ChaRM:Logical Components for Projects

Hi Experts,
I have done ChaRM config and i am about to create logical components for the project Project.
I have below two questions please help.
While creating a logical component when i have multiple clients in DEV, QAS and PRD how to proceed and second question is about RFC Users in satellite systems.
1) My ECC landscape have DEV ->100, 200, 300, 400, QAS-> 100, 200, 300, PRD-> 100, 200 with multiple clients.
So while creating logical component do i need mention all clients in the logical component or its enough if i mention DEV->100, QAS->100, PRD->100 ?
If i mention only one client in logical component how transports will move to other clients in DEV, QAS and PRD. Please help.
2) Second question is do we need to create READ, TMW, back rfc users in all clients for DEV, QAS and PRD for above ECC landscape ?
Please help for above question.
Regards
Latha

Hi,
So while creating logical component do i need mention all clients in the logical component or its enough if i mention DEV->100, QAS->100, PRD->100 ?
Yes, you can have this TMS track defined and use SCC1  for performing imports within the system (like QAS 100 to QAS 200 ). Or use the Tranport Target Group option so that your TR is visible in import queue of all system. More info Extended Transport Control (SAP Library - BC Change and Transport Organizer)
2) Second question is do we need to create READ, TMW, back rfc users in all clients for DEV, QAS and PRD for above ECC landscape ?
Yes, you need RFCs b/w your working client (100 ) and 000 client of domain controller. Not for all clients.
Regards,
Vivek

Similar Messages

  • 2 Logical Components for 1 Business Process Step

    Hello All,
    I'm looking for a way to assign in SolMan --> transaction Solar01 - Tab Structure - Business Process Step, 2 logical components for 1 business step. When creating the business step I have to assign 1 specific logical component to this step. Once I have done this I can only select  the chosen logical component ffor SAP Transactions, configuration object etc.. As my business step is running on 2 different systems I need to find a way to link transactions etc. in the step to the different systems. Is there any way to change this for the Level 3 elements, like it is for level 2 (business processes) where I can choose in the different tabs between all the logical components?
    Thanks in advance
    Ramó

    I've seen people use some absolute craziness to get more than three levels. The most extreme being using multiple projects at the highest level (i.e. a project for PTP Accounts Payable). Don't go there.
    I personally like to have 1 transaction per process step. Don't use the transaction tab as another process level, use it to better describe the process step (like all the other tabs are uses). It results in a better understanding of the system as you go forward. To do that I make teams break up things they think are one step (this can take some arm twisting, so hit the gym and maybe take a few judo classes).
    This allows you to use SolMan in more powerful ways. For instance, if you attach development objects to a step with 5 transactions, you cannot tell which transaction is modified by the development object. However, one transaction per node provides you this link. There are other examples, but basically the "where used" button becomes very useful when you have 1 transaction per node.
    Maybe you could provide a specific example of your process and we can think of a better way to collapse it.
    Such as:
    - PTP Non-Merchandise Purchasing
    -- Expense Purchasing
    --- Create Purchase Requisition
    --- Create Purchase Order (Assign Vendor & Price)
    --- Send to Vendor
    --- Post Goods Receipt
    --- Perform LIV
    --- Process Payment
    Some companies have 6 level processes already defined in models and putting it into SolMan can be a pain for sure. Your naming convention is usually the best route.
    regards,
    Jason
    The system role and template work around doesn't apply to your situation.

  • Error Loading Business Components for Project

    Good Afternoon,
    I am running JDeveloper ver. 10.1.2
    when I open JDeveloper I get the pop up:
    Error Loading Business Components for Project
    U:\Jdev\mywork\CUSTLEVR\CUSTLEVR\CUSTLEVR.jpr

    You could simply edit the .jpr file outside the Jdeveloper and remove <ownerMap /> element.
    Additionaly, there are some <properties> in the bottom of the file, that need to be removed as well - try experimenting with them.

