Changing standard material types

Hello All,
We are using ECC 6.0
I want to change few settings for standard materials types like FERT, HALB, ROH and HAWA.
For example Standard FERT does not have Purchasing view enabled but I enabled it.
Will these settings be reset when we go for upgrade in future?
Thanks
George

Hi,
You can change settings related to std config, depending upon your clients requirement using T code OMS2. In that case once you make changes in std config then all materials are created with purchasing view.
But it will reset after you upgrade your system in future as these are standard SAP settings.
As our collegue mentioned it is better to create another material type instaed of changing std material type.
Hope this will resolve your issue.
Best Regards,
Avinash.

Similar Messages

  • Modifying standard material type configuration provided by SAP

    I was recently involved in a discussion regarding whether or not to modify sap provided material types (e.g. FERT)
    My position was that SAP provided material type configuration should not be modified, instead a z-version of the standard material type should be copied over to a z-version or a y-version (FERT copied as ZFRT), configurations changes made the z-version. My position was based on the following considerations:-
    Reference to the original
    Possible implication at the time of future releases or upgrades - In Some of my previous projects this was a reason why the standard material type configurations were never touched
    Hence I am curious to know if there a more current or correct position on this topic.

    Hi Jose,
    You are absolutely correct that standard material type should not be changed as you can always reference to the original if you want to create a new material type by copying the old ones. I too have seen ZFRT and FERT.
    I go by creating a Z one, as I have always the option to reference the original Material Type. As the above members have already replied the same.
    It is very easy to check the material type like FERT, ROH etc. However, say you have changed the settings for standard material type like FHMI, LEIH, VERP etc and you want to create a new material type by referencing any of the above, you will need to check client 000 (as referred by Jurgen) to check what Pricing control it have S or V. What Item Category is in original. What selection of views are there in original etc. you always have a better edge to check from the originals if you do not change them.

  • Change the material type

    Dear All,
    i have changed the material type "FERT" to "ROH" wrongly and then , i am trying to reverse it . but the system give the error"material type can't be changed . and its give some PO number and line item also. for all those PO's are STO PO's. this All   the PO has been created  last year and GR/ IR also completed. could you please explain , why the system doesn't give any error while changing the material type FERT to ROH.
    Rgt
    KT

    Hi,
    Check whether this is helpfull,
    Following are the pre-requisites for changing a Material type :
    1. No PR , PO should exist
    2 No Stock should exist .
    OR
    1. Account Category refernce assigned for both the material type should be same so tht the accounting determination wrt to material type is not effected .
    Hoep that was helpfull..
    Thanks & regards
    Vicky

  • Change the Material type & Material industries

    Hi Expert,
                      I have created one material code. Suppose that Material Code is " XYZ"
    Material code : "XYZ"
    Material Type : FERT
    Industry sector: Chemical industries
    I want to Change material type & Industry sector.
    Please help me how i change the  Material type & Industry sector.
    Best Regards
    Shashi Singh

    Hi
    I want to Change material type & Industry sector.
    Changing the material type for a material is possible as it has been well explained by other friends
    It is because a semifinished goods  one material type  can become a finished goods another material type
    Changing the industry sector is not possible at all
    Once industry sector is assigned to a material you cant change it at all
    Regards
    Raja

  • Error while Change of material Type

    Hi,
            I have one material  and the same material is present in our 3 company code and plant,  the materila TYpe is HALB  anf I want   to change it to  FG  but while changing with MMAM  first it was giving error that valuated stock is avalable then  I have issue the material  now my stock is zero  but  still it giving error that  many PO exist  and Porduction order exist,  for the HALB valuation class is 2000  and for FG it is  3000,
    How this probelm can be solve.
    regards,
       zafar

    Hi,
    While changing the Material Type, following points needs to be confirmed :-
    1. There should be no stock against the materials. If there will be any stock against the materials, then u will have to nullify the stock for the materials.
    2. There should be no open documents against the materials like PO, PR etc. In case if any open documents, same needs to be closed.
    3. Also there should be no open reservation order against the materials.

  • Change of Material Type via MMAM

    Hi All,
    May I ask what are the other prerequisites in changing the Material type?
    What I know is stocks must be zeroed out, Open POs must be closed (is it the open POs only? or all POs with the specified material?) ,and OLD and NEW Material type should have the same Value and Quantity Updating setup.
    I tried changing one material by it reflects an existing Delivery for the said material, I checked the DR and found that it was already received - although its Shipment Cost hasn't been transferred. What should be done with these DRs?
    Thanks a lot.
    =)

