Changing Cycle Modification factor in a maintenance plan.

On the basis of MTBF of an equipment, Can i change cycle modification factor of any maintenance plan.i.e. suppose MTBF of an equipment if reaches to 3 months then cycle modification factor for all preventive plan should get multiplied by 1.5 automatically.
please suggest on this thanx
ravi

hi
in standard it will not automatically change ,you have to make it manually .
another workaround is create it like test equipment and follow the calibration process ,while making the usage decision you can specify the modification factor.
regards
thyagarajan

Similar Messages

  • Change or Add Cycles in a Maintenance Plan (IP02)

    good afternoon all,
    we have an issue with a number of maintenance plans that were setup as 1 year cycles, and now we want to run them as monthly. Is there a way to either change the yearly cycle to monthly, or add a new monthly cycle?
    SAP ECC6
    Release 731 sp level 0007.
    Thanks.

    Greetings Santosh,
    You are correct, the key word here is "approximately", as the Cycle Modification Factor has only two decimals of precision, you will need to input 0,08 to reflect the appropriate factor of 1/12=0,08(3) - so that will mean your cycle is 360*0,08=28,8 and not 30 days, which is why I did not propose this route. But if it's not an issue, then yes, that's another way to do this
    EDIT: Which reminds me, after switching the cycle to monthly, consider if you require Time or Key Date scheduling on the Maintenance Plan scheduling parameters, as for SAP 1 Month = 30 Days with the former, but with the latter the scheduling is always for the same day of each month.

  • How to change the main work center and  work center of each operation when generating work order by maintenance plan

    Dear experts,
    I face a problem that system get main work center from equipment master data as a default main work center in maintenance plan when creating maintenance plan. however, if main work center in equipment is changed later, the change will not synchronize to related maintenance plan. if work order is generated from maintenance plan, main work order in order is defaulted from maintenance plan instead of updated work center in equipment.
    another problem is that, for those orders generated by maintenance plan, the work centers in  operations is defaulted from task list in maintenance plan. in most case, work center in task list is dummy. Actually the work is done by work center in equipment master data.
    My expectation is how to auto replace the main work center and work center of operations in work order with the one in equipment master data if order is generated by maintenance plan? is there any standard configuration or enhancement/BADi that can help with this requirement?
    thanks!
    Wesley

    Wesley,
    Sorry - development is the only way.
    Another option is to create a batch program that runs before your IP30 run(s) and updates any maintenance items and task lists with the correct work centres.
    PeteA

  • Changing a cycle in an active maintenance plan

    Hello All,
    I received a request from an end user to make a change to an active maintenance plan. The plan has a 3mo cycle. The users would like to first, generate a call for March 2011 and second, to change this to a an annual cycle. I am able to use the 'Restart in Cycle' to generate a call in March, unfortunately, I am not able to figure out how to change the cycle from 3mo to 12mo. Is it possible for to change the plan cycle from 3mo to 12mo once the plan is started? The header section in IP10 is grayed out.
    At the moment, it looks as though I need to create a new maintenance plan to accommodate the request.
    Thanks in advance.
    Anna

    Mahee,
    Appreciate your quick response. This was a strategy plan and I was able to make the changes as you had suggested, through the task list.
    Thank you so much for your help!
    -Anna
    Edited by: Anna Vuong on Feb 24, 2011 10:08 PM

  • Change start of cycle date in maintenance plan

    Dear Experts,
    We would like to change start of cycle date in maintenance plan. Iwe have rescheduled the plan but the start of cycle date remains the same.
    could you please confirm, whether it can be changed. The requirement is because of some Mt plan created with future start date in production (Year-2020) and we want to correct the same.
    Thanks

    Don,
    To determine the next maintenance call date you need to tell the system when the last maintenance call occured
    Example:
    You want the next call date on the 1 June based on a six month cycle. Therefore the last maintenance date would have been 1 January (assuming key date scheduling).
    In your case you need to RESTART your single-cycle plan on the 1 January and the system then calculates the next maintenance calls.
    PeteA

  • Maintenance Plan: Change Yearly cycle

    Hello,
    We created maintenance plans for an equipment that has: Weekly, Monthly, Quarterly, and Yearly task.
    THe date we initiated this maintenance plan was 6/1/2009. Is there a way to change the Yearly task date to 6/30/2010, but still keep the rest of the cycles the same dates?.
    *Note we currently have a s'Schedule date of "0 days"
    Thanks.

