I realize there are a variety of ways of affecting
a change to the speed of a clip already in the timeline,
but I'm trying to figure out how to do it in one very specific way:
If I have 3 clips (A,B,C) and I want to change the speed
of B so that it is slower, but not expand the clip from
it's original length (meaning it will still occupy the
same spot, duration and length in the timeline), is there a way of accomplishing that just by punching a specific figure
in somewhere (i.e. make it move at 50%).
I know about fit-to-fill, time remap, right clicking a clip
and changing speed. However, I don't want the clip to
expand past it's spot in the timeline, just play slower in the spot it occupies.
The closest I've come is going into the time remap tool and lowering the end keyframe so it moves slower, but this is
imprecise. I want to be able to punch in 50%, or 60% somewhere and have it take, without expanding. The time remap tool won't let me punch in 50%, although that indicator moves when I drop the ending keyframe down a little.
Can what I'm describing be done, and if so, how? Thanks.

Match frame back to the original media. Slow it down, then cut it back in.
You cannot slow down the clip in the timeline without it expanding. You are telling FCP to take the existing clip and make it longer...of course it will expand in size. It doesn't know that you don't want it to do that. It assumes (rightly so) that you want the clip, with the IN and OUT points you designated, to be slower. Keeping it in the same spot on the timeline means cutting off the head or tail of the clip...losing points you told FCP you wanted.
Simple to just load the clip into the viewer, slow it down to the speed you want, then cut it in.
Shane

Similar Messages

  • Can't change speed on clips in timeline - get error message

    In Final Cut Pro 5.1.2, when I try to change the speed of clips in the timeline I get the error message "Unable to complete command. A conflict occurred during a trim operation." I have changed the speed of many clips in this project previously, but it suddenly won't do it now. I have searched for a solution but can't seem to find it. Any help would be appreciated.
    Mac Pro   Mac OS X (10.4.8)  

    You could go next door and search the forum there. Or you could search for the answer here. It comes up pretty often.
    When you change the speed of a clip it changes the duration of the clip, which ripples the sequence. That changes its duration. Sometimes changing the duration/clip speed will move things in the timeline. Sometimes when you try to move things in the timeline, overlapping clips or other things bump into each and prevent the sequence from rippling. This is most common cause for the error message you're seeing.

  • Best way to change speed of clips

    Hey, I want to change speed of clips, both faster and slower in one clip. What is the best way to do that preserving the quality? I am still learning FCP so my apologies, and I had a hard time finding anything on here through search.

    Jerry's right...
    Take a look at this:
    http://homepage.mac.com/captmench/SlowMo3.mov
    Two frames each of FCP and Shake at 50%. Use your arrow keys to go frame by frame. First frame is normal, second is interpolated. Look at the background!!
    Creative cow should have the whole tutorial online soon... I'll post back with the link when they do.
    Also, for time remap -- shake's got that under control too... but for now, look at this:
    http://www.proapptips.com/proapptipsvideotutorials/879F6B61-CFF9-4FD1-8D43-FDF89 605611A/D95A1854-BE2C-46A6-A064-FA0A2306E254.html
    Good luck,
    CaptM

  • Any way to change speed of a clip in "over-write edit" mode?

    I want to change the speed of a clip in the timeline without having to lock all the other tracks or having to move the other following clips out of sync. For example I have a clip which lasts for 1 sec, which I want to change to 3 secs. Normally when I do this in the timeline the other clips on the same video tracks which follows, will move their position..... How to change speed in "over-write edit mode"?

    I think it's even easier to just match frame the "source file"... put your playhead on the clip you want to speed change in your sequence. Then type optioncmdf. Perform the speed change in the Viewer, then simply cut it in... Might help to put it up above the older, use the double arrow selection tool facing right to move the clips past this change later... pull the upper track speed changed clip down over the old, and viola.
    Gotta say though, it's a lot easier to perform the speed change in the Viewer, and edit it all in as you go rather than doing it after you've put the clip in a sequence. (not always possible to determine what the speed change should be maybe, but sure easier.... FCP 7 handles this problem a lot better for sure, and worth the upgrade price if your machine is compatible.
    Jerry

  • Quickest way to change speed but not clip duration

    I'm trying to determine the fastest method for changing the speed
    of a clip already in the timeline, but not the clips duration. Primarily, slowing a clip down.
    The best I've come up with so far is to put the timeline playhead over the
    clip and hit X to get the clips IN and OUT points placed in the timeline. Then,
    drag the clip into the Browser, effectively making a copy of it there. Then bring the clip into the Viewer, then hit APPLE J to bring up the speed change window, affect the change, then overwrite the change you've made in the viewer back down into the timeline where you placed the original IN and OUTS. Seems like alot of step.
    Is there a faster way? Any change I try to make in the timeline itself results
    in a clip duration change. The only other way I've found it to use the time remap tool put that is even more complicated and is alot less exact when trying to make something, say, 50% slower.
    Any input would be appreciated.

