Change the transport package of a SAPScript, Smartform

Hi!
There are several SAPScripts and Smartforms in our system, which is assigned to a transport package Z1, which points to nowhere, so it's just a technical, local package.
Now the basis team set up a new system, and there is a new package Z2, which points to this new system.
So I would like to assign the object from Z1 to Z2 package.
Within a program it could be easily changed.
How can I change it in a SAPScript or within a Smartform?
Thank you
Tamá

> How can I change it in a SAPScript or within a Smartform?
>
for smartforms
in the smartforms transaction
enter the formname which you want to change , and from menu Goto->Object Directory Entry , now you can edit the package , using the change mode option.
For script.
go to Transaction SE03
Now you can see Object Directory entry option, press the change button.
(change object Directory entries)
Enter FORM in the input for object type, it comes in this way, now check the checkbox.
check  RETR  FORM   <formname>
press F8,
Now you will see the option to change the Directory entry in the result screen.

Similar Messages

  • Iview not selected in the transport package during the export

    Hello Expert,
    I created a transport package to send the change I made on the iview com.sap.portal.masthead to QA system.
    I added correctly the iview to the transport package but when I clicked on the button EXPORT to create the epa file, I found that the iview was not selected.
    My change canu2019t be send to QA system.
    Any idea how to fix this issue?
    Thanks a lot.

    Khaled,
    You can not transport a standard content as it can overwrite the old version and create a new version of the content.
    Refer the below link,
    http://help.sap.com/saphelp_nw04s/helpdata/en/26/edee3da7138e5be10000000a114084/content.htm
    You can copy a the existing iView , change the id and transport the same. Use the changed iView everywhere instead of the standard ones in this case.
    Ram

  • Changeing the Transport request Attributes?

    Hi Guys,
                 Can anybody tell me how to Change the Transport request Text , means while creating a Request u will enter the Description for Each request.Can anybody tell me how to change that description?
                   Very Urgent.
    Thanks,
    Gopi.

    HI,
       You cannot change the text of a request if you are not the owner of that request..first change the owner of the request to your id and change the text.
    Thanks
    mahesh

  • Change the Transportation zone - No jurisdiction code could be determined

    Dear All,
    when trying to change the Transportation zone for the customer of Brazil ,
    Error message comes as : No jurisdiction code could be determined
    Message no. TAX_TXJCD101
    Even you change a single character in the address any where e.g. Name, City, Postal code- The same message comes.
    Please advice
    Thanks in advance,
    Ranjan

    In other words, your address is currently incorrect according to your tax jurisdiction determination.
    You surely have a tax jurisdiction engine like Vertex and your Vertex (or other) database is not maintained properly.
    As a result the determination, from the maintained element of the address, fails.
    Or simply, your current address is incorrect according to your determination engine.
    You may have a look to your settings in the customizing first.
    SPRO / and start find engine with 'Tax Jurisdiction' as key word.
    Feel free to provide points if useful.

  • Changing the Transport Request of an Object(Report)

    Hi,
    By mistake I have saved one of my Custom Transaction Code( of a custom Report) under wrong Ttransport Request Number.
    Could you please let me know the procedure to change the Transport Request number of any object like Report, TCode etc.
    Regards,
    Nitin

    Hello,
    Delete that perticular object from the request.
    And save that object again , so , system will ask you for the request again.
    Regards,
    Naimesh

  • To change the Transport request nUmber

    Hi
    i have created some programs with diffrent request numbers
    and task numbers
    now i need to change the descriptions , requst numbers for the same programs
    how to change that
    Thanks in advance

    Hi Sri,
    if the request is not released just double click on the request and click on change button (pencil icon) click on Properties tab and you can change the description there, just save it and you are good to go.
    Hope it helps
    Gothrought the following links,
    Changing description of a Transport object
    Regards,
    Harish

  • Changing the BC4J package name?

    Hi All
    I created New Business Components Package for a project as xxxx.oracle.apps.pji.projperf.reporting.server.
    Now i need to change the name from xxxx to yyyy as
    yyyy.oracle.apps.pji.projperf.reporting.server.
    Please let me know how can i change the name of the package.
    Its urgent.
    Thanks

    Create your new BC4J package yyyy.oracle.apps.pji.projperf.reporting.server
    Now right click on each of the view objects in xxxx.oracle.apps.pji.projperf.reporting.server and select "Move package", choose your new BC4J package.
    --Shiv                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               

  • Change the Transport Directory.

