
    I am working on two company codes, Company A and B.  The number range for Company A starts from 1 to 10,000 and number range for company B from 10,001 to 20,000.  When HR Administrator of Company A runs this report, he is able to see the changes made for Company B too.  How can I restrict this in authorization.
    Please help
    Regards
    Santhosh.S

    Dear Andy
    Thank you for the reply, its working fine now, but I am able to track the changes from now onwards only, I mean to say I performed the configurations just 2/3 days back , while executing the report, its showing the only those infotypes which are changed from last 2/3 days only.
    But I want to track all the changes since beginning of the infotype creation. Any way to track the entire history of the infotypes
    Regards
    Kiran

  • How to change the default date in Person assignment tab?

    Hi experts,
    Does anyone know how to change the default date in person assignment tab in cj20n? Currently, the system always take the scheduled finish date to the date of the person assignment tab. Can I change it to the start date?
    Thanks and rgs,
    Michelle

    Hi Michelle,
    Goto SPRO->Project system->Dates->Scheduling->Specify Parameters for Network Scheduling, Here you can control the workforce planning dates.
    Hope this is useful...
    Regards
    Aatish

  • How to change the posting date in UD stock posting for a HU managed item?

    Hi,
    We are using Handling Unit managed items with QM activation. For a specific HU managed material, we wanted to post the stock on a previous date. We have created PO on a back date and made GR also on a back date. Now the problem is, the system has generated an inspection lot. Now while trying to do UD and stock posting, I do not see the "Doc" tab which we normally see in UD stock posting for normal inspection lots (non-HU managed items) for changing the date.
    I don't see any other way to change the posting date for the HU managed item in UD stock posting. Anyone can help please?
    Thanks & Regards,
    Madhavan Krishnamoorthy.

    I don't think you can.
    Craig

  • Is there a way to change the Digitised Date for Mov files in Lightroom?

    I am scanning some old photos.  Unfortunately Programs such as Dropbox and OneDrive display Mov files by their digitised Date.
    Consequently, My scanned photos are shown by the date that I scanned them. I can not seem to find anyway in LightRoom to change the Digitised Date so that they are shown on OneDrive/Dropbox in the correct order on my iPad.
    Any help would be appreciated.

    Your subject line says "Mov files" (which are video files), but your message talks about scanning old photos.  I'll address the old photos issue.
    Because there are so many dates/times associated with photos, and because every program feels free to use its own names, it's critical to be pedantically precise about terminology. The date/time a photo was originally taken (when the shutter was pressed) is called Date/Time Original or Capture Date. The date/time a photo was transferred to digital media is called Date/Time Digitized (when the analog file was scanned or when the digital-camera shutter was pressed). 
    A good rule of hygiene is to ensure every photo has a Date/Time Original (capture date).  Typically only digital archivists care about maintaining Date/Time Digitized.  If you ensure that every photo has a Date/Time Original, then pretty much any modern app and Web site will order your photos correctly.
    In LR, you set Date/Time Original using the Metadata > Edit Capture Time command.  By default, LR won't write the capture time back to the file's metadata, so depending on how you are transferring photos to other programs, the capture time won't necessarily get transferred.  So you either need to do Metadata > Save Metadata To File, or better, set the option Catalog Settings > Metadata > Automatically Write Changes Into XMP.
    Unfortunately, LR's Edit Capture Time isn't very flexible with dealing with scanned photos in which the precise date/time is not known.  So some people like to set an entire batch to, say, 1963/10/01 00:00:00, while others like to have each photo set in increasing increments of 1 second, so that programs will at least maintain the known relative ordering (which comes from the film or slide ordering).   To do that, you'll need a third-party plugin, e.g. ExifMeta or CaptureTime To EXIF.

  • How can i change the Creation Date of a video (mts-Format)?

