Changing of Means of Transport for deployment order

Hi All,
Is it possible to manually/ programatically change the means of transport of a deployment order ? for example once deployment has run, it has created a deployment order with means of transport, lets say, 0001 ( Truck). Now i want to change the means of Transport to 0003 ( Air). Is it possible using some BADI etc ?
Pls note that i know that by assigning product speciic means of product of 0003, it is possible to directly create deployment order for 003 means of transport. Due to some requirement, we want to change it manually.
Regards,
Pawan.

Hi Senthil,
I tried that option already. Infact there is no need to delete existing deployment order, you can simply run deployment with replan all option. This will create deployment orders on the new means of transport. What i wanted is, without running deployment, is there some option possible wherein i can change the means of transport of an existing order, which is already created on another means of transport ?
regards,
Pawan.

Similar Messages

  • Means of transport in sales order

    Hi all,
    i want to enter some data in field "means of transport" in sales order Header data in shipping tab, but i dont have any values maintained there, where do i maintain the data of means of transport so that i ll reflect in F4 values of my sales order.
    plz advice.
    thanks in advance.
    kumar.

    Hi.,
      SPRO-LOGISTIC EXECUTION-Transportation-Basic transportation functions-routes-define routesdefine mode of transportation
    REWARD If helpfull
    Srini is right
    Thanks & Regards
    Narayana

  • Safety days supply not followed due to change in Means of Transport in SNP

    Hello All,
    I am facing a strange issue regarding the SNP heuristics and means of transport. We observed that the system was not respecting the safety days supply. For example if we had a receipt in bucket 'N' and there is a violation of safety days supply in bucket 'N-1'. When we un a heuristic ideally system should delete the receipt in bucket 'N' and create a new one in bucket 'N-1'.
    But we observed that the system is retaining the existing receipt in bucket 'N' and also creating a new one in bucket 'N-1'. This is making the available days supply to increase manyfolds and the whole plan looks inconsistent from Safety Days point of view.
    After analyzing the issue i observed that if we have existing receipts using a Means of Transport 'X'. Now if we run the heuristic using a Means of Transport 'Y' then the system doesnt touch the existing receipts. If I run teh heuristics using the existing Mean of Transport then it works absolutely fine.
    Kindly suggest.
    Regards,
    Abhi

    Hi,
    when you check all products flag it means the means of transport is available for all products and not product specific, to select the MOT for SNP you need to check the aggrgtd plng flag.
    Also safety stock has nothing to do with MOT, SNP heuristic plans based on checks the quota arrangement if its for multiple MOT it will distribute the PR based on the ratio in quota if both MOT are able to meet demand on time, otherwise it will violate quota till the time both MOT are not capable of meeting the demand on time.
    If no quota is defined it will check for which lane is able to meet on time n if their are multiple lanes which can fulfill demand on time then it will choose MOT with less cost.
    Have you got multiple MOT for a source destination combination to be considered for SNP heuristic?
    Just check your design again and explain the problem again as this is not the standard expected behavior.
    Thanks,
    Sanjog

  • Stock tranport order APO - R/3: means of transport

    Situation: we are publishing stock transport orders from SNP to R/3. It can happen that we are publishing orders of different means of transportation between same locations (several means of transportation maintained on the lane). Do anyone have any idea how to transfer information of the means of transport within certain order to R/3 ?
    Dmitry

    Sorry, I haven't been able to find a way...
    R/3 really doesn't care...
    I definitely think its a short fall of the integration between SNP and R/3.
    Like you said, if SNP selects air ship vs ground, how does R/3 know?   How will planners know in R/3 to air ship the product?
    He wouldn't...
    TPVS may remedy this problem.  As there is more integration points...
    Ken Snyder

