Changing quality level on cancellation of a GR

Hello,I need help.
I have a dynamic modification rule on lot creation and at characteristic level.
At level one of the dynamic modification rule I have inspection for the characteristic and if the result is correct I donu2019t want to inspect it another time until 6 months later.So, the level two is an skip level.
But  I have a problem. When I make the first GR and the first lot is created with quality level register . If for some reason I have to cancel this GR and this cause at the same time the inspection lot cancellation, the level quality remains on level 2  which is on skip and not return to level one till 6 months later.
Do you know if there is something I'm not doing well?. Is just the system that works in this way?
Thanks in advance,

Problem is solved. For future reference, I use
Say, start_id is the root or they node you want to start,
Select level
FROM table
START WITH PRIOR node_id = start_id
CONNECT BY node_id = parent_node_id
This will show all the children under start_id.

Similar Messages

  • Change quality level in mass ?

    Hi,
    I would like to change quality level for all materials of a vendor.
    I found transaction QDL2 but it is only for one material.
    Is it possible to do it with a mass transaction ?
    Thank you for your answer.
    Aurelie.

    Thanks, but I still have to change quality level one by one material... Is it possible to change a list of materials of a vendor ? For example, add 5 stages to all the quality levels of a vendor's materials.

  • Quality level

    Hi,
    We are migrating QM related master data from 4.6C to ECC6. We have loaded inspection plan. Please let me know the importatnt fields that we have to check in inspection plan.
    When we try to load quality level, it gives an error stating inspection plan for inspection lot does not exist. At material master level, inspection type has dyn modification rule.
    The quality level created when GR is done. Please tell me quality level belong to master data . If so how we can load the quality level.
    Thanks
    Rajkumar

    Hi,
    Quality level is master data.
    AT HEADER LEVEL
    Usage                        Maintained
    Status                        Maintained
    DMR                       Not maintained
    Inspection point                                 Not maintained
    Sampling drawing procedure                                        Not maintained
    AT OPERATION LEVEL
    Work center                                      Not maintained
    control key                                      Maintained
    AT CHAR LEVEL
    Preset indicator                                Not maintained          
    MIC                     Maintained
    Inspec Method                Maintained
    DMR                     Not maintained  ?  why
    sampling procedure                                Maintained
    PRT                     Maintained
    Till date  the quality level is being created without DMR, inspection point and sampling drawing procedure.
    From your reply i have understood the following. if my assumption wrong, please tell me.
    1. As per your suggetion, copying the quality level from one system to another is not possible
    2. If loaded, then DMR to be load in inspection plan creation and create quality level with initial stages. Then change the go to QDL2 and change the skip status.
    If skip status is updated in QDL2, then what will happen to usage decision, lot created and other sctivities table entry in old system.  or once updated, system will automatically create the necessary entries.
    Please clarify.
    Thanks
    RAJKUMAR

  • Quality level maintenance

    Hi,
    We had initially three plants .For all those plants quality level is maintained for quality managed materials.
    But these quality levels having no task list type, task list group and group counter.
    I analyzed and found these are created automatically by system when inspection lot is created provided these (quality managed materials) materials should have dynamic rule defined for the inspection type.
    Our problem is system is creating these quality levels not in the first instance i.e. it is creating the quality level while creating inspection lot for the second attempt.
    I have following queries.
    1) what is the use of quality level in inspection lot creation .
    2) How the standard settings, if the quality level is created manually to trigger the quality level at first attempt?
    3) As I have explained earlier we are creating new plant, if we need to upload cutover data for quality level?
    If we do not what will happen? If we need to, then how?
    Regards
    Dina

    Hi,
    Quality Level: Def: The quality level is a data record that the system automatically updates at the time of dynamic modification (at lot creation or when the usage decision is made), by checking the conditions for an inspection stage change and, if necessary, storing a new inspection stage for the next inspection.
    The information in the quality level determines which inspection stage will be used for the sample determination of the next inspection lot. So, Quality Level works in conjunction with DMR.
    1) what is the use of quality level in inspection lot creation .
    Quality Level is only for changing Inspection Severity: Reduced-Notma-Tightened Inspections. Because DMR deals with skip lots/char, it keeps changing the Quality level, based on the settings you made in DMR. AQL depends on your industry requirements and is only useful for accepting/rejecting a lot.
    2) How the standard settings, if the quality level is created manually to trigger the quality level at first attempt?
    In Standard Settings, Quality Level initially is generally set to Normal Inspn. Based on DMR,  it changes immediately upon UD. Quality Level can be created using the t-code QDL1, as above. You can change  the next inspection severity manually in QDL2. 
    +3) As I have explained earlier we are creating new plant, if we need to upload cutover data for quality level?
    If we do not what will happen? If we need to, then how?+
    To start with, you don't have to define any Quality level. However, for DMR, you need to set-up the stages (severities) of inspection. That will ensure that Quality Levels are automatically updaed.  Regards, KrishnaM

