Changing the work order concept .

While creating  PM Order IW31 , I get responsible work center and profit center populated once I select the main work center .
My question is if I change the Main work center should the responsible work center and profit center change automatically ?In my case it does not change and my client is asking if they can be changed by some settings .
Along with this I have some doubts as where the following comes from and what s their significance.
>Responsible cost center(Additional Data)
>Profit Center(Additional Data)
>Cost Center (location tab )
>Cost Center (in settlement rule )

Responsible cost center(Additional Data)
This is labor cost center which have been defined in Main work center. In KP26, for the combination of this cost center & activity type which has been mentioned in Main work center, cost will be defined. So its important to calculate the Internal labor cost.
Profit Center(Additional Data)
Generally profit centers will be defined to club the costs & profits, so that in controlling, profitability analysis can be done. Each cost center will be assigned to profit center. More cost centers can be assigned to profit centers. For example, by means of production, company will get the revenue. By means of maintenance, they incur some cost. By comparing cost & revenue, analysis for CO can be done easily.
Cost Center (location tab )
This will be picked from Technical object (Equipment / Functional Location) masters. This is settlement receiver where order cost will be settled. So that, by seeing cost center based report, we can find out how much we spent on for maintenance.
Cost Center (in settlement rule )
Generally Cost Center (in settlement rule ) will be Cost Center (location tab ).

Similar Messages

  • All default routing value has to be changed, while changed the work center in production order

    Dear friends,
    our client they want to change the work center in production order.according to production version work center also they are changed.so while change the WC,all the default value has be changed as per routing what we maintained in routing.At present we have to enter the manually change the W.C as well as set up time and operation time enter manually.Any other option to do the automatically capture value from routing while change in Work center in production order.pl help me on this.
    Thanks&Regards
    Sabhapathy R

    Hi Rahul,
    Thanks for reply. I am maintained in diff value  maintained routing , Ex :First routing i have  work center 'X' value maintained as a setup time in 15 Min's and operation time 10 Min's
    second work center 'Y' I have maintained as set up time 10 Min's and operation time 30 Min's,
    Now I want to change the work center in production order as a 'Y' so whatever value maintained in routing , it has to be changed automatically (10 min's and 30 Min's), but system will not change only old value only picked (15Min's AND 10 Min's).
    Now I think you get to know what the client requirement, kindly do the need full.
    Regards,
    Sabhapathy R

  • Tracking the component changes - Open work order

    Hi
    We have been using special work order type, it is an open work orders. Was created for adding the small consumable and do the time writing for small jobs. The users are instructed to use only for consumable material and time writing job. But how ever the user who have acces to change the workorder are adding those material with high value. I want to trach who has ordered this changes is there any standard way to check the order.
    If any changes made to the component list it will display the same reservation number which the warehouse will issue the goods, I would like to know each time item added to the component list by different user there ID or the name i should find.
    Thanks
    Mujeeb

    Hi Peter,
    Yes we can see the material reserverd against the person who is taking the material from the warehouse.
    But the issue is while adding the material in the work order does not show who is the person adding the material to the workorder, it will go to the person who created the workorder to the same reservation.
    For my issue is there any standard way or we have to go for development please let me know.
    Thanks,
    Mujeeb

  • How do I lock the work order number on my form to not change

    Thanks to everyone who helped on this form.  The work order number is setup to generate according to the date and time, only problem is that it changes everytime it gets opened, can it be setup somehow to lock it in automatically when I send it or the customer sends it back?   Form is attached
    Thanks
    Mike

    Simply put a condition in to test if there is anything in the field .....if it is empty then go ahead and calculate your number if there is something in it then do not calculate the number. Also you shodul not use teh Calculate event for this script. I moved it to the docReady event. It will work on the calculate event but the calc event is fired many times in the normal operation of the form where as teh docReady event is only fired once (when the form loads). This is a much more efficient way to use your form.
    See the modifed attachment.
    Paul

  • How do I change the sort order in the file picker?

    Hi there,
    I've recently hit a problem with the Save and Open dialogs in Mavericks. Some how I have changed the sort order within the Column View so that it sorts by modified date and no longer by name. Unfortunately I can't work out how that happened or how to get it back so that it sorts by Name.
    Please could anyone help?

    Normally, you click on this thing (shown below) and select the sorting preference.

  • How I can change the z-order of objects?

    Hi,
    I'm creating subform that contains "tabs", I want to change the z-order of the a tab when it's clicked to be on top of other tabs.
    it seems instanceIndex does not work or it wan not mint for this kind of visual effects. 
    Any idea on how this can be achieved?
    BR,
    Yasser

    Simple. Use the reorder button on the toolbar.
    Message Edited by Dennis Knutson on 10-18-2007 03:06 PM
    Attachments:
    Reorder Button.PNG ‏2 KB

  • How to change the tabbing order of an array of clusters?

