Hi Experts,
I want one object to be changed in the cube as navigation attribute.
but for this cube we have aggregates.
how to proceed.
I have done similar changes for the cube which does not aggrigates.
so in this case what are the extra steps i need to take.
thanks in advance.
sunil.

hi sunil,
u have changed the attr of a infobject in cube which has aggregates
<u>cube with out aggr</u>
1. once u change the infoobject in cube there exist two state of cube active modified .
the active versioin remain active till the modified version is activated .
u can do reporting the reporting are not affected.
cube with aggregates.
if changed attr that is used in aggr u have to perform agg change run.
u can also do reporting on cube haveing the aggr in switch off sate.provided the change has to activated.
reward points if helpful.
bye.

Similar Messages

  • Can we change Basic Cube to Transectional Cube

    Dear All,
                  I have one doubt that is "Can We change Basic Cube to Transectional Cube.
        If anybody knows about this.tell me please.
    Thanks&Regards
    SubbaRao Koyalakuntla

    yes u can do ...
    Thanks,
    Debasish

  • BPC 10.0 NW - Change technical cube name during transport

    Hej gurus,
    One of our users have run a full optimization, and therefore the technical names of the cubes in DEV and PRD are no longer the same.
    We have looked at the SAP notes, and found the following.
    1689814 – “Stabilize InfoCube's technical name in the modeling process”
    We have made sure the note is on both DEV and PRD, and we have enabled "ENABLE_FIXED_CUBENAME" on all models. By doing this the notes states that:  "If the InfoCube technical names of the model are different between source and target system, the technical name of the InfoCube on target system would be changed to the same as the technical name of the InfoCube on source system."
    When I run the transport, the transport is succesfull, but the technical name has not changed.
    Therfore, I would like to know, if anybody have tried using this note and successfully changed the technical name? If yes, what did you exactly do? Did you transport everything for making it work? clear the database?
    I hope somebody can help us.
    Best regards,
    Mikkel Kristensen

    Hi Mikkel,
    Did you have any luck with this?  The only time I had any luck was changing the target structure (adding a dimension in the target), when the transport went through it changed the structure and reset the technical name to the source name.  It doesn't appear to work if the technical name is not due to be reset.
    Best,
    Chris

  • Changing a Cube - SAP Best Practice

    I have a situation where a Consultant we have is speaking of a SAP Best Practice but cannot provide any documentation support the claim.
    The situation is that a change has been made in BW Dev to a KF (changed the datatype).  Of course the transport fails in the BW QA system.  OSS note 125499 suggest activating the object manually. 
    To do I will need to open up the system for changes and deactivate the KF in question, then a core SAP BW table (RSDKYF) is to be modified to change the datatype.   Then upon activation of the KF, the data in the cube will be converted.
    If I delete the data in the cube, apply the transport, and then reload from PSA would this work also?  I would rather not have to open up the systems and have core BW tables being modified.  That just doesn't seem like a best practice to me. 
    Is this practice a SAP Best Practice?
    Regards,
    Kevin

    Hello Kevin,
    opening the system for manual changes is not best practice. There are only few exceptional cases where this is necessary (usually documented in SAP notes).
    "Easy" practice would be to add a new key figure instead of changing the data type. Obviously this causes some rework in depended objects but transport will work and no table conversions will be required.
    "Save" practice is to drop and reload the data. You can do it from PSA if the data is still available. Or create a backup InfoCube and use data mart interface to transfer data between the original and backup.
    Regards
    Marc
    SAP NetWeaver RIG

  • Outline Change ASO cube in Version 7

    Hi Guys,
    I am working on version 7 of EAS.
    I have to make a minor change(add a child) to the outline in the ASO cube. I am not able to see the option of retain data with restructure ( which is the case with higher versions).
    so how do i save the restructure and data in version 7 of Essbase.
    any inputs will be great
    Thanks
    Ram

    You don't Version 7 deletes data with most outline changes. (Simple changes like chaging a formula might not delete data). THe whole premise of ASO cubes was you would always have the source data to reload from. In System 9 it was improved to be able to retain data in most cases

  • Is Initialization must if I change the cube.