  • Quality score & quality level

    Hi Experts,
    Can anybody please help.New comer in QM.Please help.
    How system calculate Quality score & quality level.What setting required for it. And where it is use. Please do not suggest sap library or F1 help.Please help.

    hi
    Evaluation of Quality Levels  
    You can use this function to can select quality levels, display the selected quality levels in a list, reset or tighten selected quality levels, display the data and dynamic modification rules for selected quality level records, and display the dynamic modification history for quality levels as a graphic or in a list.
    Quality levels that have been deleted can no longer be evaluated (that is, you can no longer obtain a dynamic modification history of the inspection lots that were included in these quality levels).
    If the system finds more than one quality level record for the selection conditions, it switches to a dynamic selection list that contains all quality levels that meet the selection conditions.
    If only one quality level exists for the selection criteria, the system switches directly to the dynamic modification history list for the corresponding quality level. The dynamic selection list appears by choosing Goto ® Back. You can make changes in this list. There are the following functions in the dynamic selection list:
    In the transaction Edit list (menu path: Logistics --> Quality management --> Quality inspection -->Quality level -->Edit list)
    Creating a Quality Level Manually  
    Use
    In most cases, you will not need to create a quality level manually. However, if you are implementing the Quality Management (QM) application component for the first time, you may want to enter data for the quality levels recorded in your previous system.
    Prerequisites
    You can only create a quality level manually for lot-based dynamic modification.
    Procedure
    Choose Logistics -->Quality management --> Quality inspection --> Quality level --> Create.
    Enter the necessary data on the initial screen for creating a quality level and choose Quality level.
    You define the dynamic modification criteria (material, vendor, manufacturer, or customer) and the inspection plan for which the quality level will be maintained on the initial screen.
    Enter the following data on the screen for creating quality levels:
    Next inspection stage
    Number of inspections or inspection lots that (based on the dynamic modification valuation) have been completed since the last inspection stage change or were accepted without an inspection (skip)
    Number of inspections or inspection lots (based on the dynamic modification valuation) that were rejected since the last inspection stage change
    Reset date on which the quality level again uses the initial inspection stage (specified in the dynamic modification rule) as the current inspection stage
    Earliest possible deletion date for the quality level
    The system makes entries in all other fields if:
    An  inspection lot is created.
    A  usage decision is made.
    Save your data.
    The initial screen for creating a quality level appears and the system informs you that the quality level was created.
    -ashok

  • Change stock level to zero

    Hello to all,
    I wanted to change stock level in SAP to 0.  This is for test purposes and replication of issue that I have.  Can anyone help?  Thanks.
    Regards.

    Hi,
    Identify a cost centre.
    1. Create a reservation using MB21 with 201 mvt type and the identified cost centre with quanity equal to the stock availability
    2. Create a MB1A ( Goods issue ) with respect to the reservation and note down the material document number.
    3. Test your scenario ( as the stock will be zero )
    4. Once the test is over, go to MIGO and select cancellation with material document number option and give the document number noted down in step 2 and check and post the transaction.
    Regards,
    DilliB

  • Quality level not updated

    Hi QM Gurus,
    I am facing problem in quality level updation through Dynamic Modification rule.
    Setup:
    Plant level setting - Inspection lot completion - Skip lot and automatic UD time as
    1 minute.
    Material master - skips allowed and automatic ud masked for inspection type 01-Goods Receipt
    Dynamic modification rule created as 1st inspection stage - one lot needs to be inspected. 2nd inspection stage = two lots to be skipped. then again stage go to 1st stage.(Rule is at usage decision level)
    I have assigned the same Dynamic modification rule in inspection plan for respective material.
    While doing goods receipt (MIGO), first lot comes to inspection stock and 2nd and 3rd lot is skip lot. after 4th lot should come to inspection stock,but it is still skip the inspection.
    When i check Quality level for material "Inspection since change" field is not updating based on the DMR. Suppose 1 inspection completed in Skip stage, but the insp. since change is showing 0 only in the display quality level transaction QDL3.
    Please suggest some solution for this.
    thanks and regards
    murugesan

    Dear,
    Please refer these threads,
    Dynamic Modification Rule In Quality Module
    Re: Dynamic modification rule
    Regards,
    R.Brahmankar

  • Reset Date in Quality Level / DMR.