    Another, close but not quite there method I've tried is the TIME REMAP tool
    that lives with the SLIP AND SLIDE.
    I can affect speed changes, and see what percentage speed change I'm
    trying to make, but it wants to change speed on both the left and right side
    of the clip. In other words, I can't place the timeline playhead or Time remap tool at the beginning or end of the clip and only effect the speed of the entire
    clip unless there is no clip adjacent to the clip I'm trying to change.
    Otherwise it changes the speed as I want for 99% of the clip and then during
    the last several frames I've accidentally sped up up those frames. I can't position it to just change the speed for the entire clip.

  • Ripple effect on timeline when changing speed

    When I speed a clip up, all clips on my timeline after that clip get sucked back.  If I slow a clip down, it will push all clips ahead of the slow clip forward on the time line.  Is there a way to stop this from happening?  Right now I just put the clip I want to edit the speed on a new video track and lock everything all other tracks.  But is there something in the settings maybe that can make it so speed changes do not move any other clips on the time line?

    Well, one way is to use the speed tool (sss)...
    Just make sure the clips aren't touching (unless you want to change the speed of the clip butted up to it, and in that case it will have the opposite effect), then speed up the clip, then close the gap by extending the speed changed clip.
    However, to slow it down, it may be a bit harder because you have to ensure you have empty spece or else the speed tool will just write over the next clip.

  • Changing SPEED to entire timeline

    I know how to change speed on an individual clip but how can I do it to all of my clips on my timeline? thanks in advance

    Select the clip with the speed change. Copy it. Select the other clips and use paste attributes.

  • Timeline shifts when I when I slow or speed a clip

    How do I stop the entire timeline from shifting when I change the speed (from the Modify menu)? If I make the clip slow motion, it enlarges and every track shifts to the right. I just want a particular clip to enlarge and everything else in the timeline to stay put. Help?

    In FCP 7 you can turn off the timeline rippling effect, in earlier versions you can't.
    What I used to do (prior to FCP 7) was to select and copy the clip to be adjusted, move to the end of the timeline, paste the clip at the end of the timeline, adjust the speed to where I am happy, then trim the speed adjusted clip so that it is shorter than the original (by dragging the right end of the speed adjusted clip to the left), copy that and paste it back over the original clip, adjusting its duration to fit the edit.
    Hope this helps.

  • How to change an audio clip's speed without changing pitch

    is there a simple way to change an audio clip's speed without changing the pitch in FCP? thanks

    Can't do it inside FCP, but you can in Soundtrack Pro.
    Another option is Amazing Slow Downer http://www.ronimusic.com/

  • Way to change speed of entire Project easily?

    Hi, I know how to change the speed of an individual clip in the timeline - but is there an easy way to change the entire speed of the project? Thanks.

    Hi, thanks guys - that worked - although it seems when I change the speed of the nested sequence and export it the quality is quite a bit worse (exporting it with the same settings) - seems to be a lot of jagged edges now. Is there something in the 'Change Speed' window that should be changed? I am creating a sequence and doubling the speed and another sequence exported with 4 times the speed. What is checked in the Change Speed window is 'Frame Blending' and 'Scale Attributes' (the default settings). Any ideas how to get rid of the 'jaggedness' that is being created? (this file was originally a .dv file - a regular export to quicktime from regular speed sequence looks fine. Thanks.

  • Trouble shooting changing speed

    Not able to change speed in Final cut express.  Telling me there was a problem during a trim operation.  Anyone run across this?  Thanks

    This can happen when the speed change moves the content of the timeline and tracks, usually the audio tracks, collide. There are various ways around this. You can use the F key to match frame to the browser clip, apply the speed change to that, and edit it into the timeline. With the playhead at the start of the clip you can press Cmd-Opt-F to call up a new copy of the clip from the hard drive, apply the speed change there, and then end into the timeline. The last way some people use is to drag the clip to the end of the timeline, apply the speed change there, and then move back into the timeline however you like.

