CHARM: Activation of Different Land Scapes at different times

Hi All,
I am configuring ChaRM in solution manager. The requirement is mentioned below:
We have 4 systems land scape: DEV, QA, PRD and TRN (training system) and all transports go into the systems in the following way:
1. DEV->QA
2. QA->PRD
3.QA->TRN (training system)
However, sometimes we have projects going on where in, business says that, all the "project" related transports should only go to PRD system on a specific day (lets say friday). These "project" related transports should not go into TRN (training system) until next week (that is, next friday). Also, during this complete week, no normal or minor transports should go to TRN (training system) except PRD. On Friday (exactly after 1 week), all the "project" related and normal and minor transports should go to TRN (training system) thereby matching the exact status of PRD system.
May anybody please tell me how I can organize these things in ChaRM?
If you need any more information, please do let me know.
Waiting for your kind replies.
Regards,
Faisal

May some body please reply?
Regards,
Faisal

Similar Messages

  • Different landing pages for different campaigns

    Hi All
    Is there a way to make different pages that people land on when subscribing? We are running two different campaigns and they are for seperate parts of the business, so when someone subscribes we want them to click through to a relevant page when they get their email confrimation link. And for these pages to be totally different.
    Thanks
    Ken

    Hi,
    Hope I understood the scenario correctly: You can use 2 secure zones. Each subscribe/login form will redirect the user, after submission, to the respective secure zones's landing page. As each secure zone has a different landing page, users of each secure zone will have a different page they access after logging in.
    Kind Regards,
    Alex

  • How the project land scape in real time?

    hi,
    i am new to XI just i want the landscape of any XI project. and the defferent systems and how we will chose the adapter for that perticular landscape? we will have any project landscape for XI?
    Tks,
    PK

    Hi,
    Refer
    SAP Network Blog: Pipeline Approach in SAP XI Implementations.
    Pipeline Approach in SAP XI Implementations.
    Intoduction to XI project
    Steps for a Sound Footing in your XI Project
    step by step scenarios in XI -- The usage of adpters based on various integration scenarios,
    Aspirant to learn SAP XI...You won the Jackpot if you read this!-Part III
    To know more on SAP XI Architecture .... Please go through the below links...
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/0482c490-0201-0010-cc9c-91c5a538a0a6
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/9928db90-0201-0010-6894-ffa53bf77672
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/ed49db90-0201-0010-c4a5-c520866a19c7
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/ed49db90-0201-0010-c4a5-c520866a19c7
    http://help.sap.com/saphelp_nw04/helpdata/en/e5/d083e172314b9aab358fde5f501142/frameset.htm
    http://help.sap.com/saphelp_nw04/helpdata/en/e2/42a0404dd52b54e10000000a1550b0/frameset.htm
    Thanks
    swarup

  • How to use different page scapes in smartforms

    hi
    How to use different page scapes in smartforms.
    I want Potrait format in the 1st page and Lanscape format in 2nd page is it possible if so plz suggest me an idea

    Hi,
    It is possible in smart forms, but not in scripts.
    we can have 3 tabbed options for pages in smart forms.
    <b>General...
    Output options
    Conditions</b>.
    In <b>output options</b> u can define whether a page can portrait or land scape in <b>print attributes</b>.
    Reward if helpful.
    Regards,
    Sandhya

  • I have "chatted" with customer service 5 different times. I was sent here. I have activated Photoshop Elements 9 on two different iMacs. They are both dead and I am unable to get it to activate on my newest computer. iMac. Can anybody help me?

    I have "chatted" with customer service 5 different times. I was sent here. I have activated Photoshop Elements 9 on two different iMacs. They are both dead and I am unable to get it to activate on my newest computer. iMac. Can anybody help me?

    Unfortunately, only adobe can help you with that, as most people here are just posters such as your self and don't work for adobe.
    If you go here and use the Chat now button (bottom of page), they should get you up and running by resetting your activations.
    http://helpx.adobe.com/x-productkb/policy-pricing/activation-deactivation-products.html

  • How to Takes Active directory backup and Restore in different Hardware

    Hi 
    how to takes Active directory backup and Restore in different Hardware in Windows server 2003 R2 standard Edition.

    You can give a look to that: https://support.microsoft.com/kb/249694/?wa=wsignin1.0
    This posting is provided AS IS with no warranties or guarantees , and confers no rights.
    Ahmed MALEK
    My Website Link
    My Linkedin Profile
    My MVP Profile

  • LAND SCAPE ?

    what is a  LAND SCAPE ?give me the real time scenario of land scape ?
    what is a staging server ?