    Hi Jay,
    I assume that you are using a Time Based Strategy Plan for this. I also assume that you have created Packages of Weekly, Monthly, Quarterly, and Yearly in the Strategy & a Suitable Task list for it.
    If you have not done my assumptions, please do them first and then carryout below steps. (Aviod weekly package if you want the date exactly on 06/30/2010, if it is compulsory then you will get approximately yearly package at that time)
    After you create a Strategy plan for the Equipment and save.
    Set Scheduling Indicator as Time-Key Date. (Possible only with packages in multiplications of Months)
    Goto IP10 and Say Start in Cycle & give the Completion date as 6/30/2009 and in the Offset select the package as Yearly.
    Now all the dates will adjust based on the requirement.
    Regards,
    MLN Prasad

  • Change/restart start of cycle for strategy maintenance plan MPLA- STADT

    Dear experts,
    is it possible to change the start of cycle date in strategy maintenance plan (MPLA- STADT).
    The start of cycle was entered incorrectly into the strategy maintenance plan (IP42)
    Maint. plan was already started
    ...and called: Service orders are already created
    The existing maint. plan should be used with a new cycle start date.
    By using u201Crestartu201D in IP10, a new start of cycle date is entered and the orders are called correctly.
    But the cycle start date is not updated in the data base: MPLA- STADT
    Why?
    Regards,
    Philipp

    Dear all,
    I opened a OSS message. SAP replied that this is not covered by SAP standard. so system works as designed.
    SAP:
    The described behaviour is the SAP/R3 standard and works as designed.
    IP16 only shows this field if it's updated in MPLA-STADT.
    The 'Cycle start' resulting of scheduling (IP10) is kept in the table
    MHIS (field STADT).
    Transaction IP16 takes data from MPLA and does not read the entries
    in MHIS. The only value that can therefore be shown as 'cycle start'
    is the original value as recorded in MPLA.
    Well, this explains why system behaves like it does.
    But in my eyes this is not the correct system behavior.
    If a maint. plan is restarted, future calls will be calculated based on
    the new cycle date - what is ok.
    But IP16 indicates the old cycle date!
    In my eyes this is not correct because the list will show an incorrect
    cycle date.
    I was told to take a look at note 11:
    Sehr geehrte Kundin, sehr geehrter Kunde,
    die von Ihnen benötigte Funktionalität ist leider nicht im SAP-Standardsystem enthalten.
    Wenn Sie mit SAP an zukünftiger Produktfunktionalität arbeiten möchten, empfehlen wir Ihnen, dies entweder über die Mitarbeit in einer SAP Anwendergruppe oder über die Mitarbeit in einer der SAP Communities of Innovation zu tun. Eine Liste aller SAP Anwendergruppen finden Sie unter http://www.sapusergroups.org.
    Eine Beschreibung der SAP Communities of Innovation können Sie unter http://www.sap.com/ecosystem/communities/index.epx einsehen.
    Alternativ können Sie spezielle, von Ihnen gewünschte Funktionalität von SAP Custom Development entwickeln lassen (http://www.sap.com/services/bysubject/customdev).
    Weiterführende Informationen finden Sie unter http://service.sap.com/rollin.
    Mit freundlichen Grüßen
    Ihr SAP Active Global Support
    How can I trigger such an improvement?
    Regards,
    Philipp

  • Table for maintenance plan and maintenance cycle and Unit

    Hello,
    I need to know the table where the values are stored for maintenance plan, maintenance cycle and Unit.
    I know that we can get the maintenance cycle and unit from MMPT table.
    Question 1
    If the maintenance plan has only a single cycle then the data is stored in above table MMPT, but if a maintenance plan has mutiple cycles like 1 maintenance plan has maintenance cycle as 364 Days and 1092 days then the data is not stored in MMPt table.
    Question 2
    Requirement is I need to develop a report where in I need maintenance order, maintenance plan and the relevant maintenance cycle and unit. Supose an maintenance order is created for the above maintenance plan which has 2 maintenance cycle how can I identify for which maintenance cycle the order is created.
    Regards,
    Narendra