    I work with Phohoshop Elements 13 an i use Online-Album (Revel)
    My Problem:
    I would like to change the Creation Date of a Video-File (mts-Format). I don't no why but the date (in Metadata) is wrong and i would like it to change. If i change it in Photoshop Elements the Date (Edit... Change Date...) it seems that the date has changed, but in reality in the Metadata is still the wrong date (see attachment).
    Why this ist important for me:
    The Adobe Revel (Online-Album) takes always the date from the metadata which is wrong.
    Any idea how i can resolve my Problem?
    How i can change the Metadata?

    Hi,
    Did you get help ? Or do you have a work around ? I have about 20.000 Pictures and countless videos to organize myself.
    I just ran into the same problem. Except that after a while Adobe will undo the changes I have made to the date.
    Here's a  screen shot I just made of one of the files.
    Look at this one ! This one is really interesting:
    After changing the date to : 1889 . Adobe changed it to 01.01.1970 00:59

  • Error message while changing the delimit date of a job in ppome

    Hi experts,
    I have delimited a job in ppome to date 11.05.2011. But now i want to remove that delimit date and change it to unlimited(31.12.2999). when iam trying to change the delimit date it is showing a popup message 'select a date between 15.11.2008 and 11.05.2011'. Can anyone say why it is showing this message. how can i delimit that job again to 31.12.2999.? Same problem with the position also.
    Pls help...

    Dear Priaynka,
    Thanx for ur reply, I am again furnishing below the details:-
    I have to change the Valuation Class of the material :-
    7 POS for which Goods Receipt & Invoice Receipt have been done from period 1 to 7.
    1 PO for which Goods Receipt & Invoice Receipt have not been made.
    All the material reced in period 1-7 have been consumed by MFBF. Now no material is available in the material in that plant.
    Should I change the valuation class by deleting the line item of all the PO's  7 POs + 1 PO.
    Please advise, as the fresh PO will be made with new val class and GR/IR and Consyumption will happen after the change is made.
    Please advise if I am wrong in the procedure.
    Regards,
    Alok

  • Tax Code removed on changing the posting Date in Purchase Order

    Dear All,
    This is with reference to the Purchase Order Document tax part, the document has been defined with the approval procedure and document series followed as annual series. The document series is linked to the period indicator as I am using the monthly series for the A/R & A/P Invoice.
    Now some Purchase Order was generated in the last month i.e. 30 NOV 07 which has gone for approval. These document are approved in the current month (Dec 07) & user are trying to add the records it displays the message as "Date deviates from permissible range [Purchase Order - Posting Date]  [Message 173-11]" as the period indicator is changed to Dec 07 in document numbering.
    The problem is when user changes the document date to Dec 07 for posting; system removes the tax codes, which is available in the document. Now as this is approved document user is not able to change or renter the tax codes.
    In this situation what can be done as the same case will again happen for the next month.
    Pls. provide the solution / work around for this problem.
    Regards,
    Yogesh Jadav

    hi yogesh,
    Cancel/Close the created purchase order.
    First you should change docduedate in posting period upto december 2007/end of fiscal year,by following the below path.
    (Administration->sytem intialization-> general settings--> posting period tab)
    Create a new purchase order.
    Send it for approval,authorizer can change date as required,
    once the posting date changes,tax code get refreshed,authorizer
    need to select tax code once again.
    <b>Tax code normally get refreshed when you change posting date it's normal
    system behaviour.</b>
    After authorizer does above changes,he can approve purchase order.
    Once purchase order is approved,orginator can add it as purchase order in draft stauts.
    <b>After approval we can not do any changes in purchase order.</b>
    Hope my solution will solve the problem.
    Thanks,
    With regards,
    A.Jeyakanthan

  • Costing error while change the mrp data

    Hi dears,
    This is Rem process. when i try to change the material master MRP data ex. ( mrp type M1 to M0)
    system not allow to change and show the error as
    Product cost collector 000000750122 is still active (assigned to PrCtr 50601-025)
    pls give some hints to clear
    Any program is there to change the MRP data for the material master in production server directly
    thanks

