Change UoM in delivey from bae unit to new UoM

Hi ,
In the Order level UoM conversion is happening and at picking it back from the existing UoM to new UoM at G/I.
And since we cannot have enough decimals in the system to correctly convert. so the delivery get changes.
Please give your sugessions.
Thanks.
Vijay.

hi,
hope you have maintained the copy control to copy the Sales order details fully to your delivery level. and in material master the Conversion details are given properly.
If it is due to the Decimal points, then you may need a technical team to extend the decimal point at delivery level. then can do it at programme level and i think that could work out for you
Regards,
Sudhir

Similar Messages

  • Deriving/ change the item category from handling unit

    Hi SAP GURUS,
    In vl01n I want to derive the item category based on the handling unit. Hnadling unit is derived from the payment terms.
    Please let me know the required configuration or the development for this.
    Thanks

    i need ur help regarding the Sales order item category redetermination.
             we are having two item categories YNAE and YNAG and it contain schedule  line categories CP and CB ( i.e for item category  YNAE schedule line category is CP and 
             for item category  YNAG schedule line category is CB), for YNAG Purchase Requisition is automatically created becz of functional setting on save and it is working fine.
             For every line item in sales order line item level item category YNAE will be determined by default as per functional settings.
             Now my requirement is that, if sales order line item doesn't contain 100% confirmed quantity, than i needs to change the default line item category YNAE to YNAG
             which i am trying to do it in USEREXIT_PRICING_PREPARE_TKOMP becz in this exit i am getting the values in XVBAP and XVBEP and  it is working fine .
             But schedule line category is not getting redetermined automatically what i mean is, if i change the item category to YNAG from YNAE in user exit corresponding schedule line category CB of YNAG is getting determined automatically at the schedule line level and if ichange the schedule line categories in XVBEP in exit USEREXIT_PRICING_PREPARE_TKOMP, changes are reflecting at the schedule line level but Purchase requisation is not getting created for schedule on SAVE and its delivary dates are also not getting determined properly. If press the option ATP check at the schedule line level than very things will getting corrected in the order.
    i am using UPDKZ = U  in both xvbap and xvbep for changes
    I feel that i am not doing this in proper way, do u have any idea about how to redetermine item category. please let me know if u have any idea .
    Regards,
    Vaddepally Manoj

  • UoM Conversion from SAP units to ISO units -- Prod Order IDOC (LOIPRO01)

    Hello,
    We are trying to build interface for Production Order details to pass to a Mfg. system. using IDOC LOIPRO01.
    Looks like the IDOC processing is converting SAP on-screen UoM to ISO UoM for ex.  PC (in SAP Screen) to S2 (IDOC Field Value).
    I would like to know if there is any OSS notes or anyother way to prevent this conversion and just pass the same value what we see in SAP screen to the Mfg. system.
    Appreciate your inputs in thsi regard.
    Best Regards,
    Bharat.

    changes in master data have only effect to NEW data, created after this change .
    SAP never updates automatically already existing data.
    Answer: No there is nothing that can trigger an automatic change.
    changes to ratios between base unit and alternative units are unusual and the changer has to know about the effect. it is not only the existing info record, you have to think as well about open POs which still have the old conversions.

  • HT1918 I want to change my itunes account from United Kingdom to another Country, when I try to do this I get told that i can only purchase from the UK store please help

    I want to change my itunes account from United Kingdom to another Country, when I try to do this I get told that i can only purchase from the UK store please help

    We are fellow users here on these user-to-user forums, you're not talking to iTunes Support nor Apple.
    The payment methods that are available in your country will show on your account. If debit cards aren't available on that screen then you won't be able to use it as your payment method.

  • Hello, how can i change my billing address from united states to another country

    I cannot manage to change my billing address from united states to another country.. Therefore am not able to use my current credit card to purchase an application.. Any idea anyone??

    What do you mean by 'cannot manage to change my billing address' ? What happens when you try to update your details, and what country are you in ? You need to be in a country to use its store.

  • Change UOM in PR but PO exist for PR

    Hi Experts,
    We created a PR with a customized account assignment cat. and material text (no material code) with UOM L , we created PO in UOM L but purchasers cant do GRN because they received material in UOM LG ( which they mentioned in PO/PR Texts area). Now, the issue is with changing the UOM from L to LG in PR/PO.  I could though of only option to delete PO and PR line item and create a new but that we can't do because the same PO number is been shared between concerned parties/departments/contractors.
    Please tell me what are the other ways to change UOM. (as I am not using material code so additional data field doesnt come in picture)
    Thanks.
    Saurabh