    Hi,
    Please review PM tables
    PM/SM/SD Tables
    MPOS                       Maintenance Items
    AFAB     Network - Relationships
    PLKO     Task list
    PLAS
    AFFH     Operations
    PRT assignment data for the work order
    AFFL     Work order sequence
    AFFT     Order process instructions
    AFFV     Order process instruction values
    AFFW     Goods movements with errors from confirmations
    AFIH     Maintenance order header
    AFKO     Order header data PP orders
    AFPO     Order item
    AFRC     Table of planned changes to conf.: Automatic goods receipt
    AFRD     Default values for collective confirmation
    AFRH     Header information for confirmation pool
    AFRU     Order completion confirmations
    AFRV     Pool of confirmations
    AFVC     Operation within an order
    AFVU     DB structure of the user fields of the operation
    AFVV     DB structure of the quantities/dates/values in the operation
    MPOS     Maintenance ITEM
    AFWI     Subsequently posted goods movements for confirmations
    AUFK     Order master data
    AUFM     Goods movement for order
    MPLA     Maintenance Plans
    BGMK     Master warranty header
    BGMP     Master warranty item
    BGMS     Text item master warranty
    BGMT     Master warranty text
    BGMZ     Warranty counter information
    CRHD     Work Center Header
    CRTX     Text for the Work Center or Production Resource/Tool
    EQKT     Equipment short texts
    EQST     Equipment link to BOM
    EQUI     Equipment master data
    EQUZ     Equipment time segment
    HIKO     Order master data history
    IFLO     Functional Location (View)
    IFLOT     Functional location (TABLE)
    IFLOTX     Functional location: Short texts
    IHGNS     Plant maintenance permit segment
    IHPA     Plant Maintenance: Partners
    IHSG     Object-related permits in Plant Maintenance
    ILOA     PM object location and account assignment
    IMPTT     Measuring point (table)
    IMRG     Measurement document
    KAKO     Capacity Header Segment
    KONP     Conditions (Item)
    KONV     Conditions (Procedure Data)
    OBJK     Plant Maintenance Object List
    QMEL     Quality notification
    QMFE     Quality notification - items
    QMIH     Quality message - maintenance data excerpt
    QMMA     Quality notification - activities
    QMSM     Notification - Tasks
    QMUR     Quality notification - causes
    STPOA     Name is does not have an A at the end; BOM items
    T001     Company Codes
    T001L     Storage Locations
    T001W     Plants
    T077D     Customer account groups
    T003O     Order Types
    T352R     Maintenance revisions
    T353I_T     Maintenance activity type description
    T356     Priorities
    T357G     Permits
    T357G_T     Table 357G texts
    T370A     Activity category for PM lists
    TINCT     Customers: Incoterms: Texts
    TVKO     Organizational Unit: Sales Organizations
    TVKOS     Organizational Unit: Divisions per Sales Organization
    TVKOV     Org. Unit: Distribution Channels per Sales Organization
    TVTA     Organizational Unit: Sales Area(s)
    VIAUFKST     Order selection view
    MMPT Cycle detail
    Regards
    Carlos

  • Start cycle date in maintenance plan

    Hello Every one,
    In my project i have uploaded all the plans in production server with start cycle date. Now when i am going in change mode i cant see the start cycle date even thoug i can see the scheduling overview in plan as correct date but i m not able to see the start cycle date. Kindly help me in this.
    Regards
    Abhishek Sinha

    Hi,
    In Maintenance Plan, once you have mentioned the start of the cycle. Again it wont appear in Change Maintenance Plan, you will have to restart or reschedule the Plan.
    Regards,

  • How to change maintenance Strategy in Maintenance Planning?

