Changing UOM

Hi Experts,
I want to change the UOM of few materials.
I have already followed these steps but having a issue.
Checked the stock through MARD and MMBE - No stocks
Deleted all the open PRs/open POs and reservations.
Now when I try to change, system allowed to change the UOM for 3 materials but its still throwing error "Stock still exist in plant" for other two materials in MM02. I rechecked there is no stock for this material in any storage location.
what could be the reason?
Regards,
Senthil
Moderator message:
Locked. Reason: basic question, discussed many times on the forum.
Points will be removed.
Edited by: Csaba Szommer on Jun 27, 2011 12:53 PM

Hi,
You should not change base unit of measurement as system will have transactions( PO, GR,SO,GI) already.You can maintaion alternative unit of measurement.
For more check the link:
http://wiki.sdn.sap.com/wiki/display/SI/UnitofMeasurerelatedsettingsinSAP
Regards,
Biju K

Similar Messages

  • Change UOM in PR but PO exist for PR

    Hi Experts,
    We created a PR with a customized account assignment cat. and material text (no material code) with UOM L , we created PO in UOM L but purchasers cant do GRN because they received material in UOM LG ( which they mentioned in PO/PR Texts area). Now, the issue is with changing the UOM from L to LG in PR/PO.  I could though of only option to delete PO and PR line item and create a new but that we can't do because the same PO number is been shared between concerned parties/departments/contractors.
    Please tell me what are the other ways to change UOM. (as I am not using material code so additional data field doesnt come in picture)
    Thanks.
    Saurabh

    Thanks Jurgen.
    Even if I delete PO line item and create a new one then UOM should come from PR itself but after PO deletion also PR UOM is in display mode. Is there any program required to run to make it editable?
    I found one info. in PO about 'Order price unit' which says:
    Order Price Unit (Purchasing)
    Indicates the unit of measurement to which the purchase order price relates.
    Example
    A material or commodity (for example, oil) can be ordered by the liter, but the vendor's invoice shows a price of 2 dollars per kilogram.
    You enter 10 l as the order quantity and order unit, but specify 2 dollars per kg as purchase order price and purchase order price unit.
    In addition, you enter the conversion factor "order unit -> purchase order price unit" (for example 2 l per 1 kg) in the "details" data of the purchase order item.
    In GRN it says:
    Definition: purchase order price unit
    Purchasing (MM-PUR)
    An alternative unit of measure that can be used for ordering purposes.
    The purchase order price unit enables you to express the purchase order price in a unit that differs from the order unit.
    Example
    Ordered: 100 m2;    Price: $24.20 for 10 kg.
    The order unit is m2. The purchase order price unit is kg.
    Return ->
    Definition: purchase order price unit 
    I was just wondering if I could use this method to change/show a change in UOM. But if no relation exists then... it wont work I think.
    Kindly suggest.
    Thanks

  • Changing UoM of Item which has a transaction

    we are going to change UoM of one Item in inventory, But this Item has transaction in system , and also some onhand. how we can do this task by consider the cost and quantity?
    thanks

    Dear Farhadn,
    It is not possible to change the items UoM once there are transactions linked to the item. This is the current system definition of SAP Business One.
    However, you can use factors (in the item master data) and Base units in marketing documents as workaround.
    Please, find instructions in the attached document.
    There is also a webex session available on the SAP service market place. Please find below the path to the webex:
    https://websmp207.sap-ag.de/~sapidb/011000358700000050892007E
    Go to Logistics - Inventory and core logistics -> 11.12.2006 - Items per purchase Unit in the Item Master Data
    Regards,
    Varun
    SAP Business One Forum Team

  • Change UoM in Master Data

    Dear All,
    I am going to change UoM in material master data but the system prompts an error "Independent requirements are already assigned to the Material".  However, I already deleted the independent requirements and still the system does not allow.  There are no existing PO or stocks for the material.
    Where else should i look into to resolve my error?
    Thanks and regards
    Ching

