Changes to FL GL  in ECC 6.0

Hi Gems,
Can any one tell me what are the changes with FI General Ledger in ECC 6.0?
Also i have an interview tommorrow on ECC 6.0 for ABAP. Any FAQs on ECC 6.0 would be helful.
thanks
Dan

Dan,
For Fi GL enhancment details u need to look into SAP Note 1070629

Similar Messages

  • Limit PO price changes are not replicated to ECC backend

    Hi all,
    SRM 5.0 ECS SP13.
    When I change the value(increase/decrease) in limt PO which is already created(PO is changed for first time) and order the PO,under Overview screen.,the PO total value(at header level) shows the correct changed /new value while at the Item level,the Net price is shown as the old value!However when I go and check the item details,the  field "VALUE" and "EXPECTED VALUE" have the changed/new value.
    Because of the above issue,the PO changes are not replicated to ECC backend system.When I tested the BAPI BAPI_PO_CHANGE1 with the test data,there is no error mesasge in ECC backend system.
    After this,when I change the PO for second time(again value increase/descrease),the total value and net price is shown correctly in SRM and changes are also replicated to ECC backend system!
    I have also checked the cong for SPOOLPARAMETERS under Set Control Parameters and eveything is set correctly as shown below
    SPOOL_JOB_USER     User that execueds spool job.     CUA_ADMIN
    SPOOL_LEAD_INTERVAL     intervall by which the retrytime incr.     60
    SPOOL_MAX_RETRY     Max. number of retrys for writing BAPIS     10
    Can someone throw some pointers how to resolve the above issue.
    Thanks in advance.

    Hi
    can you recreate the same issue
    are you saying that
    1. create a limit po for 100 USD and replicated to ECC AS 100 USD total value.
    2 . now update the PO in SRM 150 USD and it was not replicated to ECC ?
    or
    1. limit sc
    2. Limit PO
    3. update not reached ECC.
    Note 1284361 - Limits not transferred to backend purchase order
    Symptom
    Extended classic scenario.
    You have ordered a purchase order with more than one hierarchy item containing a limit.The purchase order is created or updated in the backend system without errors but the limits are missing in the backend purchase order.

  • Transaction changes from 4.7 to ECC 6.0

    Hello,
    we are planning a release change from 4.7 to ECC 6.0.
    We need to know which transaction will be replaced or changed.
    We need to know this for planning test etc.
    Gruß
    Toni

    Hi Antonio,
    Please refer this wiiki link for
    Transactions Changed in ECC 6.0 - ERP Upgrade - SCN Wiki
    Regards,
    R.Brahmankar

  • Upgrade changes from 4.7 to ECC 5.0 in HR

    Hi Experts,
        Can somebody give an idea on changes that took place while upgrading from 4.7 to ECC 5.0?
        1. What are the major uni-code changes that we have in ECC 5.0 compared to 4.7? I know the unicode check is present in 4.7 too (like WS_UPLOAD & WS_DOWNLOAD are obsolete) But are there any major unicode checks that we have to deal with while upgrading to 5.0?
       2. Are there any specific screen flow changes that we need to make a note for HR module?
      3. Any changes that can be found from using transactions SPDD and SPAU?
    Any reply would be really appreciated...
    Thanks in Advance,
    RVSS.

    >     Can somebody give an idea on changes that took place while upgrading from 4.7 to ECC 5.0?
    http://solutionbrowser.erp.sap.fmpmedia.com
    http://service.sap.com/releasenotes
    >     1. What are the major uni-code changes that we have in ECC 5.0 compared to 4.7? I know the unicode check is present in 4.7 too (like WS_UPLOAD & WS_DOWNLOAD are obsolete) But are there any major unicode checks that we have to deal with while upgrading to 5.0?
    Upgrade and Unicode conversions are two different things.
    You may read
    Note 367676 - Release upgrade from 4.6 to 6.10 for customer programs
    Note 689951 - Release upgrade from 6.20 to 6.40 for customer programs
    >    2. Are there any specific screen flow changes that we need to make a note for HR module?
    check the corresponding release notes in
    http://service.sap.com/releasenotes
    >   3. Any changes that can be found from using transactions SPDD and SPAU?
    What do you  mean? Those transaction are for the technical modification adjustment.
    Markus

