Change the inspection stock of material
Der Sir
We are facing error Change the inspection stock of material T1240054F1832350HV in QM only
during reversal 105 E,QM inspection 01 is activated,stock is in quality
Regards
kunal
Hi,
Which transaction you are using because you just try with MBST( Cancel document ) with document number & check it may work for you.
If not please elaborate your scenario.
Regards
SANIL
Similar Messages
-
Change the inspection stock of material in qm only
Hi All,
Error I am getting while doing a Goods Movement is "change the inspection stock of material in qm only". Let me explain you what exactly happend.
We moved transports, some how moved transports deleted the existing Inspection types in Production system. So there were no inspection types available in the system untill we send another transport. During the period of the transport in transit Goods reciept agains the Purchase order is done. So inspection lots were not generated. So now inspection types exist due to another transport.
So Users complained about the inspectiion lots.
I told them to reverse the Goods reciept documents and do the Goods recipt again so that inspection lots get generated.
When they are trying to do 102 Mvt Type they are getting the error.
I was even trying to use 321 Mvt Type, still Unsussesful.
I tried de-activating the Inspection typem but system throwing an error "Quality stock exist".
Is there a way to Move stock from Quality to Unrestricted?
How to generate an Inspection lot for the existing stock to move the stock from quality to unrestricted?
QA01 inspection lot creation, i dont see the purchase order field. Is there any possibility of adding purchase order to the inspection lot?
Thanks,
Quantum.hi ,
How to generate an Inspection lot for the existing stock to move the stock from quality to unrestricted?
activate 0800 inspection type in material master, its basically for stock which is in qulity and does not have a inspection lot.
regards
satish -
Change the inspection stock of material 16 in QM only Movement type 105
Hello,
I am trying to do GR with Movement type 105 and gettig the error message " Change the inspection stock of material 16 in QM only"
When I change the stock type from Quality to Unrestricted during 105 movement type, then I do not get this error message.
Scenario : I want Inspection lot to get generated with movement type 103 and not with movement type 105. And with my current settings, Inspection lot is getting generated with 103 and not with 105.
I want that, if I do GR with movement type 105, then the stock should go directly to unrestricted stock and not to Quality stock. BUt currently, it is giving me above mentioned error message.
Thanks and Regards
Prabhjot SinghCan you explain your business scenario.
Here is how standard SAP process is
1. Use movement 103 movement to receive PO in GR blocked stock
No inspection lot is created
2. Move material from GR blocked to own stock using 105 movement
This movement is identical to 101 movement. SAP will create Inspection lot if QM is activated. -
Change the valuation class of material [Stock transport order scenario]
Dears,
Client would like to change the valuation class of material.
There is no open Purchase order/Process order/Purchase requistion and stock in plant.
Scenario- One Stock transport order is created.
For same goods issue (351-issuing plant) and goods receipt (101-receiving plant) is done.
When we are going to change the valuation class of said material, message is "purchase order is open
and it shows the no of STO [for which receipt and issue is done]"
To resolve this issue we had first delete the STO line item no(ME22N). Then change the valuation class.
(this allows). and then undelete the STO line item. Through this we can change the valuation class of material.
Please advise in such business process that this is right way or there may be other option.
Thanks & Regards
Rajanrajanshah219,
Here's my take on how to fix:
*Manually change Config TCode OMT4 - change message MM 326 & 327 to type "W" (if open order exists...now you can enter through warning messages)
*If inventory exists, then issue out of stock to a cost center
*Change valuation class
*Put stock back into inventory (reverse to that same cost center) Note issue out and reverse back into inventory must happen in the same posting period.
**Valuation class should be changed as expected
**Manually change config TCode OMT4 - change message MM 326 & 327 back to type "E"
Thanks,
Jason -
How can we change the inspection type
Hi
Can any one answer my question.... How can we change the inspection type...I think its not possible through BDC and i am not able to find any custom program for LSMW...Any help?
