Hi,
When BW jobs failed in error, the status of the job step in Redwood is console => waiting an operator action.
How do we can have the step directly in status error as no action will be done in the night for those BW jobs, please ?
Clement

Hello,
When you start the BW chain with parameter RESTARTABLE=N(o) it it will always go to an end status immediately.
Regards Gerben

Similar Messages

  • Can we change log_buffer parameter online e.g. when all users are working..

    Hi,
    Can we change log_buffer parameter online e.g. when all users are working.. ???
    What is relation between redo buffer in sga and log_buffer parameter ?
    SQL> show sga
    Total System Global Area 3758096384 bytes
    Fixed Size 1983152 bytes
    Variable Size 553655632 bytes
    Database Buffers 3187671040 bytes
    Redo Buffers 14786560 bytes
    SQL>
    SQL> show parameter log_buffer
    NAME TYPE VALUE
    log_buffer integer 14338048
    SQL>
    SQL>
    If the log_buffer parameter is 14 MB then why redo buffer is no as same size e.g.
    14 MB
    SSM

    I am hoping your Oracle Consultant know what he's talking about.
    According to Oracle Performance Guide,
    http://download-west.oracle.com/docs/cd/B19306_01/server.102/b14211/memory.htm#sthref654
    "On most systems, sizing the log buffer larger than 1M does not provide any performance benefit. Increasing the log buffer size does not have any negative implications on performance or recoverability. It merely uses extra memory.
    The best method to determine if bigger redo buffer is needed is
    SELECT NAME, VALUE
    FROM V$SYSSTAT
    WHERE NAME = 'redo buffer allocation retries';
    The value of redo buffer allocation retries should be near zero over an interval. If this value increments consistently, then processes have had to wait for space in the redo log buffer. The wait can be caused by the log buffer being too small or by checkpointing. Increase the size of the redo log buffer, if necessary, by changing the value of the initialization parameter LOG_BUFFER. The value of this parameter is expressed in bytes. Alternatively, improve the checkpointing or archiving process.
    Other than that, hight log file sync event indicate you need faster disk for your redo logfiles. However, please also post your commits per second and redo per second from your AWR report.
    100M redo logs might be small for your environment.

  • Change shopping cart status to reject when older than certain period

    Hi Guru's,
    I'm new to this environment.
    Please help me with advice and sample code for the following.
    I need to check if shopping cart is open for more than 20 days then change status to reject, daily background job.
    Then need to inform user of new status via email.
    Which is the correct FM, s to use.
    Many thanks
    Daniel

    Hi
    <b>Here are the steps -></b>
    1. Create a Customer Implementation of BBP_DOC_CHANGE_BADI for Object (filter) type - BUS2121 using SE18 Transaction.
    In the coding, you can set you condition ( >= 20 days then change status to reject)
    2. Using either of the standard Function modules, you can create a Z program to send emails.
    <b>Use the following Standard SAP Function modules -></b>
    SO_OBJECT_PREPARE_FOR_SEND
    SO_OBJECT_SEND
    SO_DOCUMENT_SEND_API1     
    SO_NEW_DOCUMENT_ATT_SEND_API1
    SO_NEW_DOCUMENT_SEND_API1    
    <u>Other related links -></u>
    Re: Email notifications
    SO_NEW_DOCUMENT_SEND_API1 is working in foreground not in background..
    Hope this will help.
    Regards
    - Atul

  • How can I change a string to a numeric when the numbers are separated by blank spaces?

    I would like to change a list of numbers in string to a list of number in numeric like in the attached vi. Unfortunately, the numbers are not separated by commas but by blank spaces. Which character can I use for the blank space?
    Ninskaya
    Attachments:
    readcommdelim.vi ‏19 KB

    Why don't you just use the Spreadsheet String to Array function instead. You can specify any delimiter you want. See the attached picture.
    Attachments:
    string_to_array.jpg ‏6 KB

  • Change the transaction status when creating a follow up activity

    Hello All
    We need to change the activity status if a follow up document is created from. E.g. If an activity is created type 001  then a follow-up activity type 003 as a follow up document from 001 the system automatically changes the activity status from open to in process. I need detailed steps regarding how to reach this
    Regards
    Jacopo

    See if you can "exploit" CRM_COPY_BADI and function modules CRM_STATUS_CHANGE_EXTERN to change the User status or CRM_STATUS_CHANGE_INTERN for System status.