    Hai All,
       We have decided to route the data to new cube because our cube is increasing size. Do I need to initialize for the new cube. I am thinking to select the right data target so the infopackage will start loading data to the new cube. Please correct me if Am I wrong.
    Thanks, Vijay

    Hi Vijay,
    You are right...no need to reinit, just mark the correct data target in the InfoPackage. I assume you are planning to use a multiprovider based on these cubes for reporting.
    Hope this helps...

  • SSRS Parameter Drop downs are greyed out after changes to SSAS cube

    Hi
    I am facing a weird problem. I have 3 SSRS reports that are based on an SSAS cube. Few days back I deployed some changes to cube and everything works ok on dev environment. When I deployed the same changes to production, SSRS reports don't work. I don’t
    get any error or anything when I click open the report but all the parameter boxes are greyed out. If I restore SSAS database from dev to production then SSRS reports work fine and I can select parameter drop downs. What could possibly wrong here. I have no
    idea to what to troubleshoot here.
    Thanks
    Nik

    Hi Nik,
    Are you using render the report from a report snapshot? In contrast with reports that run on demand, it is not possible to specify a different parameter value for a report snapshot when the report is open. So the parameter textbox is grayed out. If the users
    want to view the report with different parameter, we can select “Always run this report with the most recent data” option in “Processing Options properties” page.
    Besides, if the issue is not in this scenario, we can try to edit the report with Report Builder to check whether the report is ok. Such as delete the parameters, then recreate them to check again.
    If there are any misunderstanding, please elaborate the issue for further investigation.
    Thanks,
    Katherine Xiong
    Katherine Xiong
    TechNet Community Support

  • Changing cube spin direction for multiple dissolves

    Can't seem to figure out how to change multiple cube spins on time line from right to left direction . . in other words save the left as a favorite. I change it to left and then tried to copy, duplicate, save as a favorite but it always defaults to right direction.
    I'm sure I'm missing something here that will become obvious when replies come in.
    thanks . . this forum is a great learning centre

    Once you setup the cube spin, drag that spin to the Browser. It should remain as you've set it to be. Then drag it from there to another transition.
    Jerry

  • Can we change the attribute once the cube is live

    Hi:
    i was wondering whether can we change the attributes once the cube is live?
    kedar

    If the Cube is LIVE with data ,we can turn ONN the NAV attribute for the cube as per the post above.
    1)Do i need to delete and reload data in the cube for the navigational attribute changed inthe cube??history data
    2)Will my deltas be affected which are live and running??
    3)will update rules deactivated be a problem when we transport to production??
    4)If we make changes to existing data model like adding infoobjects and want to have history data modified to that object ,than Can FULL REPAIR load work ??
    or making a copy of the cube ,generating export DS..loading ..the olad traditional way is the option

  • How to close an open request for a RealTime Cube in a Process Chain ?

    Hi,
    I've a real-time infocube, let´s call it C1RT. C1RT is connected to another standard Infocube C2 via a DTP.
    The users enter the planning data; it's stored  on C1RT. I wan't a process chain that loads data from C1RT to C2.
    What I've done yet and doesn't work is:
    Process chain PC1:
    Start->Change load mode from input ready to load ready for C1RT->Run DTP.
    I need to go to C1RT, right click, manage, click on the yellow ligth of the open request, and chage it to green, after this DTP transfers the data succesfully.
    I want to automate the yellow to green issue in PC1.
    Any ideas ?
    Best Regards,
    Miguel P.

    Hi,
    no report necessary.
    I had a similar problem lately.
    changing the cube in process chain is enough, but there are some settings to be made for the cube.
    Look it up at OSS note 1063466 .
    regards
    Cornelia

  • Two Cube dimensions with the same name.