    Thanks Jurgen.
    Even if I delete PO line item and create a new one then UOM should come from PR itself but after PO deletion also PR UOM is in display mode. Is there any program required to run to make it editable?
    I found one info. in PO about 'Order price unit' which says:
    Order Price Unit (Purchasing)
    Indicates the unit of measurement to which the purchase order price relates.
    Example
    A material or commodity (for example, oil) can be ordered by the liter, but the vendor's invoice shows a price of 2 dollars per kilogram.
    You enter 10 l as the order quantity and order unit, but specify 2 dollars per kg as purchase order price and purchase order price unit.
    In addition, you enter the conversion factor "order unit -> purchase order price unit" (for example 2 l per 1 kg) in the "details" data of the purchase order item.
    In GRN it says:
    Definition: purchase order price unit
    Purchasing (MM-PUR)
    An alternative unit of measure that can be used for ordering purposes.
    The purchase order price unit enables you to express the purchase order price in a unit that differs from the order unit.
    Example
    Ordered: 100 m2;    Price: $24.20 for 10 kg.
    The order unit is m2. The purchase order price unit is kg.
    Return ->
    Definition: purchase order price unit 
    I was just wondering if I could use this method to change/show a change in UOM. But if no relation exists then... it wont work I think.
    Kindly suggest.
    Thanks

  • Change UoM in copy control

    Is it possibl to automatically change the delivery quantity from Sales UoM to Base UoM. For example, I have a sales order line item for a quantity of 3 Dozens and when I create a delivery for this line item the quantity should be 36 EA. I looked into copy control routine (currently 101 is assigned at item level) but quantity field LFIMG is not being passed there. So my question is, is it possible automatically change the UoM when creating a delivery.
    Thanks,
    Raj

    hello, friend.
    i'm not aware of any standard configuration to allow you to change the UoM in the deliveries, because this, the quantity and the material are supposed to be copied from the sales order.  i suppose there are user exits or enhancements for this.
    however, if WMS is enabled in your scenario, then it is possible to specify the UoM by setting this in Units of Issue.
    regards.

  • Mass change UOM

    Hi,
    I tried to change alternative UOM in MM17 but instead of change - the new alternative UOM was created. Both units have the same ISO code set and the one that was added is flagged as a primary unit for that ISO code. Is it a standard behavior?

    Hi Joven,
    I have maintain the alternate UOM for those materials in Master Data.
    What I want to do is during the inventory count entering in transaction MI04, I want to do a mass change for the unit of enter (UOM) for one whole inventory document (change from base unit to alternate unit).
    For example, in MI04, count sheet 10000001 has 40 materials, the unit of entry is default to M (the base unit of the materials). If lets say during the inventory, we weight the materials in KG, so we have to enter the count qty in KG as well. I want to do a mass change to change the unit of entry from M to KG for one whole count sheet 10000001 (all 40 materials).
    Currently, I have to manually change the unit of entry from M to KG line item by line item, if there is 40 materials (40 line items), then I have to change 40 times for 1 count sheet.
    Is there a way to do a mass change during the count entering (change 1 time for all the 40 materials, instead of change 40 times)?
    Kindly please advise. Thank you.

  • Change UoM of on routing operations.

    Hi PP Experts,
    Please someone help me on my problem regarding changing UoM on routing operation. I have to change or convert the labor time and machine time from CTS (cents of second) to S(second). How can i change that and i have to consider the impact on report such as routing check, standard time checking report and finacial cost.
    Thanks for your help.
    Edited by: yatch0325 on Oct 13, 2010 7:58 AM

    Hi,
    1. In the routing change the UOM for standard value to S and eneter the calculated machine time in S.
    2.Change the Base qty and the operation unit.
    3.Activity type and the cost needs to be checked.
    Thanks,
    nandha
    Edited by: S.Nandakumar on Oct 13, 2010 8:25 AM

  • I have an old Mac Tower.  I need to move data from the unit to an external hard drive. What kind of hard drive do I purchase.  There is not a lot of data to be transferred.

    I have an old Mac Tower.  I need to move data from the unit to an external hard drive.  What kind of of hard drive must I purchase so that it works with the Tower?  There is not a lot to transfer.

    MG,
    What we might need to do is to change the question.  What computer do you plan to use the data on in the future?  For example, if you have a newer tower, just move the hard drive to the new tower.  If you want to use the data, what about an ethernet LAN to get the data over?  If you want to archive the data, how do you store the second drive?  What are your plans for the first drive?  If the new software will not recognize the old file type, the data must be exported.  Just getting files to another hard drive will not finish your journey.
    As Allan said, knowing the exact model and year of your tower is important.  My suggestion is to find a user group near you.  Please post back with more information, including the name of a large city near you.
    For example, our user group just experimented with a 1983 Apple IIc that predates the Mac.  It started right up, read files from 1984  and saved them from a 5.25" floppy to a 3.5" floppy.  That 3.5 floppy will go into a platinum G3 which will read PRODOS files using Apple File Exchange.  That G3, with a USB card, will allow saving the files to a USB flash drive.  But, somewhere along the way, some software has to read the file and convert it to data that is useable by current software.
    Ji~m

  • Update table HRP1001. Change the Position and the Org Unit.

    Hi,
    I am new to SAP HR and have been given a work in this area. The requirement is to update the relationship table HRP1001 replacing the old Manager' Position and the Org Unit with the New Manager's Position and the Org. Unit.
    I have some how found out the way to get the Postion and the Org unit of the old manager. Now I am replacing the same with the new details using the Update HRP1001 Command but this is the old and not recommended method acheiving this task.
    Can anyone please suggest me any Function Module OR the BAPI to update the HRP 1001 table with the New MAnager;s Position and the Org Unit.
    Thanks...!!!
    Regards,
    Deepak.

