Changes in Qty for PO exists

Hi Experts,
After generating a PO for a PR generated from projects,I want to restrict the changes in Qty of material component .How can we accompolish this?
Thanks in Advance
Edited by: Vala .K.N on Nov 25, 2008 8:15 AM

Use user exit COZF0001. Take a help of ABAPer.
Venkat

Similar Messages

  • How to change the SID for an existing system

    Hi All,
    I need to change the SID of the development and quality system without making a system copy.
    The requirement is on strict timeline basis so I need to find out an alternate way to do it. A system copy will need a lot more time to do the same which is the last option at this time.
    Please suggest.
    Relevant answers will be rewarded accordingly.
    Regards,
    Himansu Roy

    Do not cross post same questino across different forums.
    Changing the SID for existing SAP systems
    Markus

  • How to change the server for the existing project in netbeans5.5?

    we r using netbeans5.5 with visual we pack.
    In netbeans for the project properties>run it is not giving in the list box it is only showing sun java system applicationn server 9.
    the remaining servers like tomcat and jboss which we have it is not showing .How to get the remaining options?
    please let me if any of you know

    Do not cross post same questino across different forums.
    Changing the SID for existing SAP systems
    Markus

  • Upload using eCATT to change fax number for all existing Vendors

    Dear All,
    Using eCATT upload, i need to change the Fax number format for all existing vendors. How to do this?
    I havent used eCATT before, please guide me in this regard
    Thanks
    RS
    Edited by: Ramapuram Saravanan on Feb 8, 2009 6:13 AM

    Hi Luis,
    Use tcode XK99 for vendor mass change, select the Fax no field. You have to take note that this changes will be only 1 fax number for all vendors.
    Else you have to use BAPI for mass change.
    regards,
    maia

  • Change material group for an existing material

    Hi all,
    What is the steps to change a material group for an existing material?
    Is there any impact on the reports if I were to change the material group of an existing material?
    Thanks and regards,
    JT

    Yes, You can change in MM02 and also while changing you will get the folloeing Warning message..
    You are changing material group, but material already used by purchasing
         Message no. M3531
    Procedure
         When changing the material group of a material that is already being
         used by the purchasing department, you should note that:
         o   The purchasing statistics show how much of a material group has
             already been ordered. Unitl the change is made, the material is
             managed under the old material group and therefore the old material
             group statistics are updated. From the moment the change is made,
             the new material group's statistics are updated.
         o   Some purchase orders may derive from contracts with item categories
             referring to material groups. If this is the case, the material
             cannot be used after the change has been made.
         o   Every purchase requisition is allocated to a release strategy that
             can depend on the material group. A new release strategy may apply
             to a new material group. Purchase requisitions that were created
             before the change are subject to the old strategy; purchase
             requisitions that were created after the change are subject to the
             new strategy.

  • Need to change db details for an existing OIM env.

    Hi,
    We are doing a POC where we have two non prod env. One is TST env. and other one is QA env. I have one question here. Can we point TST IDM to QA db? Means we need to use application of one env. and DB of another env. If anybody have done this type of change then please respond. You help will be highly appreciated.
    Regards,
    Kalpana.

    Hi,
    I have done that couple of times without much trouble. Please follow the below doc. to make this change:
    1359656.1 - Start from section where it ask you to update JDBC sources.
    Let me know if you ran into any issue.
    Regards,
    Sunny

  • Is it possible to change out of the box Callout content for already existing library using some javascript API ?

    Is it possible to change out of the box Callout content (change DOM elements) for already existing library using some javascript API?
     API ?

    Hi,
    We can use CSS and jQuery to achieve it.
    Please add the following code into the Content Editor Web Part.
    <style type="text/css">
    .js-callout-content{
    display:none;
    .js-callout-mainElement span{
    display:none;
    .js-callout-mainElement{
    border-width:0px;
    </style>
    <script src="http://code.jquery.com/jquery-1.10.2.min.js" type="text/javascript"></script>
    <script type="text/javascript">
    $(function () {
    $("a[title='Open Menu']").click(function(){
    setTimeout(function(){
    $(".js-callout-body .js-callout-bodySection").eq(0).html("<span>Test</span>");
    $(".js-callout-mainElement span").show();
    $(".js-callout-content").show();
    $(".js-callout-mainElement").css("border-width","1px");
    },1000);
    </script>
    Result:
    Best Regards
    Dennis Guo
    TechNet Community Support

  • Change of address for existing Plant -

    Hello,
    The requirement is to change the address for an existing Plant. Is this opkay to do - does this impact any other MM/Production processess.
    Thanks,
    RT

    Hi,
    Change in address will not impact on anything except the TAXES
    In address detail country,region and tax jurisdiction is maintained and this fields area in use for calculation of tax then it will impact.
    If region and tax jurisdictions is not in use for tax calculation then you can change.
    kapil

  • Is it possible to change settings for an existing sequence?