    Dear ,
    Did you try MASS or MM70 Transction ?
    If you do not want to go for Deletion flag of PCC  , you need to settle the REM qty  .You need to do product cost for semi finished product and finsihed product in KKF6N and after that you have to do mark and release in CK24N .For standard cat Estimate create std Cost estimation(CK11n)  and std cost Estimation Mark & release(CK24) .
    1.Backflush (confirmation) the Planned order - MFBF. Results planned order will Reduced and GR,GI, activity cost will be posted. U need not convert the planned order to production order, Confirmation for planned order only.
    2.To see Backflushed documents MF12
    3.Then Goto KKF6n to see the Manufaturing cost.
    4.Over head calculation - (Co42)
    5. Variance calculation (KKS6)
    6.Settlement(KK87)
    Try and revert back
    Regards
    JH

  • Getting Error after changing the recalculation date in retropay status page

    We run Retro-Notifications Report (Enhanced) - PDF and one record came with the recalculation date as 01-JUL-2009 ( Hiredate). We want his retro should be calculate from 12-Jan-2010. When we are changing the recalculation date of this employee in HRMS Super User -> View-> Retropay Status page it is giving a error like that.
    Error :
    You cannot update to this recalculation date for the assignment because it contains one or more elements with an earlier recalculation date. Please choose an assignment recalculation date that is the same as, or earlier than, the recalculation date of all the individual elements.
    Please suggest in this case.
    We are using Oracle 12.0.6.

    Entry or hiring date
    This is date which is being posted to FI so it will not allow to change the old data
    Even if you try to do so the retro will start from this date and will trow errors
    Reward points

  • How to change the capitalization date

    Hi ,
    I carried out WBS to AUC settlement on 31.12.2009, due to which AUC cap. date becomes 31.12.2009. Now i want to change the cap date to 01.12.2009. How do i do it? Reversing the settlement using CJ88 can only change the first Acq date but not the cap date. Also cap date is not an editable option in AS02.
    Reason for all this is that i want the cap date of fixed asset to be 01.12.2009.
    Regards,
    DP

    Hi Srinu,
    Thanks for your reply. Are there any implications of changing the cap date manually? Is it an advisable option or is it better to keep asset value date as 31.12.2009 and then post an unplanned dep for the asset.
    Regards,
    DP

  • Can we change the doc date in a purchase order ?

    can we change the doc date in a purchase order ?
    i have created PO with wrong dates but now want to correct it, but its not letting me do it ...why ?

    I don't think DOC DATES can be changed. You can only change the posting dates of the Goods receipt and Invoice documents as that is what matter for your financial consolidation.
    Regards,
    Ravi
    Note : Please mark the helpful answers

Maybe you are looking for

  • How do I change my telstra bigpond cable login details on my airport extreme base station?

    I have reason to believe my password has been compromised so have changed my account details with my ISP but now I need to change the password on my home network. I have connected to the (n) airport extreme (which is connected to my cable modem) but

  • Every time I close an app, it freezes

    Every time I close an app, the screen freezes. I have to reset most of the time.is there a fix for this?

  • OS authentication via Web interface (Intranet) possible?

    Hi, I have database users that have access to iFS too. The database users are OS authenticated. It anoyes them, that contrary to the standard explorer interface, the Web (IE) interface requires them to type in their OS password. I did not find any me

  • Playback cursor not smooth

    So I NEED to be able to make an image enlarge and get smaller rapidly to the bass line of a song. The playback cursor only moves in large increments when I try to match it to the fast bass. Please Help Urgently

  • Iphoe 3g power switch doesn't appear to work

    I have an older 3g.  The power switch doesn't seem to work, so I can't turn it off.  Nor can I re-boot it. Neither holding the power switch nor the home and power switches together seem to have any effect. Any ideas what to do next? Thanks