  • TCodes that have changed from 4.7 to ECC 6

    Hi,
    We are planning a upgrade from 4.7 to ECC6. Is there any readily available list of:
    1) Transaction Codes that have undergone a change from 4.7 to ECC 6?
    2) transactions that have become obsolete?
    Regards
    Peter

    Thanks Gautham for the prompt response.
    That means that I can only come to know of the changed TCodes after I upgrade and not before that? Or can I look at this table in any other company's ECC 6 system and get the data?
    Will company specific cutomisation have any bearing on the changes done by SAP to the std TCodes?
    Also does this table give the complete list of changed TCodes?  Also is there any table, FM etc which also gives what has been changed in these TCodes?
    Peter

  • Changes are not updated from ECC to CRM How to debug

    Hi,
    QCs 1140049726  and 1140047459 were updated in P20 system to remove the WBS.  This was done per normal P20 process and instructions.  P20 system correctly reflects that QCs have no WBS value and the contracts are BOX - all is correct in P20.
    CSP still shows these QCs as having a WBS assigned to them.  This is incorrect.  It has been over 24 hours since the P20 QCs were changed to reflect no WBS, but CSP still has not been replicated with the correct data.
    How to proceed with it. How to debug from ECC to CRM.
    Prem.

    Hello Prem,
    Could you please have a look at SAP note 656823?
    This note contains debug tips for btx data transfer. Please check point 6 which talks about the delta download.
    Hope this could be helpful.
    Best regards,
    Maggie

  • Changes in 4.6c to ECC 6.0

    Hi all,
    Can any one do let me know the major changes tht incurred frm SAP version 4.6c to ECC 6.0.
    Useful answers will be awarded with full points
    Thanks in advance
    Madhu.

    Hi
    There are other things like
    Basic Order View
    Connection to Search Engine TREX
    Enhanced List Editing
    Mobile Work Clearance Management
    New EAM Key Performance Indicators in Business Warehouse
    SAP Role "Maintenance Technician
    SAP xApp Mobile Asset Management 3.0
    Maintenance cost budgeting
    SAP role: employee self-services
    Computer-aided design integration
    SAP role: production supervisor
    New enterprise asset management key performance indicators in the former SAP Business Information Warehouse (whose functionality is now part of SAP NetWeaver)
    Installation and removal with simultaneous goods movement
    Spare parts management in maintenance execution
    Consumption control for vehicles

  • Changed PO Approval required in ECC.

    Dear ALL MM consultants,
    We have one of the requirement of our client that
    the following change to the PO will require approval:
    u2022     Value;
    u2022     Change of cost element
    When the PO is transferred from SRM to ECC system , should not ask for PO approval unless it is changed for Value and cost element (Cost Centre / Network) in ECC.We has SRM System where approval of the PO is taking place and from SRM system PO are transferred to ECC System. Once there is a change in the Value and Cost element in the PO in ECC system then PO should go for reapproval in ECC system (PO should ask for approval again).
    Is anyone came across the same scenario for their client. Please help me with the tips and steps for this scenario to configure.
    Note : We have version management also activated for the PO. Version Management is activated for Doc type and Purc Org.
    Regards / Rajeev

    Hi Jennifer,
    Since SRM PO will be leading PO in extended classic scenario, why donot you design the process controlled workflow in line with the existing release strategy that you are using for ECC PO?
    Thanks and regards,
    Ranjan
    Ranjan Sutradhar

  • Passing changing parameter to RFC of ECC 6.0 from webdynpro java

    Hi,
          I need to use a simple ZRFC from ECC 6.0 for ESS customization in one of the ESS components (Portal 7.0). There is a  changing parameter in the zRFC which should return a set of multiple values. I can see one single parameter under as input parameter (directly under the main node) and i can set a value for it. How to pass the values to changing parameter (it is a structure of multiple fields) while executing the model. Can any one please provide the code sample of executing the model.
    Regards
    Ramesh