    I am cutting a short "crowd-sourced" class play, shot by parents. I have 4 different types of footage from 4 cameras: Two are 720p (30p), one is a 640x480 .mov and the other was shot in 720p but burned to a PAL DVD so they are .VOB file rips at 25fps, 720 x 576 w/1.2 widescreen.The main camera is an .MTS file (AVCHD 720p)
    Since I am planning on ultimately making widescreen NTSC DVD's, I sync'd the cameras in a widescreen-DV sequence, then nested that into a new widescreen-DV sequence and activated the multi-cam. I did all of my actual editing in the new muti-cam sequence - but now I am thinking that I should have started with an AVCHD 720p sequence to sync cameras and just maintained 720p thoughout - until exporting the MPEG-2 file for the DVD.
    I can make a new 720p sequence and cut/paste everything from my timeline - but they would still be nested multi-cam cuts that link back to the original widescreen-DV sequenece I setup to sync the 4 cam views. I cannot seem to change the settings for the existing sequence - so is there maybe a workaround for what I am trying to do? Essentially, to trick the new 720p sequence (with all the actual multi-cam edits pasted into it) to linking to a new 720p sequence with the already sync'd cam footage pasted into it? And secondly, will it actually effect the quality of the final DVD output? I may also want to make a 720p web version for Vimeo if feasible...
    Any help would be greatly appreciated.

    I have created the new 720p AVCHD and cut/pasted all of my edits. That is not the problem.
    Almost of my edits (other than a few titles amd stil pics I added) are cuts from the original nested sequence called (4-CAM SYNC). It is a regular NTSC widescreen sequence. In this original sequence, I am scaling the the cameras down to fit the frame and sync'ing the four cameras. I am attempting to get this new sequence to link to a new 720p nested sequence that has my sync'd cam footage - to replace 4-CAM SYNC on the time, while still retaining all the edits I have made - I will just have to change some of my scaling settings in a few clips.
    It sure would be easier if I could change the "Editing Mode" parameter under Sequence Settings...

  • Can I change the default for podcast deletion after listening?

    I have only just discovered that many of my cherished podcasts have been getting deleted after I listen to them. I originally set the option to NEVER delete after listening when I first installed iTunes years ago and I haven't change it since. However, I can only assume that it was changed by Apple during an upgrade at some point and I never noticed. The delete after listening option has been set to On for podcasts going back many years (2008 at least).
    Two questions:
    1. Is there some way to change the default setting to Off?
    2. Is there a way to bulk change the setting for multiple existing podcasts?
    Thanks.
    For what it;'s worth; I'm running iTunes 12.1.2.27 on Windows 7 64-bit on a Dell Latitude laptop.

    Choose the Podcast view you are using (either Podcasts/Podcasts or Podcasts/Episode List) from below:
    or
    and select Delete Played Episodes <Off> from the drop-down menu

  • I have bought an used Iphone 5. I dont have the password for the existing login id of the old owner. How do i use the phone and change the log in id?

    I have bought an used Iphone 5. I dont have the password for the existing login id of the old owner. How do i use the phone and change the log in id?

    Unfortunatly the only way that you can get it off is to get the old user to input the password.  You may need to contact that old user and see if he can put the old password in.  hope this helps.

  • How can i change authentication settings for existing account?

    I have an email account from my work server that i have set up as a pop account in Mail. The problem is that the settings have recently been changed on the server and on other accounts but I cant find the same options in the preferences of mail.
    What I need to change is requiring authentication on the outgoing mail server (smtp) of username and password. I can find no checkox in preferences enabling this. Our internet provider suggested creating a new account, as in account setup it is possible to check a box for requiring authentication.
    If at all possible i would like to keep my existing account.
    Does anyone have any ideas as to how i can do this?
    Thankyou!

