Check List for Functional Upgrade from 4.7 to ECC 6.0

Hi Gurus,
                  Cany anybody tell me what is the check list for SAP SD Functional Upgrade from 4.7 to ECC 6.0.?
My Email :  [email protected]
Points for sure for useful answer
Venkat
Edited by: Venkat Goteti on Feb 4, 2008 5:34 AM

If it is possible can you send me file to [email protected]

Similar Messages

  • Upgrade from 4.7C to ECC 6.0

    Hi Gurus,
                  I am going to do a functional upgrade from 4.7C to ECC 6.0 (classic GL, not new GL). Can someone please list me the steps that I need to do to achieve the upgrade.
    I would be very grateful and would assign points as a gesture of appreciation.
    Thanks
    Chandan

    If you are not going to implement new g/l, then all you have to do is test if all the transactions that the client is using are wokring fine in ECC 6.0 or not.Do the unit testing and integration testing and get business sign off.
    Assign points if helpful

  • ISU upgrade from 4.6C to ECC 6.0 (CIC)

    Hello there
    We are currently going for an upgrade from 4.6C to ECC 6.0
    Can anyone of you provide some insight on whether the frontoffice and other configuration in 4.6C have any kind of impact on ECC 6.0? Basically I can see that there are new functionalities in ECC6.0 for CIC . But will the current config lin 4.6C like action box , move in/out processes, owner allocation etc will be impacted after the upgrade?
    Thanks
    Gautam

    Hi Gothic,
    We are also planning to upgrade this month from 4.6C to ECC 6.0. It would be very nicce if we can share the information and the experineces.
    We will do the upgrade in a pilot system.
    We will have a new hardware with windows server 2003 64 bit and oracle oracle 10.2.0.2.0. than we will install oracle and SAP 4.6C and after that we want to export the Database from the production system to the pilot system. after that we upgrade the pilot system to ECC 6.0 to test first.
    I do not know if there is an easyer way to do the upgrade or at least the test. Maybe a homogenouse system copy...?
    Best regards
    Atik

  • After check for updates upgrade from 1.5.0 to 1.5.1 all connections are los

    I executed a "check for updates" upgrade from 150 to 151 and all my connections are not displaying in the connection pane. I had nearly 100 connections defined - how do I get these back? There seems to be several issues related to this but nothing is clearly described as to exactly how to get these back.

    I take you didn't migrate your settings on first start after the upgrade; so logically you get a clean environment.
    Now I guess the easiest fix would be to copy the [user profile]\sqldeveloper\system1.5.0.53.38\o.jdeveloper.db.connection.11.1.1.0.22.49.35\connections.xml to [user profile]\sqldeveloper\system1.5.1.54.40\o.jdeveloper.db.connection.11.1.1.0.22.49.42.
    Have fun,
    K.

  • OSS notes relevant for FI/CO for upgrade from 4.7 to ECC 6.0

    Hello,
    I need the list of the applicable OSS notes relevant for the FI/CO module for upgrade from 4.7 to ECC 6.0
    Thanks
    Sid

    Hi,
    Please visit the following links:
    http://service.sap.com/erp
    http://solutionbrowser.erp.sap.fmpmedia.com/ (Functional prespective)
    http://service.sap.com/instguides --> mySAP Business Suite Applications --> mySAP ERP --> mySAP ERP 2005 --> Upgrade
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/LOVC/LOVC.pdf
    For Functionality Differences pls refer to the below site -
    http://solutionbrowser.erp.sap.fmpmedia.com/
    After opening the site, please select the Source Release Version which is 4.6 b Then Select the Target Release Version which is "mySAP ERP 2005" or ECC 6.0
    Select the Solution Area like Financials, Human Capital Management, Sales....
    Select module like MM, PP, SD, QM.....
    Click on Search
    Then it displays the Release Version and the Delta Functionality. which can be downloaded to a word document if required.
    and also check the release notes of ECC 6.0 in service.sap.com.
    Hope this helps you.
    Please assign points if it useful.
    Regards
    Ravinagh Boni

  • Upgrade from 4.6 to ECC 5.0 Functional Upgrade

    HI Friends,
    We are upgrading from  4.6 to ECC 5.0 Functional Upgrade, with New G/L Functionality, i would like to know what are the pre requistics for performing this upgrade and along with check list.
    Thanks in Advance
    Satish

    Hi Satish,
    Now i am sending some URL for Functional upgrade
    May be those are all useful toyou
    https://www.sdn.sap.com/irj/scn/wiki?path=/display/erp6/transactionsChangedinECC6.0
    http://solutionbrowser.erp.sap.fmpmedia.com/Default.aspx
    https://www.sdn.sap.com/irj/scn/wiki?path=/display/erp6/
    Regards
    Surya

