CHARM- No task list found for implementation project

Hi All,
I created an implementation project, and created a task list for the implementation project.
But when i create a change request with normal correction, The Task list is not getting displayed.
I am facing a conflict also, When i directly create a correction document without creating a change request. I am getting the task list for implementation project.
Why is it am getting the task list for Implementation project in correction document and not in change request.
When i tried to explore. found that in change request it is getting the list of maintenance cycles(Maintenance projects) and not the tasklist for other type of projects.
Our customized flows are all dependent on the change request. So Is there any configuration i can do to get the task list of implementation project also in the list.
Kindly guide on this issue.
Thanks in advance.
Regards,
Subhashini.

Hi Xavier,
I  was also checking that one only.
For the standard transaction type SDCR, it is working perfectly as you toldh when i select development(Implementation).
But the problem is, here we have customized SDCR to ZDCR with our follow up documents.
When i try to include the Code group of implementation(Implmntn), Nothing is happening.
The subject is getting included in the list. but iam getting only the list of maintenance project only.
I have made the changes in copy nsontrol also. but i dont see any difference.
I could not able to trace where exactly i need to do the customizing to bring the list of implementation projects in my change request(ZDCR) when i select the subject( Project-implementation(SDMI))
Kindly advice.
Regards,
Subhashini.

Similar Messages

  • Project Server 2010 - Unable to open project, no valid Project Detail Page could be found for the project error

    I have a workflow being deployed for the first time on a farm. When I create a project with an EPT connected to the workflow it runs and can enter the required field in a PDP.  Then I Submit the workflow to go to the next stage and I get the "Unable
    to open project, no valid Project Detail Page could be found for the project" error.  After that the project is stuck on the same error.  All of the 18 stages have PDP and Schedules assigned to them.
    Any ideas on why the workflow cannot see the PDPs?  Is there a farm permissions that I am missing?  Thanks!

    Hi David,
    It starts to be a bit technical for me, but here is what I found on the web (seems to be an authentication issue with Sharepoint 2010):
    http://social.technet.microsoft.com/Forums/en-US/120ab535-63d2-4205-a51f-1987e9c0cf79/sharepoint-fba-the-content-type-texthtml-charsetutf8-of-the-response-message-does-not-match-the
    http://social.msdn.microsoft.com/Forums/silverlight/en-US/5cc70ff6-50d9-4cd3-b092-12007f4e495b/response-message-contenttypebindingtype-mismatch
    http://stackoverflow.com/questions/5263150/the-content-type-text-html-charset-utf-8-of-the-response-message-does-not-match
    Hope it will help you going forward in resolving your issue.
    Guillaume Rouyre - MBA, MCP, MCTS

  • What's the difference between task list release for order and release for c

    What's the difference between task list release for order and release for cost?

    Pallavi,
    The status of the task list determines in which other application areas the respective task list may be used.
    Release for costing: means that the task list can be used to calculate costs in Transaction IA16 i.e. the costs for the task list operations would be calculated if released for costing status is set.
    Release for use in the order: Released for Order means that you can use the task list in an order i.e. you could include operations from a task list in an order.
    Regards,
    Usman

  • Error - No defining declaration found for implementing declaration of partial method

    Hi,
    I am quite  new to c# and using lightswitch to create a webform. However, I have to write a code as per the webform logic and requirement and now getting error on this part -
    partial
    voidgridDeleteSelected_Execute(StringID)
    The error is -  No defining declaration found for implementing declaration of partial
    method
    Could someone please tell how this error can be resolved ? Please find the code attached below.
    Thanks.
    using System;
    using System.Linq;
    using System.IO;
    using System.IO.IsolatedStorage;
    using System.Collections.Generic;
    using Microsoft.LightSwitch;
    using Microsoft.LightSwitch.Framework.Client;
    using Microsoft.LightSwitch.Presentation;
    using Microsoft.LightSwitch.Presentation.Extensions;
    namespace LightSwitchApplication
    public partial class EditableServicesGrid
    partial void gridDeleteSelected_CanExecute(ref bool result)
    partial void gridDeleteSelected_Execute(String ID)
    if (!string.IsNullOrEmpty(ID))
    string sqldelete = "Update services set DELETED_FLG = 'Y' WHERE ID IN ( " + ID + ")";

