Changing Original System and Transport Target System for Objects

Hi Gurus,
         I need to do mass transport of all the Infoobjects to newly defined system. Since these objects have different Original system. Its giving me error. Again, for other objects, Transport Target system is QAS, But we want to change it to NBW (A new system to which we want to send transport) . I am able to change package of Infoobjects. Is there mechanism to change Original System and Transport Target for System? Please let me know ASAP.
Regards,
Harpal
Message was edited by:
        Harpalsinh Gohil

If you simply edit your original post, it will go to the top of the list. There's no need to post duplicates.
Subjects with a subject of "Urgent" will be filtered out by a lot of responders.
Why not close this thread and bump the other one?
Rob

Similar Messages

  • All Information regarding Change and Transport management System in SAP

    Hello Experts,
    Iam into Basis . I need all information ,fundamentals and concepts over Change and Transport management system in SAP .Its fundamentals,the way it works ,how requests r transporteded etc.  I want more of this information in regards to practical scenario. Plz dont provide help link as iam aware of that. I need good explanatory content ,in your own words shall be appreciated more. If any body has any self prepared good explanatory and procedural matter , tat will be of help.requested to revert at earliest as this is a bit urgent. My Email Id is [email protected]
    Useful answers shall be rewarded points.
    Thanks and Regards,
    Somya

    check this link
    http://help.sap.com/saphelp_47x200/helpdata/en/d7/8eb9361a75ea43e10000009b38f839/frameset.htm

  • How & Where to create the Target Groups and Transport Targets for Business

    Hi Experts,
               I am Transporting the scenarios from Development 500 client XI system to Development 500 client PI7.1 system. I have taken the exports of Technical system and Business System from the DEV XI system and correspondingly have imported the same in the PI7.1 system. I can see the all the business system in the Business system SLD of the PI7.1 system. I would like to assign the Business System Groups and Transport Targets for every business system that I want to transport. How can I do that ? Whether this is to be done in DEV XI system or the DEV PI system? Can somebody elaborate the step by step method to create the Groups and Target system for the every Business system so that I can import the object of the Integration Directory sucessfully................................
    Thanks & Regards
    suk4023
    Edited by: sukande on Aug 17, 2010 8:18 AM

    Hi Supriya,
               Thanks for the reply and good illustration............Still going further after defing the destination for transport in the source SLD Business system ( XI dev server) , then we should export it and subsequently import it in the SLD of the PI 7.1 ie the destination server.  Then we should transport the objects of Integration Repository and Integration Directory to the new PI7.1 server. Is this the right way to proceed.?  Hope that this will not give the error while importing the objects in Integration Directory. An typical which comes while importing the objects in the Integration Directory is as follows:-
    *Import failed because of business system transfer of object Communication Component | PCM: Obligatory transport target for business system PCM not found in System Landscape Directory*
    Pls clarify on this ......
    Thanks & Regards
    suk4023

  • My ipad mini ID code is forgetten, and its system is also broken and how to change the ID and restore the system?

    my ipad mini ID code is forgetten, and its system is also broken and how to change the ID and restore the system?

    Hi ..
    Follow the instructions here >  iOS: Forgotten passcode or device disabled after entering wrong passcode

  • I have installed Photoshop element 12 trail version in my system and i worked also for some days but it given error that "cannot load default brushes because scratch disk is full " but scratch is 158GB free

    Hi,
    I have installed Photoshop element 12 trail version in my system and i worked also for some days but it given error that "cannot load default brushes because scratch disk is full " but scratch is 158GB free why whats the problem am not getting.

    That thread helped for a time.  But now it seems as though my computer is back to slow again.  But, some of the jargon is over my head as well.  Not sure I knew quoite everything they were talking about.  But thanks a lot for that, it helped I probably just need to reread it and follow the instructions again.  Thanks so much.