Thanks,
AparnaHi
For indivial material you can change it from MM02 . ( Select Insp.setup under Quality Management view) and again choose for Create new Inspection Type
For multiple or mass change MM17
Edited by: Sanjay Shah on Feb 19, 2010 10:43 AM -
TCode for collective changes in inspection type in Material Master
Hi
Can any one tell me the TCODE for mass changes for inspection type in Material Master.
Charuhasyou can use MM17 or through LSMW or create a BDC through ABAP.
Regards,
qsm sap -
How can I change the name of a Materialized View?
How can I change the name of a Materialized View?
Oracle permitted renaming the snapshot in the earlier versions of 8i. However, it does not permit renaming the materialized view in 9i or 10g.
SQL> rename mymatview to mymatview2;
rename mymatview to mymatview2
ERROR at line 1:
ORA-32318: cannot rename a materialized view
SQL> disconnect
Disconnected from Oracle Database 10g Enterprise Edition Release 10.1.0.2.0 - 64bit Production
With the Partitioning, Oracle Label Security, OLAP and Data Mining options
SQL> rename mymatview to mymatview2;
rename mymatview to mymatview2
ERROR at line 1:
ORA-32318: cannot rename a materialized view
SQL> disconnect
Disconnected from Oracle9i Enterprise Edition Release 9.2.0.3.0 - 64bit Production
With the Partitioning option
JServer Release 9.2.0.3.0 - Production -
How to change the price of a material in PO
Hi,
Please tell me how to change the price of a material while raising a PO,for example i am raising a PO and in conditions the price is 100 and i wanna update it to 110.Please help meHI,
If you are using condion record, you can change the value for the required condition type so that it will flow to PO. IF you are not using that, you can change the price at the line item level in PO itself.
Regards
Ram -
FM/BAPI for changing the inspection plan
Hi,
I need to change the inspection plan.
Can anyone suggest any FM or BAPI please.
When I am trying to use BAPI BAPI_INSPECTIONPLAN_CREATE for this purpose,
I am getting the below mentioned errors:
E BAPI 001
A CPCL 006 Task list Q Q0000171 1 already exists
A CPCC_DT 210 For further processing, the routing entry is missing
Thanks in advance.Hi,
Could you please help me with the fields that need to filled for this purpose ?
I am currently filling the TASK and INSCHARACTERISTIC structures with the following fields filled:
TASK:
TASK_LIST_GROUP
GROUP_COUNTER
VALID_FROM
VALID_TO_DATE
TASK_LIST_USAGE
PLANT
TASK_LIST_STATUS
TASK_MEASURE_UNIT
LOT_SIZE_FROM
LOT_SIZE_TO
INSPCHARACTERISTIC:
TASK_LIST_GROUP
GROUP_COUNTER
ACTIVITY
INSPCHAR
QUANTITATIVE_IND
MSTR_CHAR
PMSTR_CHAR
CHA_MASTER_IMPORT_MODUS
CHAR_DESCR
UP_TOL_LMT_IND
LW_TOL_LMT_IND
TARGET_VAL_CHECK_IND
TARGET_VAL
UP_TOL_LMT
LW_TOL_LMT
But still I am getting the error mentioned above(previous message).
Thanks
Shilpika -
Change the characteristic Values in Material master date
Hi Experts,
How do change the characterstic values in material master ? Is there any standard BAPI or t.ocde or LSMW
Best Rgds
SumaI often changed classification with LSMW using IDOC CLFMAS
-
Change the characteristic Values in Material master dat
Hi Experts,
How do change the characterstic values in material master ? Is there any standard BAPI or t.ocde or LSMW
Best Rgds
SumaHi Suma,
Probably this question should be asked in another forum (MM) then the one for DMS related questions -
Can not change the ABC indicator in Material master MRP1 View?