    Hi Kalpesh,
    I am using the FM: 'BAPI_HRMASTER_SAVE_REPL_MULT'but still not updating. I am trying to change the Position and the Org unit but not successful yet.
    I first used the Operator 'I' withi the table BAPIHROBJ-OPERATOR, it failed then I tried 'U' for update it still failed. Can you please let me know how many such operations possible with their charecter values apart from I & U. the domain value set does not exist as it is char1.
    Now I came to know that I have to terminate the old relationship by changing the ENDDA and create a new one with the new BEGDA as tomorrow's date.
    Can you please suggest something.
    Regards,
    Deepak.

  • Changing UoM of Item which has a transaction

    we are going to change UoM of one Item in inventory, But this Item has transaction in system , and also some onhand. how we can do this task by consider the cost and quantity?
    thanks

    Dear Farhadn,
    It is not possible to change the items UoM once there are transactions linked to the item. This is the current system definition of SAP Business One.
    However, you can use factors (in the item master data) and Base units in marketing documents as workaround.
    Please, find instructions in the attached document.
    There is also a webex session available on the SAP service market place. Please find below the path to the webex:
    https://websmp207.sap-ag.de/~sapidb/011000358700000050892007E
    Go to Logistics - Inventory and core logistics -> 11.12.2006 - Items per purchase Unit in the Item Master Data
    Regards,
    Varun
    SAP Business One Forum Team

  • Change UoM in Master Data

    Dear All,
    I am going to change UoM in material master data but the system prompts an error "Independent requirements are already assigned to the Material".  However, I already deleted the independent requirements and still the system does not allow.  There are no existing PO or stocks for the material.
    Where else should i look into to resolve my error?
    Thanks and regards
    Ching

    Hello Ching,
    If it is the base unit of measure that you want to chnage and you have made some use of the material already then the way you will change the base unit of measure is to create a new material copying the existing one but changing the base unit of measure of course before saving and deleting the existing material afterwards.
    Regards, Richard

  • Change UOM in Material master

    Hi friends,
    I have a material X in Plant ABC and Plant XYZ.
    I have no open PR's and PO's for those materials.
    I have received 10 Ea in Plant ABC on 10/20/09 ( Current stock is 10 ea in ABC)
                       and 20 Ea in Plant XYZ on 11/12/2009.( Current stock is 20 ea in XYZ)
    Now I wanted to change the UOM from EA to LB.
    I did issue (GM 201) 10 Ea from ABC and 20 Ea from XYZ. So, in MMBE no stock was showing.
    Still, when i try to change UOM, it was erroring that "Stock exist in Plant ABC and Plant XYZ" ????
    Any Idea, why so.
    Appreciate your valuable feed back.
    Note: I could change the UOM once I canceled the previous material documents to make sure Zero stock.
    But, Why I could not be able to change when I issue (GM 201) and made zero stock????
    Regards,
    Dev.

    Hi,
    According to your explanation the condition has gone through as below scenarios:
    You have received 10 Ea in Plant ABC on 10/20/09 ( Current stock is 10 ea in ABC)
    and 20 Ea in Plant XYZ on 11/12/2009.( Current stock is 20 ea in XYZ)
    You've issued 10ea in plant ABC on 11/23/09 (GM 201)
    and you've I issued 20 ea in plant XYZ on 11/23/09 (GM201)
    From the above, I conclude your current period is 11/2009 (November) and for solving the case on:
    Plant ABC. --> cancel your GI (mvt 202) for 10ea with the same current date 11/23/09 then follow by
                            GI with the previous posting period 10/30/09
    Plant XYZ --> display material stock with MM03 under storage location stock tab for previous period stock info.
                           then you should GI for relevant qty that you've seen onto previous period posting date.
    Hope it may helps you...
    Cheers,
    Girang
    Edited by: girang irawan on Nov 25, 2009 9:48 AM

  • How to change UOM conversion rate

    I have an item assigned to a UOM. I define the conversion rate like 1case = 500 pieces. Having done that, I transact a few numbers. Now after some time, the business requires that the conversion be changed as 1case = 450 pieces. Now, as I understand, changing the conversion rate from 500 to 450 directly on the existing conversion definition will definitely corrupt the data. Now if I have to define a new conversion, then the system would not let me choose the UOM 'case' on the same item.
    Creating a new UOM also would not help as changing the UOM of the item is also not receommended.
    What can be the approach in this case? Any pointers or help is greatly appreciated.
    Thanks
    Khyum Mohammed
    Edited by: 817125 on Dec 29, 2010 9:14 AM

    Hi,
    If the Business no longer uses the 500 pcs conversion, one could Inactivate the conversion and define a new one.
    If Business wants to have a choice of using 500 or 450 pcs, then a new Case UOM needs to be defined.
    I hope this helps.
    Regards
    Adarsh Krishna