    Hello
    The following are the checks the System made :                                                                               
    The POs will need to be flagged for deletion and/or the production          
    orders will need to be archived, in order to change the material type       
    for the material.                                                                               
    The value and quantity updating must be identical for the old and new       
    material types in order to allow a material type change.                    
    Review note 160970.                                                         
    If you do not want to flag the deletion flag of the PO line item for        
    the material, please use note 160970.                                       
    Note 160970 is only for material types where the quantity and value         
    updating is similar (txn OMS2 configuration) .                              
    Please refer to the Online documentation:-                                  
        Logistics - General                                                     
        -> Logistics Basic Data                                                 
           -> Material Master                                                   
              -> Material Master Records                                        
                 -> Material Types                                              
                    -> Changing a Material Type                                                                               
    If the material is already in stock, or if reservations or purchasing       
    documents exist for it, the following conditions must also be met:                                                                               
    o Quantities and values of the material of the new material type          
        must be updated in exactly the same way in all plants as quantities     
        and values of the material of the old material type.                    
    Please take note that the account category reference must be the same       
    for both the new and old material types and the stock values for the        
    materials with the new material type must be updated in the same G/L        
    account as the stock values for materials with the old material type.       
    Regards,
    Mauro

  • Change of material Type

    Hello to all,
    I have one question. We are doing implementation with SAP R/3 version ECC 6.0. First let me explain the scenario. The scenario is Intercompany sale. We have two Statergic Business Units e.g. 'A' & 'B' . One SBU ('A') isues PO for manufacturing Press Tool to other SBU ('B') for which it will be SO. . ETS is operated through Project System Module for which Tool is a FERT (Finished product). Now 'B' manufactures the tool and delivers & sales it to 'A'  with the material type as FERT whereas for 'A'  it is FHMI (Production resource tool). The problem is that both the Statergic business units are operated through SAP with same client.
    Kindly provide the soluion. Please feel free to ask any furthur clarification required.
    Thanks in advance
    Sudhir

    Hi,
    If you want to change the material type, you can try in T.code: MMAM
    But in your scenario, u just go for BOM in T.CODE: CS01( example: in a finished products how many parts are there).You can have PO for parts and SO for finished products.
    Hope this will help.
    Regards,
    Biju K

  • Change of Material Type in Plants

    Dear Guru's,
    Good Day.
    I've two plant Codes Plant A and Plant B with one company code.
    Plant A Procures a Material(ABC) from an Vendor. Material type for ABC is maintained as ROH(Raw material).
    Plant B produces Material(ABC) inhouse and does STO to Plant A.
    I've extended the Material (ABC) from Plant A to Plant B.
    Now,  I need to Change the material Type for ABC in Plant B as Finished Goods(FERT), which is not Possible by transaction MMAM.
    I need to Change the Valuation Class and Price control for mateiral ABC in plant B.
    With Regards,
    Siddharth

    Hi There
    Steps in Split valuation
    1. Define the valuation category Globally
    2. Define the Valuation types Globally
    3. which valuation types belong to which valuation category
    4. Define the Vlauation category/Valauation type locally- Per Plant
    Ref the below links for Split valuation config
    http://www.sap-basis-abap.com/mm/step-by-step-procedure-of-configuring-split-valuation.htm
    http://www.sap-img.com/mm025.htm
    Thanks
    Senthil

  • Reg change of material type

    Dear Guys,
                      how do i change a material type after it is created in material master...?

    Hi,
    Material Type can be changed using transaction MMAM
    Menu: - Logistics > Material Management > Material Master > Material > Change Material Type
    Refer following link for the same;
    [HOWTO change the Materials Type of a material master|http://www.sap123.com/showthread.php?t=21]

  • Changes of Material type

    Hello All.
    I have created a Material master and by mistake i have put wrong Material type, so now can i change that material type for that material master.
    please suggest.
    Regards,
    Vishal

    Hi,
    Before changing material type check whether any stock is there for that material also check open purchasing & sales docs. If you are changing the material type use T.code MMAM once you change the material type valuation class of the  material  also changes.
    Regards
    Ravi shankar.
    Edited by: Ravi Shankar H N on Oct 8, 2008 11:02 AM

  • How to clear the PPC balance to change the material type?

    Dear experts,
    Our customer need to change some material type (valuation class as well) from semi-finished product to purchase part. It uses Product Cost Collector for semi-finished/finished product and never makes settlement for any PCC.
    To change the material type through MMAM requires zero stock and cleared PCC balance. So we removed the stock of the semi-finished product and settled the PCC for every month of this year.
    Since the products could have entry this year and last year, even if we settled their balances of this year, it still can not be changed the material type.
    And we do not know how to settle the PCC balance of last year because only one field YEAR can be entered on screen KK87/CO88. If I enter settleme period 11, posting period 12 and fiscal year 2007, system will give error "Period 12 is not allowed".
    But we happend to find one product has no entry this year but has balance value of last year. Its material type can be changed w/o any errors, which seems last year balance has no impact material type change. I get confused.
    Can any one advise whether I'm wrong and where?