  • Logical Components for a project

    Hi,
    We have ECC6.0 on which we have applied the Enhancement Package 2.0.
    While trying to create a project in solution manager for the Business Sceario we selected it is requiring Logical component for SAP ERP Enhance Package.
    While trying to create the SAP ERP Enhance Package logical component we are not able to find any systems to attach under that even though we have maintained installed product versions as both  SAP ECC / SAP ERP ENHANCE PACKAGE 2005.2. in the system defintion of our development system.
    We tried to put SAP ERP ENHANCE PACKAGE 2005.2 as leading product version even then we are not able to pickup that system under the SAP Enhance package Logical component.
    Please suggest.
    Thanks & Regards
    Mrutyunjay

    Hi,
    In SMSY under landscape components select your system and go to Header Data Tab. Click on Installed Product version. Then select the check box Free Product/Select product Version.
    Then you can find your product there. This will solve your problem.
    Feel free to revert back.
    --Ragu

  • How to set up logical components for ChaRM?

    Hi,
    we do have the following system landscape. One DEV and two separate QA and PROD systems.
    DEV->
    >QA1  -> PROD1
    >QA2  -> PROD2
    For these we want to transport parallel from DEV to QA1/QA2 and then parallel to PROD1/PROD2 via ChaRM.
    My questions are:
    1) Do I have to set up one or two logical components?
    2) How do I have to set up the logical component exactly?
    Thanks.
    Regards,
    Alex
    Edited by: Alexander Barth on Jul 20, 2009 4:02 PM
    Layout changed
    Edited by: Alexander Barth on Jul 20, 2009 4:03 PM

    Hi,
    Chk the below link .
    https://websmp202.sap-ag.de/~sapdownload/011000358700000657692007E/ECTS_CHARM_SP12.PDF
    Thx,
    Waseem.

  • Understanding and using Logical Components for Managed System configuration

    Experts.....
    I am embarking on a fresh installation of SolMan 7 EhP1 SPS25 and after a few bugs along the way, I am finally nearing the end of including the first Managed System.  Somewhat related to {forum:id=10293771] I am hoping I can get some advice, but specifically with regards to Logical Components.
    General question - I have a slide from SAP that shows a picture from Product->System->Instance->Logical System (client)->Logical Component.  I am confused because it shows that Client 100 of a given ABAP system could be assigned to Logical Component A, whereas Client 200 of the same system could be assigned to Logical Component B.  This seems wrong to me?
    I am at the last step of the managed systems configuration wizard : "create logical components" and only want to ensure that I set things up to hopefully ensure that later usages (Maintenance Optimizer, etc) will handle things correctly!!!
    - Our SAP landscape is not very complex
    1. only ERP and EP (Dev/Test/Prod). 
    2. We are utilizing HR Self Service (XSS).
    3. The ERP ABAP systems are on Netweaver 7.01. 
    4. EhP4 has been installed, however we only activated the HCM business functions.  Therefore SAP_HR is on 604 whereas SAP_APPL is on 600.  I think this might be driving some of the confusion in SMSY
    For the DEV ABAP system I am trying to configure:
    1. The system is showing up in two products : "SAP ERP" and "SAP ERP Enhancement Package" with the header data for both showing "EHP4 FOR SAP ERP 6.0 / NW7.01" and "SAP ERP 6.0"
    2. Under "SAP ERP" the "product instance selection" shows only "SAP NW - Adobe Docu. Service" and "SAP ECC Server" as relevant
    3. Under ""SAP ERP Enhancement Package" the "product instance selection" shows only "Human Capital Mgmt" as relevant by default.  I manually flagged the development portal system as "relevant" for "SAP XSS (Self Services)"
    4. The RCA DBA Cockpit system is complaining "No data available for extractor activation. Please check product mapping and Software Components in SMSY"
    5. In the Managed System wizard, there is no logical component for any of the "EHP4 FOR SAP ERP 6.0 / NW7.01" selections
    From what I can tell, I think this is correct:
    1. Create a Z_EHP4 logical component and assign the DEV/QAS/PRD systems to them
    2. Also assign the DEV/QAS/PRD to the existing SAP logical component "SAP ERP ECC SERVER"???
    3. For the Solutions, my plan is to create
    a. Non-Production ERP : with the dev/test erp/ep systems, but test system as the leading system
    b. Production ERP with the prod erp/ep systems only
    Thanks for any advice/guidance to help me avoid future problems!!
    Edited by: Eric Poellinger on Jun 15, 2011 6:32 PM