  • Optimiser with means of transport

    Hi Experts,
    Pls spend some time to understand the below requirement and the design.
    Requirement- there are two plants, P1 and P2. Material M moves from P1 to P2 using a train R. The train can move 2100 tonnes in one trip.It takes 2 hrs to go from P1 to P2, hence it can make only 6 round trips between P1 and P2(i.e. 12 single trips) in a day. Hence APO should create only 6 orders in a particular day with max of 2100 tonnes as quantity for each order.
    Master data-
    Plants- P1, P2
    Material-M
    Resource(train)- R(bucket resource)
    Tlane- P1-->P2
    There is one SNP planning book and there are two data views- daily and monthly
    System design
    Max lot size for M at P2 is maintained as 2100
    Max bucket capacity for the resource= 6*2100= 12,600
    Means of transport for T Lane P1-->P2 is maintained as 'All products'. Transportation duration is set as 2 hrs
    Product specific means of transport is maintained for M, with consumption as 12 Tonnes
    Results-
    There is a requirement of M at P2 for 12,800 Tonnes. Stock of M at P1 is 12,800 Tonnes
    When I run optimiser on monthly view- it creates 6 orders with 2100 qty and one order with 200 qty, but all on one day-violating the rule of 6 orders only in one day
    when I run optimiser on daily view- it creates 6 orders with 2100 qty in one day and one order of 200 qty on the next day
    Query-
    1.Why do we need prod spec means of transport when the means of transport is defined as 'All products'
    2. What is the use of maintaining consumption as 12 Tonnes
    3. If I just go by transportation duration of 2 hrs, so the train makes 24/2=12 single trips, or 6 round trips. Hence 6 orders should get created with 2100 tonnes each in a day. But this does not happen and no planning happens in this case
    4.Why do I get different planning results when I use daily and monthly bucket views
    Would be very helpful to analyse the design and the concepts if someone can give some pointer
    Regards
    Manotosh

    Hi Kaushik,
    Thank you so much for your prompt reply and help. However I still have some query.
    1.As per my understanding we do not actually need prod spec MOT when all prod incator is there.I think some older versions of optimizer do not consider all prod tlane (I am not too sure abt it).But if all the prods for a specific plant can not be transferred through same MOT then it is required.Also if the res comsumption and the cost is different then also it is required.
                 - Your justification to have a separate MOT is absolutely valid as long as we need different MOT for any reason(cost, duration etc). But here there is only one product M being transferred between P1 and P2.
    2. Resource capacity will define the capacity in terms of total transportation capacity and consumption is required to do the planning.Like if the consumption is not maintained the capacity becomes as infinite.So there will be more than 12600 tons transported.
               - We define the resource max capacity and the utilisation. If the utilisation is more than 100%, I understand that it will try to supply more than 12,600 tonnes. But here the utilisation is maintained as 100%. What will happen if I maintain consumption as 10 Tonnes or 10 BBL or anything other than 12 T as currently maintained?
    3.There is a difference between scheduling and capacity.When you say 2 hrs but parallaly another tran can also go and transportation can happen.But when you define resource and capacity then you restrict the same.This is constrain plng but that duration of 2 hrd will not put any contraints.
           - The transportation resource is assigned to the T Lane. Hence whenever the T Lane is used, only the same resource is used for transportation. Hence we can not have more than one resource(R) acting simultaneously.
    4.If you see the results are same only difference is the period.Check the resource capacity view.I think you can see the capacity planned correctly and also the monthly view check the strt and end date.
           - As per the concept, SNP does bucket planning. Hence it will consolidate all the demands in a bucket and would create orders for the qty equal to the demand qty either at the begining of the bucket or middle of the bucket or end of the bucket. It will split the orders based on lot size or any other parameters defined. Hence I am getting multiple orders with 2100 qty(Max lot size) on 1st of the month. But the resource capacity is overshot in this case.

  • Basis of picking means of transport in APO

    Please help me in understanding basis of picking means of transport in APO and what is the link between R/3 means of transport and APO means of transport.
    Manish

    In R/3 the means of transport is recorded in Shipment document. It contains all the information necessary for carrying out transportation. The means of transport necessary for a shipment is reflected in the system as a handling unit. These handling units contain information about tare weight and -volume of the means of transport as well as the weight of the packed handling unit. Information about the country providing the means of transport, details about the driver and travel time are also included in these handling units. Handling units that have already been created for delivery items are copied into the shipment document where they can be packed further, if necessary. Delivery items that have only been partially packed or not packed at all can be packed in the shipment documents.
    In APO the means of transport is planned in TPVS. If the client do not have TPVS implemented, the means of transport are taken based on the locations, products and cost as well.
    The difference between the R/3 and APO means of transport I see is that in APO there is product specific means of transport wherein we can assign the means of transport for specific products based on its demand or perishability. For example, if we have a Tlane between US and Ind, the possible means of transport could be by AIR or by Water. For a product which is a primary and active product for a company, the means of transport can be assigned as Air rather by water.