    Hello Ching,
    If it is the base unit of measure that you want to chnage and you have made some use of the material already then the way you will change the base unit of measure is to create a new material copying the existing one but changing the base unit of measure of course before saving and deleting the existing material afterwards.
    Regards, Richard

  • Change UOM in Material master

    Hi friends,
    I have a material X in Plant ABC and Plant XYZ.
    I have no open PR's and PO's for those materials.
    I have received 10 Ea in Plant ABC on 10/20/09 ( Current stock is 10 ea in ABC)
                       and 20 Ea in Plant XYZ on 11/12/2009.( Current stock is 20 ea in XYZ)
    Now I wanted to change the UOM from EA to LB.
    I did issue (GM 201) 10 Ea from ABC and 20 Ea from XYZ. So, in MMBE no stock was showing.
    Still, when i try to change UOM, it was erroring that "Stock exist in Plant ABC and Plant XYZ" ????
    Any Idea, why so.
    Appreciate your valuable feed back.
    Note: I could change the UOM once I canceled the previous material documents to make sure Zero stock.
    But, Why I could not be able to change when I issue (GM 201) and made zero stock????
    Regards,
    Dev.

    Hi,
    According to your explanation the condition has gone through as below scenarios:
    You have received 10 Ea in Plant ABC on 10/20/09 ( Current stock is 10 ea in ABC)
    and 20 Ea in Plant XYZ on 11/12/2009.( Current stock is 20 ea in XYZ)
    You've issued 10ea in plant ABC on 11/23/09 (GM 201)
    and you've I issued 20 ea in plant XYZ on 11/23/09 (GM201)
    From the above, I conclude your current period is 11/2009 (November) and for solving the case on:
    Plant ABC. --> cancel your GI (mvt 202) for 10ea with the same current date 11/23/09 then follow by
                            GI with the previous posting period 10/30/09
    Plant XYZ --> display material stock with MM03 under storage location stock tab for previous period stock info.
                           then you should GI for relevant qty that you've seen onto previous period posting date.
    Hope it may helps you...
    Cheers,
    Girang
    Edited by: girang irawan on Nov 25, 2009 9:48 AM

  • Error during Changing UOM

    Hi All,
    When we are changing UOM for a material, we are getting error - Purchase orders exists for this material.
    When we checked line items of POs with this material, all the line items where this material is used are closed ( that means delivery is completed and delivery completion indicator") is checked.
    One method to change UOM is to set the deletion flag for these PO line items and then change UOM.
    Can anyone let me know does there is any other option to change UOM for the material without setting deletion flag for the PO line items. IF yes, please let me know how can we change UOM ?. User does not want to set the deletion flag for the POs due to legal risks. Can anyone advise please.
    Thanks in advance

    >
    AdityaS wrote:
    > Hi Jurgen,
    >
    > Thanks for the reply.
    >
    > As mentioned we have line items which are open in the Purchase orders shown in the error snapshot when we are trying to change the UOM. So, we cannot archive the Purchase orders.
    >
    > So can i simply set the Deletion flag for the line items of the Purchase order mentioned in the error snapshot and change the UOM and after changing UOM, can i remove the deletion flag?
    >
    > Please advise ASAP
    no way to change the UoM until the the PO is archived. you have to delete theopen items as well, then archive the order, then change base unit, then create the order again.
    (it is easier to create a new material)

  • Change UoM of on routing operations.

    Hi PP Experts,
    Please someone help me on my problem regarding changing UoM on routing operation. I have to change or convert the labor time and machine time from CTS (cents of second) to S(second). How can i change that and i have to consider the impact on report such as routing check, standard time checking report and finacial cost.
    Thanks for your help.
    Edited by: yatch0325 on Oct 13, 2010 7:58 AM

    Hi,
    1. In the routing change the UOM for standard value to S and eneter the calculated machine time in S.
    2.Change the Base qty and the operation unit.
    3.Activity type and the cost needs to be checked.
    Thanks,
    nandha
    Edited by: S.Nandakumar on Oct 13, 2010 8:25 AM