    How to change the tabbing order of an array of clusters?  I have the cluster arranged in table in the front panel.   The cluster element goes horizontal and array element goes vertically.   When I press the tab key, the cursor goes to the next array element instead of the next cluster item (down instead across).
    Solved!
    Go to Solution.

    Broken Arrow wrote:
    Harold asked a perfectly reasonable and necessary question, but how is that a Solution ???
    I believe it is called the Socratic Method.
    Sea-Story time
    I had the privledge of working for Ron Davis when he managed the Allegheny District of DEC. He was an ex-WO4 (Highest possilbe rank for non-commisioned officer in US Navy, required act of congress to confirm).
    Ron never answered any question I ever saw presented to him. I remember a group of managers in a frenzy over some issue  running to him to to see what he thought. He asked them a series of questions that lead them to the solution and soon they were smiling and slapping each other on the back as they walked away.
    Who is that has a signature that read "it is the questions that guide us"?
    Ben
    Ben Rayner
    I am currently active on.. MainStream Preppers
    Rayner's Ridge is under construction

  • How do I change the PDF order in a portfolio?

    I have been creating a PDF portfolio and would like to know how to change the specific order of the files as they appear in the carosel. I have tried all of the view modes, dragging and dropping doesn't work, renaming and adding 1,2,3 or a,b,c doesn't work.
    I just want to be able to place the pdfs in a specific order. Any help would be appreciated.
    Best Steve

    You  need to change the name and then change the Initial Sort order.

  • How to refer the work order status value from a different transaction in the step handler?

    Hi All,
    I have a requirement to check the status of the work order from a different transaction before doing some logic in the current transaction. The following transactions are done to replicate the issue
    1)changing the status to ONSITE to edit the work order (transaction 1)
    2)Adding some information which will do some logic (transaction 2)
    3)Completing the work order (transaction 3)
    The transaction 2 will have some logic and will be executed only if the status is COMP but even though the status is COMP now (transaction 3) my condition check in the logic is showing as ONSITE status(transaction.status=ONSITE) and it fails. How can i get the latest status of the work order in the device? Please advice

    Hi Jason,
    The CompleteWorkOrderFinish sub action does have Apply action (screenshot 1) and the transaction definition (screenshot 2)of CompleteWorkOrderFix transaction with the only property Status which has the following settings (screenshot 3)
    Also I am trying to add a status property in EditMeterFitDetaisl transaction and update this value with the current status of the work order using object collections filtering with key value. Please let me know if that approach can be followed. Thanks

  • How change the sort order of searched items so last search item shows first. I DO NOT mean the order of search engines, but existing searches by down arrow key

    I want to be able to change the sort order of items I have already searched for in the search box. I want to be able to hit the down arrow key and see my previous searches in the order of last search showing first. At the moment I have no idea how it is sorting and it's very annoying to have to re-type a query I typed 5 minutes earlier but because I typed in another 10 since it is lost somewhere in the list. Can this be done, I have googled but did not find the topic anywhere. Just to clarify, I DO NOT MEAN the order of search engines (which is all that comes up in google), I mean the actual text typed in which has been saved in the drop down list.
    Thanks

    The "form fill" feature uses a "frecency" algorithm, frequency + recency, similar to the address bar autocomplete list.
    I found an extension that seems relevant, but the reviews are old so I'm not sure it's still working: [https://addons.mozilla.org/en-us/firefox/addon/searchbar-autocomplete-order/ Searchbar Autocomplete Order].
    But... is the autocomplete not working? I would expect that typing a couple characters of the earlier query would filter the list so you can easily select it? Or is the problem that the list doesn't remember enough searches for that?

  • Change the boot order of an RHEL  ESXi server

    How to  programmatically change the boot order of an RHEL  ESXi server?

    Broken Arrow wrote:
    Harold asked a perfectly reasonable and necessary question, but how is that a Solution ???
    I believe it is called the Socratic Method.
    Sea-Story time
    I had the privledge of working for Ron Davis when he managed the Allegheny District of DEC. He was an ex-WO4 (Highest possilbe rank for non-commisioned officer in US Navy, required act of congress to confirm).
    Ron never answered any question I ever saw presented to him. I remember a group of managers in a frenzy over some issue  running to him to to see what he thought. He asked them a series of questions that lead them to the solution and soon they were smiling and slapping each other on the back as they walked away.
    Who is that has a signature that read "it is the questions that guide us"?
    Ben
    Ben Rayner
    I am currently active on.. MainStream Preppers
    Rayner's Ridge is under construction