  • Job status of Business Rules not reflecting correctly in Hyperion Planning

    Hi,
    In our Planning Web Application version 11.1.2.1 (Classic application), we have issue with the Business Rules not changing the job status from Processing to Complete.
    Essentially giving an indication to users that the job is taking longer than expected.
    Having noticed that behavior, when we cross check with Admin credentials (Application Logs ) HBR Launch.log. The End Time of the job is updated promptly.
    We have couple of SRs Open with Oracle but they concluded it’s a bug and need to upgrade to 11.1.2.2. But currently we do not have any plans to upgrade to the latest version.
    In order to force the Status change to mark it as Complete at the SQL Server backend.
    We have to update the status table HYP_JOB_STATUS manually via database update.
    But this is laborious process.
    Did anyone encounter such issue? Please suggest a feasible option here ?
    Thanks,
    Venkat
    Edited by: 947686 on Dec 18, 2012 6:21 AM

    Hello Shiva,
    We do not have any issue with calc rules; we are facing this issue with Business rules.
    We have looked into the logs in both Applcation logs and Essbase logs nothing found strange except couple of .xcp files were generated in Essbase server. We have sent those .xcp files to Oracle for investigation. We have also noticed that Web Logic server was not hand shaking properly with Hyperion Server. Oracle responded with few application settings which we are already sycn with recommended settings.
    We had the same issue in 8 months back and the same repeated now.
    Thanks,
    Venkat

  • Job Status emails not being sent

    Hello,
    I'm hoping to find some help here after searchs of the forum and google did not find a solution.
    Since yesterday I ceased receiving "Job Status" email messages when I use ePrint. The jobs do print on my HP Officejet Pro 8500A, and the "Recent Print Jobs" list in the ePrintCenter is up-to-date. I made sure that under "ePrint Settings" (on the ePrintSenter webpage) all the little boxes near the allowed sender's email addresses are ticked, indicating that job status emails should be sent. I tried restarting the printer - all without any change. 
    The only thing I changed yesterday was to install the "HP Printer Control" app on my iPhone and start using it. Interesting the ePrint job list there is empty...
    I really like getting these verification emails. Is there any way to repair this?
    On a separate topic - is there a limit to the number of allowed email addresses in the "allowed senders" list in the "ePrint Settings" section in the ePrintCenter? Is seems to save only 3 addresses.
    Thank you for any help,
    Danny
    This question was solved.
    View Solution.

    Currently HP is in the process of migrating from ePrintCenter to HP Connected, through this migration some of their services may change or no longer exist. At this time those status emails are not a feature of the service. This does not mean that it will not be re-added in the future, but I cannot make any statment verifying if this will or will not happen. I apologize for the inconvenience that this might cause, but you should be able to still see the job status by visiting the website itself. 
    Let me know if this is the information you are looking for and I will get right back to you as soon as I can! 
    -Spencer 
    PS have a wonderful day and a fantastic weekend! 

  • Cannot change PO's in SRM due to system copy/ logical system error

    Hi All-
    We are running SRM extended classic scenario.  We would like to change PO's that have been created in our production system, but copied to another environment.  We are trying to change these PO's in the copied system but are getting error messages in the process purchase orders transaction in SRM, and are not allowed to change the PO's.  The message reads "purchase order contains items with different logical systems".  Our basis team changes the logical systems as part of our system copies.  Has anyone experienced this?  I this part of standard SAP functionality?  Are their logical systems in any of the transactional data(PO) tables that we need to change?
    Also, we are deleting the material group/product hierarchy in comm_hierarchy as part of our system copy tasks because the material groups each have a GUI ID that is system dependent.  Could this have something to do with our issue?  Any feedback is greatly appreciated.
    Thanks.

    Hey John,
    Yes I'm still at CA.  How are you? 
    I checked bbp_pd and the logical systems are changed correctly to the copied system, not set to production.  Am I missing something here? Should they be set to production logical system names even though I am trying to change the PO in the copied system?
    Thanks!

  • Job status in OEM console is not updated

    Hi,
    I am using OEM job console to run some batch jobs. When a job is submitted for execution, the job status does not change to started/completed. It always remains in the scheduled status, but when I check the database the job is running and it finishes fine. I checked the agent on the target database and restarted the management server. Any thoughts on what could be the issue?
    Thanks
    Rk

    Whats exactly you are looking ? is there any reason for comparing ?

  • URGENT : Error 5 when checking the job status

    Hello Forum,
    While monitoring the Process Chains in BW 3.1, I got the following message in the <b>Information </b>Pop-up:
    <b>Error 5 when checking the job status</b>
    Could you please tell me what it means?
    Thank you,
    its my duty to assign points,
    raj

    Hi,
    Are you able to view the log after refreshing and clicking the tick mark button on this message or is it not letting you go into the log itself.
    Can you directly go to Log view thru Tcode RSPCM and see. Once you are inside try to find where exactly the process failed.
    Thanks,
    JituK

  • How to change a prospect status to customer in BP,when the prospect turns out to be a potential customer?Please help me with the details.