    Hi,
          This is my Model Node. Ch_Ethnicity is supposed to hold a set of rows (table). It is at both Input and Output. Currently I am passing only Im_Raky which is a code and I should get the table of descriptions into Ch_Ethnicity parameter under the Output Node. But webdynpro Model is expecting some input to the Ch_Ethnicity parameter under the Input Node also. This is the problem and when I have contacted Ababp team, I am asked to send an empty table structure for Ch_Ethnicity parameter under Input Node also. Can you suggest me the code to send an empty table structure as input according to the below given context.
    Z_Get_XXXXXX_Input
    Ch_Ethnicity
    ---Zhr_Ethnicity
    ethcode
    ethdesc
    AndSoOn Attrib N
    Output
    Z_Get_xxxxxx_Output
    Ch_Ethnicity
    Zhr_Ethnicity
    ethcode
    ethdesc
    AndSoOn Attrib N
        |----
    Im_Raky
    Regards
    Ramesh

  • Changing logical system name on ECC

    Hi,
    We have made copy of production to our test environment.  Next, we created a number of copies of the test environment.  We now want to hook the copies up to BI, XI etc. where we don't have multiple test environments, which means that a single BI test instance will support several ECC test instances as an example.  This means that our ECC instances will have to have their logical system name changes changed in addition to the obvious SID change.  We have a fairly comprehensive landscape with GRC, XRPM, BI, SolMan, CRM connected to our ECC instance.  What areas of concern would you consider important to test once the logical system name changes are done?  We are looking at the ALE, RFC connections, BI connections.  We included the [help.sap.com information |http://help.sap.com/saphelp_nw04/helpdata/en/33/c823dbaea911d6b29500508b6b8a93/content.htm] in our thinking, but since that did not really explore landscape wide issues....
    Thank you,
    Mike

    Hi
    As prelim checks:
    Check if these changes are maintained in SCC4 client details as well, and check if all the RFCs are working fine.
    Regards
    Rahul

  • BADI to change the PDS priority in ECC

    Need to change the priority of the PDS during CIF. Please suggest the BADI which can be used in ECC side.I guess BAdis /SAPAPO/CURTO_SNP and /SAPAPO/CURTO_CREATE.can be used in APO. I need to change PDS value in ECC side while doing CIF or CURTO_CREATE..
    With thanks & regards,
    naveen

    Hi Naveen,
    As far as I know, in ECC the PDS is represented by the Production Version.
    We don't have a priority to be assigned directly in the Production Version in ECC. The PV determination in ECC can be managed by the locking indicator, the lot sizes, the validity periods and the sequence in which the PV was created.
    It can be possible to assign a priority thru a Quota Arrangemenet.
    Production Version Selection - Process Orders (PP-PI-POR) - SAP Library
    Kind Regards,
    Mariano

  • Change the Product version from ECC to ERP 6.0

    Hello Experts
    I am planning to apply EHP4 on my Development ECC system. In line with the the suggestion from guide "How to install SAP Enhancement Package 4 for SAP ERP 6.0" system I am supposed to define my ECC system with leading product version ERP 6.0.
    My Ecc system is currently defined with Product version SAP ECC 6.0.
    As per the above guide and also suggestion from "Note 1344564 - Maintenance Optimizer: Check system landscape" which says-
    "In particular for a system of the product SAP ERP, assign the product version of SAP ERP, not SAP ECC."
    I am supposed to change the leading product version to ERP 6.0.
    Now with the current definition of system with product version SAP ECC 6.0, it is being used in a logical component. In order to change this I need to delete the associated logical component. The problem is -this logical component is being used in more than one Project definition that has huge documentation associated with them.
    My question -
    will the deletion of current logical component affect my documentation in any way?
    How can I change the product version from SAP ECC 6.0 to SAP ERP 6.0 without affecting the current setup?
    Regards
    Dhiraj

    Hello Warren,
    Thanks for the suggestion.
    I have already taken care of all the suggested notes in the master note that you suggested. I am able to generate the XML file for other solution defined in my system. In those I have my ECC system defined purely as ERP 6.0 system. I am not able to make out why its not generating the XML for this solution.
    Regards
    Dhiraj