    partial
    voidgridDeleteSelected_Execute(StringID)
    The error is -  No defining declaration found for implementing declaration of partial
    method
    Could someone please tell how this error can be resolved ? Please find the code attached below.
    Could you explanation what your requirement is? detailed information is necessary.

  • Change Request Management for Implementation Project

    Hello gurus!
    I have a problem with execution change request in implementation project.
    I have created Implementation project and task list for him."Change request management" is active for this project.
    I can create document Change Request, but I can not to create Correction linked with Task plan...
    Dmitry.

    HI,
    Have you verified if your project definition is setup correctly ? Please verify with some of the steps available in the blogs
    First steps to work with Change Request Management scenario
    /people/dolores.correa/blog/2008/07/26/first-steps-to-work-with-change-request-management-scenario
    Change Request Management scenario: Usual questions
    https://weblogs.sdn.sap.com/cs/junior/view/wlg/15116
    Change Request Management scenario: Working examples
    /people/dolores.correa/blog/2009/07/23/change-request-management-scenario-working-examples
    Hope this helps.
    Cheers
    Sh

  • Build Report using sharePoint list datasource for EPM projects.

    Hi all,
    I am using Project Server 2010. 
    When project is created using EPT then for that project a site will be created and each site has sharePoint Lists. 
    I want to build SSRS report that uses this sharepoint list as datasource. 
    My connection string to the site URL must be dynamic as each project site URL will be different. 
    Your help will be appreciated!!!
    Thanks,
    Rohit

    Hello,
    Look to use an expression and pass in the Project Site URL, see the example below:
    SharePoint Web Services (XML) version but gives you the idea for using an expression:
    http://nearbaseline.com.au/blog/2010/02/reporting-workspace-lists-directly-from-sharepoint/
    Paul
    Paul Mather | Twitter |
    http://pwmather.wordpress.com | CPS |
    MVP | Downloads

  • How to map services for Implementation Project

    Hii
    its an implementation project
    Client is providing normal sales and services ( Job work ) also
    for that purpose how we can map services in SAP SD
    1 ) by creating different sales org (services)
    or
    2 ) by creating different doc type for services
    which 1 is better
    ThanX

    HI,
    Service document is most better.......b'coz you will get efficient reports thr this...and you ccan maintain Diff Pricing procedure for this....
    Regards
    Raj

  • Solution Manager for Implementation project

    Hello,
    I want to know how we should use solution manager for an implementation project. I am aware about the ASAP methods and the transactions in solman system for each phase. I have starting trouble like how to and where to start with? My ECC systems are not yet installed. Still we can go ahead with Blueprint creation and definition of roadmaps etc. Currently, it is done on paper.  If anybody has done an implementation project through solution manager, could you please give me some hints how to start ? I repeat I am aware of the transactions but dont know what to add there in solar01/02 when the process are not defined/system not installed. Please guide me.
    Rajeev

    Hi Rajeev,
    You're correct; you can start building the Business Blueprint without SMSY having all the systems that are 'to-be'. As long as you enter logical components in the project landscape with the correct product versions, you can replace those with the actual components once they have been installed. The BPR needs those product versions in the blueprint when you load the relevant scenario's. Once loaded, you can start documenting the scenario's, place the processes and process steps not used out of scope or delete them entirely and define custom scenario's, processes and process steps.
    When the Blueprint has been completed with relevant design documentation, the Configuration transaction can be used to document how you actually configure the systems and, of course, to configure them from Solution Manager. The system landscape officially has to be definitive at the end of the Blueprint phase, unless you won't be configuring the systems centrally from Solution Manager.
    The Solution is actually not necessary for a clean implementation; the Project will eventually lead to the solution. Once the systems are all configured and documented in SSM, you create the Solution and upload the project documentation into it in the Solution Directory.
    Let us know how you get on!
    Kind regards,
    Patrick

  • ChaRM- Is data scrambling required for Implementing ChaRm in SM?