    Business Requirement = Vendor Annual Certification. All batches received by the vendor during the year goes through minimal inspection and on the 365th day (reset period (days) in DMR) it changes to the initial stage of the DMR.
    However, the reset date field in the Quality level screen resets itself on the basis of the "date of last Inspection" field in the same screen. This field changes every time a UD or MIGO is executed. Therefore, the true 365th day is never reached and so the quality level never resets to the original stage.
    I'd like to change the functionality of the reset date in the Quality Level screen to reset after the yearly requalification sample (to conform to the reset period in the DMR), as opposed to after every inspection UD/MIGO. The reset date should "reset" after the initial inspection stage (in the DMR) is completed.
    Is there a way to do this through config or a user exit, or something else? Thanks in advance,

    To fulfill this requirement created DMR as following:
    Stage -1: InspeServ-4,  Skip - Blank, Ist - Select check box, Stc - select, No of insp - 1, Next stage -2, reject -1, Nect -Stage 2.
    Stage 2: InspServ - blank, Skip - select check box, Ist - skip, Max. skip duration - 365, next - stage 1, reject - 1, next - stage 1.
    Hope this would help you.
    Thanks!!!

  • Quality level modification

    HI,
    The quality level changes using the dynamic modification rule , sap records the number of lot accepted or rejected since the last change. According to others norms, the change should be done after n successive acception or rejection, does someone has encounter the same problem ?
    Thanks,
    Frédéric

    HI,
    If R is for rejected  inspection lot and A for accepted inspect lot and 2 rejections reinforce the quality level .
    SAP works as following R A A A A A R (the quality level is reinforced) .
    The norms indicates to work as following R A A A A A R  A A A A R R (the quality level is reinforced) only when successives rejection are taken. So it's hard to degrade the quality level.
    As SAP behaviour seems not to follow the norms , I wonder how this point is implemented in others companies.
    Others points, when the quality level is bad, the norms indicates a full control which generate an heavy inspection load when dealing with retail company. Same question, how it works in other companies ?
    regards,
    Frédéric

  • Best Practice: Dynamically changing Item-Level permissions?

    Hi all,
    Can you share your opinion on the best practice for Dynamically changing item permissions?
    For example, given this scenario:
    Item Creator can create an initial item.
    After item creator creates, the item becomes read-only for him. Other users can create, but they can only see their own entries (Created by).
    At any point in time, other users can be given Read access (or any other access) by an Administrator to a specific item.
    The item is then given edit permission to a Reviewer and Approver. Reviewers can only edit, and Approvers can only approve.
    After the item has been reviewed, the item becomes read-only to everyone.
    I read that there is only a specific number of unique permissions for a List / Library before performance issues start to set in. Given the requirements above, it looks like item-level permission is unavoidable.
    Do you have certain ideas how best to go with this?
    Thank you!

    Hi,
    According to your post, my understanding is that you wanted to change item level permission.
    There is no out of the box way to accomplish this with SharePoint.               
    You can create a custom permission level using Visual Studio to allow users to add & view items, but not edit permission.   
    Then create a group with the custom permission level. The users in this group would have the permission of create & add permission, but they could no edit the item.
    In the CodePlex, there is a custom workflow activities, but by default it only have four permission level:
    Full Control , Design ,Contribute and Read.
    You should also customize some permission levels for your scenario. 
    What’s more, when use the SharePoint 2013 designer, you should only use the 2010 platform to create the workflow using this activities,
    https://spdactivities.codeplex.com/wikipage?title=Grant%20Permission%20on%20Item
    Thanks & Regards,
    Jason
    Jason Guo
    TechNet Community Support

  • Change the level of isolation in a Informix connection

    Post Author: mibarz
    CA Forum: Data Integration
    Iu2019m working over informix and I need to change de level of isolation befor make a Query.
    The Informix instruction is SET ISOLATION TO DIRTY READ.  In the Data flow we are using the SQL statement object for retrieve the data.
    I try to change the level of isolation in the ODBC configuration, but its impossible.
    ¿Anybody can help me with this problem?
    Thanks,
    Martí

    Post Author: bhofmans
    CA Forum: Data Integration
    Unfortunately this is not possible in Data Integrator today. We have several enhancement requests for this and similar functionality for several RDBMS. For MSSQL server a workaround is provided via a DSConfig parameter, for other RDBMS we don't have a solution yet.