Hi All,
I could not change the ABC indicator in Material master for material X. Could some one please specify the condition or prerquisit for making chnages in ABC indicator?Hi Animesh,
In Logistics Information system , ABC analysis can being done and results updated in Material master for ABC indicator by background job run.
The relevant transaction is MC40 ( Total Analysis) .
This transaction when run in backgroung with field "Update ABC Ind.in background processing mode" clicked, will update the ABC indicator appropriately.
You can find different criteria based on which A, B,C is decided.
I hope this will be useful to you.
Please check and confirm.
Regards
Datta -
Changing the profit center for Material impact on inventory turnover
Dear All,
Due to recent organization structure change, we have some up with new set of profit center in our organization.
This means that old profit center as case in point in material master should be changed to new ones, after flushing the stock out. Probably, by moving stock to cost center with movement type 201 and then after the profit center change we reverse with movement type 202.
We use standard SAP report MC.7 inventory turnover calculation. Based on this inventory turnover, we use this ratio to calculate the inventory obsolescence provisions.
So, our issue is the above movement profit center change by moving it to cost center, does it impact the inventory turnover?
Or alternatively, can use some other movement type which does not change the inventory turnover? So, that we are assured from our side, about no change on inventory turnover and subsequent the change to our inventory obsolescence provisions.
Please help me here.
Kind Regards,
PrakashHi Venkat,
Thanks for the reply. How different this movement type 562 (intial stock upload) is different then 201 (cost center consumption)?
I mean does it not update the info structure?
Regards,
Prakash -
How to change the current period in material master
hi everybody,
as i have installed sap 4.7 ides version on my home pc for practice , but hwenver i am creating the new material master in the system , i observe that in accounting1 tab the current period is 12 2002 , how should i change the current posting period so that i can start the transaction in current uear 2009 and then later i can work in 2010 ....
i have tried the transaction mmrv, mmpv, mmpi through some resources but i didnt know how to do the settings in the system in IMG (SPRO) kindly help me through , i have wasted lot of time in this..
i hope MM team will help me out of this...
AMIT BATHLAHi,
Check in OMSY Transaction that, Which current month and year is having your comapny code.
and go to T.Code MMPV
enter Next Month of that cureent period and Year
and Execute. You find the message that your current period has changed.
Do the same process month by month till reaches to current period and year.
Let me know if you have further queries.
Padma. -
How to fetch the current stock of material based on Plant?
Hi Experts,
Could any one tell how do i need to get the current stock data of the material based on Plant.
Thanks in advance.
Regards,
Abdur RafiqueHi ,
MBEW stores the value of particular stock . T-code to find stock MMBE compare both wiht table and tcode.
please let me know if you still find any issues .
Thanks and regards,
Rajeshwar
Maybe you are looking for
-
Ichat doesn't log all the time/poor camera connectivity
My ichat doesn't always log on. Sometimes it will after using the computer for thirty minutes or so and sometimes not at all(same is true with AIM). However, my firefox and safari both work all the time so it's not an internet connection problem. I'm
-
Capturing VHS through DV cam to FCP - Audio clipping!!
Hey all, I'm capturing a VHS through my DV cam (it has analogue to digital version) and when it comes into FCP the audio is clipping (going above 0db) Is there anyway to lower the input volume? Thankyou Paul
-
Finding those missing ...
Hallo everyone, I have one large table covering two periods and would like to find codes (article numbers) in one period which do not appear in the other. With two separate tables or a smaller volume of data this is quite easy as you can either conne
-
CS4 Freezing / Program Error
Before I get yelled at, I know there are similar posts, I have gone through them all, and have not gotten ANY progress. This has happened all of the sudden, I have had no issues previously even with Lion, but for some reason there's been some hardcor
-
Restore to a time before I installed Adobe CS4
How do I go back in time for my whole Macbook Pro using Time Machine? I installed Adobe CS4 and then when I uninstalled it left 8 GB of information all over my Macbook Pro! I did a backup just before I installed CS4 and now I want to go back to that