    Hello
    Is data scrambling required for the implementation of ChaRM in Solution Manager?  Iu2019ve heard that data scrambling is a requirement for CHaRm and if so is there documentation from SAP with the specifics.  I do not understand why data needs to be scrambled for transport management.
    Thanks!

    We are using CHaRM since 2007, and there is no data scrambling for CHaRM itself required. CHaRm is jsut taking control over TMS. It is a process to ensure some quality and to facilitate audit.
    Regards,
    Holger

  • How to prepare a  Documentation of SAP and DB2 for implementation Project

    Dear Guru's,
    sap ecc6.0 , DB2, windows 2003 and HP Data Protector (third party tool) for an on line backup and i have Hardware & software Specs.....
    anybody send me a model implementation Docu or any body Guide me to prepare Documentation work.
    regards
    sathies kumar.N
    Sap Basis Admin
    Edited by: sathiskumar nagarajan on Apr 13, 2009 2:37 PM

    Hi,
    you can get material from www.esnips.com easily
    Best Regards
    Krishna

  • Link between implementation project configuration (SOLAR02) and ChaRM?

    Dears;
    We want to benefit from listing all IMG Objects and developments in an implementation project (SOLAR02) to control our transports as we have ChaRM activated on the affected systems.
    But there seems to be no link/control which has several consequences:
    *Status of "changes" in ChaRM and related developments in the implementation project have to be tracked seperately
    *There is no link between the development in the project (SOLAR02) and the created TR.
    *There is no limitation/control in the content of the TR if it concerns items not listed in your project => how to check if the project is up-to-date?
    Are my assumptions correct? Or am I forgetting something?
    What is the experience in maintaining changes (transports) for implementation project? On what level? Linked with the structure in Solar02 or completely independant?
    I have done quite some reading around the topics but documentation around project management via SolMan and ChaRM via SolMan seems never to be really connected? (only the overall status of the project and the activation of charm via SOLAR_PROJECT_ADMIN)

    >
    Jett Jiang wrote:
    > 1. Active Change Request Management. the inter-connect is in SOLAR_PROJECT_ADMIN.
    > 2. Use normal correction to control the TRs and updates the documents at the same time.
    Thank you for the reply. Concerning these points:
    1) This is done... No questions there
    2) The "and" in your sentence means that I myself have to do both things? So there is no link?
    So this does mean that (what my understanding was) I have to create a normal change via ChaRM but under the project for example a certain business scenario. That developers work on all topics related and should "remember" that if they put something under that transport they should verify if this is documented in the SOLAR02?
    If then the change is put to testing they should manually update the status of everything related to this transport in the SOLAR02...

  • ChaRM: Implementation project vs. Maintenance project

    Hi!
    What is the difference between an Implementation and Maintenance proejct in ChaRM?
    For both of them I can create CR's. Is not?
    Thank you very much much!
    regards
    Thom

    Hi, Thom
    I think the normal corrections in both cases are the same,
    and the project workflow's look's similar.
    from Sap Library:
    [Workflow for Maintenance Cycles|http://help.sap.com/saphelp_sm40/helpdata/en/06/172e4208d06869e10000000a1550b0/frameset.htm]  vs [Workflow for Implementation Projects|http://help.sap.com/saphelp_sm40/helpdata/en/1a/c39742042fc86ae10000000a155106/frameset.htm]
    In my opinion, we use each project type for concrete task's (Implementation Project for business process implementation, Maintenance project - for solution maintenance).
    Regards,
    Oleg.