  • SAP System copy without shutting down the source and the target system

    Hi,
    We need to need to System refresh without shutting down both the source and the target system, i read the docs from SAP looks like we need to shutdown the source system during export and import phase, is there any way to do the system refresh without shutting down the system.
    Sathish

    Hi,
    Think a little bit about what is a database and you'll get the answer that what you "need to need" is impossible.
    Of course it is possible to keep the source running (hopefully, because ususally it is the production system !) by using an online backup, but you need to stop the target system because you will restore a backup on it.
    If you use the export/import way, you have to stop both source and target system.
    Regards,
    Olivier

  • How to Configuring Groups and Transport Targets ?

    Hi Experts,
             In my scenario i am having two XI Servers XI1(DEV) and XI2(QUA) each system is connected to different r/3 system.
         If i transport object from XI1(DEV) to XI2(QUA) after defining Transport Target in XI1(DEV) as r/3 system connected to XI2(QUA) using file system would be fine (or) should i go for CTS?
    Regards,
    RajeshKumar.D

    Hi,
    You have to use Transpoprt method
    Procedure:
    1) Call Integration Builder screen on DEV Server with http://hostname:J2ee Port/rep
    2) Call SLD (System Landscape Directory) Component from the Integration builder
    Save all the .zip files on the Local Desktop
    3) Select the Software Component & say Export that you want to Export from DEV
    Server to Production server and which is going to use in the IR of XI
    4) Also Select the Product of the above SWC and say Export
    5) Select the Technical Systems (TS of XI & TS of the SAP R/3) and say Export
    6) Select the Business System(s) & say Export; those are associated with above Exported
    Technical systems.
    In Production Server
    1) Logon to the SLD of the Production Server.
    2) Create a Technical System and Business system which points to the Production SAP R/3
    3) Go to Administration TAB in the main page of SLD
    4) Select the Import option to Import the SWC , PRD, TS,& BS which we Exported Earlier in DEV Server
    5) Click on Browse and select the .zip files that is to Import into Production Server,
    Which were stored on the local desktop at the time of DEV Server Export
    And say Import Selected File Option
    By this we exported and imported the SLD Objects
    Now we have to create transport groups and transport targets in the Production server of SLD
    Creation of Transport Groups
    1) Select the Business systems GroupEdit Groups
    2) Click on New Group and give the name of the group as DEV_group & select the
    Corresponding Development serveru2019s integration Server
    3) Similar way create another group for Production serveru2019s business system as
    PRD_group and select the Production serveru2019s integration Server
    Creation of transport targets
    This is to Define which business systems in two different groups correspond to each other
    1) Select each Business system in the SLD and select transport TAB---click on
    Add/Change Target and select its corresponding target business system.
    For Example:
    If you select the business system of Production XI server means
    In the target you have to select group as DEVGROUP and the business system of Development XI server.
    Like this do the same for other business systems also
    Ex:
    BS_PRD_Integration Server----
    BS_DEV_Inetration Server
    How to create Transport Groups & transport Targets
    http://help.sap.com/saphelp_nw04/helpdata/en/ef/a21e3e0987760be10000000a114084/content.htm
    Regards
    Seshagiri

  • Transport Groups & Transport Targets Creation for BS

    Hi,
    I have DEV and  QTY Servers And i have 2 seperate SLD's. i need to do BS Export.
    In Which Server we have to create Transport Groups and Transport Targets????
    Regards
    Bopanna