    General question - I have a slide from SAP that shows a picture from Product->System->Instance->Logical System (client)->Logical Component. I am confused because it shows that Client 100 of a given ABAP system could be assigned to Logical Component A, whereas Client 200 of the same system could be assigned to Logical Component B. This seems wrong to me?
    Client 100 could be assigned to any number of logical components, client 200 could be assigned to those same ones or none of them. A logical component is just a grouping of systems used to accomplish some task in SolMan.
    For example with ChaRM you could have 2 logical components.
    ZCHARM_DEV development (100) -> QA (200) -> prod (300)
    ZCHARM_SEC security (900) -> QA (200) -> prod(300)
    One is used to show the path for moving development changes to prod, the other for security changes. 200 belongs to both, but 100 only to one.
    Set them up in whatever way meets you needs. It looks like for you, you could just use the default one and assign your clients to the various system roles. Not all functionality in SolMan uses the logical components though.

  • Logical components for ERP and ERP EnhP 3

    Hello,
    We have a landscape or ECC 6.0 Systems created in the SMSY.  Those systems were linked to a new logical component Z_ERP60 under product ERP 6.0.  Then  we used that logical component in all the projects.
    Later on, we upgrade ECC 6.0 to EnhP 3.  So, we went to the SMSY transaction, to the infrastructure components--systems and add new product versions to the existent system.
    However, the logical component is defined as valid only for the original product ERP 6.0, and not to the new ERP 6.0 EhP3.  When we go to SOLAR01 transaction we still see that processes from BPR that belongs to EhP3 are greyed. 
    We want to know which is the best practice to handle this request, whether we create a new logical component associated to the product ehp3, Z_ERP60_EHP and then replace all the projects with the new component, or is there any other alternative.
    I appreciate your inputs.
    Regards
    Esteban Hartzstein

    Many thanks for your answer.  The attachment is related to whether ERP EhP is available as a product in Solution Manager.  We are in SolMan EhP1 (SP 18), so we already have the product available.  However my concern is that we need to redefine the logical component.  Logical component belongs to one single product, being ERP 6.0 or ERP 6.0 EhP.   So, in our case we need to create a new logical component with the new ERP 6.0 EhP and then re-atach all the individual systems to the new logical compoent.  Then we need to replace in all the projects withe the new logical component.  Is there any alternative to deal with this problem of redefintion of logical components??
    Regards
    ESteban Hartzstein

  • Multiple logical components for a single step in Business Process Structure

    Question 2 of 3:
    I'd like to hear about how other people have handled Portals transactions and similar items. I.e. when building the Business Blueprint or Business Process Structure, what if a single transaction runs on more than one product or logical component? Solution Manager only allows you to assign one logical component to a process step and transaction in the Business Blueprint Structure. This isn't the ideal solution, since you lose the linear affect of the what transactions take place for the step.
    Your insights and opinions are appreciated.
    Regards,
    Marcel

    Hi Marcel,
    an ABAP transaction can only run or at least be started on one single system. A portal transaction can be assigned using a URL. This doesn't need any logical component.
    Regards
    Andreas

  • Web Logic classpath for projects???

    I have a project that needs a first level class (i mean, outside packages) and
    i don't know where to put it in order to be saw for all the JSPs
    Greetings

    Copy the Jsp support classes to the WEB-INF/classes directory.
    thanks,
    Deepak
    "Carlos de Luna Saenz" <[email protected]> wrote:
    >
    I have a project that needs a first level class (i mean, outside packages)
    and
    i don't know where to put it in order to be saw for all the JSPs
    Greetings

  • Solution Manager - Logical Component for SAP Netweaver EHP2

    Hello,
    I installed the newest SAP Netweaver Ehp2 (with usage type AS ABAP only) for a future integrating with BI_CONT (SAP BI requirement). So... what I want to know is... I want to do an update of support packages to the latest Stack (SPS) and in this product version (NW EHP2) the latest stack is stack 06 !! But I ´m facing with a problem which is, because I have to maintain this system in Solution Manager (for Maintenance Optimizer activity)...so what I want is configure this new system on Solution Manager Ehp1 (with SPS 23) but in tcode SMSY I didn´t found this Product in Logical Components for I can apply this system to my Solution... I only see SAP Netweaver with EHP1 and not with EHP2 which is the version that I want to apply this new system. (This is mandatory task, because without it, I will not be able to download the support packages for NW 7.0 EHP2)
    Tell me two things... first if this level version of Solution Manager that I have here (SPS 23) have this product in logical components, and two... if not it, is necessary to raise the level of Solution Manager support packages (to latest stack SPS 25) for I can see that logical component SAP Netweaver EHP2?!
    Thank you very much
    João Dimas - Portugal