    Hi
    If I have a cube dimension that has the same name as another cube dimension, will this be an issue when quering the cube through 1) Excel 2) SSRS or Cognos Reports?
    For instance: The Database dimension DimOrganization exists in cube A as well as
    DimOrganization_Dep. Both dimension has the same attribute names and the same hierarchy names.
    Their database names are different. (object_ID and Object_name differs) 
    In the cube I change the name of DimOrganization_Dep to DimOrganization.
    This seem to work when I query the cube in Excel, the mdx looks like this;
    SELECT NON EMPTY { [Measures].[AntalNotNull] } ON COLUMNS, NON EMPTY { ([Dim Organization].[Yes- No].[ Yes- No].ALLMEMBERS * [Dim Organization].[Yes- No].[Yes- No].ALLMEMBERS ) } DIMENSION PROPERTIES MEMBER_CAPTION, MEMBER_UNIQUE_NAME
    ON ROWS FROM [TEST] CELL PROPERTIES VALUE, BACK_COLOR, FORE_COLOR, FORMATTED_VALUE, FORMAT_STRING, FONT_NAME, FONT_SIZE, FONT_FLAGS
    Anyone knows if this kind of setup will result in problems when quering from SSRS reports or Cognos?
    And/or if even though I get it right in the cube (quering from Excel) it might as well give me the wrong result the next time?
    Cheers
    /Martin

    Hi
    Thanks for the reply.
    I have tried and yes I can change then cube dimension namn to that of another cube dimension.
    For instance if i have Cube Dimension "DimA" and "DimB" to begin with , then  I change the name of the cube dimension "DimB" to "DimA". So now I have two Cube dimensions with the same name.
    It works to deploy and process and Excel somehow understands which one is which.
    Both is present in the same cube as you can see from the MDX above.
    The tricky part is how does the mdx return the correct result when the mdx looks like this (and it dpoes return the correct result).?
    Cheers
    /Martin

  • Problem while adding a new dimension in a existing cube with data in BW3.5

    Hi,
    We are trying to create a new dimension with new characteristics in a existing cube. But while activating we are getting error that "InfoCube contains data; intentional changes not permitted". Can we add a new dimension in a existing cube with data in BW3.5? If it is not possible then we can take the backup and delete the data from cube and then change the cube. But my question is that, when we will transport the cube with changes to quality then will it transport successfully or same procedure needs to be done there as well.
    Regards,
    Saikat

    hi,
    Adding new infoobject /dimension to the cube containing data in 3.5 is not possible.
    easier solution is create a new cube similar to old and add the new dimension and proceed.
    else you have to drop data and transport.
    Ramesh

  • How to do Fragmentatiom of Two Essbase cubes.

    Hi
    How can we create a fragmentation on OBIEE taking data sources from 2 cubes? For example:
    I have two cubes basreg(current year) and basreg09(history) .Their is a minor change in cube structure for that reason they created a new cube for year 2010.
    I need to pull both cubes data inorder to show report result. Is their any method or way through which i can use both cubes in obiee in creating report.
    Regards
    Sandeep Artham

    Hi Everyone
    Please respond to this request. Help me out how to solve this issue.
    Thanks
    Sandeep

  • How to change primary keys of existing InfoCube.

    Greetings everyone!
    I’m trying to change the Key Fields in my reporting architecture as per our new company mandate.  I’ve been able to successfully change the primary keys for DS, DSO and InfoSource.  Can any kind soul out there please tell me how to change the primary keys on an existing InfoCube?  I will surely appreciate all the assistance I can get.  Its kinda urgent!
    Regards,
    Philips

    Hi,
    Check the possibility with Remodelling option . If it is not possible with Remodelling, then you can only change the cube deleting the Data.
    With rgds,
    Anil Kumar Sharma .P

  • Display/Change/Delete of planning object not working in BPS

    Hi Guys
    While displaying or changing object in planning workbench, system is taking too long to process the request and request doesn't completes even in hours. The following operations are not working
    1. Delete Planning Area/Level.
    2. Display/Change planning Level.
    3. Display/Change Planning Layout.
    4. When clicking on Variable Tab of infoarea.
    5. When clicking on Set variable button.
    In all of the above mentioned cases System displays a message "Generating Environment" and it runs for indefinite time.All this is ha0
    We are on Suppport Pack 12 of BI NetWeaver(2004S)and we are using BPS for our planning application.
    Thanks
    Tripple k

    Hi Dear
    Thanks for info. i know that it will take some time to regenerate the BPS classes after making changes in cube but in my system its taking at least half an hour which i think is too much.....i don't think that its normal behaviour of system...
    Thanks
    Kamal