    Hi everybody, We have I system installed (S01) and we have just installed a new one (S02), we want to be able to trasnport from the system S01 to the system S02. What I have to do in order to do that?
    I read that the systems have to have the same Transport Directory. And I checked with AL11 and the values for the DIR_TRANS parameter are the following for each system:
    system S01 -> DIR_TRAN ->
    S01\sapmnt\trans
    system S02 -> DIR_TRAN ->
    S02\sapmnt\trans
    I tried to change the DIR_TRANS parameter with the transaction RZ10, but in S02 we don't have any profile.
    Cuold you please help me to do that?
    Thanks and Regards.

    Hi,
    read that the systems have to have the same Transport Directory.
    not neccesary to have tarnsport directory, it depends upon scenario.
    Pls follow the below link for configuring stms configuration.
    bbs.cenet.org.cn/UploadImages/200581112435749207.pdf
    Also check the below link
    Common tranport directory on Windows local installation
    Thanks,
    Anil

  • I want to change the transport directory

    Hello gurus,
    I want to change the tranport directory in all our systems. Please advise me how to do it.
    I really appreciate your help.
    Regards,
    N.S

    Hi N.S,
    How about :
    http://help.sap.com/saphelp_47x200/helpdata/en/d5/10b4496f0f11d2b41a006094b9ea64/frameset.htm
    is it common transport directory ?
    To change the common transport directory configuration, you can
    first go to transaction AL11 of one of your system, for example, PRD.
    Change the 'DIR_TRANS' parameter, so that it points to the directory that you want to change
    Then go to STMS, choose 'System Overview' button to display systems
    of your transport domain. Double click PRD, with 'Transport
    Tool' tab, click 'Display <-> Change' button, you can change the
    'transdir' value.
    Please make sure it is equal to the same configuration of 'DIR_TRANS'.
    Repeat the above steps on your other system. Make sure the configurations
    of 'transdir' and 'DIR_TRANS' are the same as that on the PRD system.
    cheers,
    Vincent

  • Tcode to change the object package

    hi,
    what is the transaction code to change the object package

    hi
    good
    Try this.
           1.      Select the required development object from the object list.
           2.      Choose Other Functions àChange Package Assignment from the context menu.
    The Reassign Object dialog box appears.
           3.      Enter the name of the new package in the New Package field.
           4.      Choose Continue to confirm your entries.
    If the object has not already been assigned to a change request, you must enter a change request as well.
           5.      Enter a valid change request and choose Continue.
    thanks
    mrutyun^

  • How can we change the existing package details of a report

    I am having one repor. For that program I was saved in $tmp package. Now I need to change my packge from $tmp to $atb.
    How can I do this.
    Same problem I am facing for one database table also. I need change my package details for one of my customized dat base table.
    Don't post basic questions here and at the same time who ever answering to basic posts, Points will be unassigned.
    Edited by: Vijay Babu Dudla on Jun 29, 2009 7:06 AM

    Goto Change mode for the report.
    Choose Goto->Object directory entry from menu bar
    Click on "Edit" button in the pop-up.
    Now you can provide the package details.
    After that you have to click on "Save" button.
    Regards,
    Siva.

  • To change the Transport Request Number Range.

    <b>Hi Experts,</b>
    My customer needs a typical solution.
    He wants SAP to create the Future Transport Requests starting from 10000. ( Ten thousand)
    now the sequential order is 321
    that is <SID><K9>00321. From now on the new transport request should start from 10000
    i.e.
    <SID><K9>100000
    <SID><K9>100001
    <SID><K9>100002
    etc.
    Is it possible. ?
    Thanks for your help.
    Best Regards,
    Raghunahth L

    Hi
    Check the report RSWBO301 and check its documentation..
    Press "I" button in the selection screen to get the documentation..
    I believe this might solve your problem...
    Program documentation
    Short text                                                                               
    Number Assignment for Requests: Find Free Interval                                                                               
    Description                                                                               
    This report program searches for a free interval for numbering requests.
        If the search is successful, you can save the interval. The request    
        numbers are then taken from this interval.                                                                               
    Requirement                                                                               
    For customers the number range interval includes the follwing areas:                                                                               
    o   900000-999999 (just numerals)                                                                               
    o   9A0000-9ZZZZZ for ASCII character set or                           
            9AAAAA-9Z9999 for EBSDIC character set.                                                                               
    You only need to execute this program if you have come to the end of the
         number range interval, but there are still large gaps in the range that
         you want to use up.                                                                               
    Example                                                               
             Why you might get into this situation:                            
             The customer has the R/3 System C11. The last number assigned is  
             C11K900115. The customer now imports transport request C11K9ZZZZA 
             from an external R/3 System C11 into the customer system C11. The 
             next request created in this system will have the number C11K9ZZZZB
                                                                                    Procedure                                                                               
    Proceed as follows:                                                                               
    1.  Execute this program in transaction SE38.                                                                               
    2.  Enter the interval limit, for example 5000. You can change this   
             limit at any time.                                                                               
    3.  Choose Execute.                                                   
             If you entered an interval limit of 5000, the report searches for a
             free interval with a size of 5000.                                                                               
    4.  If the search was successful, you can save this interval. If not,
              repeat the search with a smaller interval.                      
    Thanks,
    Naren
    Thanks,
    Naren