    Hi João,
    You can verify if the EHP2 is available (if) in your system, this can be done once you are in SMSY -> Product Definitions -> SAP Netweaver where you should able to see the EHP2. If so, then it's a matter of marking the leading Product & Product Version under the Header Data ->Change Product Assignment where you can use the drop down arrow to select the Product and Product Version. If it's not available, then by checking the 'Free Product / Select Product Version' then use the drop down arrow to select the product & Product Version, once you selected that then click on copy and mark that as active and save.
    Then you need to create a new logical component in System Group & logical Component under SAP Netweaver, then assign the system to the logical component. Once this is done you can use the logical component in a solution and create a maintenance transaction.
    I hope this help you to proceed further, thanks.
    Jay Soma.

  • Meaning of defining multiple logical components in mainenance project?

    Dear friends of SolMan,
    I have a question regarding a possible functionality of ChaRM .
    In the maintenance project, defined in SOLAR_PROJECT_ADMIN, there is on the tab "system landscape" another tab "systems" where you define the logical component for which the maintenance belongs to.
    In the list for the logical components you have the possibility to define more than one logical component.
    Now my question is:
    - Why and for what am I able to define more than one logical components?
    Thanks for your help in advance.
    Best regards,
    Alex

    Alexander
    Yes it is very important part of CHARMS
    Because logical component tells you which client is dev or QA or Prd for any system
    When you activate CHARMS in your project where you have added the logical comp then system check for this logical comp ...the needed things ...like rfc or transport route etc
    You can have multiple logical comp for various systems in one project i& it s enough to support them with one maintenance cycle working ...........to support CHARMS functionality
    Hope it clarifies
    Regards
    Prakhar

  • Logical components problem when checking project

    Hello,
    I have searched in the forum for a solution, but the people who had the same kind of problem managed to solve it with means that do not work for me.
    Here is the situation :
    - We have a three tier landscape, DEV-QAS-PRD, in transport domain DOMAIN_A, with domain controller DCA
    - We have our Solution Manager system, DCB, which is part of (and domain controller of) transport domain DOMAIN_B
    - The two transport domains are linked, as specified in SolMan prerequisites for managing systems from other transport domains. This has been tested, and transports can be forwarded and imported freely from one domain to another.
    - I have created the systems, RFC destinations, and logical component for the three tier landscape in SolMan system DCB. The RFCs are all OK.
    - I have created the domain controller DCA system in SolMan DCB, with RFC destination to client 0, as defined in the prerequisite for Change Request Management.
    - Finally, I have created a project in SolMan system DCB, with this logical component.
    When I try to do a Check on this project, in the Change Request management tab, I have green lights everywhere, except for the following :
    - In "Check logical components" : No consolidation system found for DEV-040 (our development system)
    - In "Check consistency of project" : Message from function module /TMWFLOW/CHECK_PRJ_CONS: No export system for PRD-020 (our production system)
    We have checked the TMS settings and transport routes, and everything looks OK.
    Any ideas on what to check/try would be welcome.
    Thanks,
    Thomas

    Hi,
    Check the status of the DC's in the track created in CBS.
    at following location.
    http://url:port/webdynpro/dispatcher/sap.com/tc.CBS.WebUI/WebUI
    There should be no Broken DC's in the track.
    If every thing is fine here and you still have problems then check by repairing the class path of the component.
    Hope this helps you.
    Regards,
    Nagaraju Donikena
    Regards,
    Nagaraju Donikena

  • 2 Logical Components in 1 Maintenance Project

    Dear all,
    We have two system system landscapes / logical components (Dev -> Tst -> Prd) in parallel; Finance and Logistics.
    Is it possible, to have them both in one Maintenance project?
    And more important, to have them both available in the project logistics task list (/TMWFLOW/PROJ).
    How do I arrange the parallel transporting eg. for Dev_FI -> Tst_FI and Dev_LO -> Tst_LO?
    Thanks for the answers,
    jan