    How to change a prospect status to customer in BP,when the prospect turns out to be a potential customer?Please help me with the details.
    Moderation: Kindly search before you post

    Dear Ramesh,
    Using Account life cycle we can record the different stages of a BP.
    But at any point of time we can hold one Stage at Business partner.and once we change status Prospect ro Customer. We can't able to see Prospect Status in that BP.
    Ex -
    Stage A- Potentail
    Stage B- Prospect
    Stage C- Customer
    with the help of UI configuration we can define.
    Need your comment,
    Thx
    Karthik

  • Closed WIP job status change

    how to change closed WIP job status to released.
    Thanks
    Vijay

    If you are in the same period as you closed the job then go to Discrete Jobs>>Close Discrete Jobs Form>> Tools>> Unclose.
    Once unclosed then you can change it to released.
    If you are not in the same period, you cannot change the status.

  • Scheduling a BI job chain in Redwood

    The problem I am having is we are trying to schedule a BI job chain via Redwood software and are not getting any response. Within Redwood, I have executed these jobs IMPORT_BW_CHAINS, IMPORT_BW_CHAIN_DEFINITION, IMPORT_BW_INFOPACKAGES using BI job chain  0fcsm_cm_10 which is defined in BI as a job chain. These jobs run to completion but nothing is moved into Redwood to schedule as you would see from a import of a CCMS job. When I run job RUN_BW_CHAIN using the same BI job chain ID I receive the below error.  Not sure what I’m missing or doing with the process to get to schedule the BI job chains with Redwood.
    ORA-06502: PL/SQL: numeric or value error
    ORA-06512: at "RSI.RSIEXEC", line 1638
    ORA-06512: at "RSI.RSIEXEC", line 1759
    ORA-06512: at "RSI.RSI_RUN_BW_CHAIN", line 21
    ORA-06512: at "RSI.RSI_RUN_BW_CHAIN", line 80
    ORA-06512: at line 1
    ORA-06512: at "SYS.DBMS_SYS_SQL", line 1200
    ORA-06512: at "SYS.DBMS_SQL", line 323
    ORA-06512: at "SYSJCS.DDL", line 1085
    ORA-06512: at "SYSJCS.DDL", line 1118
    ORA-06512: at "SYSJCS.DDL", line 1177
    ORA-06512: at line 3
    JCS-00215: in statement RSOJ_EXECUTE_JOB

    I am also seeing the same issue 
    anton the last information  you requested
    The following products are installed in the Cronacle repository:
    Product                                  Version    Status
    Cronacle for SAP solutions               7.0.3      Production 
    Cronacle Forecast Module                 7.0.3      Production 
    Cronacle Reports Module                  7.0.3      Production 
    Cronacle &module Module                  7.0.2      development
    Cronacle Mail Module                     7.0.3      Production 
    Cronacle Audit Module                    7.0.2 r2.2 Production 
    Cronacle Process Manager for Web         7.0.3      Production 
    Cronacle Module Installer                7.0.3      Production 
    Cronacle Repository                      7.0.3.34   Production 
    Cronacle Monitor Module                  7.0.3      Production

  • How can we change the Job priority in the Source system

    Hi All,
    We are facing an issue with the process chain execution in the Production system. We have a process chain which runs daily in BI system and the chain is designed in such a way, that as soon as the chain starts in BI system,  a corresponding job is triggered in the Source system (ECC  6.0system).
    Now the issue is that after we have our Source system upgraded the memory allocation for the particular Job (FIGL )is reduced and due to which the FIGL job is failing frequently. When we have consulted some experts.They  advised Us to increase the Priority of the Job in source system to A/1, as of now the job is running in B/2 priority.
    Please let us know the way how we can increase the priority of the Source system Job, so that when the process chain triggers a job in source system and that particular jobs  should run with Priority A/1.
    Thanks in advance.
    Regards,
    Chandra.

    Hi Chandra,
    First please find the job name in SM37 for FIGL and check the job status to be in "released" status. Select that job and go to job menu and click on change. then it will take you to the job screen where you have "job class". Here you can change the job class to "A" to get to high priority.
    If you are unable to edit the job then create a new job with the same variants by clicking STEP button in the Job screen.
    Try these steps, let me know if are able to do so.
    Regards,
    Ravi Kanth

  • Changing leave request status.

    Dear all expert,
    I am trying to customize my leave application wf (12300111) to 2 level of approval. I am facing a problem, after my first approval approved the leave request, the status in PTREQ_HEADER will change to approved. How can i reset the status to any other status so that when the schedule posting job (RPTARQPOST) run, it will not pick up this request which has been only approved by first level manager.
    Thanks
    Regards,
    Bryan

    Hi,
    I remember seeing this same topic discussed earlier, and I think that there were also some solution explained. I just cannot find the topic now - maybe you have better luck.
    Anyhow, I think that you need to create a custom method for changing the leave request status back from approved to sent. Take a look to the existing leave request WF class - there should be a generic method for changing the status - or at least some sort of an example about how to do it.
    Then just place a new step after the approval step, which will execute this new method.
    Regards,
    Karri

Maybe you are looking for