    Hi Friends
    In our maintenance plan, maintenance plan additional data, maintenance strategy is defined as 3M6M. Within this strategy, maintenance cycles are defined. Now we want it to change  to  the maiintenance strategy, 2M that is bi monthly. How to do it?
    Do I need to chage it in the maintenance plan category? I am very new to PM. Pls explain.
    Thanks
    Sangeeta

    Dear,
    It is not possible to change the maintenance strategy once assinged to task list,other option just try in the task list select the operation and select the maintenace package ,here delesect all the maintenance package alloted and then try to change it.
    First delete all the operations in the task list ,then system wil allow you to change the maintenance strategy.
    Best way is to create new maintenace plan with new strategy.
    Hope clear to you.
    Regards,
    R.Brahmankar

  • Maintenance plan package change resulting in incorrect call dates

    When we change a maintenance package on an existing maintenance plan to a package whose frequency is not an exact multiple of the previous package (for example, changing from a 6M 180-day package to a 1Y 365-day package) and then restart the plan, the call horizon of the plan seems to be ignored and the new call dates are always a day or so before the plan date regardles
    Why is the call horizon being ignored in this situation?

    Hello
    Please check the Option Start in Cycle while scheduling the Plan.
    Also refer the below thread too
    http://scn.sap.com/thread/1788240
    Br
    Rakesh
    Message was edited by: RAKESH MANE

  • Table name with feild Duration of Task/Frequency , Change in Duration/Frequency for maintenance plan

    hi experts,
    i need a table for maintenance plan which has field
    1) Duration of Task/Frequency
    2) Change in Duration/Frequency
    below i have elaborated my requirements.
    among those fields i have got the table name mpos,mpla,plpo except the above listed two feilds.
    i have to create a report with these requirements.
    anyone tell me in which table can i get that 6 and 7th fields.
    Requirement1:
    Maintenance Plan Number 
    Operation Code 
    Standard Teode(assigned to Plan)
    Standard Text Key description
    Cost Center
    Duration of Task/Frequency
    Change in Duration/Frequency
    Created Date
    Created By 
    Changed On 
    Changed By
    Requirement 2: layout of the report should be modifiable with the existing fields.
    Requirement 3: A transaction will be created to access the report.
    Requirement 4: In the report, Maintenance Plan number will be hyperlinked which will divert to AMP screen (display view of maintenance Plan) once clicked on it.
    Requirement 4: Report should contain all created and changed Maintenance Plan details.
    Requirement 5: Initial selection parameter for the report will be only Date. Based on the entered date, records created or changed during the duration should be picked up in the report.
    Requirement 6: Change in frequency will only be picked for single cycle plan. Strategic Plan will not be considered in case frequency change made in it.
    Requirement 7: Change By and Created By should be the complete name instead of User ID.
    regards,
    priya

    can anyone answer for my above question?
    regards,
    priya

  • Work Order - Maintenance Planning plant change

    Hi Gurus,
    Is there any way to change the maintenance planning plant in a created work order? We are having an issue on work orders and we need to tranfer our open work orders to another plants to solved the issue. Please me let me know if this is possible to do in SAP. And let me know how to do it in SAP.
    Thanks in advance,

    Hi,
    The start of the plan is not option as this will surely have an impact. Anyway, work around for this issue was provided and this is OK now. We will continue with the old orders untill such time they will finally be closed. No postings will be created against this old orders and if there's a need to do GR new orders will be created in new plants for the postings.
    Thanks for you help,

  • Maintenance Plan Call Completions Changing

    Has anyone noticed in ERP that a maintenance plan call completion date can be changed when the work order for a call is given a new TECO date.  I don't remember this happening with 4.6c.  When scheduling parameters are set to adjust future calls based on the completion of a previous call, the future calls are moved based on last completion date. 
    Is there a setting that can be made to fix the completion date for a call as the first TECO or call completion such that it cannot be changed with TECO reversals and new TECO dates? 
    Thank you,
    Gene

    Gene,
       I don't think there are any new settings there. The completion dates will be provided for input, on TECO, as long as the MP hasn't generated the next call object. Maybe you could schedule the plan to generate the next call object to be Planned and executed in the future, as soon as the existing call object has been set to TECO?
    if not, You could  try using the user exit  IWO10004 Maintenance order: Customer check for order completion to make sure that the date(NPLDA) isn't changed.
    Regards
    Narasimhan

  • BAPI to change maintenance plan(IP02)

    Is there any BAPI available to change maintenance plan(IP02).

    I doubt if you have any bapi's for your purpose.

Maybe you are looking for