  • Overdelivery tolerance Screen selection for Purchasing order

    Hi all,
    Currently we have a scenario over here, where we need to change the over delivery tolerance for purchasing order.
    Overview:
    We have received plastic packing screw ( PO 3480000011 , PO qty 98,000 pcs ) in 3 GR's
    1st GR.   21,000 pcs
    2nd GR. 29,000 pcs
    3rd GR.  50,000 pcs
    total   = 100,000 pcs
    ===================
    For 1st & 2nd del. we have input into SAP, but for the last del. we can't input because qty over 2,000 pcs than PO
    Because of this, we have reversed the 1st and 2nd GR, but we still cant enable the over/under delivery tolerance field selection.
    Other than that i have make the changes thru the
    OLME -> purchasing order -> Define screen layout at document level -> select Me22 and click on details ->GR/IR Control -> overdelivery tolerance with "X" at Reqd. entry.
    But this doesnt seem to work.
    have anyone encounter this issue kindly provide me some hint on this.
    Point will be rewarded for useful answer.
    Thank you.
    Kah Fei

    Hi,
    I think Under/Over delivery tolerance are a part of 'purchasing value key' of the purchasing view in the material master record.
    Try changing that for your material so that you get a overdelivery tolerance of more than 2% in the material master record.
    Otherwise in your PO , under the delivery tab in the item details mark the chkbox 'unlimited' overdelivery and check out....
    Revert back for further help...
    Regards,
    Prithviraj
    Edited by: Prithviraj Talekar on Jan 19, 2009 10:49 AM

  • Setup time in means of transport ignored by TP/VS Optimizer

    Hello Gurus,
    I have a requirement of having a break for vehicle resource after each trip to carry out certain routine activities. I have modeled setup time of 2:00 Hrs in means of transport  for this. However when I run the TP/VS optimizer, it plans two consecutive shipments without considering any setup time.
    Any idea on how to achive this requirement?
    Regards
    Sandeep Patil

    Hi Sandeep.
    In the transaportation lane, in the means of transport settings, there is one field u201CAddnl Retentn Per.u201D
    Additional Stop Duration for a Transportation Lane (hhh:mm)
    Did you think to use this ?
    Additional Stop Duration for a Transportation Lane (hhh:mm)
    The stop duration indicates the time that a means of transport is not in motion between two locations. It thus represents an addition to the duration of actual transportation. The duration of transportation represents the pure travelling time (working time, net transportation time), whereas the stop duration is defined as a gross time (that is, it relates to both the working time and the non-working time of the means of transport).
    Regards
    Datta

  • Weblogic.deployer  and deployment order

    Good day all,
    Is there a way to force an application to deploy last (because of dependencies)?
    I know how to modify the deployment order in the console or wlst, but if all applications are in the same application directory, how can you make sure that appxyz.war deploys last?
    Thanks
    Ash

    Ashanty,
    you may want to refer this link for deployment order of applications..
    http://docs.oracle.com/cd/E12839_01/apirefs.1111/e13952/taskhelp/deployment/ChangeTheServerDeploymentOrder.html
    I don't think weblogic.deployer will allow you to do deployment order and it can be done through Administration console only.
    Thanks
    Lawrence Manickam
    http://toyork.blogspot.ca

  • TLB Order changes means of transport

    Hi Experts.
    We are using TLB to create transport loads.
    We have a pair of source location and destination location, where a product is maintained for two means of transport MODE1 & MODE2
    When TLB order is created in APO it is created for MODE1 and saved in APO.  When It is transferred to R/3 the order coming back from R/3, it shifts to other means of transport.
    Let me know why this happens and what is the way out.
    Thanks in advance.
    Nitin Thatte

    Hi Nitin,
    Before we get the reason of the change in Mode od Transport, please tell me when the order goes into SAP from APO does it have the same mode of transport in SAP as was in APO. Is there any manual intervention in SAP side for changing the mode of transport ?
    Thanks,
    Harsh

  • Means of transport change update to SNC5.1

    If we change the Means of trasport in r/3 sales order, then this update should be send to SNC5.1 Is this mapping is done thru ORDERCH ?
    We have done ORDERSP mappings for order confirmation. Now issue is that when we do the change in r/3 sales order in means of transport that should be updated in SNC.
    Thx

    Hi Vaibhav
    Means of transport is the basic master data and in general it is created in SNC system manually even though the data is available in SAP ERP
    The behavior can be changed so that the SNC does not create means of transport  from SNC master data and the data should be picked from IDOC with the help of coding.
    Now question is how many different means of transport does this customer have? I could imagine many resources, but means of transport is mostly just  a few
    Upon which basis does the planner decide which means of transport should be taken???
    Best Regards
    Vinod