  • Issue related to changing UoM in PO which is created w.r.t PR

    Hi All
    I have Created a PR without material (i.e for Projects) and entered UoM as EA
    I have created a PO w.r.t PR and saved it.
    Now i want to change the UoM from EA to AU but system is giving me error.
    "Order unit AU not convertible into unit EA of requisition"
    So i tried changing in PR but in PR the UoM field is disabled so i cant change the UoM there also
    Can you plz guide me what could be the solution to resolve this issue.
    Thanks and regards
    shailesh

    hi..
    UoM cant be changed...
    It can be chaged only if..
    If there are no stocks of the material in the current period and in the previous period
    If there are stocks in the previous period, you can clear them as follows:
    a) Post the stock in the previous period to the current period (for example, using movement type 561) so that the stock for the previous period is the same as the stock for the current period.
    b) Clear the stock with the posting date in the previous period (for example, using movement type 562).
    If no purchase requisitions, purchase orders, or scheduling agreements exist for the material
    So. please all these..
    Thnks..

  • Not able to change UOM in material master for a material

    Hi all ,
    I have a issue with changing of the UOM in the material master , IN MMO2  after changing the UOM , in Display error , its showing the error as : The base unit of
                                         The reasons for
                                         Manual  reservation
                                         Reserv.No   , Item - No data
                                         Purchase order  - 30017056  , Item 1 - 1
    There is no stock in the previous as well as current period , and deleted the PR , still i am not able to change
    Please help urgently
    Thanks in Advance
    Neha

    Hi Satyajit,
    Please look at OSS  Note 1069560 - Data inconsistencies: Activating integration. models in parallel, if this helps you.
    Since  Gross data of material is in the basic view, it is common across plants , whereas, IMs are normally designed to have material masters at plant level.
    We may have same material in different IMs with different  plants. Therefore changes of the basic view fields are then contained in multiple IMs.  SAP advises to have a larger IM or sequential activation of IMs.
    I hope this will  help you .
    Regards
    Datta

  • Requisition Import changing UOM and quantity when AUTOSOURCE_FLAG ='Y'

    I am loading PO_REQUISITIONS_INTERFACE_ALL with the information for my requisition. I give the UOM_CODE as EA and quantity as 20 and it is changing the quantity to .06667 and the UOM to CA. We have three lines in the QUOTATIONS for this item. The first has CA as unit of measure, the second has EA as unit of measure and the third has BG as unit of measure.
    I tried unapproving the first line since it appears that Oracle is using the first quotation line to convert. But when I rerun, it doesn't select EA which would be the next quotation line, but rather it selects BG as the UOM.
    Has anyone else ever seen this behavior before? I am passing the correct quotation line in AUTOSOURCE_DOC_HEADER_ID and AUTOSOURCE_DOC_LINE_NUM yet Oracle ignores this and seemingly insists on using everything BUT the correct one.
    Has anyone else seen this behavior? Is this a configuration setting or am I not filling out PO_REQUISITIONS_INTERFACE_ALL properly?

    This was fixed by a patch.

  • Changing UOM / Price on a PR / PO

    Need to identify the best way to update pricing / quantities on a non-inventory item. 
    The end user put in a Purchase Requisition for 275 ea at 87.50 per each, total $24062.50.  The Buyer inadvertantly put the PR into the Purchase Order without changing the PR price / UOM.  The actual value of each item should have been .31 cents.  The buyer changed the PO price but then the PR stills shows as needing to be processed.  The buyer cannot change the PR quantity or Unit of Measure. 
    There must be a better way than cancelling the item off of the PO, contacting the PR requestor and having them make changes to the PR and resubmitting the PO. 
    Other systems I have used let the Purchasing Agent / Buyer correct the PR but then it sends it back to the PR Requestor for re-approval. 
    Any advice appreciated.

    OPEN only list of PR's
    what is this?
    do you mean in the document overview of ME21N ?
    the document overview has a list of purchase requisitions. it is not defined by SAP as open PRs only, this is something what a user has to do with his selection settings.
    I just guess that the user has done a wrong selection.