  • Change the transport  request number

    HI All,
    One of my program in porduction we done few modifications to that program one month back that is still in QAS,again we done few more modifications to the same program so now I have 2 request numbers due to few problem here my client don't want to move to PRD the TR number that I created one month back he is asking me to create new TR number,but my problem is after that TR I already created one more TR that is also in QAS,if I create again a TR is it will have modifications that I done in two earlier requests,any one please suggest me.
    Thanks and regds,
    Sree.

    Hi Sree,
    If i am not wrong, you are having below doubt :
    1. You have done some modification which u transported to quality. Transport No A.
    2. You have done some new changes which u record into another transport request. Transport No B.
    If its a workbench request, then no need to worry, you can transport request no B only to PROD.
    But if its a customize request, the u have to include Transport A contents to Transport B.
    Thanks
    Piyush

  • How to change the transport request of a NOTE without undoing the note

    When we applied the OSS NOTE we put it in a transport request. How can we move the objects into another transport request? Since this is a REPAIR type, SAP does not allow manual copy of the entries. I don't want to include the objects of this transport into another one, Is there any other way?

    1. Create a new transport request in SE01
    2. Select the request and click on "Include Objects: button.
    3. Select "Freely Selected Objects: option from the pop-up windoe
    4. Select "Selected Objects" option
    Now you see three rows without any PGMID selected.
    5. Check the checkbox corresponds to the row and enter the value OBJ & OBJNAME (Textbox without any label). (This valued can be retrieved from your previous request).
    6. Delete the same object from your previous request.
    7. Click on "execute" button.
    8. Click on "Save In request" button.

  • Impact of the Transport Layer changes in the package

    Dear Experts,
    We are in the process of the Upgrade. As a part of the upgrade from 3.1to BI7. We have two Dev systems one is with the 3.1 - BWD   and the other one is with the BI7- CBD now. We have transported all the objects with the Package : ZBWD (Where the transport Layer of this Package ZBWD).
    And we have introduced the new Integration system(CBQ) in the landscape now and we have changed the Package ZBWD properties(We have changed the Transport Layer of this Package from ZBWD to ZCBD).
    Can anyone please tell me the consequencies of this change in the package. We are planning to move this changed package, once the upgrade is finished.
    Can any one tell me the consequencies of this change and also if we dont transport this package change in the other systems, then what wil be the consequences.?
    Thanks
    Raman
    Edited by: Raman R on Aug 12, 2008 5:42 PM

    Hi,
    We have the package exists in the production which is with the earlier Transport layer called ZBWD.
    As we have the new development system now, we need to change the Transport layer in that same package: to ZCBD.
    Can anyone tell me will there be any impact of this change on the objects in the further landscapes? and also please explain me what are all the steps which needs to be carriedout if the transport layer got changed in the package?
    Thanks
    Raman.....

Maybe you are looking for

  • Error while trying to deploy a SOAP service to 9iAS

    Hi, I try to deploy the simple clock sample to Oracle 9iAS 9.0.3 and I get the following output: This test uses a SOAP URL of http://avia.mindcti.com:7777/soap/servlet/soaproute r Deploying the simpleclock service... Exception in thread "main" [SOAPE

  • How to go back in ios 7 to ios 6.1.4?

    How to go back to ios7 to ios6.1.4? In ios 7 the front page app icons  are big that is very bored and  also colors. The front page look like If we buy any local videogame or plastic mobile we see a free mobile shape color cardboard in the packet now

  • Having problems copying and pasting in Photoshop CS5

    Hi, I'm running Photoshop CS5 on my laptop (Win 7) and desktop (Win 8). When I have three documents open and open a New one, I can't get the others to copy and paste by keys or menus...not even by dragging to the new document. Same thing happens in b

  • ITunes store print too small and light

    Does anyone else with that it were possible to enlarge iTunes store with a two-finger swipe?  Or at the least, make the type bigger and darker.  Thanks for your consideration.

  • HT204053 How do I sign on to iCloud?

    I am looking for my voice messages on my old ipone that I backed up to icloud?