    Hi ,
    Refer to these weblogs and links
    Overview of Transition from Dev to QA in XI
    /people/sravya.talanki2/blog/2005/11/02/overview-of-transition-from-dev-to-qa-in-xi
    /people/sap.india5/blog/2005/11/09/xi-software-logistics-ii-overview
    Two types of transport mechanism are used in PI.
    • File transport method.
    • CMS transport method.
    File transport method:
    http://help.sap.com/saphelp_nw04/helpdata/en/a8/5e56006c17e748a68bb3843ed5aab8/frameset.htm
    CMS transport method:
    http://help.sap.com/saphelp_nw04/helpdata/en/a8/5e56006c17e748a68bb3843ed5aab8/frameset.htm
    • CMS for SAP Exchange Infrastructure:
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/b8d8f7b2-0701-0010-b09a-cda4cca2c98e
    • How to handle Xi with CMS:
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/43f5d790-0201-0010-2984-ff72d822b109
    • Configuration of CMS in Central NWDI & SLD to transport XI objects:
    /people/praveen.mayalur/blog/2007/05/31/configuration-of-cms-in-central-nwdi-sld-to-transport-xi-objects
    • XI Software Logistics Solution III: CMS:
    /people/sap.india5/blog/2005/11/28/xi-software-logistics-solution-iii-cms
    Refer the configuring group and transport group for Business systems.
    http://help.sap.com/saphelp_nw04/helpdata/en/ef/a21e3e0987760be10000000a114084/frameset.htm
    Transport mechanism
    1. Create Technical System and Business Systems for the QA system.
    2. Create Transport Groups in the Business System.
    3. Create Transport Targets in the Source Business SYstem.
    Try with this
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/43f5d790-0201-0010-2984-ff72d822b109
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/b8d8f7b2-0701-0010-b09a-cda4cca2c98e
    /people/sap.india5/blog/2005/11/03/xi-software-logistics-1-sld-preparation
    /people/sap.india5/blog/2005/11/09/xi-software-logistics-ii-overview
    /people/sap.india5/blog/2005/11/28/xi-software-logistics-solution-iii-cms
    https://websmp104n.sap-ag.de/nw04 -> SAP NetWeaver 2004 - Release-Specific Information -> How-to Guides -> Exchange Infrastructre
    1. How ToTransport XI Content Using CMS
    2. SAP XI 3.0 - Using CMS for SAP XI 3.0
    Also
    Look at the below weblog for XI transports.
    /people/sap.india5/blog/2005/11/03/xi-software-logistics-1-sld-preparation
    /people/sap.india5/blog/2005/11/09/xi-software-logistics-ii-overview
    /people/sap.india5/blog/2005/11/28/xi-software-logistics-solution-iii-cms
    CMS for SAP Exchange Infrastructure
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/b8d8f7b2-0701-0010-b09a-cda4cca2c98e
    regards
    Aashish Sinha
    PS : reward points if helpful

  • One Sender system and two receivers system scenario. Pls help

    Hello,
    I have One Sender system and two receivers system scenario.
    My sender is RFC (sync) in nature.
    My one receiver is RFC (sync) in nature.
    My second receiver is RFC (sync) in nature.
    Pls tell me and send me links/docs for this scenario.
    Regards

    Hi Rick,
    For two receivers you require 2 interface determination, receivers determinations etc.
    Go through these threads for one sender and multiple receivers:
    one sender and two receiver
    /people/shabarish.vijayakumar/blog/2005/08/03/xpath-to-show-the-path-multiple-receivers
    Then configure your RFC communication channel in XI system + activate it and after that using all same parameters make an TCP/IP RFC destinatioon on R3 side.
    Rewrads if found helpful.
    BR,
    Alok

  • How to change font size and style in keynote for ios

    How to change font size and style in keynote for ios

    Same situation for report parameter input value font. What ever we do , it is still Arial and size 10.

  • I have One Sender system and two receivers system scenario. Pls help

    Hello,
    I have One Sender system and two receivers system scenario.
    My sender is RFC (sync) in nature.
    My one receiver is RFC (sync) in nature.
    My second receiver is RFC (sync) in nature.
    How to proceed with this.
    If my second receiver is async then how to proceed with this.
    Regards

    Hi Rick !
    Depending on your requierements, you can create a BPM that
    1) receives request from sender
    2) sends request to receiver 1 / receives response from receiver 1
    3) sends request to receiver 2 / receives response from receiver 2
    4) do some processing with both responses
    5) sends response to sender.
    If your second receiver is async, just use an async send step in step 3. As far as I know, you cannot use multimapping with sync scenarios.
    Regards,
    Matias.
    ps: please award points if helpful