    HI,
    SAP Landscape:
    Landscape is like a server system or like a layout of the servers or some may even call it the architecture of the server’s viz. SAP is divided into three different landscape DEV, QAS and PROD.
    - DEV would have multiple clients for ex: 190- Sandbox, 100- Golden, 180- Unit Test.
    - QAS may again have multiple clients for ex: 300- Integration Test, 700 to 710 Training.
    - PROD may have something like a 200 Production.
    These names and numbers are the implementer's discreet on how they want it or they have been using in their previous implementations or how is the client's business scenario.
    Now whatever you do in the Sandbox doesn't affect the other servers or clients. Whenever you think you are satisfied with your configuration and you think you can use it moving forward, you RE-DO it in the golden client (remember, this is a very neat and clean client and you cannot use it for rough usage). As you re-do everything that you had thought was important and usable, you get a transport request pop up upon saving every time. You save it under a transport request and give your description to it. Thus the configuration is transported to the Unit Test client (180 in this example).
    You don't run any transaction or even use the SAP Easy Access screen on the 100 (golden) client. This is a configuration only client. Now upon a successful transport by the Basis guy, you have all the configuration in the Testing client, just as it is in the Golden client. The configuration remains in sync between these two clients.
    But in the Testing client you can not even access SPRO (Display IMG) screen. It's a transaction only client where you perform the unit test. Upon a satisfactory unit test, you move the good configuration to the next SERVER (DEV). The incorrect or unsatisfactory configuration is corrected in Golden (may again as well be practised in the sandbox prior to Golden) and accordingly transported back to 180 (Unit Test) until the unit test affected by that particular config is satisfactory.
    The Golden client remains the 'database' (if you wanna call it that) or you may rather call it the 'ultimate' reference client for all the good, complete and final configuration that is being used in the implementation.
    In summary:
    Landscape : is the arrangement for the servers
    IDES : is purely for education purpose and is NOT INCLUDED in the landscape.
    DEVELOPMENT ---> QUALITY -
    > PRODUCTION
    DEVELOPMENT : is where the the consultants do the customization as per the company's requirement.
    QUALITY : is where the core team members and other members test the customization.
    PRODUCTION : is where the live data of the company is recorded.
    A request will flow from Dev->Qual->Prod and not backwards.
    1. Sandbox server: In the initial stages of any implementation project, You are given a sandbox server where you do all the configuration/customization as per the companies business process.
    2. Development Server: - Once the BBP gets signed off, the configuration is done is development server and saved in workbench requests, to be transported to Production server.
    3. Production Server: This is the last/ most refined client where the user will work after project GO LIVE. Any changes/ new development is done is development client and the request is transported to production.
    These three are landscape of any Company. They organized their office in these three way. Developer develops the program in Development server and then transport it to test server. In testing server tester check/test the program and then transport it to Production Server. Later it will deploy to client from production server.
    Presentaion Server- Where SAP GUI has.
    Application Server - Where SAP Installed.
    Database Server - Where Database installed.
    Regards,
    Gaurav
    <b>Reward points if helpful</b>

  • I would like to open different Safari windows in different Spaces

    I would like to be able to open different Safari windows in different Spaces. They guy at the Apple store told me this was impossible, but I am 99% sure that I accidentally had it working this way before I realized what Spaces was, but now that I have set my Spaces preferences, I cannot get it to work for me.
    Ideally, my husband could use one space - he only uses Safari. And I could use the other Spaces for my various applications, including Safari.
    Any suggestions appreciated!

    I do it as follows.
    I don't have Safari assigned to any (or all) spaces. I don't have the little checkbox checked at the bottom of Spaces preferences ("When switching to an application...").
    In a given space I click on Safari in the dock. This makes it the active application. Of course, if a window is already open in that space it will come to the front. But suppose there isn't a window open. I then ask for a new window (via the File menu, or via command-n). Voila. That window is in that space. You can do this in any space and the windows stay where you created them.
    (A shortcut is simply to control-click on the Safari dock icon and select "New Window".)
    charlie

  • Time Division Multiplexing and Processing Different Loops at the same time

            Hi, I am new in Labview so you may find my questions too silly, sorry about that
    I want to design an interface to control the test&measurement devices remotely. I have two desks and there are several devices on these desks. The real problem is to use two different devices at the same time. To do this I heard that I can use time division multiplexing. But I couldn't find enough information about it in Labview. Another advice I heard was to use a matrice and hold the on/off state of the devices in this matrice. 
    Where should I start the design to create such a system? Do you have any advices? Thank you in advance.
    My basic GUI is attached.
    Attachments:
    InterfaceAli.zip ‏42 KB