  • ChaRM and test management in implementation projects

    Hi
    I am doing implementation projects in solution manager. i have activated charm in the project so as to transport all the changes related to the project with the project lifecycle.
    I have got confusions regarding CHarm and Test MAnagement.. when we activated CHaRM the tester can logon to the system and perform testing and pass the Change Document to the next phase.
    What is the standard flow when both CHaRM and TEst Management for a project exists??
    Thanks

    Please can someone tell me how to use TEST MANAGEMENT and ChaRM for Implementation Project together??
    Edited by: Hasan Sidra on Jan 2, 2012 11:11 AM
    Edited by: Hasan Sidra on Jan 2, 2012 11:11 AM

  • Error in creating task list /TMWFLOW/PROJCTC

    Hello,
    We are implementing charm in release 7.1.  We are getting an error some times that says that user was not able to create a task list for an urgent correction SMHF. 
    The error message says:
    There is no active task list in the associated project
    However we run the charmcheck transaction and no error for the project.  Error SOCM_ACTION_LOG014.
    Then we got the error saying
    "Task list H.xxxxxxxx not created by user mmmmmmmmm
    Error writing to table /TMWFLOW/PROJCTC"
    Errors are
    /TMWFLOW/TASKLIST304
    /TMWFLOW/TASKLIST177
    When we start testing early in the morning we can create the first ticket with no problem (every day the system is down for backup and then restarted).  However, subsequent ticket show this same error.
    We checked SLG1, ST22, and SM12 to find any error, however we are not able to find any problem.
    We think that problem is that something is blocking, however we are not able to find the error.
    Please advice
    Many thanks
    Javier Mandiroal

    Hello all,
    We are facing the same issue.  While creating ZMHF (custom Urgent Change) users "sometime" receive error "There is no active task list in the associated project"
    Hi Mateus , the document is you mentioned is currently expired / unavailable.  Can you kindly upload the same again please?
    Thanks in advance,
    Shaji Narayanan

  • Implementation project - needed to activate ChRM?

    Dear SolMan gurus.
    Is needed to activate a sap solman change management during creating an Implementation project? Or in other words, how to create task list for implementation project without activating ChRM?
    Thank you for you answers.
    Best regards,
    Petr Syka

    Hi
    If you want to use task list and other functionalities given under
    System Landscape tab->change request tab..................in solar_project_admin project
    you need to activate charms which helps to automate the transport mechanism for managed systems like ecc etc
    but in case you just want to implement or execute SAP ecc blueprinting and store doc etc you dont need to activate charms for that and you won't get any task list or phase wise maintenance cycle etc.
    hope that ans ur query
    regards
    prakhar

Maybe you are looking for

  • How to display on the graph three or more waveforms where time scale is not an index of array but a real time

    How to display on the graph three or more waveforms where time scale is not an index of array but a real time: I measure three voltages Va, Vb, and Vc on my Test stands every 3sec. So I'm building four arrays (Va, Vb, Vc, Time) and combine all in one

  • Device Control for HV-20 capturing DV?

    In FCE, I'm using the "DV-NTSC Firewire Basic" Easy Setup to capture DV (not HDV) from a Canon HV-20. It works great using "Capture Now," but "Capture Clip" apparently is not available. Can anyone confirm that full-fledged device control is not avail

  • Making a customable resizable JPanel, but it only works in certain L&F

    Hi, I have created the following resizable JPanel (so that I can set a minimum size it can be dragged to). However, I need it to work under the system L&F, which is XP, but it wont work. The code is below. if you run it the first time, and try to res

  • In Camera, how does HDR work?

    I cant see any difference the HDR feature makes in Camera ... HDR and non- HDR photos seem the same to me. Does it not work if you shoot in dim light ... do you have to be in a well-lit area for it to show any difference? And are you supposed to hear

  • Components group for unloading point

    Hi, How to add components group to unloading point? How to add material to  components group for unloading point. With regards Lakki