  • Functional Upgrad from BW 3.x to Netweaver 2004s

    Hi Guys,
    i have gone through almost entite forum on sdn but i could not get the information/document for functional upgrad. currently i am using BW 3.5 and going for BI 7.0
    could some one tell me the steps to do functional upgrad to BI 7.0. i am not talking abt the technical upgrad here. i would really appriciate if some one could send me some document that gives step to step procedure to do the functional upgrad.
    ur help will be rewarded in terms of points.
    manmit

    Hello,
    There are multiple resources to review since a functional upgrade requires a value proposition, gap analysis, and in some cases an ROI.
    First, all releases below BW 3.5 are currently scheduled to go off maintenance December 2006.  So customers need to be at release BW 3.5 or higher by Jan. 1, 2007.  This helps with the value proposition!  
    Please check the delta feature list from BW 3.5 to NW 2004s BI on SDN or the Service Marketplace.  As Prakash mentioned, customers should evaluate which features they want to implement and the timeframe.  Many customers will focus on a technical upgrade which is what we recommend initially, and also determine which features could be included in the first go-live.  Other features can be added to subsequent go-lives, but this is based on customer specific go-live timetables.  Some customers have implemented only new functionality while others only chose the most important, i.e. BI accelerator, BEx.
    Also, please check the webinar entitled "Upgrading to NW 2004s BI" which covers many of these points and lists the relevant references.
    Finally, SAP (and trained partners) will be offering an Upgrade Assessment service beginning of July which will assist customers in planning an upgrade to NW 2004s BI including both technical and functional considerations.  Please contact your SAP account team for more information.
    Thanks,
    Bryan

  • Doubts in functional upgradation from 3.x to 7.0.

    Hi All,
    I have some doubts in functional upgradation from 3.x to 7.0.
    After migration of Transfer rules, update rules ( between the ods & cube also) & datasource.
    1). Cube & ods have filed which is added like enhanced field, do we have to do anything after migration for that filed.
    2). Is the Z object also will get migrated automatically or not ( i have zfield in the datasource).
    3). If i have a routines in the trans rules & update rules, what has to be done for these routines
    4). How the custom reports, deliverd reports and workbooks will get migrated.
    5). Macros in the web templets ( is the macros coding in the web templets also will get migrated auto matically r do we need to rewrite the coding).
    6). Is the migration steps are same for the all SD, MM, FI datasources.

    1. this should not be a problem
    2. IO is not needed to be migrated, it is not changed so much between 3x. and 7.x
    3. routines & update rules in the trans rules are migrated automatically, see
    http://help.sap.com/saphelp_nw70ehp1/helpdata/en/43/f00e2696d24c5fe10000000a155369/frameset.htm
    https://wiki.sdn.sap.com/wiki/display/BI/Migrationof3.xobjectstoBI7.0
    4. reports are to be migrated manually, see http://wiki.sdn.sap.com/wiki/display/BI/Migrationof3.xBExQueriestoBI7.0-Useful+Tips
    5. see https://wiki.sdn.sap.com/wiki/display/BI/QueriesorWorkbooksMigration-ErrorsandFixes
    6. in general yes.

  • Requirements for upgradation from 4.7 to ECC 6.0

    Hi Guru's,
                      Can anybody explain what are the steps required for upgradation from 4.7 to ECC 6.0, technically and functionally. If any body have documents regarding the same, please share.Full marks will be awarded.thanx in advance....

    Hi
    You have to aware of all related program like BDC's , Screens related errors and all dictionary related problems.
    Some function modules may become obsolete, and some screens will change
    abnd some new fields will be added in the new versions etc.
    Also take care of SPAU and SPDD tcodes.
    You should be able to know about Unicode concept in sap.
    chk this
    http://www.thespot4sap.com/upgrade_guide_v2.pdf#search=%22upGRADE%20STEPS%20-%20SAP%22
    also chk these 2 notes in service.sap.com
    Technical Upgrade is only a version upgrade without any functionality changes.
    The objects that are needed to be upgraded are:
    Includes
    Function Groups / Function Modules
    Programs / Reports
    OSS Notes
    SAP Repository Objects
    SAP Data Dictionary Objects
    Domains, Data Elements
    Tables, Structures and Views
    Module Pools, Sub Routine pools
    BDC Programs
    Print Programs
    SAP Scripts, Screens
    User Exits
    You can refer to the below links for more information on technical upgrade:
    https://www.sdn.sap.com/irj/sdn/wiki?path=/display/profile/2007/05/07/upgradeFROMR3TOmySAPERP-PARTII&
    https://wiki.sdn.sap.com/wiki/display/profile/UPGRADEFROMR3TOmySAPERP-PARTIII
    http://help.sap.com/saphelp_nw2004s/helpdata/en/60/d6ba7bceda11d1953a0000e82de14a/content.htm
    http://help.sap.com/saphelp_nw04/helpdata/en/2e/6d66647d9011d396b60000e82de14a/content.htm
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/5ac31178-0701-0010-469a-b4d7fa2721ca
    Reward points if useful
    Regards
    Anji