    As Mike pointed out you cannot communicate in parallel on the GPIB bus - unless you have separate buses for each instrument - and that defeats the purpose of a bus. I am not sure about LXI.
    With regard to your VI:
    1. Do not use global variables to pass your data around.
    2. You should use the Array data type, not the Matrix data type. The Matrix data type in LabVIEW should only be used for matrix mathematical operations (linear algebra) which cannot be easily performed on the array data type. You have many more tools in LV to work with arrays.
    3. The Event structure needs to be in a parallel loop. This is basic data flow. If you do not understand this concept, get some training, either though the online tutorials or through a class.
    4. Use Value Changed events and place the button terminals inside the event case for that control.
    5. The parallel loops need to have a Wait or some other function which causes a delay. Otherwise, the first one to start executing could consume all available processor resources. These are called "greedy loops." 
    6. Use integer data types for case structure selector inputs. Floating point values are coerced to integers at the inputs. If the values resulted from calculations, unexpected rounding effects may occur, resulting in the wrong case being selected. In some cases using type defed enums may be even better. The underlying data is integer and the enum item names show up in the case selector labels, helping to document what the case does or why it was selected.
    7. Remove the timeout case from the event structure since it never executes. Also avoid Use Default if Unwired on the terminal with your matrix (array) data. You never have a situation where an empty array is appropriate.
    Before going any further with the program questions, you need to carefully define your requirements.  How many instruments will you have? How many can be active at one time? What kinds of communication between the program and the instruments is required? This includes commands to the instrument, data returned from the instrument, error handling, and timing requirements. What will be done with the data? Display, save to file, use to automatically control another device? What safety requirements or constraints need to be met? Once you have a good requirements document, then you can begin to determine what kind of program architecture is best suited to meet the needs.
    I suspect that you may be making some things much more complicated than they need to be while ignoring other important issues.
    Lynn

  • Different Sampling rates for different channels in Analog Input

    Hi,
    I would like to acquire data at different sampling rates on different channels say ACH 0, ACH 1 and so on. I have a PCI 6052E board and NI DAQ 6.9.2. Also is it possible to simultaneously perform Analog output on two different channels along with the Analog input? What will be the problems/consequences as far as the system resources are concerned. I am a beginner in this area and would greatly appreciate any help/pointers for my queries.
    Thanking you in advance
    Deepak

    Search the eaxamples that ship with LV.
    Theer is one called simultaneous input and output or something like that.
    It will get you started.
    re: multiple scan rates. This is acoomplished by sampling all channels at the highest rate and throw away the expttra samples you do not need.
    Ben
    Ben Rayner
    I am currently active on.. MainStream Preppers
    Rayner's Ridge is under construction

  • Different mail ID for different workflows

    Hi All,
    As per my knowledge if we use mail task in work flow a e-mail will be triggered from mail ID maintained for user wf_batch , is there any way to send mail through different mail iD for different workflows by using mail tasks only, not by using a separate task and using some function modules in that to send mails.
    Thanks
    Vinod

    Hi,
    I have done this once. It is not the best I admit as many things must be considered, yet it worked.
    In the binding of an activity step, prior to the mail send step, I have included the calling to a custom FM.
    In this FM I have dinamically changed the mail address of WF-BATCH (the address was set in an ad-hoc paramenter.
    Then right after the mail send step, again in the following binding, I have run the very same FM, with different paramenters of course, to put the address back to where it was.
    Corrado

  • How can I use different calendars associated with different emails to see appointmen​ts separately​?

    I have 3 emails accounts on my Blackberry curve. I want to use different calendars for different type of reminders/appointments. How can I do that? In calendar I pressed menu key and then clicked on select calendar, choose one email address (email 1) then entered an alarm but now if I go to a different calendar associated with different email ( email 2), it also shows me that alarm which I entered in email 1 calendar. Thanks for help

    Don't have LV handy to open the old code, but I did read through the thread you referenced.  It sounds like the example configured 2 counters to create the variable-freq finite pulse train and configured a 3rd counter to count the # steps generated as verification.   That 3rd counter would be a problem for you as there is no internal timing signal connection between your 2 USB devices.  You would need to run a physical wire connection and change some of the config code to match.  Alternately, you could just delete all the code associated with the 3rd counter for now because it isn't strictly necessary.
    Further advice/questions:  Are you planning on a pure sine wave of frequency such that you oscillate with both positive and negative velocity (example: varying from -1000 to +1000 Hz clockwise)?  Or is there a nominal average frequency with a small sine wave superimposed (example: nominal of 1000 Hz clockwise, variation of +/- 50 Hz)?
    I *think* you may be dealing with more of a continuous pulsetrain situation, which is actually much simpler.  You would only need 1 counter/timer, though you would still perform the freq changes in a timed loop which uses the pulsetrain as its timing source.  You'd just need to keep track of your total elapsed time so you could figure out the right sinusoidal freq value at the moment you're ready to update it.
    Another subtlety to watch out for if you're oscillating about 0 velocity  -- don't try to create a frequency that is lower than the rate at which you need to update.  Also, with steppers you may have mechanical stability issues at low freqs like 10's to low 100's of Hz.    These kinds of things may need to be managed as special cases which force you to deviate from a "pure" sine wave.
    -Kevin P.