    Hi Sharan,
    Matl Povided to Vendor stock will appear in Subcontracting scenario.
    If at all you have given some material to a subcontractor , this will be consumed automaticaly when you will recieve the ordered material from subcontractor.that is 543 movement will take place in the backgroung when u do the GR.
    In case if u need to clear the stock u can do 542 and take the stock back to unrestricted.
    Edited by: Donsandy on Jan 21, 2009 6:19 PM

  • Regarding Standard Material Types in SAP

    Dear Gurus,
    We are Implementing New Project.
    For CAPEX (Capital Goods) What should be Standard Material type to be Used.(ROH,FERT,........Which One among these).
    For Engineering goods What should be the Standard Material Type to be used.
    With Regards,
    PMG

    Hi,
    You can take material type ROH /or copy the same and make new material type with required valuation class and G/L setting.
    And while making PR and PO select account assignment A-Asset and make capital PO accordingly.
    Hope this will resolve your issue.
    Reagrds,
    Sandesh Sawant

  • Pro's and Con's to using Copies of Standard Material Types

    Hi
    We are looking for the pro's and con's of using copies of standard SAP material types for my company.  We are a consumer goods company and looking to see if there are drawbacks and benefits when it comes time to upgrade SAP.  Also what industry standards are out there for when we change / add views to standard SAP material types.
    Regards,
    Josh

    there are no real pros and cons - just philosophy
    We're using the SAP given material types, even adjusted to our needs, already for many years from 3.1 to 6.3 release and had never any issue with hotpackages or ith release changes.
    We are using as well many own material types created by copy of SAP material types.
    the only issues I know are, that the users need some time to understand which type to use if the description appears twice.
    (Remember, it is a personal setting if keys are shown in dropdown lists, and I know many user who do not display the keys)

  • Change material type - any warnings?

    A material with very little history exists in the system as a semi-finished item with 1220 valuation class.  One purchase order exists that is due in, in two days.  No inventory exists.  The problem is that the system is not configured to post goods against 1220 valuation class items.  So it needs converted to a finished good since the plan is to sell it after it is received from a vendor.
    No open orders or other movements exist in the system.  Just one new open po that was created today, and could easily be deleted. 
    So, delete the po then change the material type using MMAM. 
    Are there any recommendations/warnings someone can offer before this is done?

    Hi,
    Pre requisites for changing a material types:
    1. If you use a material ledger the material ledger must be settled in it.
    2.If the old material type did not require you to specify a price control for the material the new material type must not be configured such that it allows only
    standard price as price control.
    3.If the material is already in stock or reservations exists or purchase orders exists the following conditions must exist.
          1. The stock values of the new material types must be updated in the same
              G/L Account as the stock values of the old material types
         2.  Quantities and values of the new material types must be updated exactly as were by the old material types.
    Regards,
    nandha

  • How to change material type and industrial sector of the exsisting material

    Hi,
    There is an issue where user wants to change material type and industrial sector of the exsisting material .Is  it posible to do so??
    IF not ,how can we delete that material from material master so that another material with same number and required material type and industrial sector  can be created.
    Points will be definitely rewarded.
    Thanks
    Rohit

    Hi Rohit,
    You can change the material type in MMAM trxn code if the material dosenot conatain any open purchase requisitions, open reservations & open purchase orders. Also material stock should be zero.
    Remember the new material type should have same attributes same as old material type.
    OLD Material New Material
    1) Standard Price 1) Standard Price
    2) Manufacture part 2) Manufacture part
    profile actvated profile actvated
    3) Quantity & Value 3) Quantity & Value
    Updation in all areas Updation in all areas
    4) should have same GL 4) Should have same GL acs
    acs
    It is not possible to change Industry sector once created.
    If you want to delete the Material, you can flag it in MM06 trxn code.
    Reg,
    Ashok
    Dont forget to Assign points if useful.

Maybe you are looking for

  • How to load a document in Muse without linking it to anything?

    I would like to load some documents to Muse before linking them to anything.  Is there a way to do that? So far I have been writing text and linking a new file / document from my computer to that text.....  but I don't really need that text as I just

  • SharePoint 2010 Content Type Hub

    Hi, I have a Content Type Hub in the SharePoint Server and it is being subscribed to one of the Web application and it's site collections. If I make any changes in existing column of the Content Type in Content Type Hub and subscribe to the required

  • Problem In Limits for Service PO

    Hi, I create a service PO with Acct "K" and Item "D". In Limit, i put Overall Limit       3500                      Expected Limit   3000 But when i m doing MIRO, i put amount 4000. System is not giving me any error or warning while simulate. Regards

  • Visa Write go slow

    I have a LabVIEW program which uses a duplicate session to write stuff to an Arduino and read stuff from an Arduino.  After running for some time, occasionally some of the VIs "freeze".  This was on an executable so I haven't investigated what's goin

  • TM2T * What are the voltage and current requirements of the Tm2T?

    I didn't purchase the car adapter when I ordered my tm2t and it hasn't arrived yet so I can't check the power brick myself. Are there car adapter sources other than HP? Thanks