    Hi Jan,
    Yes it is possible to have both parallel landscapes in same maintenance tasklist. Just create 2 separate logical components with the appropriate system role assignment in SMSY transaction.
    Now assign them in the Systems Landscapes Tab in the Project. When you create the maintenance cycle for this project it will automatically generate a tasklist with these 2 landscapes.
    It will show total six systems in your tasklist. DEV1>QAS1>PRD1 and DEV2>QAS2>PRD2. Now when you assign this IBase Component in your change request, it gets linked to this maintenance cycle.
    When in Normal Correction, you will get pop-up for actions like 'Logon to System' and "create transport Request' asking which Development system you want to logon to or create transport request in.
    Hope this helps...
    Thanks,
    Kriti Bhalla

  • Changes in logical components of a project

    Hi
    I have the requirement to add another system to my maintenane project.  Having read Dolores Correa's Usual Questions and known errors blog I see that this is not s straight forward scenario.
    The blog states that I should "Close the current project cycle", does this mean that I should "Complete the maintenance cycle"? in transaction /TMWFLOW/MAINTINST ??
    If that is the case does that not mean that all of my transports will be imported into production?
    I cannot find further information on consequenses of this requirement, so all help you can offer is welcome.
    regards
    marina

    Hi,
    When you close a maintenance project, TRs will not be automatically imported into PRD. You have to execute the task in your Tasklist to import into PRD.
    While closing the the transport requests that are not yet imported into the production systems are also taken into account in the new task list for project imports (in technical terms, this means that the import project includes not only the current CTS project, but also the CTS project of the completed cycle).
    If you create a new cycle, the system automatically assigns these processes and objects to the new cycle.
    Refer Note: 1071412
    Hope this helps.
    Feel free to revert back.
    -=-Ragu

  • ChaRM configuration issue for 2 Clients...

    Dear Friends,
    I have configured ChaRM in Solution Manager 7.0 EhP1 system. It is working fine without any issues. But now I came across a new requirement and finding trouble in configuring the required scenario.
    Currently there is only single client in DEV, QA and PRD system for which ChaRM is configured. Now, I want to configure the ChaRM for 2 clients in each system.
    For example,
    <ZCHARM_1> -- SOL:001 -- > DEV : 100 --> QAS : 200 --> PRD1 : 300
    <ZCHARM_2> -- SOL:001 -- > DEV : 500 --> QAS : 600 --> PRD2 : 700
    (Please note, ZCHARM_X is a project and SOL-001 is a Solution Manager ChaRM client).
    First up all, I would like to understand, is it possible? is it supported by SAP ?
    If yes, how can we configure client specific route for SAP standard transport layer (SAP)? What are the other concerns in using above system landscape in ChaRM?
    Please note, we do not want to use separate hardware for either DEV or QA system.
    Please can someone guide in this case?
    Rajesh Narkhede

    Rajesh,
    I am not aware if you have searched on this issue, but You may want to take a look at this thread.
    Change Request Management for multiple production clients
    This configuration should work fine, because in essence, its a 3 system landscape, so there should not be major issues on the way.
    From the TMS Standpoint you need to define a transport layer for each development client.
    You can create a single project with the logical components or you can create multiple projects with each set of systems. Remember to do the TMS configuration right and you should be set.
    Cheers!
    Edited by: Banerjee Vivek on Mar 29, 2011 1:02 PM

Maybe you are looking for

  • How to set up HP PSC 2410 printer for mac and windows

    The printer currently works with the MAC but we have a new PC in the house and would like the printer to service both computers.  Can the printer be set up to work with either one wireless?

  • I need to use the PDF editor so I can sign or edit documents already on pdf format. Please advise?

    I need to use the PDF editor so I can sign or edit documents already on pdf format. Please advise?

  • Post Parked Doc

    There are two separate groups using the FBV0 post parked docs tcode.  One is GL the other AP.  What controls the posting - doc type?  If so what value?  I did think it was 10 for Post, but that doesn't come back on the trace.  Appreciate some advice.

  • 3D Tween Quality Issues

    Hi all, Has anyone noticed how the 3D tween causes a loss in visual quality of the movieclip?  For example, if I have text within a movieclip, and then put a 3D tween on that movieclip, the text becomes almost blurry (even when the tween is complete)

  • Transferring users to new CUA without transferring parameters

    Greetings, we are in the process of moving our CUA users from our current (4.6) system to our new CUA (Web AS 7.0) system. We would like to transfer the users from the old CUA (4.6) to the new CUA (7.0). After we add the old CUA to the new CUA distri