  • Hi I have two questions. I am using NAS 4.1 and was wondering is it possible to set a different session timeout for different users? How is the session timeout set? Thanks, YS

     

    <i>I am using NAS 4.1 and was wondering is it possible to set a different session timeout for different users?</i>
    Um, there is no such thing as NAS4.1.
    I'm assuming that you mean NAS4.0 (maybe NAS4.0sp1?). If so, then the session timeouts are specified in the session section of the NTV configuration files.
    AFAIK, you can specify session timeouts on a per user basis.

  • Controller different Input in the same time in a real Scenario...(SIMULATION IN 2 TANKS CONTROLLER BY PCB BOARD)

    Hi! I really need help....
    I´m doing a simulation where I can controller the input and output with one external PCB, all is working properly (the communication) but my problem is, I can´t open where ever I want the different valves...I mean, I must wait until the process is finish...
    The program is working with diferents process like this:
    §Process 0:
        Programinitialization. Tanks and pipes in zero state. Control for this state with  “pump on” button.
    §Process 1:
        §State:
             “ Pump on ” button istrue: Pump 1 isrunning, andTank 1 starts to be filled with water.
             “ Pump on ” button is false: nothing happen, go to the next process
    §Process 2:
         This process is controlled from the “Control 1”button with is who control “Valve 1” for the discharge of water from tank 1 to tank 2.
    §Process 3:
          This processiscontrolledfromthe “Control 2 ”button with is who control “Valve 2” for the discharge of water from tank 1 to tank 2 if “Control 3 ” button is close or if “Control 3 ”button is open the water go out from the loop.
    §Process 4:
          This processgiveyoutheoptiontocome back totheprocess 1 ortotheprocess 2 dependingofthestate in process 3.
    So my problem is I want  run different processes in the same time, without having to wait out the current process is running....
    this look like this:
    and with the differents states...so I was trying to use a Statechart for try to improve the simulation....
    like this:
    But when I was tried to implement in labview with the statechart module i can't find the way to interconexión with this new module...
    Because i need two differents regions...but i can't use the connexion between them....
    Some new idea, help....all is welcome!!!
    Thanks in advance.
    Elena

    Buenos días Alvaro,
    Si, mejor en español
    Si, me has entendido bien, exactamente es lo que me gustaria. 
    Empece por mi cuenta con labview y hay muchas cosas que se me escapan... Voy a implementar la máquina de estados a ver si asi soluciono el problema.
    Muchas gracias!
    Un saludo!

  • Print 2 different forms to 2 different printers 1 ABAP program

    Is it possible to print 2 different forms to 2 different printers from one program?
    Example: a Shipping invoice and a Shipping Label (mailing sticky label)
    Could they be a combination for form types? SAP Script and SMARTFORMS, SAP Script and PDF, SMARTFORMS and PDF
    I have a need to print a Shipping Invoice and Label from a single program. I need to beable to print multiple copies of the label at the same time for multiple shipping packages. i.e. 1 of 4, 2 of 4 etc.
    The users want to select print a single invoice and the neccessary labels from a single transaction request.
    Ken

    Hi,
    Could you please see the program RLVSDR40.
    Thanks,
    Abhijit

Maybe you are looking for

  • How to recover a Lightroom 3 to 4 Upgrade?

    I bought Lightroom 3 on CD and installed that in my new system. But I cannot find my hard copy of the Lightroom 4 upgrade that I purchased, during 4's reign. Since my current Lightroom catalog is for 4, I want to upgrade the software for this new bui

  • Where is security configuration for deployed web application stored

    Hi, We have deployed a folder as a web application. The changes I am making in Deployments -> web application -> Security -> URL Pattern -> Roles -> Edit a Stand-Alone Web Application URL Pattern Scoped Role is not saved and it is getting lost when I

  • 10g install on XP pro

    I am trying to install oracle 10g 10.2.0.1.0 on an XP pro, SP2. The installation goes well, until about 35% when nothing happens. I didn't touch the machine for many minutes. The last part of the logfile is not to any help either: Oracle Universal In

  • Printing in Elements 9 (Macintosh)

    I'v recently bought a new iMac along with Elements 9, installed my printer, an Epson stylus R2400 with updated drivers. I then tried to do some printing and discovered that I could not change some advanced settings ie. paper type, paper tray, print q

  • Problem Printing Front Panel

    I'm having a problem printing the front panel of a particular VI.  When I set the print option to Standard Printing the printer prints nothing.  When set to Bitmap Printing it works, but it's not the type of printout that I want.  In both cases the P