  • Content model and transport in system using different repository

    Hi experts,
    In our development environment, we generated a content model for incoming post document
    storing in a content server.
    As the content model have been generated for this specific repository, I assume that this content model
    will not work properly in an other environment using a different repository if we transport it. Am I correct?
    Is it possible to change directly the content model assignment to a new repository in the target environment?
    Or we have to generate a new content model in the target system using the initial content model as a template and assigning the
    correct repository? In this case, we will have to maintain each content model in all the differents environments...
    What are the best practises to handle this situation?
    Thanks in advance for your help !
    Regards
    Frédéric

    Dear Frederic,
    It is possible to transport such model. You will just need to change the setting of the storage category to point to the new content server in the new system- transaction OACT. Storage category is attribute called STORAGE_CAT in the virtual PHIO class of the content model( ends with **V).
    Please note that the content model should be transported in its creation language.
    Best Regards,
    Pragya

  • Change Request Management without Transport Managment System

    Hello,
    we would like to use the Change Request Management but without using the Transport Managment System (TMS). Means, we do not want that transport request are created automatically, we do not want that it is possible to log on to the satellite systems via the Solution Manager and we do not want to integrate the transport track into the Solution Manager.
    What effort do we have to estimate for such a change? Does anybody already use a process like this? We would be grateful for any idea or solution.
    Many thanks in advance.
    Jenny

    Hi Jenny,
    you can do this with the following activities in your custom Business Transaction (BT):
    - remove un-useful actions from your action list (TA: CRMC_ACTION_CONF)
    - remove the action from the actions depending on user status (TA: starting from SPRO)
    - unlock the switches from your SMI Project CTS Switches (TA: SOLAR_PROJECT_ADMIN)
    The effort, for copying a standard BT and remove the actions and testing it, is about 5 days, if you already know how to customize a ChaRM BT... last but not least if one of the standard flows is what you really need.
    Please let me know if you need more details, otherwise please reward the forum points
    Regards ,
    Giampaolo

  • Best system and file set up for SSD + HDD in optical drive

    I have finally pulled the trigger and purchased a Samsung 512GB 840 pro SSD for the main bay in my late 2011 Macbook Pro and a iTB SATA 2 HDD with Data Doubler from OWC to replace my optical drive. My question is what is the best way to set these up after I have installed them?I am an audio engineer and I do a lot of multi channel audio editing with large files and want the SSD for the speed for my editing. Do I set these up as separate drives or do I RAID ( if that is possible)? Do I have my System software and programs on the SSD and use the HDD as my scratch drive? I don't have access to a Mac Mini, so can't create a fusion drive. Appreciate the advise.

    Put the SSD in the main drive bay and the rotating HDD in the Optical bay. Use either Disk Utility or one of the Cloning software programs to Restore or Clone your current install from the HDD to the SSD.
    Or Make a Time Machine Backup of the current install and then use the Recovery HD system to Restore that TM backup to the SSD.
    Or you can do a Clean install of OS X on the SSD then reinstall all your programs and then copy over all your files from the HDD to the SSD.
    Many ways to do what you want. You just have to pick the one you want to use.
    Yes all files on every drive connected to your Mac in any way, internally or by an external port, will be seens by Finder.

  • Difference between Existing QM system and Vendor QM system in QI info recor

    In Quality info record, under inspection control tab, I find 2 options for certificate monitoring, one is Existing QM system and another one is Vendor's QM system, Please advice the difference between them.

    hi dear,
    There is no such difference, only he thing is when u developed or upload some new vendor based OM system which is valid from its industry type. Like in manufacuring it is strongly recomended that vendor is certified by some authorized agency like ISO, TUV Nord etc. so when u use this and configure it in ur sap system than u may change the setting and use Vendor QM system in Q-Info, while if is not there than u may use existing QM system of ur own company if u uploaded in SAP or u may keep it blank if not required.
    if we use Vendor QM system than it is best practice to maintain QM procurement and related document like Certificate or Delievery assurance from vendor in MM02 ---> QM view.
    I hope this short one cleares ur point.
    regards
    Shailendra Gaur
    SAP-QM

Maybe you are looking for