  • Modification of the Work Order Program TCode IW31

    I need to do a modification to the work order program. Tcode IW31
    When creating a work order with reference to an old work order, we want to clear any PRT data that might be in any item of the operations tab of the old order.
    My question is:  Which method should I use to get this change done?
    I looked at the badi = IWO1_ORDER_BADI --> the method REFERENCE_ORDER_CHK, but I do not think this is the right one.
    Please help me...
    Thanks.
    Regards,
    Francisco.
    Message was edited by:
            Francisco Alonzo

    To check for the suitable badi, Go to transaction SE24 and give the Object type as CL_EXITHANDLER and click on Display button.
    Double click on method GET_INSTANCE, put a break point on case statement.
    Execute your transaction and look for variable EXIT_NAME at your scenario then It will show the available badi's.
    Reward if it is useful.
    Thanks,
    Srinivas

  • How do you change the movie order in iDVD?

    I'm doing a video showreel and need to change the running order of movies that I'm using. My menu page lists the 4 movies in a vertical list, which is fine, except I'd like to move the last one up the running order in the menu.
    I assumed you'd drag it, but that doesn't work. Can anyone help?

    You can drag the sub-item (movies) back into the parent item and it will place the item you dragged into it at the "end" (on the right looking at it in the top-down tree view.) You cannot put the first item on the end, but you can get around this by putting it into a child node and then back into the parent node.
    Hope this makes sense...

  • Change of Sales Order  automatically changes the purchase order

    Hi 
       I am working on a scenario where a  as soon as a sales order is created it will also create a purchase order on plant which will supply the item to the plant on which sales order is created.This works fine.
    Now when I change sales order( order qty ,requested delivery date, new item added) . On saving the sales order it should change the purchase order which has already been created by updating the schdule lines in the purchase order with new values from the sales order. It is all in same SAP instance.
    Here are possible ways I can think of:-
    1 Change of SO will create a SO IDOC . The SO IDOC should supply required values to the PO Idoc . The PO IDOC should get posted to SAP to change the existing PO.  Client does not have XI so we cant use XI for conversion.
    2 Changing a SO will trigger workflow.The Workflow executes ABAP program which takes data from SO and calls BAPI to change the purchase order and sends notification that PO has changed.   Which BAPI?
    Any thoughts are welcome. We are on 4.7 and we dont have XI. So please do not suggest XI based solution.
    Prashanta

    Prashanta,
    For your 2nd part of question, you can use 'BAPI_PO_CHANGE' to change the PO.
    Thanks

  • Printing issues i'm not able to change the print order it always prints back to front.

    I have an HP Pavilion  model p6112p. Operating System is Vista Home Premium 64-bit, with an HP Deskjet Printer Model 6980.
    The issue is I am unable to change the printing order of multiple page printing, they print from back to front on everything that I print, even my Quicken Checks, print back to front. I am unable to resolve this issue. HELP!!!! 

    I changed the code a bit. I removed the graph and replaced it by a value, the same error occured.
    How to reproduce:
    1) Exit LabVIEW completely (VERY IMPORTANT)
    2) Open and run the attached VI
    3) change the value of the 'value'-control to eg. 2.2 by typing in the value.
    4) press on the print button
    5) try to change the value of the 'value'-control to eg. 5.0 by typing in the value. This is NOT possible.
    Changing the value with the arrows is possible.
    6) stop the VI.
    7) restart and no problem will occure.
    8) Completely exit LV, restart the VI (and LV), the same error appears again after having printing the front panel.
    I notice this only with LV 6.0.2. With LV 6.1 it seems to work fine.
    Attachments:
    PRINTfp.vi ‏28 KB

Maybe you are looking for

  • How do I connect MacBook to LCD TV?

    Hello there, I have a MacBook and would like to hook it up to my widescreen TV so I can see photos on it through FrontRow and maybe watch movies too. I have the following connections on my TV red/white/yellow s-video x2 scarts pc input pc audio input

  • Stepper, VISA

    Hey guys, it's me again   so I have been trying to control my stepper motor, via it's driver, via VISA on LabVIEW because the driver has a UART interface.  Anyways, I have been trying to control the motor for a couple of hours now and nothing seems t

  • Inside  WEB -INF

    We are developing the current version for better. These are what we have done.... 1)Check out the latest  code from subversion. 2) Now, using Jdeveloper, open up an existing application 3) point it to the *.jws JavaWebStart file that should pull in a

  • HEEEELLLPP​PP

    Howzit people! I realy need ur help, my blackberry (torch 9800) has been givin me abit of an issue. My app world has disappeared from my home page. Av tried reinstallin a copy from tha internet stil it doesn't show, but wen I check in applications it

  • Moving emails between 2 computers?

    What's with the Mac Mail app? I use a mac at work and one at home. I was using Entourage, until it ate my entire email existence. But, with it, I could simply drag a message to my thumb drive, and then simply drag it into the message window on the ot