  • Error while Changing log level in Agentry 6.0.44.1

    Hi ,
    I am trying to change the log level from the Agentry Administration client, but i am getting the below error message.
    And it is showing any option to change the log levels for users. How can I change log level for users also.
    How can I resolve this error.
    Regards,
    Shyam

    Shyam,
    This is fixed or planned fixed in 6.0.46 Agentry Server (supposed to be available anytime soon in the Service Marketplace - it was submitted already to the SMP team). The fix was in SMP 2.3 and SMP 3.0 but it was ported back to the Agentry 6.0.X release. If you have no access to the Agentry 6.0.X patches this means that your SAP License is preventing you from downloading it. You may need to contact the SAP CIC (customer interaction center) group.
    Or you can do the manual setup for a workaround for now.
    SAP KBA article: 2048202 - AgentryGUI does not allow to change log settings - Not all setttings were successfully changed.
    Regards,
    Mark Pe
    SAP Senior Support Engineer (Mobility)

  • Dont allow to change item level data in sales order.

    Hi all,
    I have a requirement in which, users should not be allowed to change  item level data or not allowed to add any new items in sales order on a certain condition. But they should be allowed to change the header level data.
    How can i achieve this.
    Can anyone help me?

    Hi,
    Check below exit.
    MV45AFZZ and in form USEREXIT_MOVE_FIELD_TO_VBAP.
    Here check for ur validation, If passes then CHECK variable SVBAP-TABIX. If it is 0 then item is created. If it is GT 0 then item is changed. Other way could be...
    select data from VBAP for each sales document and item in xvbpa internal table.
    If for any item u don't have data in VBAP table that means u r adding that item. So issue error message.
    *       FORM USEREXIT_MOVE_FIELD_TO_VBAP                              *
    *       This userexit can be used to move some fields into the sales  *
    *       dokument item workaerea VBAP                                  *
    *       SVBAP-TABIX = 0:  Create item                                 *
    *       SVBAP-TABIX > 0:  Change item                                 *
    *       This form is called at the end of form VBAP_FUELLEN.          *
    Thanks,
    Vinod.

  • CHANGE THE LEVEL NUMBER IN AN SQL QUERY

    Hi
    I've this query:
    SELECT LEVEL,LPAD(' ',(LEVEL+1)*5,' ')||ENAME ENAME
    FROM EMP
    START WITH MGR IS NULL
    CONNECT BY PRIOR EMPNO = MGR
    the result is:
    LEVEL ENAME
    1 KING
    2 JONES
    3 SCOTT
    2 FORD
    3 SMITH
    my question is that if i except FORD how can i change the level number to SMITH from 3 to 2.
    for example:
    SELECT LEVEL,LPAD(' ',(LEVEL+1)*5,' ')||ENAME ENAME
    FROM EMP
    WHERE ENAME <> 'FORD'
    START WITH MGR IS NULL
    CONNECT BY PRIOR EMPNO= MGR
    the result is:
    LEVEL ENAME
    1 KING
    2 JONES
    3 SCOTT
    2 SMITH
    regards
    nadia

    Hi,
    If you notice the level of SMITH is 4 in the initial query but when you exclude FORD, then SMITH is taking up his level i.e., 3.
    SQL>     SELECT LEVEL lvl, ENAME
      2      FROM EMP
      3      START WITH MGR IS NULL
      4      CONNECT BY PRIOR EMPNO = MGR;
           LVL ENAME
             1 KING
             2 JONES
             3 FORD
    4 SMITH
             2 BLAKE
             3 ALLEN
             3 WARD
             3 MARTIN
             3 TURNER
             3 JAMES
             2 CLARK
             3 MILLER
    12 rows selected.
    SQL> Select decode(ename, 'SMITH', lag_level, lvl) dec_lvl,
      2      ename from (
      3      SELECT rownum rn, LEVEL lvl, lag(level) over (order by level) lag_level, ENAME
      4      FROM EMP
      5      START WITH MGR IS NULL
      6      CONNECT BY PRIOR EMPNO = MGR )
      7      Where ename <> 'FORD'
      8      order by rn;
       DEC_LVL ENAME
             1 KING
             2 JONES
             3 SMITH
             2 BLAKE
             3 ALLEN
             3 WARD
             3 MARTIN
             3 TURNER
             3 JAMES
             2 CLARK
             3 MILLER
    11 rows selected.
    SQL>Regards

  • Photoshop CS4 has quit asking for quality level when 'Saving As'?

    Windows Vista 64bit  /  CS4 v11
    I had to reinstall CS4 after a hard drive failure. In the new setup,  Photoshop CS4 has quit asking for quality level when 'Saving As'? Help appreciated, IM

    ImageMan II wrote:
    Windows Vista 64bit  /  CS4 v11
    I had to reinstall CS4 after a hard drive failure. In the new setup,  Photoshop CS4 has quit asking for quality level when 'Saving As'? Help appreciated, IM
    It depends on the original format and the destination format of the file.
    PS: You should upgrade to version 11.0.1

Maybe you are looking for