  • Change JDK midway? New ECC 6.0 install

    Hi
    While installing ECC 6.0 am running into problems at step 52 of 112, "start java engine"
    The ABAP stack install is complete and I can login.
    Can I play with changing the JDK version midway?
    Thanks
    Hari

    Hi Hariharan
    I would suggest not to change your JDK in midway.It can be risky.There is a wprk around for your problem.
    Start the engine manually ,once it is done you and press retry and continue the installation.Try if few times your problem might get solved coz we had a similar issue.
    Award points if useful

  • Changes form 4.6cc to ecc 6.0 for sap sd

    i am doing upgrde project. may i know the changes from 4.6cc to ecc6.o.
    please help me regarding this is there any file or path for this
    regards
    satish

    Dear satish babu,
    Please visit the following links:
    http://service.sap.com/erp
    http://solutionbrowser.erp.sap.fmpmedia.com/ (Functional prespective)
    http://service.sap.com/instguides --> mySAP Business Suite Applications --> mySAP ERP --> mySAP ERP 2005 --> Upgrade
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/LOVC/LOVC.pdf
    For Functionality Differences pls refer to the below site -
    http://solutionbrowser.erp.sap.fmpmedia.com/
    After opening the site, please select the Source Release Version which is 4.6 b Then Select the Target Release Version which is "mySAP ERP 2005" or ECC 6.0
    Select the Solution Area like Financials, Human Capital Management, Sales....
    Select module like MM, PP, SD, QM.....
    Click on Search
    Then it displays the Release Version and the Delta Functionality. which can be downloaded to a word document if required.
    and also check the release notes of ECC 6.0 in service.sap.com.
    Hope this helps you.
    Do award points if you found them useful.
    Regards,
    Rakesh

  • How do Changes in shipment made in ECC get updated in APO TPVS?

    Hi All,
       Suppose a shipment is created in APO TPVS and transfered to ECC. Now After shipment has started I get to know that due to some issues shipments will end 3 days after the planned date. Say Shipment start date is 1 st and planned end date is 5th of the month. Now on 2nd of the month I get to know that due to vehicle break down there will be a delay of 3 days and shipment will end on 8th of the month. Is it possible to change the planned end date in ECC so that same gets updated in APO as well.So that same can be captured in next planning run and resource will  not be planned again till 8th.
    Rgds,
    saurav

    Hi Saurav,
    You have genuine query.
    I have seen the details of Carrier assigned in ECC going back and updating APO. However, for the resource it might be difficult.
    You can try looking at different options available in function module "CIF_SHIPMENT_SEND".
    I guess this might help you in proceeding further.
    Regards,
    Vivek

Maybe you are looking for

  • Songs don't show up on iPod yet show as purchased on iTunes.

    I had synced my iPod with my computer like I always do. After I disconnected it, all my songs were gone from my iPod. So I synced it again and tried to put all the songs back on the iPod. Most of them went back onto the iPod, but some didn't. They sh

  • Display a variable d'user exit as text in the title of a colomn

    Hi, experts, I would like to calculate the number of days of a certain month. This calculation would be done in the user exit. Then in the report, this number will be displayed in the title of the colomn. Is it possible to realise this requirement an

  • Re: Safari Keeps Quitting Unexpectedly

    My Safari keeps quitting driving me crazy i am mac illiterate please help Process: Safari [758] Path: /Applications/Safari.app/Contents/MacOS/Safari Identifier: com.apple.Safari Version: 5.0.3 (5533.19.4) Build Info: WebBrowser-75331904~3 Code Type:

  • Report Painter for FI reports.... (BS & PL)

    Hi Experts, Can anybody here teach me the detail step-by-step procedures on how to create a report in the Report Painter? And what are my look-outs? I need to develop a balance sheet report and income statement report thru the report painter. Would a

  • Close one CMD window leave the other one open

    I have two CMD windows open runnig a LabVew launched commandline program It is two instances of the iperf program and I found this searching here  taskkill /F /IM iperf.exe That works but it kill both windows. I take it I need to find the PID on the