Changing A Sequence Start Time To Zero

I have had to cut an intro portion of a sequence and am now left with a 15-second gap at the beginning. I would like to set where the video starts to zero without 'Ripple Delete' because I have lots of timeline Encore markers that would not ripple with the footage. So, is it possible to go to any place in the timeline and set it to zero at that point?

If you need the timecode to start at zero go to the sequence toolbar (top right of the sequence box) and set tour sequence start time to 23:59:45, your material will then start at 00:00:00:00, then, as Harm said, set the WAB to just include your film.

Similar Messages

  • Change calendar day start time?

    Is it possible to change the starting time of the day on my iCloud calendar?  I mean, I don't want my iCloud calendar to open up showing 12 midnight at the top, I want it to start at 8A.  I am unable to find anything in settings to do it, nor can I find this question asked in Help forums more recently than 2012. 
    Even when I change it to show 12 hours or 24 hours, it still has 12 Midnight at the top.  I don't want that, I don't plan anything at midnight.
    I'm using:
    iPhone 5S
    iOS 8.1.3
    iCloud v 4.0.2
    Desktop:  Windows 7 Ultimate
    TIA,
    Audrey

    I hope I'm not asking for the impossible, I hope there is a way to do this.  Please let me know if you know how!
    Thanks again.

  • ICal events changing duration and start time after .Mac sync

    I sync two OS X Tiger computers (10.4.2) using .Mac to keep my iCal calendars in order. Certain events following a certain date are mutating with longer durations and different start times after syncing between the two computers.
    Anyone experiencing the same problem?
    Any ideas?

    Two different problems here:
    Try one at a time:
    Quit iCal. Delete iCal preferences in your User Library: ~/Library/Preferences/com.apple.iCal.plist ( you'll have to reset iCal prefs after)
    For those having problems with .Mac sync, reset the sync System Preferences/ .Mac/ Advanced tab.
    Come back with results

  • How can I change the default start time of an activity in iCal (Mavericks)?

    My current default time in iCal is 9.00 AM. Don't know why. In iCal on my MBP it is 10.00 AM. Can I change that to 11.00 AM? I am not an early riser...
    Gr. K.M.

    If the program does not open the last folder you visited you most likely have the option enabled to autoload Bridge on Startup.  Either disable that option  in PS or shut Bridge down before you shut off the computer.
    Message was edited by: curt y
    If you always want it to start on a specific folder you can leave it on autoload, go to folder you want it to start on then exit Bridge.  It should load this each time in future.  Many of us discourage the autoload option as it can lead to other problems as well.

  • Changing the day start time

    I'm a sudent at uni, and so often go out for the evening, and return sometime in the early hours of the next morning. Is it at all possible to change the settings so tat a day begins at 4 a.m. rather than midnight?

    Take a look into iCal Preferences.
    On OSX 10.3.9 iCal has a "Day" Preference which lets you set the time that the day begins and day ends.
    Expect it would be the same on Tiger.
    G4 MDD Desktop Tower   Mac OS X (10.3.9)  

  • CO01 - system changes sch.start time given by the user (fwd sched., no cap. check, no shifts defined)

    Dear Experts,
    I am facing a very strange issue. Whenever I am trying to manually create and schedule a discrete production order  in ECC 6.0, with 1-forward scheduling (in CO01 transaction), by giving scheduled start date and time and pressing the "Schedule" button; the system changes the start time given by me (the date remains) and executes the scheduling with that start time.
    For example, when I want to produce 12072 PCs, and I give 08:00 as shceduled start time, the system changes it to 15:59, adds the operation times correctly and defines the 'correct' scheduled end date (again, with fwd scheduling type!).
    There is some logic on how the system changes the scheduled start time given by me. Below a certain production quantity, the issue doesn't come up, lead time scheduling is carried out, as it is expected. So the problem only occurs, when the order qty exceeds a certain limitation. In that case the order cannot be scheduled to a certain time phrame (between 07:59 and 15:59), so the system changes the scheduled start time given by me (whenever the order falls into the mentioned period). Depending on the order qty the mentioned period (to which the order cannot be scheduled) is changing.
    I made the following checks in the system:
    production calendar is set correctly, it is not blocking the production
    all the applied work centers are available from 00-24 hrs
    no shifts has been defined on any of the WCs, production is enabled in 00-24 hrs
    there is no other production scheduled on any of the work centers, capacity load is 0% on all of them, as it has been checked in CM03
    order scheduling was performed with '1-forward' scheduling type
    anyway, capacity check is switched off in the system
    formulas on the work centers are all correct, the processing time calculated based on them is also correct (No queue, wait, setup, etc. times are set in the system, we are only using processing times.)
    no error messages
    As far as I know, in the above case lead time scheduling must be carried out, the system is simply 'not allowed' to change the start date given by me, just add operation times to the start and define the scheduled end date.
    Thank you in advance,
    T