  • Change speed for multiple images in CS6

    Hi,
    I am curious if anyone can help me, I am trying to change multiple speed/duration at a time for an image sequence and so far I have only been able to change just one clip.
    I have tried to change a image/clip, copy then paste attributes to all but was unable to get the speed changed.
    Thanks for help,
    Jay

    you can select all the clips you want to change, right click and choose speed/duration.  if you need more control, another option is to nest those selected clips and control the speed for the nest.

  • Marking an in or out point in the event browser changes the selected clip

    I'm getting quite infuriated with this issue at the moment. I'm not sure if it's a bug, or I'm doing something wrong.
    I've created collections of subclips by tagging ranges with keywords in the event browser. I'm now trying to edit these onto the timeline. I find the clip I want in the browser and use JKL and IO to mark the in and out point of the actual part of the clip I'm going to use. The problem I'm having is that sometimes - not all the time - pressing I or O changes the selected clip in the event browser.
    Any ideas what's going on?
    Many thanks in advance for any help you're able to offer.

    Changes how? Post screen shots of what you're seeing and what you expect to see.

  • Can´t activate the button to speed up clips

    Hello! i see the little dinosaur icon but i can`t activate it when click on it. How do i make it work? Thank you!!!

    Are you using the Adjust settings above the viewer?  This is a new way of changing speed that was introduced in 10.0.3 and which works fine for me but apparently not for everyone. 
    The old way was to select Modify - Fast Forward (or Slow Motion).  You can only select certain speed ratios but a slider should appear near the top of the clip which allows finer speed adjustment.  have you tried this?
    Geoff.

  • Text Overlay Speeding up Clip

    I have Final Cut Pro 6.0.6
    Out of nowhere, after one editing project (which was a hassle in HD, but worked begrudgingly) I started a new, standard project (non-HD). when I went to overlay some text, the clip below sped up. Just the video, the audio was fine. the clip didn't shorten, just sped up within itself and then dropped frames message box came up. I left the text on, thinking it was a playback issue. after it was exported (as both iphone.m4v file and a .mov file), the clip stayed sped up.
    I even exported the project without text, and attempted to import it and then lay text over the final project. it sped up again! what is causing this??
    I already dumped prefs, reset, etc. I ended up having to import the project into imovie and do the text in there--which worked fine. I don't want to do that every time, what is this text issue!?

    I did a search all across the internet and all I kept coming up with was "how to speed up clips" or "how to put text on your project". nothing like this. the last thing I want to do is sign up for a forum and post things.
    well, when I drag a clip into the timeline to edit, FCP automatically matches to the clips settings. or, that's what it's telling me it's doing. I've edited tons of m4v files over the past few months and never came across this issue before, why would it happen now to two separate projects?
    from what I understand, my settings are on DV NTSC and the file I'm editing is a Mp4 file format, which I have done plenty of times before. this is--again--only when I overlay text above any part of the clip.

Maybe you are looking for

  • How can we know the return code of BDC Program ?

    Hi All, Please tell me : How can we know the return code of BDC Program when being exceuted in Session or in Transaction mode. In my program, we are uploading data from Excel sheet to SAP via BDC The records that are not updated we want to create a l

  • ZEN MICRO won't hold it's charge!!!!!!!!!!

    I have owned a 5GB Zen Micro for about 3 years. Up until about 4 months ago I had no problem with the unit holding it's charge for several hours. Now I can't get it to last for more than 0-5 minutes when using the FM radio. By that time the battery i

  • SD Order Backlog in BW

    Hello BW Experts, I want to create a Report showing the Order backlog, hence all open orders in the system which are not billed yet. As for ERP I know that there is no sap standard solution for order backlog in VIS. Yet I wonder if there exists BW Co

  • Advice on perfect line up

    Now I use Logic Studio with the Focusrite Saffire preamp/converter. I want to upgrade my gear to pro level. What would be the best preamp and/or audio converter to make a real sound improvement? I only need two inputs. I have a budget up to € 2000,-.

  • Availability check - Planned order not considered

    Hi Experts, I am facing an issue in Make to Order scenario. My sale order is of quantity 10. when i save the sale order, i get confirmed quantity as Zero. But in my controls setting of availability check i have selected consider all firmed planned or