  • Re : Roles of  Functional Consultant in upgradation from 4.6b to ECC 6.0

    Hi
              I need the Roles of  Functional Consultant and Technical Consultant in upgradation from 4.6b to ECC 6.0.
    Thanks
    Anto

    Dear Anto,
    In Technical SAP,Upgrade from 4.6 to 6.0- the role of any fucntional consultant would involved integrated with the technical Consultant.
    The phase starts with the technical Patches apply to the latest stack level which will done by the BASIS Consultants.
    Once the System preparation is happened, the next phase is with SPDD phase, Thru this transaction the dictionary Objects-Database elements, database tables and structures of teh latest system can be
    compared with the old system.
    This results in the version modification results between the old and New versions. During this phase the involvement of the Functional Consultant needed for the tech guy, to identify the functional chnages between the two version (Old and New). Which helps for him either to Reset to Original(ie., adopting the new one) or Adopt Modification in previous system(ie., adopting to older functionality)
    Once this is done, the System Upgradation will be done by the BASI, the system will be replaced with new system. At teh end of this phase SPAU phase starts, which inturn reults with version difference in the field namely, Programs, Reports, Screens, Messages, Notes an Function Modules. Here too the involvement of functional consultant neede to determine either reset to original or to go with Adopt modification from the older design, as explained earlier.
    At teh end of the, moreover the functional consultant role involved in testing the Entire processes and transactoin in the system for system dump and bugs, in necessity to correct teh same and results with nil errors in production client.
    Also the Zprograms invloved in the older versions, needs to be examined for the actual need, and to be justified with adoption in the newer version or by adopting to the updated functionality in the newer version.
    Hope this may give better clarity in the involvement of the Functional Consultant in the Updgrade project.
    Njoy SAP
    Regards,
    -Saravanaganesh

  • Roles of  Functional Consultant in upgradation from 4.6b to ECC 6.0.

    Hi
              I need the Roles of  Functional Consultant and Technical Consultant in upgradation from 4.6b to ECC 6.0.
    Thanks
    Anto

    In Technical SAP,Upgrade from 4.6 to 6.0- the role of any fucntional consultant would involved integrated with the technical Consultant.
    The phase starts with the technical Patches apply to the latest stack level which will done by the BASIS Consultants.
    Once the System preparation is happened, the next phase is with SPDD phase, Thru this transaction the dictionary Objects-Database elements, database tables and structures of teh latest system can be
    compared with the old system.
    This results in the version modification results between the old and New versions. During this phase the involvement of the Functional Consultant needed for the tech guy, to identify the functional chnages between the two version (Old and New). Which helps for him either to Reset to Original(ie., adopting the new one) or Adopt Modification in previous system(ie., adopting to older functionality)
    Once this is done, the System Upgradation will be done by the BASI, the system will be replaced with new system. At teh end of this phase SPAU phase starts, which inturn reults with version difference in the field namely, Programs, Reports, Screens, Messages, Notes an Function Modules. Here too the involvement of functional consultant neede to determine either reset to original or to go with Adopt modification from the older design, as explained earlier.
    At teh end of the, moreover the functional consultant role involved in testing the Entire processes and transactoin in the system for system dump and bugs, in necessity to correct teh same and results with nil errors in production client.
    Also the Zprograms invloved in the older versions, needs to be examined for the actual need, and to be justified with adoption in the newer version or by adopting to the updated functionality in the newer version.
    Hope this may give better clarity in the involvement of the Functional Consultant in the Updgrade project.

  • I have a software license certificate for the upgrade from CS5.5 to CS6, but I have lost the upgrade file due to a disk crash in my computer.

    I have a software license certificate for the upgrade from CS5.5 to CS6, but I have lost the upgrade file due to a disk crash in my computer.
    where can I get the upgrade file from ?
    thanks,
    Ofer

    Downloads available:
    Suites and Programs:  CC 2014 | CC | CS6 | CS5.5 | CS5 | CS4 | CS3
    Acrobat:  XI, X | 9,8 | 9 standard
    Premiere Elements:  12 | 11, 10 | 9, 8, 7
    Photoshop Elements:  12 | 11, 10 | 9,8,7
    Lightroom:  5.6| 5 | 4 | 3
    Captivate:  8 | 7 | 6 | 5
    Contribute:  CS5 | CS4, CS3
    Download and installation help for Adobe links
    Download and installation help for Prodesigntools links are listed on most linked pages.  They are critical; especially steps 1, 2 and 3.  If you click a link that does not have those steps listed, open a second window using the Lightroom 3 link to see those 'Important Instructions'.