  • User exit/ badi needed for planned order create/change,collective ATP check

    Dear All,
    I'm looking for a user exit/ badi which can be used for planned orders at the stage of
    mass collective availability check (COMAC tcode) update; or at some other relevant stages of mass update of planned orders.
    I need after collective availability check to perform the following:
    1) to copy date from "total comitment" field on header tab of planned order and paste it (replace old date) to order finish date on header screen
    then
    2) to start a scheduling.
    Very appreciate your help.
    Best Regards,
    Andrey
    Edited by: Andrey Kruglov on Apr 15, 2010 3:06 PM
    Edited by: Andrey Kruglov on Apr 15, 2010 3:07 PM

    Dear,
    Use the BAPI : BAPI_PLANNEDORDER_CHANGE
    Or use the function module MD_SET_ACTION_PLAF for Schedule planned order.
    and the transaction MDAC Execute action for planned order
    This function module includes the following actions:
    Explode BOM
    Explode BOM, check availability
    Check availability, only explode BOM in the case of a requirement
    Check availability, do not explode BOM
    Reset availability
    Change planned order data
    Schedule planned order
    Delete planned order
    Assign the key for the respective action control to the materials in the material master (MRP 4 view).
    Please refer this thread,
    Re: MDVP for collective orders
    Regards,
    R.Brahmankar

  • Report for Sales Order Change History   CDPOS and CDHDR

    How to take a report of the data for the Sales Order Change history for a particular period of time. It is required to take a report of all the Sales Orders for which the basic price has been changed. Please let me know the procedure. I could not get the data from the table CDPOS and CDHDR
    Helpful answer would be rewarded.
    Regards
    Praveen

    Dear Praveen Kumar
    Have you tried with VBAP where sale order details at item level would be stored.
    Moreover, to my knowledge, there won't be any changes as for as pricing is concerned at sale order level but there is at billing level.  Normally, any price increase / decrease would reflect in billing.  So why dont you to table join through SQVI VBAP (for sale order details) and VBRP (for billing details) so that you can compare the selling price in sale order with billing. 
    Thanks
    G. Lakshmipathi

  • How to check open deliveries and open sales order using means of transport

    Hi,
    I want to check open sales order and open delivries which is having "ABXP" means of transport type .Can anybody suggest me to check in which table or any transa

    means of transport type
    Please reconfirm whether the above statement is correct.  Moreover, you yourself can check at your end by opening any sale order, go to that field, press F1 and press the "Technical Information" icon so that you can see the corresponding table name and field name over there.
    G. Lakshmipathi

  • Change GR/IR Account for Special Order PO Type

    I've had a request from our FI department.
    They would like a new PO type for special orders that will post to a different GR/IR Account.
    In our configuration, the GR/IR account is determined based upon valuation class of the article.
    But if they special order the same article using this new PO type, they would like it to post to a different GR/IR account.
    There doesn't seem to be a way to do this through configuration.  (If there is, I would love to know how.)
    I can't find a way to change the GR/IR account in the PO BAdi (ME_PROCESS_PO_CUST).  This BAdI would allow me to set the G/L Account Code, Profit and Cost centers but doesn't seem to have the GR/IR Account.
    Is there any BAdI or User-Exit that will allow me to maintain the GR/IR Account while creating a PO?
    Thanks,
    Deb

    Hi Deborah,
    You can do this by a FI substitution rule at item document level. Maybe a FI Consultant can help you.
    Regards,
    Alexandre

Maybe you are looking for

  • Received X1 Carbon (2014/"New") model 20A70035US but missing MultiTouch!

    I purchased a 20A70035US TopSeller ThinkPad X1 Carbon 2014 about a month ago.  It just arrived today as supply was very tight on it.  The unit looks great, but the MultiTouch display, which is documented in PSREF, and was also in the description of t

  • Yoga 2 Pro: downgrade to windows 7 ultimate

    Hi there, I recently purchased a Lenovo Yoga 2 pro laptop. (http://www.elgiganten.dk/product/pc-tablets/barbar-computer/LE59386592/lenovo-yoga-2-pro-13-3-multim... Since I'm not that excited for Windows 8, I decided to install Windows 7 ultimate. I f

  • Package runtime error

    Hi. When I test the code within the flash development environment i get no errors returned, however, when i run the code i get the following error; 1037: Packages cannot be nested. Any suggestions? Thanks Barry. The Code:

  • File to IDOC Multipe Records

    Hi everyone,       I was doing File to IDOC Scenario and trying to post Multipe Records to the R/3 System.       I tried sending Cremas03 details both as an XML file and also as a TXT file Using File Content Conversion from XI and i could not succeed

  • Issue with Intercompany billing- Third Party

    Hi Gurus,        I have a SD flow for intercompany billing the below is the problem with it:   Assume: X as customer and Y as vendor in with different company code but in same client 1) Let as X get PO(Purchase order) for  20 item from one person and