    Jiaul,
    please find the screenshots.
    1.Mark for Relevant finite scheduling in scheduling or capacity tab - yes
    2.Can be used for multiple operation - yes
    3.Capacity Planner Group set up - yes
    Caetano,
    in my case the order scheduled start date is exactly the same as the operation start date. The problem is that this date cannot be manually scheduled to a certain time interval, the system changes the scheduled start date specified by me. (Like there was a "blocked period".)
    Thank you,
    T

  • Changing Start time of Set Analysis

    Post Author: izhar
    CA Forum: Performance Management and Dashboards
    Hi all group members working on BOXI R2, I have to ask that, How to change the "Period Start" time for sets while creating it. The data i have in repository on previous years whereas while creating "set's application is picking up current date as a "Period Start" date.
    Can anyone tell, how to change it so that i can view the data under the "Membership" tab of Set AnalysisRegards Izhar

    Add it "Scaled" to a Selection (Edit menu).
    Open the .png file, select all and Copy.
    Switch to the video, create a selection (i and o keys set in/out points). You can move one frame at a time by using the arrow keys.

  • Process Chain changing start time?

    hi guysm i have 76 process chains that run every day in BWD system, so i removed all the timings from the start variant and in the infopackages, but it seems some process chains are still running, i did do the following steps on chnaging the time from a particular time to immediate, Save, Check and activate, i didnt schedule it as i dont want it to load right away .
    do i have to hit check , save , schedule once i change the time from a particular time to immediate load or activate will work as well.?
    what else could be the cause of process chains still loading even there are no events, or time given to any process chains at all.
    i went to sm 37 and i can see the bi process are all running at the time they were orignially set up on.
    so any suggestions would help,
    is there any way from sm 37 i can tell which process chain is triggered off?
    thanks
    Dante(devils never cry)

    Dante, the start conditions on the infopackages do not affect when they run in process chains.  The process chains have their own start job.  If you want to change the start time of a process chain, then you need to go to maintain the process chain, right-click on the Start process and select Displaying Scheduled Job(s)... .  Here you will see a job called BI_PROCESS_TRIGGER.  Change the start conditions of this job. 
    The start job for all process chains is BI_PROCESS_TRIGGER, so using SM37 may be difficult to identify which BI_PROCESS_TRIGGER job is associated to a particular chain. 
    Also, to let you know, each process in a process chain has an associated job.  All jobs called BI_PROCESS_xxxxx are jobs associated with a process chain. 
    Eg. 
    BI_PROCESS_LOADING is an infopackage.
    BI_PROCESS_TRIGGER is the start job
    Does this help?

  • Need a script to change the start time of meetings set by someone else...

    Hello,
    I have a series of events that someone else created and the start time is off by 1 hour in my timezone. Is there a script available to run and change these times or do I have to delete them and manually create them myself?

    What I ended up doing John is just simply deleting the original events from iCal then I went in to Outlook and manually changed the start/stop times of each event then went into the IMAP Calendar folder, clicked on that event and added it to my iCal. Thats sort of the process I use for getting my events to from Exchange to iCal anyway (can't wait for Snow Leopard) but that did the trick for me for these few items that were off. Fortunately I don't expect any changes from the author.
    Thanks for responding!
    JimN

  • Is there a way to set/change default event start/end time?

    Is there a way to set or change the default start and end time for events? 

    This question/problem applies to OS X Mavericks as well. I wish I could change it.

  • Change Media Start Time

    I've been working my way through an inability to archive a project in Media Manager. As it turns out...all the clips creating problems for MM to delete unused material were clips captured in FCP 2 & 3.
    This seems to relate to Media Start times being 00:00:00;00 instead of the 01:00:00;00. The clips play and edit without any problems but MM cannot deal with them.
    1) Does anyone know how to adjust the 'media start' value under properites.
    2) If not, any recommendations on exporting - reimporting?