  • I need the check list for SOLMAN implementation

    Hi gurus ,
    i need the check  list for solution manager implementation and what are the things to be discuss with the client , i am new to SOLMAN, i have to do this by the evening , any one can help me out
    Cheers
    Gopal.rao

    Hi Gopal,
    I am not sure if this thread of yours is in continuation of the other thread you have started which has been replied by two other Forum members.
    The checklist depends upon which Scenario(s) of SolMan you are trying to implement.
    - Implementation/ Upgrade of ERP systems
    - Service Desk
    - Change Request Monitoring
    - Diagnostics
    - Solution Monitoring (includes BPM/ Interface monitoring)
    - Delivery of SAP Services (EWA, .....)
    Unless you specify the scenario you are seeking information on, it is difficult for anyone to pose a satisfactory reply.
    Best regards,
    Srini

  • Is there any upgrade checking script for PL upgrade

    Dear Experts,
    I know there are Pre-upgrade checking script to validate database integrity before an upgrade from 2005 to 2007.
    However, is there any such similar scripts for an upgrade from 2007 PL12 to PL13? (Inter PL upgrade) or can I use the same script for the same purpose?
    Much Thanks!
    Warmest Regards,
    Chinho

    Hi Gordon,
    Thank you for your reply. Is it true that within inter-patch upgrades, there are no database structure change?
    I asked this question because sometimes I get "DB is inconsistent" error after upgrade, and I don't know why?
    Much Thanks for your Advice thus far!
    Warmest Regards,
    Chinho

  • Issue in Exporting the Sales Price List and Purchase Price List for the Materials from SAP Business ByDesign (SAP Cloud)

    Hello Everyone,
    I would like to have a discussion on the issues, which I am facing at the time of Exporting the Sales Price List and Purchase Price List for the Materials from
    SAP Business ByDesign (SAP Cloud).
    (1). Sales Price List :
    We have maintained Customer Group Specific Sales Price List for the Materials in the following Location.
    Location :         Product and Service Portfolio Work Center > Pricing > Price Lists > Customer Group Specific Price List (Type of Price List)
    Target :             We want to export the entire records in some reports or excel sheet.
    Records :          Number of Materials in the Customer Group Specific Price List is more than 2,00,000
    Issues : 
                                         (A). In the SAP Business ByDesign Screen we can filter by number of records but we can export till  50,000 records.
                                                 And if we are trying to export records more than that limit, then it throws "HTTP 500 Internal Server Error".
                                         (B). We could not find any SAP standard reports in Product and Service Portfolio and/or Business Analytics Work Center
                                                for getting the entire record set of the Sales Price List, so that we can have the entire set of records together.
    Searching For :
                                          (A). Is there any SAP reports or data source available for getting the entire Sales Price List records?
                                          (B). Can we have any other filter conditions for exporting the Sales Price List records in a single shot or module wise?
    (2). Purchase Price List :
    We have maintained the Purchase Price List for the Materials in the following Location.
    Location :           Product Portfolio Work Center > List Prices > Active List Prices (Type of Price List)
    Target :               We want to export the entire records in some reports or excel sheet.
    Records :            Number of Materials in the Purchase Price List is more than 4,00,000.
    Issues :  
                                           (A). In the SAP Business ByDesign Screen we can not see more than 10,000 records and the actual number of
                                                   records are more than 4,00,000. We could able to download the records till 10,000 but that is not sufficient.
                                                   We want to export the entire records in an excel sheet.
                                           (B). We could not find any SAP standard reports in Product Portfolio and/or Business Analytics Work Center for
                                                  getting the entire record set of the Purchase Price List, so that we can have the entire set of records together.
    Searching For :
                                           (A). Is there any SAP reports or data source available for getting the entire Purchase Price List records?
                                           (B). Can we have any other filter conditions for exporting the Purchase Price List records in a single shot or module wise?
    Please go through the attached screen shots for the references and more clarity on the issues.
    I am waiting for the valuable responses.
    Thanks and regards,
    Susanta Dey Sarkar
    Bangalore, India
    19th March, 2015

    Dear Michael,
    The number of records :
    2 Million (Approximately) is for the Sales Price List Material Price Data
    4 Million (Approximately) is for the Purchase Price List Material Price Data.
    Regards,
    Susanta Dey Sarkar

Maybe you are looking for