    In Mail, Preferences>Accounts. Select the account in question. At the bottom of the pane on the right of the list of accounts you will see 'Outgoing mail server (SMTP)' where your server details can be entered: underneath this is a button called 'server settings'. Click on this and you can set 'Authentication' to 'password' if neccesary, and enter/change the password for outgoing mail.

  • Proper way to make bulk changes the Owner ID, Path and file share credentials for my existing subscriptions, ExtensionSettings

    We are going through with an upgrade/migration to SSRS 2012 and moving everything to a different domain. We have about 200 active subscriptions running, the reports are being delivered to a file share.  What is the correct way, in bulk, to change
    the OwnerId, the Path and the FileShare Username password credentials for these subscriptions?  I see these values are being stored in Subscriptions > ExtensionSettings.  I see that the file share path and Owner wouldn't be a problem to change,
    but since I see the file share credentials are encrypted I would not be able change them directly in ExtensionSettings.  Anyone know the proper way to change the Owner ID, Path and file share credentials for my existing subscriptions without having to
    change each one of them manually in the report manager?
    Note: Reporting Services Native upgrade from SSRS 2005 to SSRS 2012.
    Thanks in advance.

    Hi Cygnus46,
    Based on my understanding, you want to change the Owner ID, Path and file share credentials for all existing subscriptions.
    In Reporting Services, the subscription information are stored in the Report Server database. In your scenario, you can go to report server database and run the query to list all the subscriptions, then modify the owner and fileshare paths in the subscriptions
    table. For more information, please refer to this article: Tip: Change the Owner of SQL Reporting Services Subscription. If you want to change
    the file share credentials for subscriptions, you can run the query provided by
    wiperzeus from this similar thread:
    Windows File Share Delivery/ SSRS 2008 R2.
    If you have any question, please feel free to ask.
    Best regards,
    Qiuyun Yu
    Qiuyun Yu
    TechNet Community Support

  • Urgent-change the end date for a existing wage type.

    Hi,
    Can u pls let us know how to change the end date for a existing wage type.
    The current end date is 30.8.2008  and we would like to change to 31.12.9999.
    Rgds,

    Use This report RPCLGV00
    The Wage Type Distribution report enables you to display wage types for several payroll periods. It does not take into consideration differences resulting from retroactive payroll. The report shows the current values (number and amount) for each wage type. The report evaluates the payroll records that are marked with update indicator ‘A’ when the report is run. Subsequent reporting runs may not give the same result if - in the intervening period - retroactive payroll has taken place for the evaluation period. The wage type distribution uses the data from the results table RT for the relevant payroll result. The employee’s organizational assignment is also evaluated from the payroll result. This data is taken from the Work Center Basic Pay table (WPBP).
    The wage type distribution offers you the following options for evaluation:
    Individual reporting for a specific personnel number or name.
    Totals evaluation without specifying a personnel number or name.
    You cannot use wage type distribution to run a report for several countries. You can only select payroll areas from one country for reporting.
    Scope of Function
    You use the following parameters to determine how the appearance of the wage type statement:
    Wage type for evaluation
    Enter all wage types that are to be evaluated. If you do not make an entry here, the system selects all wage types. Note that you can only select wage types that occur in the RT table.
    Evaluation start date
    Evaluation start date and evaluation end date define the evaluation period. Enter the year and payroll period for the start of the evaluation.
    Evaluation end date
    This parameter delimits the evaluation period. If you do not make an entry here, only the period from the period from the parameter Evaluation start date is evaluated.

  • Changing passwords for 800 + existing users.

    Hi, Hope people reading this list can help with this.
    Start of a new school year here and our local education office has generated new passwords for our existing students. I use Passenger to import new users and their passwords onto the server from the supplied spreadsheet. Can I also use Passenger (or some method within workgroup manager) to import just the new passwords for the existing users? I would prefer not to have to delete the users and then re-import them from new files.
    Thanks
    Anthony O'Brien

    Hi,
    If you are using Passenger to import new users, I presume you are using an LDAP connection to interface with OD. In which case you could just construct a script to do a batch import of the password field. If you are using Rails or Ruby this could be done with a Rake task or independently.
    On the OD side you can import passwords into OD in clear text but it has to be done following the formatting rules provided in the CommandLine_Adminv10.5 document p. 123.
    HTH,
    Harry

Maybe you are looking for