    The problem was indeed related to the clips captured through older versions of FCP. Although the clips played and edited through a sequence without problems, Media Manager was unable to condense/compact (delete unused portions) them during archive.
    I believe this was do to the lack of embedded values for source timecode...either starting value or time-code type, etc.
    SOLUTION:
    1) Select the clip
    2) Under the MODIFY menu select TIMECODE
    3) Clip "Source" box. You can leave the rest default
    This will correct the strange MediaManager behavior. Couple of notes though regarding this...
    I experiecned random crashes after clicking "OKAY" on MODIFY>TIMECODE. After you reopen, you can attempt this again and it will be fine. So save after each clip correction (if you have multiple clips needed the procedure).
    Also, I did not experiment with clips that were made independant or have a missing master. If the clip has been made independant...then I assume fixing the master will not correct the issue for the independant.

  • How to dynamically  change start time in calendar

    Hi !
    Is it possible dynamically change start time attribute in calendar. Let's say I'd like to have start time = sysdate through 24 for display

    Hello Johann,
    If you created the calendar region using the wizard, it should have created a page item 'P#_CALENDAR_DATE' (# being your page number). Look at the Default setting for that item and it will likely be:
    return to_char(localtimestamp,'YYYYMMDD');This is the default date for the calendar (current date), in 'YYYYMMDD' format. Any code that sets this item to a date in 'YYYYMMDD' format should tell the calendar to display the calendar for that date. For example, I just changed it to this:
    return '20080101';And it displayed the calendar for that January, 2008. To test further I created a submit button and a branch, and in that branch I specified to set my P1_CALENDAR_DATE item to 20080601 and when I clicked the button it redisplayed the calendar for June, 2008.
    Hope this helps,
    John

  • Change Jobs Start time

    Hi Guys,
    We have one specifi user , for whom some back ground jobs are scheduled each day .
    If i go to SM37 all these jobs are assigned to him . Now, we want to change the start date of these jobs , like change the start time of these jobs.
    how can i do this and how i can assign these jobs to the user ?
    Let me know.
    Thanks,
    Srikanth .

    Hi,
    Use transaction SM36 and change the JOB scheduled and assigned to user
    Regards,
    Chintan Joshi

  • What's up with this awful new calendar?  Cannot change start time!

    Ever since "upgrading" to Mavericks 10.9 I cannot change the start time on an event.  It's not clickable.  Only the end time is.  If I click the start time nothing happens.  If I click the end time I can adjust it easily.  What's up with this? 

    If you give no time it will set to the default start time.
    Delete the entry and include your preferred start time.
    One short cut is the + in the upper left; include the date and time and event here.
    Send your feedback to Apple:  Apple Feedback http://www.apple.com/feedback/

  • Change the start time of track 1

    Hi, fairly new with waveburner but spent about 2 hours going through all the windows so i've got a good idea about the layout and where everything is.
    Goal - to remove the 4 second silence at the beginning of the cd. There is a 2 second pause, and 2 seconds before the audio kicks in.
    I recorded a dj mix and imported from logic into waveform. I made my track edits, titled all my tracks, added my efx and automation adjustments and just burned my master cd. After further review there is a 5 second delay before the first track.
    I zoom into the timeline and it appears the audio sample is located and starts at 4 seconds. There is by default a 2 second pause for the first track. I have tried to change the start time on track 1, move the entire sample, and create a new track on the 5 second marker and delete the first track but i can't move get the first track to start at the 4 second point.
    Here is a screenshot - http://kennygrant.ca/wp-content/uploads/2010/01/kenny-screenshot.gif
    totally frustrated as the file i bounced did not have a 4 seconds of silence, so i'm totally confused.

    What I ended up doing John is just simply deleting the original events from iCal then I went in to Outlook and manually changed the start/stop times of each event then went into the IMAP Calendar folder, clicked on that event and added it to my iCal. Thats sort of the process I use for getting my events to from Exchange to iCal anyway (can't wait for Snow Leopard) but that did the trick for me for these few items that were off. Fortunately I don't expect any changes from the author.
    Thanks for responding!
    JimN

Maybe you are looking for