  • How to change UOM conversion rate

    I have an item assigned to a UOM. I define the conversion rate like 1case = 500 pieces. Having done that, I transact a few numbers. Now after some time, the business requires that the conversion be changed as 1case = 450 pieces. Now, as I understand, changing the conversion rate from 500 to 450 directly on the existing conversion definition will definitely corrupt the data. Now if I have to define a new conversion, then the system would not let me choose the UOM 'case' on the same item.
    Creating a new UOM also would not help as changing the UOM of the item is also not receommended.
    What can be the approach in this case? Any pointers or help is greatly appreciated.
    Thanks
    Khyum Mohammed
    Edited by: 817125 on Dec 29, 2010 9:14 AM

    Hi,
    If the Business no longer uses the 500 pcs conversion, one could Inactivate the conversion and define a new one.
    If Business wants to have a choice of using 500 or 450 pcs, then a new Case UOM needs to be defined.
    I hope this helps.
    Regards
    Adarsh Krishna

  • Changing UOM and activity in routing

    Dear All,
    we have defined an activity compressed air with uom FT3 in routing. Compressor are runned on electricity. The power bill is being received for kwh. Now the management wants to change the uom to kwh and subsequently the quantity also.
    Now the problem is there are approx. 5000 FG materials where the change is required to be done.
    Please give suggestions how to achieve this.
    I understand that in CUNI we can develop the conversion factor from FT3 to KWH. Any other workaround available.
    Regards,
    Divraj

    Hi,
    Try with CEWB (Engineering Workbench) where you need to select Working Area SAP_OPERATION     Focus: Operation where you will get Operations Overview screen in mass.
    Hope this helps.
    Regards,
    Tejas

  • Changing UoM in PO which is defaulted from Contract

    Dear MM experts,
    I have a Contract with a UoM UGL and now want to create a PO with reference to this contract, but I want to create with UoM UG6. The system does not allow it in PO as the field is grayed out. Is there a standard way by which this UoM can be changed in PO.
    Appreciate your reply.
    Regards,
    Anubhav

    Hi,
    Since you are creating the PO with reference to Contract, the data in contract gets copied into the PO. Hence you can't edit the UOM in PO.
    If you want to change the UOM, then edit the same in contract itself so that it gets copied at the time of PO Creation.
    Thanks & Regards,

  • Change UoM in delivey from bae unit to new UoM

    Hi ,
    In the Order level UoM conversion is happening and at picking it back from the existing UoM to new UoM at G/I.
    And since we cannot have enough decimals in the system to correctly convert. so the delivery get changes.
    Please give your sugessions.
    Thanks.
    Vijay.

    hi,
    hope you have maintained the copy control to copy the Sales order details fully to your delivery level. and in material master the Conversion details are given properly.
    If it is due to the Decimal points, then you may need a technical team to extend the decimal point at delivery level. then can do it at programme level and i think that could work out for you
    Regards,
    Sudhir

Maybe you are looking for

  • Wireless printer and airport express

    I have an HP officejet 7410 "all in one" printer that use to connect to my Imac wirelessly just fine but now I have to connect it to the usb cable to get it to print. my family has 4 mac bookpro's also and its hit or miss whether or not they will pri

  • Need to subtract one day from the date appearing

    Hi, I am modifying a script in such a way that for an output type there is an invoice date appearing.  This invoice date should be back dated to 1 date less to the actually date that is appearing currently. For ex the date is 2007.08.30 it should app

  • How to import one or two shows from a season on the iphone...

    Hi All, I hope this is an easy question. I have purchased a season of Family Guy on itunes and want to import only a few of the shows on to the iphone. The only option I've come across is to import the entire season on to the iphone. Is there a way t

  • Redo log backup failing with BR253E errno 2:

    Hi all, I am able to take online as well as offline backup through sapdba , but unfortunately from last 7 days my redo log backup is failing after online backup is complete with below mentioned error. I also tried to start redo log backup seperately

  • HP 7610 Printhead replacement

    HI    Can anyone tell me How to replace Printhead on this machine?                                                                                                Thanks Andy